ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR PRECAST SEGMENTAL BRIDGES FOR THE I-49 / I-220 INTERCHANGE PRESENTERS: PAUL VAUGHT, P.E. ASST. BRIDGE DESIGN ADMINISTRATOR LOUISIANA DOTD CRAIG FINLEY, P.E. MANAGING PRINCIPAL FINLEY ENGINEERING GROUP, INC. IVAN LIU, P.E. BRIDGE ENGINEER FINLEY ENGINEERING GROUP, INC. 1

Upload: others

Post on 27-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

ABC-UTCSEPTEMBER 2019 MONTHLY WEBINAR

PRECAST SEGMENTAL BRIDGESFOR THE I-49 / I-220 INTERCHANGE

PRESENTERS:PAUL VAUGHT, P.E.

ASST. BRIDGE DESIGN ADMINISTRATORLOUISIANA DOTD

CRAIG FINLEY, P.E.MANAGING PRINCIPAL

FINLEY ENGINEERING GROUP, INC.

IVAN LIU, P.E.BRIDGE ENGINEER

FINLEY ENGINEERING GROUP, INC.

1

Page 2: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

PROJECT PARTICIPANTS - DESIGNBRIDGE AND

STRUCTURAL DESIGNROADWAY AND

GEOMETRIC DESIGN

GEOTECHNICALEXPLORATION AND DESIGN

LIGHTING DESIGN

ARCHITECTURALDESIGN SURVEYING

2

Page 3: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

PROJECT PARTICIPANTS - CONSTRUCTIONCONSTRUCTION INSPECTION PRIME CONTRACTOR SUBCONTRACTORS

CONSTRUCTIONENGINEERING

(CONTRACTOR)

3

Page 4: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

Shreveport, LA

PROJECT LOCATION

Baton Rouge

New Orleans

4

Page 5: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

INTERSTATE 495

Page 6: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

PARK (4F)

ENVIRONMENTALJUSTICE NEIGHBORHOOD

LANDFILL

NORTH

SEGMENT K

I-49

I-220

6

Page 7: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

NORTH

SEGMENT K

PHASE 2 PHASE 1

I-49

I-220

7

Page 8: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

NORTH

SEGMENT KPHASE 2

RAMP SE(SOUTH TO EAST)

RAMP WN(WEST TO NORTH)

RAMP EN(EAST TO NORTH)

RUSSELL RD(I-220 WIDENING)

LENGTH: 3070’WIDTH: VARIES (64’ TO 40’)RADIUS: 3500’TWO LANES

LENGTH: 3300’WIDTH: 33’RADIUS: 840’ONE LANE

LENGTH: 700’WIDTH: 29’RADIUS: 550’ONE LANE

I-49

I-220

8

Page 9: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

• 66” DIAMETERDRILLED SHAFTSUPPORTED FOOTINGS

FOUNDATION

• 9 OR 12 SHAFTSPER FOOTING

9

Page 10: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

• SINGLE COLUMN

• STRADDLE

• CANTILEVER

SUBSTRUCTURE

10

Page 11: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

TRAFFIC CONTROL• REQUIRED TO MAINTAIN ONE LANE IN EACH DIRECTION

• CROSSOVER EB TO WB LANES AND VICE VERSA

• FIELD CHANGE TO SUGGESTED SEQUENCE OF CONSTRUCTION

11

Page 12: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

DESIGN ALTERNATIVES(DESIGN-BID-BUILD PROJECT)

PRECAST SEGMENTAL CONCRETE BOXESSTEEL TRAPEZOIDAL BOXES

• BIDDER #1 $138 MILLION• BIDDER #2 $144 MILLION• BIDDER #4 $159 MILLION

• BIDDER #3 $154 MILLION

• PROS: INCREASE COMPETITION / REDUCE CONSTRUCTION COST

• CONS: ADDITIONAL DESIGN TIME AND COST12

Page 13: ABC-UTC SEPTEMBER 2019 MONTHLY WEBINAR...abc-utc september 2019 monthly webinar precast segmental bridges for the i-49 / i-220 interchange presenters: paul vaught, p.e. asst.bridge

2019 PROJECT AWARD (SASHTO)“BEST USE OF TECHNOLOGY AND INNOVATION”

DR. SHAWN WILSON, DOTD SECRETARY (CENTER) WITHCARLOS BRACERAS, PRESIDENT OF AASHTO (LEFT) ANDJIM TYMON, CEO OF AASHTO (RIGHT)

2019 ASBIBridge Awardof Excellence

13