abc: the keys to success from a contractor’s perspective
DESCRIPTION
ABC: The Keys to Success from a Contractor’s Perspective. William G. Duguay J.D. Abrams, L.P. Here is the Mandate we share:. "Change the way we build highways. We need to build them faster, have them last longer, have them be safer and at a lesser cost. Be BOLD and AUDACIOUS in your thinking." - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/1.jpg)
ABC: The Keys to Success from a Contractor’s Perspective
William G. DuguayJ.D. Abrams, L.P.
![Page 2: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/2.jpg)
Here is the Mandate we share:
• "Change the way we build highways. We need to build them faster, have them last longer, have them be safer and at a lesser cost. Be BOLD and AUDACIOUS in your thinking."
• Michael P. JacksonFormer Deputy Secretary for DOT
![Page 3: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/3.jpg)
• But, lots of us are Old School
• How do we make what worked forever, work in a changing market
![Page 4: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/4.jpg)
Different Components
• Accelerated Project Delivery or Financing
• Accelerated Bridge Construction– Catastrophic Event– Embedded in a larger project– Incremental use of ABC techniques
![Page 5: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/5.jpg)
Provide the Contractor an opportunity to have a competitive edge
• This can be through:– Means and methods
– Available equipment
– Time of year & current workload
– Existing technology or availability of major supplies in the market place
![Page 6: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/6.jpg)
Efficiency defined by:
• Simplicity of design and specifications
• Cost/benefit in line with expectations
• Aesthetics are appropriate for the location & use
• Longevity & life cycle costs are met
![Page 7: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/7.jpg)
Share or Define Risk
• Contractors perceived level of risk translates to dollars on bid day
• May prevent interest in the project
• Limit what's incidental, and what can’t be defined by specification or plans
![Page 8: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/8.jpg)
To be effective, it needs to be:
• Achievable with acceptable risk
• Predictable in a variety of applications
• Satisfy the majority of, or at least the most important goals
![Page 9: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/9.jpg)
What’s to like about Prefab/Precast
![Page 10: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/10.jpg)
Lower risk from:
• Uncertainty
• Labor availability or quality
• Access or site constraints
• Weather
![Page 11: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/11.jpg)
• Bulk of Man-hours spent in a controlled low risk environment, or subcontracted out for fixed pricing
• Prefab can provide additional owner benefit if the GC is also the producer
![Page 12: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/12.jpg)
Repeatability
• Multiple repetition's drives all contractors cost reporting
• With multiple repetitions, cost can be improved upon over time
• The fewer new operations that start on a project, the more time there is to spend refining on-going operations
![Page 13: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/13.jpg)
Specifications
• Pre-cast specs are rarely ambiguous in their intent and are rarely contested
• Erection or assembly of sub-components is typically well defined
• Details tend to be clear cut and simple
![Page 14: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/14.jpg)
Clean simple details
• Tend to:– Drive down costs– Be built to higher standards– Reduce inventories & speed replacements– Reduce overheads & distributed costs
![Page 15: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/15.jpg)
Priority projects can be profitable
• Fast track projects can and should use incentive/damages clauses
• Revenue can be turned quicker for the GC, and the facility put into operation sooner for the Owner
• Assets may be better utilized across a company (assets that work tend to make money)
• Be careful the plans and specs aren’t geared towards the GC spending an equivalent bonus amount to get it
![Page 16: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/16.jpg)
Successful really boils down to:
• Developing an idea that meets your needs
• Selling it for a price that, well, meets your needs
• Getting it built in a time frame that meets your needs
• Walking away from it at completion not wanting to change a thing because the project met your needs
![Page 17: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/17.jpg)
What Contractors don’t usually like
![Page 18: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/18.jpg)
Undue Risk or Schedule demands
• Fast track needs to be reserved for when it is needed
• Specs that unduly favor one party are ones that typically are faulty and are used to cover less than satisfactory plans and detailing
![Page 19: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/19.jpg)
Project Goals not effectively communicated
• Can be Scope
• Can be details, phasing requirements, schedule demands
• If it is a new design that could be used for mass use or production pending successful testing, it needs to be communicated.
![Page 20: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/20.jpg)
“Perceived”
• Contractors perception is reality on bid day.
• Cost will be driven by the contractors perception of:
– Undefined items of work, or method of payment
– Restrictive specifications
– Poorly crafted bid documents
![Page 21: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/21.jpg)
Sole Sourcing
• Sole sourcing may be necessary due to approved lists from an agency, but they limit competitive advantages
– If they are a necessity, develop ways for the GC to maintain an edge
– Make sure the sole source will be able to meet the demands of the project prior to specification
![Page 22: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/22.jpg)
One of a kind designs
• Limits re-use of– Technology– Equipment, forms, yards– Cost history– Personnel
![Page 23: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/23.jpg)
Differing perspectives on the same thing
(understanding both sides)
![Page 24: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/24.jpg)
SpeedOwners
• Limit down time of asset
Contractors
• Prefab minimizes hindrances to speed– Weather impacts
– Labor availability
– Equipment troubles
– Material issues
– Site access issues
![Page 25: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/25.jpg)
QualityOwners
• Insure TQM
Contractors
• Items built in a controlled environment are conductive to better QA/QC programs
![Page 26: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/26.jpg)
Traffic DisruptionsOwners
• Seek to minimize traffic interruptions– Limit road user costs
– Limit detours
– Limit public scrutiny
– Limit impacts to essential services
Contractors
• Traffic closures are one of the most dangerous field operations
• Typically limit hours of work
• Frequently push work onto less productive shifts
• Have high costs of cancellation
![Page 27: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/27.jpg)
Cost
Owners
Include:• Management/Procurement• Design• Construction• Construction overheads• Life cycle• Intangibles
– Aesthetics– Historical– Research
Contractors
• We are a business, and in the business of being profitable, by constructing for owners.
Include:– Manpower– Equipment– Home office expenses– Materials (permanent &
consumable)– Taxes– Investments– Insurances– Cash flow– Profitability
![Page 28: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/28.jpg)
Thoughts on Accelerated Project Delivery
• Agreeing before, is easier than surprises after
• Level playing fields invite participation• Copy other successful programs and
adapt them to local conditions and regulations
• Those made part of the solution beforehand, usually aren't part of the problem later
![Page 29: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/29.jpg)
Don’t let this statement define your organization
![Page 30: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/30.jpg)
You Speak Engineer, I Speak Contractor
“Poor communication and collaboration is pervasive and impacts each phase of the construction process as well as everyone involved in the process… when all of the responses… were tabulated, we noted one overarching theme that stood at the top of the owner concerns, communication” 2003 FMI/CMAA Fourth Annual Survey of Owners
![Page 31: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/31.jpg)
Solution:
• Specify the different roles for participants• Assign responsibilities & authority to team participants• Define turn around times for information transfer• Ensure all participants are equal stake holders• Make sure your way of doing business matches the
business you will be doing• Follow through with your objectives by critical evaluation• Understand what drives cost and minimize cost triggers
![Page 32: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/32.jpg)
Partner from Concept to Completion
• Don’t let it be a catch phrase, but rather your primary tool to ensure the projects success. Properly used, it will bring all the benefits of ABC to your project.
![Page 33: ABC: The Keys to Success from a Contractor’s Perspective](https://reader035.vdocuments.mx/reader035/viewer/2022062423/56814ac8550346895db7dbb8/html5/thumbnails/33.jpg)
Once you have settled on an idea, embrace what drives the
Price & Schedule process
Repeatability Durability Reliability
Adaptability Survivability of the idea
Profitability