ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide Jeremy Hunter – Bridge Design Manager August 16 , 2015

Upload: others

Post on 29-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

ABC Projects - Indiana

Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide

Jeremy Hunter – Bridge Design Manager

August 16 , 2015

Page 2: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

ABC Projects - INDOT

• Past Project: Milton Madison Bridge Slide • Current Project: I-70 over SR 121• Future Projects: TBD

I-70 over SR 12

Milton Madison Bridge

2

Page 3: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Milton Madison Bridge Slide

• Built 1929 (80+ Year Old Bridge), • Remaining Life <10 years• Functionally Obsolete (24 ft Wide)• Structurally Deficient (Posted 3 Ton 2011)

3

Page 4: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Milton Madison Bridge Slide

• 3117 ft Long (Total), Steel Truss Superstructure (2428 ft)

• Concrete Piers • Connecting Madison-Indiana & Milton-Kentucky• AADT 11,000 VPD• 55 Mile Long Detour (Non-ABC Option)

4

Page 5: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Milton Madison Bridge Slide

5

Page 6: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Milton Madison Bridge Slide

• Bridge Slide TV documentary (Edited Version):

Milton Madison Bridge Slide

• Full Video Can be watched @:

http://www.miltonmadisonbridge.com

6

Page 7: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Milton Madison Bridge Slide

Lessons Learned:• Coordination among the DB Team; Prime

Contractor, The Designer, & Subcontractors (Lifting/ Sliding)

• Contingency Plans; Equipments, Lifting, Sliding, Deck Pour, Etc.

• Communication; Meetings, Specific and Productive, Small Group Meetings if Necessary.

• Scope of Work: Clear and specific when required, Leave Room for Innovation of the DB Team.

7

Page 8: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

I-70 over SR 121 Bridge Slide

Research and Development Implementation

• Twin Structures, Three Spans Each• 2-12 ft Lane, 5’-8” & 11’-0” Shoulders (Each BD) • AADT = ~35,000 vpd (~ 50% Distribution)

8

Page 9: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

I-70 over SR 121 Bridge Slide

Research and Development Implementation

• Design Bid Build Method • Status: Stage 1 plans submitted to INDOT on

Sept. 10, Letting Apr. 2017• Closure time; 14 days for each Bound• MOT (ABC): Cross-over• MOT (Conventional): Cross-over; Longer Traffic

Queue (One Lane of Traffic for Longer Construction Time)

9

Page 10: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

I-70 over SR 121 Bridge Slide

Research and Development Implementation

Alternates: 1. DO Nothing (Not an Option)2. Conventional Construction Method (MOT =

Cross-over)3. Self-Propelled Modular Transportation

(SPMT) (MOT = Cross-over + Detour for SR 121)

4. Slide-in Construction (Cross-over)5. Hybrid Slide-in Construction (Cross-over)

10

Page 11: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

I-70 over SR 121 Bridge Slide

Alternates:

Alternate BID Option Option 3 & 4 to be Detailed

11

Page 12: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Future ABC Projects

Implementation

TBD

12

Page 13: ABC Projects - Indianashrp2.transportation.org/documents/renewal/Indiana.pdf · 2015-10-12 · ABC Projects - Indiana Milton Madison Bridge Slide & I70 over SR 121 Bridge Slide. Jeremy

Questions ?