abbreviations plumbing symbols · 2010. 2. 16. · abbreviations aff above finished floor amps aws...
TRANSCRIPT
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
AMPS
AWS
PLUMBING SYMBOLS
AS
B
BB
BD
BHP
BR
C
CI
CIRC
CD
CP
CW
CUH
DN
DWH
EA
FD
FCO
FPM
G
GA
HB
HC
HW
HWC
HZ
I.E.
INT
KW
LVG
MAX
MIN
NC
NO
PD
PH
PRV
RD
RH
RPM
SS
SAN
SD
SP
S.P.
STD
SW
TDH
TEMP
TYP
V
V
VFD
VTR
UH
W
WC
WG
WH
WHA
XT
AMPERES
AUTOMATIC WATER SOFTENER
AIR SEPARATOR
BOILER
BASEBOARD
BUILDING DRAIN
BRAKE HORSEPOWER
BRINE
COMMON
CAST IRON
CIRCULATING
CONDENSATE DRAIN
CIRCULATING PUMP
DOMESTIC COLD WATER
CABINET UNIT HEATER
DOWN
DOMESTIC HOT WATER
EACH
FLOOR DRAIN
FLOOR CLEANOUT
FEET PER MINUTE
GAS
GAUGE
HOSE BIBB
HEATING COIL
DOMESTIC HOT WATER
DOMESTIC HOT WATER, CIRCULATING
HERTZ
INVERT ELEVATION
INTERMEDIATE
KILOWATT
LEAVING
MAXIMUM
MINIMUM
NORMALLY CLOSED
NORMALLY OPEN
PRESSURE DROP
PHASE
PRESSURE REDUCING VALVE
ROOF DRAIN
RADIANT HEAT
REVOLUTIONS PER MINUTE
SANITARY SEWER LINE
SAN
STORM DRAIN
SUMP PUMP
STATIC PRESSURE
STANDARD
SOFT WATER
TOTAL DYNAMIC HEAD
TEMPERATURE
TYPICAL
VOLTS
VENT
VARIABLE FREQUENCY DRIVE
VENT THROUGH ROOF
UNIT HEATER
WASTE
WATER COLUMN
WATER GAUGE
WALL HYDRANT
WATER HAMMER ARRESTER
EXPANSION TANK
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
CHECK VALVE
TWO WAY CONTROL VALVE
THREE WAY CONTROL VALVE
BALANCING VALVE
SOLENOID CONTROL VALVE
PRESSURE RELIEF VALVE
FLOOR SINK
FLOOR DRAIN
FLOOR CLEANOUT
HOSE BIBB
WALL HYDRANT
FLEXIBLE CONNECTION
TEST PLUG
OR THERMOMETERPRESSURE GAUGE
MANUAL AIR VENT
PETES PLUG
PIPING QUICK DISCONNECT FITTING
PIPE BREAK
FLOW ARROW
PIPE UP
PIPE DOWN
T DOWN
T UP
LINE CLEANOUT
PIPE CAP
UNION
REDUCER
PIPE ANCHOR
PIPE GUIDE/SLEEVE
STEAM TRAP
STRAINER
STRAINER WITH VALVE
THERMOMETER OR SIGH GLASS
FLOW METER
AUTOMATIC AIR VENT
VALVE COCK
BOP BOTTOM OF PIPE
HD HUB DRAIN
FS FLOOR SINKDOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P001286
PLU
MB
ING
LE
GE
ND
W9126G-09-C-0054
W9126G-09-C-0054
UP
UP
1
2
3
4
5
7
9
10
11
12
13
C D E F H K L N P QBA MG J
6
8
2" BR
2" CW
10" CW
1" HWC2" HW
6" SS
10" CW
4" SS
6" SS
1" CW
6" SS
4" SS
3/4" CW
10" CW
1" HWC6" CW2" HW
3" SS
A-P401
1
A-P401
2
A-P401
3
A-P401
4
1 1/4" HWC
3" SS
3/4" CW
3" SS
3" SS
10" CW1" HWC
2" HW
6" SS
6" DOUBLEYARD CLEAN-OUT
4" SS
1
6" DOUBLEYARD CLEAN-OUT
A-P403
1
2" CW
2" BR
10" CW
4" SS1 1/4" HWC10" CW
1 1/2" HWC
6" DOUBLEYARD CLEAN-OUT
1 1/2" HWC
2" BR2" CW
4" SS
6" DOUBLEYARD CLEAN-OUT
2
A-P403
2
2" SD
6" SSIE = -8' 0"
4" G
6" SSIE = -6' 3"
6" SDIE = -5' 5"
6" SSIE = -8' 0"
6" SSIE = -4' 10"
6" SSIE = -8' 0"
SP-R1-3
SP-R1-1
SP-R1-2
2" SD
2" SD
2" SDIE = -4' 5"
1 1/2" CW
1/2" HWC
3/4" HWC1 1/4" HW1 1/4" CW
10" CW
6" SS
3" SS
1 1/2" V
3" FD-1
3" SS
2" SS
10" CW
1 1/2" HW
3" SS
4" FIRE PROTECTION SYSTEMDRAIN TO STORM
3" SS
3" SS
1" HWC6" CW
6" FP
6" FP6" FP
4" FP
6" FP
6" FP
6" FP
6" FP
4" C.O.
4" C.O.
3" C.O.
6" SS
SET BALLANCINGVALVE TO 3.0 GPM
20' OF 4" DOUBLE PERFORATEDPIPE IN 12" GRAVEL BED SLOPEDTO SUMP. 11' 0" BELOW GROUNDFLOOR
20' OF 4" DOUBLE PERFORATEDPIPE IN 12" GRAVEL BED SLOPEDTO SUMP. 11' 0" BELOW GROUNDFLOOR
SET BALLANCINGVALVE TO 3.0 GPM
4" C.O.
4" C.O.
2" SD
6" FP
4" C.O.
4" C.O.
3" C.O.
4" FP
6" FP
1 1/2" SS
4" SS2" SD
10" CW1 1/4" HWC
3" SS
4
3
5
5
6" FP
6" FP10" CW
6" FP
SEE CIVILDRAWINGS FORCONTINUATION
SEE CIVILDRAWINGS FORCONTINUATION
SEE CIVILDRAWINGS FORCONTINUATION
SEE CIVILDRAWINGS FORCONTINUATION
4" DOUBLEYARD CLEAN-OUT
4" DOUBLEYARD CLEAN-OUT
4" DOUBLEYARD CLEAN-OUT
4" DOUBLEYARD CLEAN-OUT
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
6
6
6
6
6
6
6
6
6
6
6
6
IE = -5' 0"
IE = -5' 0"
IE = -5' 0"
IE = -5' 0"
4" SD
IE = -9' 4"
IE = -11' 10"
IE = -7' 5"
IE = -11' 10"
IE = -4' 5"IE = -3' 9 1/2"
1" HW
7
7
7
7
77
7
7
7
7
7
1/2" CD 8
FROM SUMPPUMP
1 1/2" V
IE = -12' 3"
IE = -9' 4"4" C.O.
4" SD
4" SD4" C.O.
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
KEY PLAN
A B
D C
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P101287
OV
ER
ALL
CR
AW
L S
PA
CE
PLU
MB
ING
PLA
N
0'8'
SCALE: 1/16" = 1'-0"
16' 16'
N
PLANNORTH
N
SITENORTH
SITE NORTH IS ROTATED90 DEGREES CLOCKWISEON THIS SHEET FROM THENORTH ARROW ON CIVILPLANS
A-P101
1OVERALL CRAWL SPACE PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRIC 1/A-P903 FOR CONTINUATION.
2 SEE ISOMETRIC 3/A-P903 FOR CONTINUATION.
3 SEE ISOMETRIC 7/A-P905 FOR CONTINUATION.
4 SEE ISOMETRIC 8/A-P905 FOR CONTINUATION.
5 3" FD IN SUMP FLOOR ROUTED TO SUMP PUMPIN CRAWL SPACE.
INVERT ELEVATION BASED ON GROUNDFLOOR ELEVATION OF 0'-0"
GENERAL NOTES:
1.
6 4" DOUBLE PREFERATED CPVC PERIMETERDRAIN. SEE DETAIL ON SHEET A-S502 FOR PIPEBEDDING INFORMATION.
7 PROVIDE A SLIP-JOINT FITTING AND EXPANSIONJOINT COUPLING AT THIS LOCATION TOACCOMMODATE 2” AXIAL AND 1” LATERALDIFFERENTIAL PIPE MOVEMENT.
8 1/2" CONDENSATE DRAIN TO 1" P-TRAP. PROVIDE1" AIR GAP MINIMUM.
W9126G-09-C-0054
W9126G-09-C-0054
UPUP
DN
UPDN
UP
1
2
3
4
5
7
9
10
11
12
13
C D E F H K L N P QBA MG J
6
8
A-P402
1
A-P402
2
A-P402
3
A-P402
4
A-P404
1
3" FD-1
3" FD-1WH
HBHB WH
1
2 P-11TYP. 15
2P-11TYP. 15
6" DOUBLEYARDCLEAN-OUT
6" DOUBLEYARD CLEAN-OUT
6" DOUBLEYARD CLEAN-OUT
6" DOUBLEYARD CLEAN-OUT
6" SS
5
6" SS
A-P404
2
33" SS
3" SS
4
FINISH FLOORELEVATION = 0'-0"
3" SS
6" SS
A-P403
3
1-1/2" CD 1-1/2" CD
1-1/2" CDTO GRADE, TYP.
1-1/2" CD
6
1/2" CD
8
1/2" CD
7
1/2" CD
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
KEY PLAN
A B
D C
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P102288
OV
ER
ALL
GR
OU
ND
FLO
OR
PLU
MB
ING
PLA
N
0'8'
SCALE: 1/16" = 1'-0"
16' 16'
N
PLANNORTH
N
SITENORTH
SITE NORTH IS ROTATED90 DEGREES CLOCKWISEON THIS SHEET FROM THENORTH ARROW ON CIVILPLANS
A-P102
1OVERALL GROUND FLOOR PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRIC 1/A-P903 FOR CONTINUATION.
2 SEE DETAIL 5/A-P502
3 SEE ISOMETRIC 7/A-P905 FOR CONTINUATION.
4 SEE ISOMETRIC 8/A-P905 FOR CONTINUATION.
5 SEE ISOMETRIC 3/A-P903 FOR CONTINUATION.
ALL PIPING IN FIRST FLOOR CEILING, NOT IN A CONDITIONEDPLENUM, SHALL BE TIGHTLY RAPPED IN 2" OF INSULATIONWITH PVC COVER. INSULATION SHALL BE SEALED TIGHT TOSTRUCTURE WHERE PIPING PENETRATES FLOOR ABOVE.
GENERAL NOTES:
1.
6 1/2" CONDENSATE DRAIN DOWN TO CUP DRAINUNDER SINK IN BREAK ROOM. PROVIDE 1" AIR GAP.
7 1/2" CONDENSATE DRAIN DOWN TO CRAWL SPACE.SEE A-P101 FOR CONTINUATION.
8 1/2" CONDENSATE DRAIN DOWN TO FLOOR DRAIN.PROVIDE 1" AIR GAP.
W9126G-09-C-0054
W9126G-09-C-0054
DNDN
UPUP
DN UPDNUP
1
2
3
4
5
7
9
10
11
12
13
C D E F H K L N P QBA MG J
6
8
3/4" HWC3" CW
2 1/2" HW
2 1/2" HW3" CW
3/4" HWC3" CW2 1/2" HW
2 1/2" HW3" CW
2 1/2" HW3" CW
3/4" HWC3" CW2 1/2" HW
3" CW2 1/2" HW
2 1/2" HW3" CW
3/4" HWC
3/4" HWC
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
3/4" HWC 3/4" HWC
3/4" HWC
A-P404
3
A-P404
4
A-P404
5
A-P405
1
1 1
11
N
PLANNORTH
N
SITENORTH
SITE NORTH IS ROTATED90 DEGREES CLOCKWISEON THIS SHEET FROM THENORTH ARROW ON CIVILPLANS
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
KEY PLAN
A B
D C
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P103289
OV
ER
ALL
2N
D A
ND
3R
D F
LOO
R P
LUM
BIN
G P
LAN
0'8'
SCALE: 1/16" = 1'-0"
16' 16'A-P103
1
OVERALL 2ND AND 3RD FLOOR PLUMBINGPLAN
KEYED NOTES
1-1/2" CONDENSATE DRAIN FROM ELECTRICALROOM COOLING UNITS DOWN.
1
W9126G-09-C-0054
W9126G-09-C-0054
DNUP DN
UPDNDN
1
2
3
4
5
7
9
10
11
12
13
C D E F H K L N P QBA MG J
6
8
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P402
5
A-P404
3
3/4" HWC3" CW
2 1/2" HW
2 1/2" HW3" CW
3/4" HWC
3/4" HWC3" CW
2 1/2" HW
2 1/2" HW3" CW
3/4" HWC
2 1/2" HW3" CW
3/4" HWC
3/4" HWC3" CW2 1/2" HW
2 1/2" HW3" CW3/4" HWC
3/4" HWC3" CW2 1/2" HW4" SS
4" SS
2" V
2" V
4" SS
4" V2" V
4" V
4" V
2" V4" SS
4" SS
2" SS
4" SS
4" V
4" V
4" SS
3" SS
4" SS
2" V 3" V4" V
2" V
4" SS4" V
4" V
2" V
3" SS
4" V
4" V
2" V
4" SS
2" V4" V
4" SS
1 1/4" SS2" SS
1 1/2" SS
2" V
3" SS2" SS
4" SS
4" V2" V
1
1
1
1
1
1
1
1
1
1
2" V
4" SS2" V 4" SS
4" SS
4" V
4" SS
2" V
4" V
4" SS
4" CO
4" V
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
4" C.O.
2 2
22
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
KEY PLAN
A B
D C
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P104290
OV
ER
ALL
4T
H F
LOO
R P
LUM
BIN
G P
LAN
A-P104
1P-04_4th FLOOR PLAN - Sheet - Overall0'8'
SCALE: 1/16" = 1'-0"
16' 16'
N
PLANNORTH
N
SITENORTH
SITE NORTH IS ROTATED90 DEGREES CLOCKWISEON THIS SHEET FROM THENORTH ARROW ON CIVILPLANS
1
KEYED NOTES:
FOURTH FLOOR RESTROOM PIPING PERDETAIL 5, SHEET A-P402. ALL OTHER PIPINGSHOWN IS IN 4TH FLOOR CEILING AND ISIN ADDITION TO RESTROOM PIPING.
1-1/2" CONDENSATE DRAIN FROM ELECTRICALROOM COOLING UNITS DOWN.
2
W9126G-09-C-0054
W9126G-09-C-0054
DN
DN
1
2
3
4
5
7
9
10
11
12
13
C D E F H K L N P QBA MG J
6
8
6" HW
8" CW
8" CW
6" HW
4" G
1
2
3
5
8" HW
6" HW
6" HW
6" HW
6" HW
4
4" FD-1
4" FS-1
HB
4" FD-1
HB
4" FD-1
4" FS-1
4" FD-1
4" FD-1
HB
HB
4" FD-1
4" FS-1
HB
4" FD-1
4" FS-1
3" FD-1
3" FD-1
HB
4" VTR
4" VTR
4" VTR
8" HW
3" SS
2" V
AXT-R1-12" HWC8" CW
6
6
2" V
2" V
2" V
3" FS-1
3" FS-1
2" V
2" V
2" V
2 1/2" G
4" FCO
4" FCO
4" FCO
2" V2" V
2" V
2" V
2" V2" V
4" FD-1
4" FCO2" V
4" FCO
3/4" CW
1/2" CW 1 1/2" CW
2" CW
1/2" CW
3/4" CW
1/2" CW
2" CW
1/2" CW
1 1/2" CW
1 1/2" CW
7
7
8
7
7
9
10
1/2" CD
11
1/2" CD
11
1/2" CD
11
111/2" CD
1/2" CW
1/2" RPBFP
1/2" CW
ROUTE DRAIN TONEAREST FLOORDRAIN OR SINK
1/2" CW 1/2" CW
ROUTE DRAIN TONEAREST FLOORDRAIN OR SINK
PRV SETTO 12 PSI
RPBFP
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
KEY PLAN
A B
D C
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P105291
OV
ER
ALL
PE
NT
HO
US
E P
LUM
BIN
G P
LAN
0'8'
SCALE: 1/16" = 1'-0"
16' 16'
N
PLANNORTH
N
SITENORTH
SITE NORTH IS ROTATED90 DEGREES CLOCKWISEON THIS SHEET FROM THENORTH ARROW ON CIVILPLANS
A-P105
1OVERALL PENTHOUSE PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRIC 1/A-P903 FOR CONTINUATION.
2 SEE ISOMETRIC 2/A-P903 FOR CONTINUATION.
3 SEE ISOMETRIC 3/A-P903 FOR CONTINUATION.
4 SEE ISOMETRIC 4/A-P903 FOR CONTINUATION.
5 SEE ISOMETRIC 1/A-P906 FOR CONTINUATION.
6 CONNECT 3/4" CW TO CW IN 4TH FLOOR RESTROOM
GENERAL NOTES:
SANITARY SEWER (SS) FOR FLOOR DRAINS AND SINKSSHOWN ON THIS PLAN ARE LOCATED BELOW THESLAB IN THE FORTH FLOOR CEILING.
1.
7 HYDRONIC MAKE-UP WATER BACK FLOW PREVENTER 1TO MAKE-UP AIR UNIT. COORDINATE CONNECTIONWITH EQUIPMENT MANUFACTURER. SEE A-M603 FORCONNECTION LOCATION.
8 1-1/2" HYDRONIC MAKE UP WATER BACK FLOW PREVENTER 2,SEE A-M604 FOR CONNECTION LOCATION.
9 2" HYDRONIC MAKE-UP WATER BACK FLOW PREVENTER 2,SEE A-M604 FOR CONNECTION LOCATION.
10 SEE A-M604 FOR CONNECTION LOCATION.
A-P105
2HYDRONIC MAKE-UP WATER BFP1
A-P105
3HYDRONIC MAKE-UP WATER BFP2
11 1/2" CONDENSATE DRAIN DOWN TO FLOOR SINK OR FLOORDRAIN. PROVIDE 1" AIR GAP AT DRAIN.
W9126G-09-C-0054
W9126G-09-C-0054
4" SALT SILOFILL
16 TONSALT SILO
BRINE PUMP PAD ANDPUMP HOUSE
SALT SILO PAD, 11-1/2"ABOVE GRADE
2" CW, SALTSILO FILL
2" RPBFPSEE DETAIL 4
SHEET A-P501
BALANCING VALVESET TO 15 GPM
2" RPBFP
BALANCING VALVESET TO 15 GPM
2" RPBFPSEE DETAIL 4SHEET A-P501
2" V
MP-R1-1
2" BRINE4" SILODRAIN
6" HD-2 TO4" SS
1
SEE MECH PLANS FORCOOLING TOWERCONNECTIONS.
4" SS, BRINE DRAINTO SS MAIN
2" BR TO ATC
2" CW MAIN
2" CW FROM ATC
PUMP PAD
2" VENT
SALT SILO PAD
4" SS UP TO6" HD-2
1-1/2"MAKE-UP WATERTO COOLING TOWER
2
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P106292
ME
CH
AN
ICA
L Y
AR
D P
LUM
BIN
G P
LAN
S
0'2' 4'
SCALE: 1/4" = 1'-0"
4'
A-P106
1MECHANICAL YARD PLUMBING PLANA-P106
2
MECHANICAL YARD UNDER SLAB PLUMBINGPLAN
KEYED NOTES:
BRINE MAKING SYSTEM SHOWN FOR SPACEUSE ONLY. CONTRACTOR SHALL COORDINATEBRINE SYSTEM WITH MANUFACTURER SELECTEDAND INSTALL PER MANUFACTURER'SRECCOMMENDATION.
SEE SPECIFICATION SECTION 23 64 26 FOR HEATTRACE SPECIFICATIONS.
1
2
W9126G-09-C-0054
W9126G-09-C-0054
9
B
8
9
B
81
1
1 1/2" CW
1/2" HWC
4" SS
1 1/4" CW4" SS
3" SS 3" SS
3/4" HWC1 1/4" HW1 1/4" CW
1
1
3" SS
3" C.O.
3" C.O.
4" C.O.
4" C.O.
2" C.O.
3" C.O.3" C.O.
3" C.O.
7
DD
7
2
2
6" SS
4" SS
6" SS
4" SS
3" SS
10" CW2" HW
1 1/2" CW
4" SS
1/2" HWC
10" CW2" HW
52
TYP. 6
6" FP
SET BALLANCING VALVETO 0.5 GPM
SET BALLANCING VALVETO 0.5 GPM
SET BALLANCING VALVETO 0.5 GPM
6" C.O.
4" C.O.
3" C.O.
2" C.O.
3" C.O.
5
D
5
D
3
10" CW1" HWC2" HW
10" CW2" HW2" HW4" SS
SET BALLANCING VALVETO 0.5 GPM
4" C.O.
9
D
9
D
4
4" SS 2" HW10" CW
10" CW1" HWC2" HW
3/4" HWC1 1/4" HW1 1/4" CW
SET BALLANCING VALVETO 0.5 GPM
SET BALLANCING VALVETO 0.5 GPM
4" C.O.
3" C.O.
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P401293
EN
LAR
GE
D C
RA
WL
SP
AC
E R
ES
TR
OO
M P
LAN
S
0'2' 4'
SCALE: 1/4" = 1'-0"
4'
A-P401
1ENLARGED CRAWL SPACE PLUMBING PLANA-P401
2ENLARGED CRAWL SPACE PLUMBING PLANA-P401
3ENLARGED CRAWL SPACE PLUMBING PLAN
A-P401
4ENLARGED CRAWL SPACE PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRIC 1/A-P904 FOR BRANCH LINE SIZES
2
3
4
5 SEE DETAIL 5/A-P502
SEE ISOMETRIC 4/A-P904 FOR BRANCH LINE SIZES
SEE ISOMETRIC 1/A-P905 FOR BRANCH LINE SIZES
SEE ISOMETRIC 4/A-P905 FOR BRANCH LINE SIZES
W9126G-09-C-0054
W9126G-09-C-0054
9
B
8
P-1 P-1
P-1 P-1 P-1
P-2
P-2
3"FD-1
3"FD-1
3"FD-1
P-4TYP. 4
P-7TYP. 4
P-4TYP. 3
P-7TYP. 2
P-3
P-6
1
1
1
3"FD-1
7
D E
P-10TYP. 6
P-4TYP. 4
P-1TYP. 6
P-2
P-2
P-1TYP. 6
P-4TYP. 4
2
2
P-5
5
D
3
P-2
P-8
P-4
P-4TYP. 6
6 7
9
D
9
D
4
P-2
P-4
P-4TYP. 6
P-8
6 7
7
D E
8
2 1/2" HW3" CW
3/4" HWC
P-6
P-2 P-2
P-1TYP 4
P-1TYP 5
P-4TYP 7
P-4TYP 7
P-9TYP 26
P-10 P-10
P-12
2" FD-1TYP 15 5
5
5
5
3" FD-1
3" FD-1
3" FD-1
3" FD-1
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P402294
EN
LAR
GE
D R
ES
TR
OO
M P
LUM
BIN
G P
LAN
S
0'2' 4'
SCALE: 1/4" = 1'-0"
4'
A-P402
1ENLARGED GROUND FLOOR PLUMBING PLAN
A-P402
2ENLARGED GROUND FLOOR PLUMBING PLAN
A-P402
3ENLARGED GROUND FLOOR PLUMBING PLAN
A-P402
4ENLARGED GROUND FLOOR PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRICS 2/A-P904 AND 3/A-P904 FOR BRANCH LINE SIZES
2
3
4
SEE ISOMETRICS 5/A-P904 AND 6/A-P904 FOR BRANCH LINE SIZES
SEE ISOMETRIC 2/A-P905 AND 3/A-P905 FOR BRANCH LINE SIZES
SEE ISOMETRIC 5/A-P905 AND 6/A-P905 FOR BRANCH LINE SIZES
A-P402
5
TYPICAL ENLARGED RESTROOM PLAN FORALL DORMATORY RESTROOMS 2ND, 3RD AND4TH FLOORS
5 SEE ISOMETRIC 1/A-P901 AND 1/A-P902FOR BRANCH LINE SIZES
6 HEAT TRACE EXTERIOR P-4 LAVATORIES COORDINATECONNECTION LOCATION WITH SHEETS A-EP101 AND A-EP104
7 SEE SPECIFICATION SECTION 23 64 26 FOR HEATTRACE SPECIFICATIONS.
W9126G-09-C-0054
W9126G-09-C-0054
UP
3
4
NM
4
NM
3
2" CW
2" BR
10" CW 6" SS
4" SS
4" SS
3" SS
4" SS
4" SS
1 1/2" V
2" HWC
4" SS
1 1/4" HWC
10" CW
10" CW
3" V
6" SS
6" SS
6" SS
6" SS
4" C.O.
4" C.O.
4" SS
6" FP
1 1/2" HWC
10
11
C D
11
D
10
C
3/4" CW
4" SS
1 1/2" V
1 1/2" V
4" SS
4" C.O.
3" SS
4" C.O.
2" HW6" CW
1" HWC
2" HW6" CW
1" HWC
4" G
1
10
11
NM
1-1/2" CD
3/4" CW
6" CW1" HWC3" SS
3/4" CW
HB
HB
3" SS1
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P403295
EN
LAR
GE
D P
LUM
BIN
G P
LAN
S
0'2' 4'
SCALE: 1/4" = 1'-0"
4'
A-P403
1ENLARGED CRAWL SPACE PLUMBING PLANA-P403
2ENLARGED CRAWL SPACE PLUMBING PLAN
1
KEYED NOTES:
SEE ISOMETRIC 3/A-P903 FOR PIPING IN CHASE
A-P403
3ENLARGED GROUND FLOOR PLUMBING PLAN
W9126G-09-C-0054
W9126G-09-C-0054
DN
3
4
NM
4" SS TODAYLIGHT
10" CW10" RPBFP
2" CW
2" BR4" FD-1
DBP-R1-1
WS-R1-1
4" FD-1
3" V3" V
3" V10" CW
6" HD-1
6" HD-1
6" HD-1
1
22" BR
HB
WH
3" SS
4
DAC-R1-1 7
3
5
DCP-R1-1
6
3/4" CW
1 1/2" SS
1 1/2" SS
3/4" CW
3/4" CW
DHT-R1-1
1/2" CD
10
11
C D
4" G
9
8
3" FS-1
HBWH
3/4" CW
3
4
C D
10
3 1/2" HW3 1/2" CW
1" HWC
HB
FS-1
3
4
NM
1" HWC 3 1/2" CW
3 1/2" HW
11
3"FS-1
HB
10
11
NM
12
FS-1
3/4" HWC
3 1/2" CW
3 1/2" HW
HB
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P404296
EN
LAR
GE
D M
EC
HA
NIC
AL
RO
OM
PLU
MB
ING
PLA
NS
0'2' 4'
SCALE: 1/4" = 1'-0"
4'
A-P404
1
ENLARGED GROUND FLOOR MECHANICALROOM PLUMBING PLAN - AREA B
A-P404
2
ENLARGED GROUND FLOOR MECHANICALROOM PLUMBING PLAN - AREA D
A-P404
3
TYPICAL 2ND THRU 4TH FLOOR ENLARGEDMECANICAL ROOM PLUMBING PLAN - AREA A
A-P404
4
TYPICAL 2ND THRU 4TH FLOOR ENLARGEDMECHANICAL ROOM PLUMBING PLAN - AREA B
A-P404
5
TYPICAL 2ND THRU 4TH FLOOR ENLARGEDMECHANICAL ROOM PLUMBING PLAN - AREA C
1
KEYED NOTES:
SEE DETAIL 3/A-P501
2 SEE DETAIL 2/A-P502
3 SEE DETAIL 2/A-P501
4 SEE DETAIL 1/A-P502
5 SEE ISOMETRIC 2/A-P903 FOR PIPING IN CHASE
6 SEE DETAIL 6/A-M501
7 REFER TO DIVISION 23 SPECIFICATIONS FOR CONTROL AIR COMPRESSOR
10 SEE ISOMETRIC 1/A-P903 FOR PIPING IN CHASE
11 SEE ISOMETRIC 2/A-P903 FOR PIPING IN CHASE
12 SEE ISOMETRIC 3/A-P903 FOR PIPING IN CHASE
8 SEE ISOMETRIC 4/A-P903 FOR PIPING IN CHASE
9 SEE ISOMETRIC 1/A-P906 FOR GAS PIPING SIZE AND INFORMATION
W9126G-09-C-0054
W9126G-09-C-0054
10
11
C D
1
3 1/2" HW
3 1/2" CW
3/4" HWC
HB
3" FS-1
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P405297
EN
LAR
GE
D M
EC
HA
NIC
AL
RO
OM
PLA
NS
0'4' 8'
SCALE: 1/8" = 1'-0"
8'
A-P405
1
TYPICAL 2ND THRU 4TH FLOOR ENLARGEDMECHANICAL ROOM PLUMBING PLAN AREA D
1
KEYED NOTES:
SEE ISOMETRIC 4/A-P903 FOR PIPING IN CHASE
W9126G-09-C-0054
W9126G-09-C-0054
270°
1' - 0"1' - 6"
3' - 6"
11 1/2"
16' - 10"
2' - 6" 2' - 9"
6' - 0"
8' - 0"
2' - 6"
1' - 0"
4' - 6"
13' - 6"
17' - 10"
HOLDDOWN LUGS
24" SIDEMANWAY
2" BRINESUCTIONBREAK
3" FULLBOTTOMDRAIN
1" WATERINLET
2" LIQUIDLEVEL
2" BRINEOUTLET
ACCESS LADDER& SAFETY CAGE
LIFTINGLUG
24" HINGED MANWAY
24" PNEUMATICDUST COLLECTION
4" PNEUMATICDELIVERY PIPING
GRADE
4" PIPE CLAMPSSUPPLIED BYBRINE SYSTEM, INC.
0°
90°
180°
4" PNEUMATICDELIVERY PIPING
90° WATER INLET90° BRINE OUTLET
135° LIQUIDLEVEL OUTLET
15°BRINESUCTIONBREAK
335° 24" DUSTCOLLECTOR315° ACCESS
LADDER &SAFETY CAGE
290° TOP HINGEDACCESS MANWAY
HOLD DOWN &LIFTING LUGS, 4EACH, 90° APART
225° SIDEMANWAY
3" DRAIN
4'-6"
Y STRAINER
REDUCED PRESSURE PRINCIPALBACKFLOW PREVENTER
BALL VALVE TYP.
BELL CUP FITTING
DRAIN TO DAYLIGHT10" CW TOBOOSTER PUMP
BELL CUP FITTING
Y STRAINER
PIPE TO DAYLIGHT
10" DOMESTICWATER SERVICE
REDUCED PRESSUREPRINCIPAL
BACKFLOW PREVENTER
10" MAIN SHUTOFF VALVE
150 HOUSEKEEPING PAD
PRESSURE TANK
BALL VALVE
PRESSURE GAUGEAS SPECIFIED BY PUMPMANUFACTURER
GATE VALVE
DRAIN VALVEWITH HOSE THREADAND CAP
INDIRECTWASTE DRAIN
HUB DRAINSEE PLANS FOR SIZE
TRANSITION PIECE
HUB DRAINSSEE PLANS FOR SIZE
INDIRECTWASTE DRAIN
HD-1 HD-2
3"
2"
3"
2"
WASTE LINE (SIZE ASSHOWN ON PLANS)
6" THICK SQUARE CONCRETEPAD CROWN TO SHED WATER
CAST IRON CLEANOUT WITHBRONZE COUNTERSUNK PLUG(TYP)
COMBINATION WYE
CAST IRON EXTENSIONSAME SIZE AS SEWER
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P501298
PLU
MB
ING
DE
TA
ILS
SCALE: N.T.S. A-P501
1SALT SILO DETAIL
SCALE: N.T.S. A-P501
4WATER ENTRY DETAIL - 2-1/2" AND BELOWSCALE: N.T.S. A-P501
3WATER ENTRY DETAIL - 3" AND ABOVE
SCALE: N.T.S. A-P501
2HYDRO PNEUMATIC TANK DETAIL
SCALE: N.T.S. A-P501
5HUB DRAIN DETAILSCALE: N.T.S. A-P501
6DOUBLE YARD CLEANOUT DETAIL
W9126G-09-C-0054
W9126G-09-C-0054
FINISHED GRADE
4" CONCRETE PAD
TEE W/ BUSHINGAND 3/8" PLUG
GAS PRESSUREREGULATOR
INSULATING UNION
PLUGGED TEE W/ BUSINGAND 3/8" PLUG
GAS COCK (TYP.)
ANNODELESS RISER
TO BUILDINGSUPPLY
36"Øx36" DEEPFIBERGLASS BASIN SUBMERSIBLE
PUMP
PUMP "OFF"
PUMP "ON"
DISCHARGEPIPE
CHECK VALVE
ISOLATION VALVETO SANITARYSEWER
VENTSUMP COVER
CEMENT FLANGE
INLET
HIGH WATER ALARM
4'-0"
1'-0"
4-1
/2"
9"
NOTES:
1. SHOCK ABSORBERS (WATER HAMMER ARRESTERS) INSTALLED ABOVE CEILING SHALL BE POSITIONED IN ACCESSIBLE LOCATIONS WITH ACCESS PANELS PROVIDED AS NEEDED. ALL SHOCK ABSORBERS INSTALLED WITHIN WALLS OR CHASES SHALL BE PROVIDED WITH ACCESS PANELS TO ALLOW FOR VALVE CLOSURE AND REMOVAL OF SHOCK ABSORBER.
2. THREADED FITTINGS ARE ACCEPTABLE IN LIEU OF SWEATED FITTINGS AND UNIONS.
3. WHA SHALL BE INSTALLED ON ALL BRANCH LINES SERVING SOLENOID OR OTHER FAST-ACTING VALVES.
CW FROMBRANCH LINE
CW BRANCHFROM MAIN
CW TOFIXTURES
CW TOFIXTURES
CW BRANCHFROM MAIN
CW TO FINALFIXTURE SERVED
WATER HAMMERARRESTERSEE SCHEDULE
UNION
BALL VALVE
WATER HAMMERARRESTERSEE SCHEDULE
UNION
BALL VALVE
WATER HAMMERARRESTERSEE SCHEDULE
UNION
BALL VALVE
SUCTIONHEADER
PRESSURETRANSMITTERS
CONTROLPANEL(BACK)
BUTTERFLYVALVE
COMBINATIONPRESSURE ANDCHECK VALVE
DISCHARGEHEADER
DRINKING FOUNTAIN
SLAB
DETAIL A
4"
SLAB
SEE DETAIL A
SS
CWCW
SS
SS TO MAIN
2" AIR GAP
CW TO MAIN
SLEEVE 4"BELOW SLAB
4" PVC SLEEVE
4" PVCSLEEVE
1-1/4" WASTE
FREEZE-PROOF VALVEBY MANUFACTURER
DOMESTICCOLD WATER
NOTES
REFER TO ISOMETRICS 7/A-P905AND 8/A-P905 FOR PIPE SIZES
1
1 1
1
2"
FILL VOID WITHINSULATION
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P502299
PLU
MB
ING
DE
TA
ILS
SCALE: N.T.S. A-P502
4GAS METER DETAIL
SCALE: N.T.S. A-P502
3SUMP PUMP DETAIL
SCALE: N.T.S. A-P502
5WATER HAMMER ARRESTER DETAIL
SCALE: N.T.S. A-P502
1WATER SOFTENER DETAILSCALE: N.T.S. A-P502
2DOMESTIC WATER BOOSTER PUMP DETAIL
FLANGED BRINE INLET, TYP.
FLANGED SOFTWATER OUTLET, TYP.
FLANGED HARDWATER INLET, TYP.
OPTIONAL BACKWASH, TYP
24" x 24" x 12"PANEL, TYP.
12" DOMESTICWATER SERVICE
PRV, TYP.
NOTE: ROUTE 4" DRAIN FROMUNDERSIDE OF WATER SOFTENERTO HUB DRAIN, TYP.
6" TYP.
6" TYP.
3" TYP.
SCALE: N.T.S. A-P502
6DRINKING FOUNTAIN DETAIL
VALVES ON ALL INLETS & OUTLETS
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P601.a02300
PLU
MB
ING
SC
HE
DU
LES
PLUMBING FIXTURE SCHEDULE
MARK FIXTURE MAKE MODEL DESCRIPTION
P-1 WATER CLOSET, WALL MOUNTED AMERICAN STANDARD AFWALL ELONGATED WALL HUNG, 1.6 GPF, 1-1/2" BACK SPUD, VITREOUS CHINA, ELONGATED RIM, FLUSH VALVE TOILET, WHITE OPEN FRONT SEAT, MOUNT RIM 15" AFF
--- TOILET FLUSH VALVE SLOAN OPTIMA 140-1.6 WB ES-S 1.6 GPF, 1" SUPPLY CONNECTION, 1-1/2" BACK SPUD CONNECTION, HARD WIRED EL-154 TRANSFORMER
P-2 WATER CLOSET, WALL MOUNTED (ADA) AMERICAN STANDARD AFWALL ELONGATED WALL HUNG, 1.6 GPF, 1-1/2" BACK SPUD, VITREOUS CHINA, ELONGATED RIM, FLUSH VALVE TOILET, WHITE OPEN FRONT SEAT, MOUNT RIM 17" AFF
--- TOILET FLUSH VALVE SLOAN OPTIMA 140-1.6 WB ES-S 1.6 GPF, 1" SUPPLY CONNECTION, 1-1/2" BACK SPUD CONNECTION, HARD WIRED EL-154 TRANSFORMER
P-3 URINAL AMERICAN STANDARD SELECTRONIC INNSBROOK WALL HUNG, 0.5 GPF, VITREOUS CHINA URINAL WITH INTEGRAL ELECTRONIC FLUSH VALVE, LOW-VOLTAGE PLUG-IN POWER SUPPY, MOUNT RIM 17" AFF
P-4 LAVATORY, WALL HUNG AMERICAN STANDARD LUCERNE 0356.041 20"x18", WALL HUNG, VITREOUS CHINA, FRONT OVERFLOW, SINGLE HOLE ONLY, MOUNT RIM AT 34" A.F.F.
--- LAVATORY FAUCET DELTA 590-HGMHDF DECK MOUNTED, ELECTRONIC FAUCET, SINGLE HOLD, CHROME PLATED, 0.5 GPM VANDAL RESISTANT SPRAY OUTLET, HARD WIRED OPERATION 120 VAC @ 60 HZ, R2970-MIX TEMPERING VALVE SET TO 110F MAX
P-5 BREAK ROOM SINK ELKAY LR1919 19.5"x19", 16"x13.5"x7.5" BOWL, 18 GAUGE STAINLESS STEEL, SINGLE BOWL, SELF-RIMMING COUNTER MOUNT SINK, SINGLE HOLD DRILLING CONFIGURATION
--- BREAK ROOM SINK FAUCET DELTA 29C2101 8" SINGLE HOLD MOUNT SINGLE CONTROL DECKMOUNT SINK FAUCET, 1.5 GPM AERATOR, CHROME PLATED CAST BRASS BODY
P-6 JANITOR'S ROOM MOP SINK MUSTEE 65M 24"x36"x10", FLOOR MOUNTED MOP SINK, "DURASTONE" BUMPER GUARDS, 3" DRAIN
--- MOP SINK FAUCET CHICAGO FAUCETS 540-LD897SWXF CHROME PLATED BRASS, VACUUM BREAKER, INTEGRAL STOPS, TOP WALL BRACE, PAIL HOOK, 3/4" HOSE THREAD
P-7 SHOWER BASIN FIAT MONTEREY MFT 36"x36" TERRAZZO FLOOR MOUNTED SHOWER BASIN
--- SHOWER VALVE SHOWER-WARE 450 APEX TYPE 5 SURFACE MOUNTED SHOWER, 304 STAINLESS STEEL WITH SATIN FINISH, WALL SUPPLY, SAFTI-THERM, H&C TEMPERATURE BALANCING VALVE, 6' SHOWER HEAD DISCHARGE HEIGHT
P-8 SHOWER BASIN FIAT MONTEREY MFT 36"x36" TERRAZZO FLOOR MOUNTED SHOWER BASIN
--- SHOWER VALVE SHOWER-WARE 450ADAHW-A APEX TYPE 5 SURFACE MOUNTED SHOWER, 304 STAINLESS STEEL WITH SATIN FINISH, WALL SUPPLY, SAFTI-THERM, H&C TEMPERATURE BALANCING VALVE, ADA COMPLIANT CONTROL VALVE, HAND SHOWER
P-9 SHOWER SHOWER-WARE 450 APEX TYPE 5 SURFACE MOUNTED SHOWER, 304 STAINLESS STEEL WITH SATIN FINISH, TOP SUPPLY, SAFTI-THERM, H&C TEMPREATURE BALANCING VALVE, 6' SHOWER HEAD DISCHARGE HEIGHT, SUPPLY COVER
P-10 SHOWER SHOWER-WARE 450ADAHW-A APEX TYPE 5 SURFACE MOUNTED SHOWER, 304 STAINLESS STEEL WITH SATIN FINISH, TOP SUPPLY, SAFTI-THERM, H&C TEMPERATURE BALANCING VALVE, ADA COMPLIANT CONTROL VALVE, HAND SHOWER, SUPPLY COVER
P-11 DRINKING FOUNTAIN HALSEY TAYLOR 4595 FT PEDESTAL-MOUNTED, WEATHER-RESISTANT EXPOSED SIERRA STONE AGGREGATE FOUNTAIN, FREEZE-RESISTANT VALVE, ONE-PIECE, VANDAL-RESISTANT, CHROME-PLATED BUBBLER, VANDAL-RESISTANT PUSHBUTTON
P-12 ELECTRIC WATER COOLER HALSEY TAYLOR HVR8 ADA SELF-CONTAINED, ELECTRIC REFRIGERATED WALL-MOUNTED WATER COOLER, ONE-PIECE, CHROME-PLATED, VANDAL-RESISTANT BUBBLER, SELF-CLOSING, VANDAL-RESISTANT PUSHBUTTON, MOUNT RIM AT 24" A.F.F.
FD-1 FLOOR DRAIN ZURN Z415B NO-HUB FLOOR DRAIN WITH POLISHED NICKEL BRONZE TOP, TRAP PRIMER CONNECTION, BACKWATER VALVE, VANDAL-PROOF SECURED TOP, SEDIMENT BUCKET, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET
FD-2 FLOOR DRAIN ZURN Z415I NO-HUB FLOOR DRAIN, TRAP PRIMER CONNECTION, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET
FD-3 FLOOR DRAIN ZURN FD-2252 NO-HUB CAST-IRON SHOWER DRAIN, STAINLESS STEE STRAINER, VANDAL-PROOF, 6" DIAMETER CAST IRON BODY
FS-1 FLOOR SINK ZURN FD2376 12" SQUARE, OPEN TOP FLOOR SINK WITH SEDIMENT BUCKET
HB HOSE BIBB WOODFORD 46-VB-RB ROUGH BRASS FINISH HOSE BIBB, 3/4" MALE INLET, LOOSE TEE KEY OPERATION, VACUUM BREAKER WITH 3/4" HOSE THREAD NOZZLE OUTLET
WH WALL HYDRANT WOODFORD MODEL 65 WALL MOUNTED FREEZE PROOF HYDRANT, ASSE 1052 ANTI-SIPHON VACUUM BREAKER, 3/4" HOSE NOZZLE OUTLET, LOOSE TEE KEY OPERATION
PLUMBING FIXTURE CONNECTION SCHEDULE
DESCRIPTION SANITARY VENT COLD WATER HOT WATER
WATER CLOSETS, WALL MOUNTED 4" 2" 1" ---
URINALS 3" 1-1/2" 3/4" ---
LAVATORIES, WALL MOUNTED 1-1/2" 1-1/2" 1/2" 1/2"
MOP SINKS 3" 2" 3/4" 3/4"
SHOWERS (P-7 & P-8) 3" 1-1/2" 1/2" 1/2"
SHOWERS (P-9 & P-10) 3" --- 1/2" 1/2"
BREAK ROOM SINKS 1-1/2" 1-1/4" 1/2" 1/2"
WATER FOUNTAIN 1-1/4" 1-1/4" 1/2" ---
ELECTRIC WATER COOLER 1-1/4" 1-1/4" 1/2" ---
HOSE BIBB --- --- 1/2" ---
WALL HYDRANT --- --- 1/2" ---
WATER HAMMER ARRESTOR SCHEDULE
MARK FIXTURE UNIT CAPACITY PIPE SIZE DESIGN BASIS REMARKS
WHA-1 1 THRU 11 3/4" WADE W-5 PROVIDE ACCESS PANEL
WHA-2 12 THRU 32 1" WADE W-10 PROVIDE ACCESS PANEL
WHA-3 33 THRU 60 1" WADE W-3/4 PROVIDE ACCESS PANEL
AIR COMPRESSOR SCHEDULE
MARK LOCATION HP PUMP RPMCFM
DELIVERY BORE DIA STROKE ELECTRICAL DIMENSIONS WEIGHT
DAC-R1-1 WATER ENTRY ROOM, AREA B 5 VTS 740 21.7 4.72" 1.92" 480V/3PH 57-1/4"x37-1/2"x37-3/8" 1030 LB
PLUMBING PUMP SCHEDULE
MARK LOCATION TYPE FLOW (GPM) HEAD (FT) VOLTS PHASE FLA DESIGN BASIS
DBP-R1-1 WATER ENTRY ROOM, AREA B DOMESTIC BOOSTER PUMP 2,055 144 460 3 158 B&G 70M
DCP-R1-1 WATER ENTRY ROOM, AREA B DOMESTIC HOT WATER CIRCULATION PUMP 15 15.5 115 1 1.1 B&G B601S
MP-R1-1 MECHANICAL YARD BRINE PUMP 20 12 120 1 9.8 MAGNATEX MP 420-N25
SP-R1-1 CRAWL SPACE SUMP PUMP 5 14.5 115 1 7.5 B&G ST51
SP-R1-2 CRAWL SPACE SUMP PUMP 5 14.5 115 1 7.5 B&G ST51
SP-R1-3 CRAWL SPACE ELEVATOR SUMP PUMP 74 37 115 1 8 STANCOR OIIL-MINDER
PLUMBING TANK SCHEDULE
MARK TYPE LOCATIONTOTAL VOLUME
(GAL)DIAMETER
(IN)HEIGHT
(IN)WEIGHT
(LB)PRESSURE
(PSI) DESIGN BASIS
AXT-R1-1 DOMESTIC EXPANSION TANK PENTHOUSE MECHANICAL ROOM, AREA B 528 48 96 1525 150 WESSELS TXA
DHT-R1-1 HYDRO-PNEUMATIC TANK WATER ENTRY ROOM, AREA B 211 30 91 760 125 B&G WTA-452
WATER SOFTENER SCHEDULE
TAGFLOW(GPM)
PRESSUREDROP (psi)
TANK SIZE(H x DIA)
MEDIA(cuft)
BEDDEPTH
CAPACITY(Grains/cuft)
CONFIGURATION
REGENERATION(SaturatedNaCl/cuft)
SERVICEINLET
SERVICEOUTLET
BRINESUPPLY ELECTRICAL SERVICE SKID SIZE BASIS OF DESIGN
WS-R1-1 2045 15.8 84" x 84" 109 34" 3,270 TRIPLEX 5.77 GALLONS 6" 6" 2" 120 VAC / 1 PH / 60 Hz /10 Amps
97 L 109 W 163 H SIEMENS PTIS-P-T-A-84x84
1
No.
Description
D.O
.No.
Action
Date
bA
ME
ND
ME
NT
AM
0002
07
24
09
b
b
b
SUPERCEDED BY A-P601.m01
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P901301
PLU
MB
ING
ISO
ME
TR
IC P
LAN
S
FD-1
SS
3"
SS
3"
P-6
3" 2-1/2"
SS
4"
SS
4"
P-2
P-1
P-1
P-1
P-1
P-1
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
FD-1
FD-1
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
FD-3
P-12
SS
2"
1-1/2"
SS
SS1-1/2"TYP-7
1-1/4"TYP-7
1-1/4"
1-1/2"
1-1/2"
1-1/4"
SS
SS
3"
3"
V
V
V
V
V
V
V
VS
S
3"2-1/2"
2"
1-1/2"
V
V1-1/4"
2"
1-1/4"
1-1/2"
V
1-1/2"
1-1/4"
V
1-1/4"TYP-7
1-1/2"TYP-7
1-1/2"
2"TYP-3
1-1/2"
2"
2"TYP-6
SS
V
V
FD-3
2"TYP-8
2"TYP-2
2"TYP-4
2"
SS
SS
2"
2"
SS 2"
SS
2" 4"
FD-3
2"
V
2"
V
3"
2"
V
V
2"
SS
1-1/2"
1-1/4"
SS
SS
VV
3" V FROM ADMINAREA. SEE A-P102FOR CONTINUATION.
3" V UPAREAS A & DONLY
A-P901
1
TYPICAL 2ND, 3RD AND 4TH FLOORRESTROOM WASTE AND VENT ISOMETRIC
P-1
P-1
P-1
P-1
P-2
A-P901
2TYPICAL ALL OTHER INSTANCES ISOMETRIC
AREA A AND D OVER ADMIN AREA
2"
2-1/2"
3"
1-1/2"
2" C.O.
V
V
SS
SS
SS
FD-1
3"
SS
SS
V
3"
SS
6"
SS
6"
2"
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
C.O.
3" 3"
SS
2"
2"
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P902302
PLU
MB
ING
ISO
ME
TR
IC P
LAN
S
HW
CW
HWC
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-6
P-2P-2
P-1
P-1
P-4
P-4
P-4
P-4
P-4
P-4
P-12
P-10
P-9
P-9
P-9
P-9
P-9
P-9
P-10
P-9
P-9
P-9
P-9
P-9
P-9
P-9
P-9
P-9
P-9P-9
P-9
P-9
P-9
P-9
P-9
P-9
P-9
P-9
HW
CW
2-1/2"
CW
1/2"
3/4"TYP P-9
CW
HW
1-1/4"
1"
3/4"
HW
CW
HW
CW2-1/2"
HWCW
CWHW
CW
HW
CWHW
CW
HW
HWCW
HW
CW
CW
HW
1-1/4"
HWCW
HWCW
HW
HW
1-1/4"
3/4"
1"
CW
HW
1"
HW
CW
3/4"
HW CW
1/2"
HW
CW
3/4"
1-1/2"
3/4"
1"
HW
CW
CW
HW
CW
HWC
HW
CW
HW CW
3/4"
3/4"
1/2"2"3/4"
2"1"
1/2"TYP-7
1"TYP-11
1/2"TYP-7
2-1/2" HW, 3" CW AND 3/4" HWCSEE A-P103 FOR CONTINUATION
1" CW1" HW1" HW1" CW
TO WASHING MACHINE
TO WASHING MACHINE
P-1
P-1
P-1
A-P902
1
TYPICAL 2ND, 3RD AND 4TH FLOORRESTROOM PLUMBING WATER ISOMETRIC
3/4"
2"
1-1/2"1"
1"
1"
1"
WH-4
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P903303
PLU
MB
ING
PIP
ING
QU
AD
RA
NT
RIS
ER
ISO
ME
TR
IC P
LAN
S -
AR
EA
S A
- D
A-P903
1
PLUMBING PIPING RISER ISOMETRIC PLANAREA A
A-P903
2
PLUMBING PIPING RISER ISOMETRIC PLANAREA B
HW
6" HWSEE A-P104 FORCONTINUATION
1" HWC, 3-1/2"CW AND HWSEE A-P103 FORCONTINUATION
1" HWC, 3-1/2"CW AND HWSEE A-P103 FORCONTINUATION
3/4" HWC, 3-1/2"CW AND HWSEE A-P103 FORCONTINUATION
HW
CW
HW
C
2" HW6" CW1" HWC3" SS
4" HW4" CW1" HWC3" SS
1" HWC, 6" CWAND 2" HWSEE A-P101 FORCONTINUATION
SS
SS
3"
3" SSSEE A-P101 FORCONTINUATION
FS-1
A-P903
3
PLUMBING PIPING RISER ISOMETRIC PLANAREA C
4" GSEE A-P104 FORCONTINUATION
6" HWSEE A-P104 FORCONTINUATION
3/4" HWC, 3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3/4" HWC, 3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3/4" HWC, 3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
1" HWC, 2" HW AND 6" CWSEE A-P101 FORCONTINUATION
A-P903
4
PLUMBING PIPING RISER ISOMETRIC PLANAREA D
PENTHOUSE PENTHOUSE
FOURTH FLOOR FOURTH FLOOR
THIRD FLOOR THIRD FLOOR
SECOND FLOOR SECOND FLOOR
GROUND FLOOR GROUND FLOOR
10" CWSEE A-P102 FORCONTINUATION
4" HW3-1/2" CW1" HWC3" SS
HWC
CWHW
HW
CW
HW
C
HWC
CWHW
HWC
CWHW
HW
CW
HW
C
V
SS
3"
FS-1
SS
3"
FS-1
VV 3/4" HWC
SEE A-P103 FORCONTINUATION
3/4" HWCSEE A-P103 FORCONTINUATION
2" HWCSEE A-P104 FORCONTINUATION
8" CWSEE A-P104 FORCONTINUATION
3/4" HWCSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3" SSSEE A-P102 FORCONTINUATION
2" & 1" HWCSEE A-P102 FORCONTINUATION
3" VSEE A-P104 FORCONTINUATION
3" VTR
HW6"
SSFS-1
3"
SSFS-1
3"
SS
FS-1
3"
HW
CW
10"4"
CW
HW
CW
HW
CW
HW
CW
V
HW
CH
WC
SS
SS
V
3"
HW
CH
WC
2"
3"
VV
VC
W
HW
HW
CH
WC
1"2"
3-1/2" HW10" CW
2"
3" VTR
6" HWSEE A-P104 FORCONTINUATION
HW
V
3/4" HWCSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
HWC
CW
HW
3/4" HWCSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3/4" HWCSEE A-P103 FORCONTINUATION
3-1/2" CW AND HWSEE A-P103 FORCONTINUATION
3" SS, 6" CW AND 1" HWCSEE A-P101 FORCONTINUATION
V
1" HWC4" HW3" SS3-1/2" CW
2"
1" HWC3-1/2" HW3" SS4" CW
1" HWC3" SS6" CW
V
FS-1
SS
3"
FS-1CW
HW
SSHW
C
V
FS-1CW
HW3"
SSHW
C
V
2"
3"
V
4" GSEE A-P102 FORCONTINUATION
4" SS AND 1-1/2" VSEE A-P101 FORCONTINUATION
3" V3" SS4" G
1" HWC6" CW2" HW
1" HWC4" CW4" HW
3/4" HWC3-1/2" CW4" HW
HW
CC
W
HW
HW
CC
W
HW
HW
C
CW
HW
FS-1
SS
G
SS
VG
FS-1
SS 3"
3" VTR
VG
HW
3" VTR
SS
SS
2"
2"
FS-1
SS 3"
FS-1
SS 3"
3" V3" SS4" G
SS
VG
3" V3" SS
SS
V
SS
3"
3"
3"
2"
2"
2"
2"
2"
6"
2"
CW
CW
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P904304
PLU
MB
ING
ISO
ME
TR
IC P
LAN
S
A-P904
1CRAWL SPACE PLUMBING ISOMETRICA-P904
2
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P904
3
GROUND FLOOR PLUMBING WATERISOMETRIC
A-P904
4CRAWL SPACE PLUMBING ISOMETRICA-P904
5
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P904
6GROUND FLOOR PLUMBING ISOMETRIC
3/4" HWC, 1-1/4" HW AND CWSEE A-P101 FOR CONTINUATION
2"
3"
2"
3"
3"
3"
4"
3"
4"
4"
3"
4"
1-1/2" CW, 1" HW AND 1/2" HWCSEE A-P101 FOR CONTINUATION
3" 2"
1-1/4"
1-1/2"
1"
2"
SS
SS
SS
SS
SS
CW
1-1/4"
P-4
P-4
P-4
P-4
P-3
P-1
P-1
P-2P-1
P-1
P-1
P-2
P-4
P-4
P-4P-7FD-1
P-7
SS
SS
2"
1-1/2"
2"
1-1/4"
2"
V SS
SS
3"
4"
2"
2"
V
2"
3"V
3" V
2"
2"V
V
1-1/2"
1-1/4"(TYP)
1-1/2"
SS
P-7
P-7
P-7
P-7
P-4
P-4
P-4
P-4
P-2
P-1
P-1P-3
P-2
P-1
P-1
P-1
P-7
P-7
P-4
P-4
P-4
1" HW AND CWSEE A-P101 FORCONTINUATION
1-1/4" CWSEE A-P101 FORCONTINUATION
1" CW AND HWSEE A-P101 FORCONTINUATION
1"
CW
HW
3/4"
1/2"
1/2"
1-1/4"
1"
CW
CW
CWHW
3/4"
1/2"
1/2"
CW
CW
CW
CW
SS
SS
SS
SS
CW
HW HWC
HW HWC
HW
SS
SS
SS
CW HW
HW
HWC
HWCW
SS
HW
CW
CW
CWSS
10"
2"
2-1/2"
4"
1/2"
2"2-1/2"
3/4"1"
1"1/2"
1/2"
1-1/2"
4"
6"
4"
3"
6"4"
4"
1/2"
1/2"
3/4"
1-1/4"
3/4"
2-1/2"
10"
1/2"
3/4"
3"
2"3/4"
P-4
P-4
P-4
P-4
P-2
P-2
P-1
P-1
P-1
P-1
P-1
P-2
P-1
P-1
P-1
P-1
P-1
P-1
P-5P-4
P-4
P-4
P-4
SS
SS
V
1-1/2"
1-1/4"
1-1/2"
2"
1-1/2"
2-1/2"
4"
SS
SS
4"
SS
SS
SS
2-1/2"
2-1/2"
3"
6"
V
V
V
V
V
SS
SS
V
1-1/4"
1-1/2"
1-1/2"
1-1/2"
2-1/2"
2"
P-4
P-4
P-4
P-4
P-2
P-1
P-1
P-1
P-1
P-1
P-1
P-2
P-1
P-1
P-1
P-1
P-1
P-1
P-4
P-4
P-4
P-4
1/2"
3/4"1"3/4"
CWHW
CW
CW
CWCW
1"
1-1/4"
1"
1-1/2"
CWHW
1/2"
3/4"
3/4"P-5
3/4"
1/2"
3/4"
1/2"
1"
1/2"
3/4"
1-1/2"
1-1/4"
3"
2"
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P905305
PLU
MB
ING
ISO
ME
TR
IC P
LAN
S
A-P905
1CRAWL SPACE PLUMBING ISOMETRICA-P905
2
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P905
3
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P905
4CRAWL SPACE PLUMBING ISOMETRICA-P905
5
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P905
6
GROUND FLOOR PLUMBING WASTE AND VENTISOMETRIC
A-P905
7CRAWL SPACE PLUMBING ISOMETRICA-P905
8CRAWL SPACE PLUMBING ISOMETRIC
1-1/2"
4" SS
4"
4" C. O.
3"
1-1/2" V
2" SS
P-8
3"3" C. O.
1"
1"
SET BALANCINGVALVE TO 0.5GMP.
2"1"
10"
10"
P-4
P-4
P-2P-8
P-4
P-4
P-4
P-4
P-4
SS
SS
CW
SS
HW
SS
CW
CW
HWC
HW
2"1"
2"1"
HWC
HW
HWCHW
1"
1"
SS
V
P-4
P-4
V
V
V
V
P-2
P-8
1-1/2"
1-1/4"
4"
2"
1-1/4"
2"
3"
3" SS
V
V
P-4
P-4
P-4
P-4
P-4
V
V
SS
SS
1-1/2"
1-1/2"
1-1/2"TYP P-4
1-1/4" VTYP P-4
1-1/2"
1-1/4"
1-1/2"
HWCW
HWCW
1/2" CW1/2" HW
1" CW1/2" HW
1" CW
1" HW
1" CW
1"
1"
1/2"
1"
3/4"
3/4"
1/2"
1/2"
1/2" TYPP-4
CW
HW HWC
1-1/4"1-1/4"
3/4"
3/4"
SET BALANCINGVALVE TO 0.5 GPM HW
CW
HWC
HW
CW
SS
SS
1"
SET BALANCINGVALVE TO 0.5 GPM
2"
1"
10"
10"
CW
1-1/2" CW
1/2" HW
3/4" HWC HW
2"
1-1/2"
4" SS
4" SS
4" C. O.
4"
2"
P-8
3"1-1/4" V
3"
3" C.O.
3" SS
SS
V
P-8
P-4
P-4
P-4
P-4
P-4 P-4
1-1/2" SSTYP. P-4
1-1/4" VTYP. P-4
V
SS
3" SS
3"
V
V
3"
3"
3"
V
V
V
V
V
2"
1-1/2"
2"
P-2
P-4
1-1/2" SS
4" SS
1-1/4"
3"
1-1/4"
1-1/2"
1-1/2"
1-1/2"
P-4
P-4
P-4
P-4
P-4
P-4
3/4" HWC
HW CW
HW CW
3/4" HWC
1/2"TYP. P-4
1/2"
1"
P-8
P-2P-4
1/2" CW1/2" HW
1"
1/2" CW1/2" HW
1-1/4" HW 1-1/4" CW
SS
SS
SS
SSCW
CW
CW
CW
CW
CW
SS
SS
SS
V
P-11
NOTE: SEE DETAIL 5/A-P502 FORP-10 INSTALLATION
NOTE: SEE DETAIL 5/A-P502 FORP-11 INSTALLATION
P-11
SS
SS
SS SS
SS
SS
SS
SS
4"
4"
2"
2"
1-1/2"
1-1/2" V1-1/2"
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11
P-11P-11
P-11
P-11
P-11
P-11
P-11
P-11
1-1/2"
1-1/2"
1"
1"CW
3/4"
1"
3/4"
3/4"1/2"
1/2"1/2"
1"
3/4"
1-1/2"
3/4"
3/4"
1/2"1/2"
4"
4"
2"
2"
1-1/2"
1-1/2"
1-1/2"
V
V
1-1/2"
1-1/2"
1-1/2"
3/4"
1/2"
CW
CW
CW
CW
CW
1/2"
1"
3/4"
3/4"
1/2"
3/4"
3/4"
1/2"
3/4"
1"
1"
1-1/2"
V
W9126G-09-C-0054
W9126G-09-C-0054
DOCUMENT WAS AUTHORIZED
P.E. 32681 ON 9 JULY 2009BY KEVIN P. BRESLIN, JR.
THE SEAL APPEARING ON THIS
EN
ER
E
EF
OL
OR
P
OC R
.
AISS
NO
K
ELG
N
I
R
32681
P.
EI
VN
DARO
B SI N
J
IEG
RETS
ER
D
L
Sheetreferencenumber
Sheet
BU
ILD
ING
Q
UA
LIT
Y S
OLU
TIO
NS
U.S
. A
RM
Y E
NG
INE
ER
DIS
TR
ICT
,
CO
RP
S O
F E
NG
INE
ER
S
FO
RT
WO
RT
H, T
EX
AS
Desi
gned b
y:
Dw
n b
y:
Revi
ew
ed b
y:
Subm
itted b
y:
EN
GIN
EE
R
Date
:
Sol N
o.
Contr
No.
Rev.
Plo
t sc
ale
:
Plo
t date
:
File
na
me:
Contr
No.
DE
SIG
N F
ILE
:
Fort Worth District
US Army Corpsof Engineers
Sym
bol
Desc
riptio
nD
.O. N
o.
Act
ion
Date
1:1
DA
VID
LU
KE
, P
E
of
LA
CK
LA
ND
AF
B, T
EX
AS
AIR
ME
N T
RA
ININ
G C
OM
PLE
X -
NO
RT
H C
AM
PU
S
AIR
ME
N T
RA
ININ
G C
OM
PLE
X 1
(A
TC
1)
442
W9126G
-09
-12-0
105
Contr
act N
o. H
ere
Plo
t D
ate
Here
9 J
ULY
2009
1 2 3 4 5
E
D
C
B
A
MP
LS
083737R
1
DR
AW
ING
NU
MB
ER
:LA
09-0
001
BR
ES
LIN
McG
LO
TH
LIN
McG
LO
TH
LIN
A-P906306
PLU
MB
ING
FU
EL
GA
S IS
OM
ET
RIC
PLA
N
A-P906
1PLUMBING FUEL GAS ISOMETRIC PLAN
4" GSEE CIVIL FORCONTINUATION
GAS METER ANDREGULATOR TO PROVIDE50,400 CFH @ 5.0 PSI0'-0" FOR CALCULATION PURPOSES
G
4"
G
G
G
4" GAS PRV SETTO PROVIDE 50,400 CFH@ 2.0 PSI0'-0" FOR CALCULATIONPURPOSES
G
GAS VENTTHRU ROOF
3"
G
G
1-1/4" TYPALL BOILERS
G
G
1-1/4" TYPALL BOILERS
2-1/2"
1-1/4"
2-1/2"
2"
50,400 CFH171'-0"AT 5 PSI
GENERAL NOTES:
1.
2.
5 PSI GAS PIPE SIZE CALCULATED USING 2006 IFGC TABLE 402.4(5)
2 PSI GAS PIPE SIZE CALCULATED USING 2006 IFGC TABLE 402.4(3)
50,400 CFH21'-0"AT 2.0 PSI
25,200 CFH29'-0" AT 2.0 PSI
21,600 CFH31'-0" AT 2.0 PSI
2-1/2"
GAS FIRED BOILER3,600 CFH EACHTYP. 14
18,000 CFH39'-0" AT 2.0 PSI
14,400 CFH41'-0" AT 2.0 PSI
2"
10,800 CFH49'-0" AT 2.0 PSI
7,200 CFH51'-0" AT 2.0 PSI
2"
3,600 CFH72'-6" AT 2.0 PSI
25,200 CFH25'-0" AT 2.0 PSI
21,600 CFH27'-0" AT 2.0 PSI
18,000 CFH35'-0" AT 2.0 PSI
2-1/2"
14,400 CFH37'-0" AT 2.0 PSI
10,800 CFH45'-0" AT 2.0 PSI
7,200 CFH47'-0" AT 2.0 PSI
1-1/2"
3,600 CFH68'-0" AT 2.0 PSI
W9126G-09-C-0054
W9126G-09-C-0054