Page 1: Abbot Point Growth Gateway Project - Environmental Impact ... · 16/07/2015 16/07/2015 drawing number check drafting rev drawn engineer project mgr approved check engineering orig
Page 2: Abbot Point Growth Gateway Project - Environmental Impact ... · 16/07/2015 16/07/2015 drawing number check drafting rev drawn engineer project mgr approved check engineering orig
Page 3: Abbot Point Growth Gateway Project - Environmental Impact ... · 16/07/2015 16/07/2015 drawing number check drafting rev drawn engineer project mgr approved check engineering orig

C.Livingstone

DRAWING NUMBER

CHECK

DRAFTING

REV

DRAWN

ENGINEER

PROJECT MGR

APPROVED

CHECK

ENGINEERING

DATUM

NOTES

REV DATE AMENDMENT

APP

DRN

CJL

ORIG SIZE

A1 ARCHIVE

MAP GRID OF AUSTRALIA BASED ON GDA 94, ZONE 55

VERTICAL

HORIZONTAL BebbCart

CLIENT

PROJECT

TITLE

A

G.Bebbington

BMT JFA-275_03-00-03A.DGN

SCALE 1 : 10000

100 0 1000

METRES

LAT BASED ON PM 66022 (RL 8.740m LAT)

T0 DREDGING

7800000 m

N

7802000 m

N7802000 m

N

7804000 m

N7804000 m

N

612000 mE612000 mE

614000 mE614000 mE

7800000 m

N

16/07/15

16/07/2015

16/07/2015

LAT

MLWS

MLWN

MSL

MHWN

MHWS

HAT

0.00m

0.67m

1.30m

1.69m

2.07m

2.70m

3.60m

(QUEENSLAND TIDE TABLES 2015)

ABBOT POINT

TIDAL PLANES

BMT JFA 275.03-00-03

(INDICATIVE)RETURN PIPELINE

SITE LAYOUT

GENERAL ARRANGEMENT

LEGEND

PROPOSED CULTURAL HERITAGE AVOIDANCE AREA

INDICATIVE RETURN PIPELINE ROUTE

INDICATIVE DELIVERY PIPELINE ROUTE

A

16/07/2015

16/07/2015

ABBOT POINT GROWTH GATEWAY

DEPARTMENT OF STATE DEVELOPMENTH.Sunarko

T.GreenISSUED FOR APPROVAL

CONTAINMENT PONDS

DREDGED MATERIAL

AERIAL PHOTOGRAPHY 20131.

2.

3.

4.LOCATION OF EXISTING FEATURES TO BE CONFIRMED ON SITE

5.CULTURAL HERITAGE AREA PROVIDED BY DSDIP 19/12/2014

ISSUED FOR APPROVAL

NOT FOR CONSTRUCTION

(LOCATION TBC)AREA (100m x 100m)

NOM. PIPE LAYDOWN

AND PIPE LAYDOWN AREA.

RETURN WATER PIPELINES, DREDGED MATERIAL CONTAINMENT PONDS

SITE OF WORKS INCLUDES TOTAL DREDGING EXTENTS, DELIVERY AND

DREDGING & DREDGED MATERIAL PLACEMENTSPECIFICATION (

DRAWINGS TO BE READ IN CONJUNCTION WITH THE TECHNICAL

Contract No. DSD-3221-15a)

SHORE CROSSINGAND RETURN PIPELINEALTERNATE DELIVERY

PUMP STATION

ALTERNATE INDICATIVE RETURN PIPELINE ROUTE

(INDICATIVE)DELIVERY PIPELINE

7798000 m

N7798000 m

N

ALTERNATE INDICATIVE DELIVERY PIPELINE ROUTE

LAYDOWN AREASITE OFFICE AND

SOIL STOCKPILE AREA

Page 4: Abbot Point Growth Gateway Project - Environmental Impact ... · 16/07/2015 16/07/2015 drawing number check drafting rev drawn engineer project mgr approved check engineering orig

-17.0

-18.0

-17.5

-18.5

-16.5

-16.0

-15.5

-15.0

-16.0

-17.0

-18.0

-17.5

-17.5

-18.0

-18.5

-17.5

C.Livingstone

DRAWING NUMBER

CHECK

DRAFTING

REV

DRAWN

ENGINEER

PROJECT MGR

APPROVED

CHECK

ENGINEERING

DATUM

NOTES

REV DATE AMENDMENT

APP

DRN

CJL

ORIG SIZE

A1 ARCHIVE

MAP GRID OF AUSTRALIA BASED ON GDA 94, ZONE 55

VERTICAL

HORIZONTAL BebbCart

CLIENT

PROJECT

TITLE

A

T0-01

T0-11

T0-10

T0-09

T0-08

T0-07

T0-06

T0-05

T0-04

-18.5m LAT

DESIGN

-21.0m LAT

DESIGN

500

RPOINT

T0-11

T0-10

T0-09

T0-08

T0-07

T0-06

T0-05

T0-04

T0-03

T0-02

T0-01

-18.5

-18.5

-18.5

-18.5

-21.0

-21.0

-21.0

-21.0

-18.5

-18.5

-18.5

RL (m LAT)

SETOUT POINTS

615021.0

614538.0

614224.0

614154.0

614150.0

614193.0

615075.0

615123.0

615131.0

615741.0

615341.9

7804004.0

7803916.0

7804024.0

7803822.0

7803811.0

7803722.0

7803417.0

7803475.0

7803486.0

7804237.6

7804271.0

EASTING (m)NORTHING (m)

LAT BASED ON PM 66022 (RL 8.740m LAT)

A

B

C

D

E

SCALE 1 : 2500

50 0 200

METRES

BMT JFA-275_03-01-01B.DGN

23/06/15

14/07/2015

14/07/2015

7803500 mN 7803500 mN

7804000 mN 7804000 mN

614000 m

E614000 m

E

614500 m

E614500 m

E

615000 m

E615000 m

E

615500 m

E615500 m

E

1029.4m

T0-03

BMT JFA 275.03-01-01

933.2m

70.4

m

T0-02

1056.9

m

213.8

m

SETOUT

T0 DREDGING

349.3m

B

LAT

MLWS

MLWN

MSL

MHWN

MHWS

HAT

0.00m

0.67m

1.30m

1.69m

2.07m

2.70m

3.60m

DEPARTMENT OF STATE DEVELOPMENT

ABBOT POINT GROWTH GATEWAY

INITIAL ISSUE

H.Sunarko

14/07/2015

G.Bebbington

T.Green

CJLB ISSUED FOR APPROVAL

1.

2.ALL DESIGN BATTERS ARE 1:5

3.DREDGE SETOUT FROM ADANI DRG. BRM202-DW-MN-GEN-0002 REV2

4.

5.LOCATION OF EXISTING FEATURES TO BE CONFIRMED ON SITE

6.NO BOX CUTS PERMITTED FOR BATTER BETWEEN T0-05 to T0-06

(REFER DRG No. BMT JFA 275.03-03-01 FOR MORE DETAILS)

HYDROGRAPHIC CONTOURS (0.5m INTERVAL) FROM COMBINED SURVEY

01-02

01-02

01-02

01-02

01-02

ISSUED FOR APPROVAL

NOT FOR CONSTRUCTION

DREDGING & DREDGED MATERIAL PLACEMENTSPECIFICATION (Contract No. DSD-3221-15a)

DRAWINGS TO BE READ IN CONJUNCTION WITH THE TECHNICAL

14/07/15

(QUEENSLAND TIDE TABLES 2015)

ABBOT POINT

TIDAL PLANES

14/07/2015