Experience Delivering Similar Systems. ABB Power Market Experience. Power Markets. North America. Europe. Asia. Australasia. South America. Africa. Pool Scheduling Systems Major ISO Systems. ABB Power Markets: North America. (EMS). ABB Power Markets: North America. California ISO: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ABB Power Market Experience

Copyright © ABB 2006

ABB Power Market Experience

Experience

Delivering Similar Systems

Page 2: ABB Power Market Experience

Copyright © ABB 2006

North America

AfricaSouth America

Pool Scheduling Systems

Major ISO Systems

AsiaEurope

Power Markets

Australasia

Page 3: ABB Power Market Experience

Copyright © ABB 2006

ABB Power Markets: North America

(EMS)

Page 4: ABB Power Market Experience

Copyright © ABB 2006

California ISO:

Eight Years Operation

Ontario IESO:

Five Years

Operation

New York ISO:

Five years

Operation

ABB Power Markets: North America

Page 5: ABB Power Market Experience

Copyright © ABB 2006

Contract SignedMarch 1997

Systems ShippedSeptember 1997

Systems OnlineMarch 1998

Combined ABB Market System and EMS System

New real-time market went online October 1st 2004

Page 6: ABB Power Market Experience

Copyright © ABB 2006

Page 7: ABB Power Market Experience

Copyright © ABB 2006

Jan Apr Jul Oct Jan

19981997

Feb Mar May Jun Aug Sep Nov Dec

6+ Month Development

Extended Testing & VerificationExtended Testing & Verification

SA/SI/BBS Dry Runs BeginSA/SI/BBS Dry Runs Begin

PMS Dry Runs BeginPMS Dry Runs Begin

PMS Factory Acceptance TestPMS Factory Acceptance Test

SA/SI/BBS Contract SignedSA/SI/BBS Contract Signed

PMS Contract SignedPMS Contract Signed

7+ Month Development

1998

Feb Mar

ISO OperationalISO Operational

Apr

Page 8: ABB Power Market Experience

Copyright © ABB 2006

IESO Ontario (Canada) Power Market Design

• New EMS

• Look-ahead in R/T market

• PASA (

• Direct message exchange with generators

• New State Estimator

• Multi-Interval Optimization (2004)

• Enhanced real-time market online June 23rd 2004

Page 9: ABB Power Market Experience

Copyright © ABB 2006

Ontario (Canada) Power Market System

First operational in May 2001

Significant changes implemented:

• New EMS Replacement for old DAX system

• Look-ahead in R/T market

• PASA (predicted adequacy assessment)

• Direct message exchange with generators

• New State Estimator

• Multi-Interval Optimization (2004)

• Enhanced real-time market online June 23rd 2004

Page 10: ABB Power Market Experience

Copyright © ABB 2006

Partnership Master Agreement Signed August 1995

Systems Deliveries commenced in 1996

NYPP Converted to NY ISO in November 1999

Significant changes implemented: SCUC, look-ahead AGC, 5-min Real Time Market

Major market redesign project started in 2003

New SMD Market in live operation since January 2005

Page 11: ABB Power Market Experience

Copyright © ABB 2006

NYSIO Market Design

Very close to FERC SMD:

• Signed August 1995• Systems Deliveries • commenced in 1996• NYPP Converted to NY ISO in November 1999• Significant changes implemented: SCUC, look-ahead AGC, • 5-min Real Time Market• Major market redesign project started in 2003

• New SMD Market in live operation since January 2005

Page 12: ABB Power Market Experience

Copyright © ABB 2006

Transmissionconstraint

Market regionin which pricescorrelate

Nordic/Baltic

Mittel

Iberia

FRANCE

NorthwestEurope

RUSSIA

FINLAND

AUSTRIA

ITALYSPAIN

SWEDEN

NORWAY

GERMANY

HUNGARY

ROMANIA

BULGARIA

TURKEY

DENMARK

POLAND

BELARUS

UKRAINE

UK

CZECH REP.

SLOVAKIA

GREECE

BELGIUM

IRELAND

SERBIA

ALBANIA

MOLDOVA

LITHUANIA

LATVIA

ESTONIA

LUX.

MONTENEGRO

BOSNIA

CROATIA

SLOVENIASwitz

MACEDONIA

Britannica

Stattnet:

NordPool Market

Endesa:

OMEL (Spanish) Market

RWEnet:

RWEnet (German) Market

TERNA:

Italian Market

National Grid:

Original UK Market

ABB in European Power Markets

Page 13: ABB Power Market Experience

Copyright © ABB 2006

UK GM Pool

ABB Scheduling Scheduling

Software

Scheduling

SETTLEMENT UNCONSTRAINED

RUNS

CONSTRAINED RUNS

Generator Data

Load Data

Regional Electricity

Company Data

Constraint Data

Energy Settlements Info. Services

POWER SYSTEM PRODUCTION

NGC System Scheduling

Pool Commercial Operation

Generators & RECS

Plant Availability

Assessment

Transmission Network Studies

Scheduling & Dispatch

System Development

Asset Management

Inp

ut

Pro

c.

Ou

tpu

t P

roc.

Settlement

Ou

tpu

t P

roc.

Inp

ut

Pro

c

ABB Scheduling

Software

First site in world to use “SCUC”, developed by ABB in 1998

Page 14: ABB Power Market Experience

Copyright © ABB 2006

ABB and Asian Power Markets

Page 15: ABB Power Market Experience

Copyright © ABB 2006

시스템구성 : 계층구조

The KPX MOS Project Contract signed

January 2002

Systems delivered August 2002

Site testing finished October 2003

Market Dry Run complete 2003

Acceptance Certificate Issued 2003

Live Market will commence this year

Page 16: ABB Power Market Experience

Copyright © ABB 2006

시스템구성 : 계층구조

The KPX Market Design

Korean Market Design:

Contract signed

January 2002

Systems delivered August 2002

Site testing finished October 2003

Market Dry Run complete 2003

Acceptance Certificate Issued 2003

Live Market will commence this year

Page 17: ABB Power Market Experience

Copyright © ABB 2006

KPX MOS Deliverables

Primary MOS Backup MOS Interface to 3rd Party EMS PSSA /market training system Development system

“Technology Transfer” to local partner KDN

Acceptance Certificate issued by KPX 2003 Now under maintenance contract

Page 18: ABB Power Market Experience

Copyright © ABB 2006

North America

AfricaSouth America

Pool Scheduling Systems

Major ISO Systems

AsiaEurope

Power Markets

Australia

East China

Page 19: ABB Power Market Experience

Copyright © ABB 2006

East China Grid Company

Contract Signing March 2003

Page 20: ABB Power Market Experience

Copyright © ABB 2006

East China Grid Company

Contract Signed: March 2003

Integrated ABB EMS/MOS

Phase 1 Market Opening Ceremony May 2004

Simulated Day-Ahead Market in Operation

System Take Over Certificate March 2006

Total System Size 2006: 100,000 MW peak load

Page 21: ABB Power Market Experience

Copyright © ABB 2006

North America

AfricaSouth America

Pool Scheduling Systems

Major ISO Systems

AsiaEurope

Power Markets

Australia

Philippines

Page 22: ABB Power Market Experience

Copyright © ABB 2006

PHILIPPINES Wholesale Electricity Spot Market

Contract Signing February 2004

Page 23: ABB Power Market Experience

Copyright © ABB 2006

PHILIPPINES

Contract signed February 2004

Dev system delivered April 2004

FAT completed November 2004

SAT completed Manila 02/05

1-yr Market Readiness Trials

Market in Live Operation since

June 2006

First full-scale multi-commodity

power market in Asia

Page 24: ABB Power Market Experience

Copyright © ABB 2006

PHILIPPINESMarket Design:

Hourly market with nodal pricing for generation and zonal pricing for consumption

Week-Ahead, Day-Ahead, and Real-Time markets for energy and ancillary services

Financial transmission rights Web-based infrastructure for bid/offer

submission by market participants Prudential risk analysis Direct interface with EMS for exchange of

market and grid data Advanced applications to perform

dispatch and compute resulting MCPs Meter data aggregation, settlements and

invoice generation Direct EFT interfaces with local banks, full

accounting functionality for WESM

Page 25: ABB Power Market Experience

Copyright © ABB 2006

PHILIPPINES

Systems Characteristics:

Primary System

Market Interface, Market Applications, Settlements, FTs, FTRs, Metering system (all ABB)

Backup Site Interface to existing GE EMS

Market simulation system Development system

Page 26: ABB Power Market Experience

Copyright © ABB 2006

PHILIPPINES Wholesale Electricity Spot Market

Market Go-Live June 23rd 2006

Page 27: ABB Power Market Experience

Copyright © ABB 2006

North America

AfricaSouth America

Pool Scheduling Systems

Major ISO Systems

AsiaEurope

Power Markets

Australia

Western Australia

Page 28: ABB Power Market Experience

Copyright © ABB 2006

Western Australia Wholesale Electricity Market

Page 29: ABB Power Market Experience

Copyright © ABB 2006

Western Australia: Market Design

Web-based infrastructure for bid/offer submission by market participants

Prudential risk analysis Direct interface with the

System Manager (EMS) for exchange of market and electric network data

Advanced applications to perform the dispatch and compute the resulting MCPs

Meter data aggregation and settlements and invoices creation

Direct interfaces with local banks for EFT through AUSTRACLEAR

Page 30: ABB Power Market Experience

Copyright © ABB 2006

Western Australia Wholesale Electricity Market

Contract Signing August 2005

Page 31: ABB Power Market Experience

Copyright © ABB 2006

Western Australia Wholesale Electricity Market

Contract signed August 2005

Market Interface, Market Applications, Settlements

FAT December 2005 Shipped in 5 months SATJan-March 2006 Market Trials

Complete August 2006 Market Live Operation

September 2006 Live 13 months AOC

Page 32: ABB Power Market Experience

Copyright © ABB 2006

North America

AfricaSouth America

Pool Scheduling Systems

Major ISO Systems

AsiaEurope

Power Markets

Australia

Ireland

2007

Page 33: ABB Power Market Experience

Copyright © ABB 2006Contract Signing April 2006

Ireland Single Electricity Market

Page 34: ABB Power Market Experience

Copyright © ABB 2006

Ireland SEM Market Design

Single Electricity Market for whole Island – two countries, two currencies

Dual, interconnected computer systems in Dublin and Belfast to support internet power trading, financial settlements, energy dispatch and grid security

Will be Etc

Page 35: ABB Power Market Experience

Copyright © ABB 2006

Ireland Single Electricity Market

Contract award to ABB April 2006 Prime Contract for all hardware and

software infrastructure Systems development in Santa Clara

May – November 2006 FAT in Santa Clara December 2006 Systems will ship to Dublin and

Belfast in February 2006 Five month site testing and market

trials Market will open July 2007 Will be the most advanced electricity

market system in Europe

Page 36: ABB Power Market Experience

Copyright © ABB 2006

Texas Nodal Market Operations

Next Project:

ABB has been selected by ERCOT to replace the Areva Market Systems in the new $200m Texas Nodal (LMP) Market

Project is just starting

Page 37: ABB Power Market Experience

Copyright © ABB 2006

Texas Nodal Market Operations

Market Design:

Congestion Revenue Rights (PTP Options, Obligations, Flowgates) Day-Ahead Energy and Ancillary Services Co-optimized Market Daily Reliability Unit Commitment (DRUC) Hourly Reliability Unit Commitment (HRUC) Security Constrained Economic Dispatch every 5 minutes 15 minute settlement Resource-Specific Offers, Congestion management resource-

specific Actual Shift Factors for Resources Nodal Locational Marginal Prices (LMP) for Generation Zonal weighted LMPs for Loads

Page 38: ABB Power Market Experience

Copyright © ABB 2006

Robb PikeSupervisor, SMD2

New York ISO3890 Carman Road

Schenectady, NY 12303

518-356-6156

Cao Mao ShengProject Manager

State Power East China

201 Nanjing Road East

Shanghai, China

021-6329-0000-2473

Greg FordVP, Market

OperationsCalifornia ISO

151 Blue Ravine Rd

Folsom California

916-351-2344

Bill LimbrickCIO

Ontario IESOStation A, Box

4474Toronto

ON M5W 4E5Canada

905-403-6923

Kim Ib-KyungGeneral Manager

IT DepartmentKorea Power

Exchange167 Samsung-

DongSeoul Korea

82-2-3456-6590

Lasse HolopainenVice President

Market OperationsPhilippines WESM9th Flr Robinsons

TowerADB Ave, Ortigas

Center Pasig City

Philippines

632-631-8734

ABB Market Operations References

Jonathan O’SullivanProject Director

ESB National GridAll Ireland Electricity

Market27 Lower Fitzwilliam

StreetDublin 2, Ireland

353-676-5831

Ms. Dora GuzelevaManager, MarketAdministration

Western Australia IMO

Level 22, 221, St George’s

TerracePerth, WA – 6000

61-8-9420-5617