a:b: sill platesgirders #1 heavy beams that support the inner ends of the floor joists are called?...
TRANSCRIPT
A: B:Sill Plates Girders
#1Heavy beams that support the inner ends
of the floor joists are called?
C: D:Subflooring bridging
Girders
A: B:post stud
#2what is a vertical upright framing member thatgoes from the bottom plate to the top plate?
C: D:joist vertex
stud
A: B:underlayment rafters
#3The subfloor is nailed to the________?
C: D:joist foundation
Joist
A: B:Framing Square Try square
#4Tool used for laying out wall plates.
C: D:hammer Circular saw
Framing Square
A: B:Benchmark seat
#5A recess in a foundation wall to support a girder
is called a _______________
C: D:casement pocket
A: B:mason carpenter
#6It is usually the responsibility of the _______
to lay out building lines
C: D:architect Foundation inspector
carpenter
A: B:Balloon frame Platform frame
#7The most widely used framing method in
residential construction is
C: D:Post and beam Random plank
Platform frame
A: B:Floor joists Sill plate
#8Anchor bolts are used to attach_________
to the foundation.
C: D:girder A,B, and C
Sill plate
A: B:16” O.C. 18”O.C.
In conventional framing floor joists are usually placed ________
C: D:Prior to the Girder Below the sill plate
16”O.C.
A: B:Crown down Crown up
#10Joists are installed with the
C: D:Lap-spiked together over the sill plate
A and B
Crown up
A: B:Sole plate Top plate
#11The bottom horizontal member
of a wall frame is called the______?
C: D:Double plate Sill plate
Sole plate or bottom plate
A: B:braces trimmers
#12Shortened studs that carry the
weight of the header are called_________ ?
C: D:Cripple Corner posts
trimmers
A: B:Vary their spacing between 8” and 10”
Mark their location on the sill plate.
#13When laying out studs__________.
C: D:Keep the studs directly in line with joists below.
A.B. And C.
Keep them directly in
line with the joists below
A: B:Speed square kitchen
#14 Rafter tables come in booklet form
and are also stamped on the ____________.
C: D:Framing square Floor plan
Framing square
A: B:6 and 12 6 and 14
#15laying out and stepping off a hip rafter
with a 6”slope you would hold ____________on the framing square.
C: D:6 and 17 6 and 24
6 and 17
Great Job!!!!Great Job!!!!
Thank you for playing!Thank you for playing!