aashtoware bridge design & rating r eports t echnical a dvisory g roup (rtag)
DESCRIPTION
2013 Design Rating User Group Presentation Virginia Beach, Virginia August 8, 2013. AASHTOWARE BRIDGE DESIGN & RATING R EPORTS T ECHNICAL A DVISORY G ROUP (RTAG). Purpose/Goal. RTAG MEMBERS. Rtag Resources. Schedule. Have the recommendations passed through TF - PowerPoint PPT PresentationTRANSCRIPT
AASHTOWARE BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP
(RTAG)
2013 Design Rating User Group Presentation
Virginia Beach, VirginiaAugust 8, 2013
PURPOSE/GOAL
Produce reports/results in AASHTOWare Bridge Design
and Rating Programs to satisfy Users’ needs
RTAG MEMBERS
1 Beckie Curtis Michigan DOT2 Cindy Wang Ohio DOT3 Arthur D’Andrea Louisiana DOT4 Todd Thompson South Dakota
DOT5 Paul Campisi New York State
DOT6 Jeff Olsen Montana DOT7 Amjad Waheed Ohio DOT
RTAG RESOURCES
RTAG
BrDR Users
BrDR RTAG
Members
Enhancement List
Baker Corporati
on
Support of Task Force
SCHEDULE
Have the recommendations passed through TF
Proposed Start of Implementation in FY 2014 Plan
APPROACHProduce standardized reports to meet users’
demandsGet feedback from the users
Evaluate BETA TAG Enhancement requestsEvaluate reports currently available in Design and
Rating
REPORT ENHANCEMENT REQUESTSIncident Benefits Disposition
2711 Both
Bridge ID, Bridge Alternate, Structure ID , Structure Alternate, Member ID and Member Alternate shall be entered on all reports. A summary report for all current and existing members shall be generated.
3205 Opis
One comprehensive report that contains input and output shall be created. Opis shall keep the last analysis results but as soon as an input value is changed, it should either indicate that the input has changed or previous analysis results are deleted.
5797 OpisSub Add tabular report navigation5830 OpisSub Include Wind data in the report input section
REPORT ENHANCEMENT REQUESTSIncident Benefits Disposition
6269 OpisSubInclude girder reactions eccentricity in live load reaction output
7471 Opis Generate flexure and shear analysis summary for RC members
7976 VirtisInclude columns that state single lane, multilane, without impact and with full impact forces
8120 Opis
Include forces at field splice locations for splice design; capacity and design ratios for steel; vertical and interface shear; longitudinal reinforcement at tenth points and at points of section change
8204 Virtis Generate LRFR report and add in the drop down menu
REPORT ENHANCEMENT REQUESTSIncident Benefits Disposition
8443 Opis
In the RC slab report display deflection up to 4 decimal points everywhere; provide deflection due to sacrificial wearing surface separate; no BRASS related enhancements; separate dead load forces and deflections
8513 Opis Dead loads on Superload shall be calculated in the report
8894 BothNeed control to sort our reports by bridge ID, year or bridge name
10481 Both Generate analysis results in tabular form
11050 Virtis
Controlling member be added in the rating results from Bridge Explorer along with material type, girder type, impact factor and controlling point location. User shall be able to select the columns to be shown
REPORT ENHANCEMENT REQUESTSIncident Benefits Disposition
11219 Virtis
Generate an LFD report for Girder-Floor beam-Stringers; option to ignore spec checks at certain locations for rating purpose; It will leave a note that the spec. check has been over-ruled at this location by the user ABC.
11232 BothCreate a single file that contains input as well as output for QA/QC purpose.
11815 Virtis Report DC & DW separately
11995 BothFor culverts, summaries moments, shears and axial loads for various members
12559 Opis Provide a Service I line to LRFD output graph screen
REPORTS CURRENTLY AVAILABLE *
1. Analysis Results window (for printing only)
a) Rating Results Summaryb) Dead Load Actionsc) Live Load Actionsd) LFD Critical Loadse) LRFD Critical Loadsf) Steel Limit State Summaryg) Concrete Limit State Summary
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
2. Report Toola) Bridge Explorer Report (XML or
Crystal Report)b) BWS Report (XML or Crystal
Report)c) LFD Analysis Output (XML)d) LRFD Analysis Output (XML)e) LRFR Analysis Output (XML)
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
3. Spec-Check Report for spec articles (XML)
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
4. Engine Output (Analysis Output window)
a. AASHTO Truss EngineI. Dead Load Analysis (XML)II. Live Load Analysis (XML)III. Live Load Analysis Impact (TXT)IV. Member Section Property Report
(XML)V. Rating Results Report (XML)
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
4. Engine Output (Analysis Output window)
a. AASHTO Truss EngineVI. Panel Point Maximum Forces
Report (XML)VII. Panel Point Concurrent Forces
Report (XML)
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
4. Engine Output (Analysis Output window)
b. AASHTO Enginei. Dead Load Analysis (XML)ii. Live Load Analysis (XML)iii. Spec Check Results (XML)iv. Beam Capacity Report (XML)v. Service II Stress Ranges (XML)vi. Fatigue Stress Ranges (XML)
* List provided by Baker Corp.
REPORTS CURRENTLY AVAILABLE *
4. Engine Output (Analysis Output window)
c. AASHTO CulvertDetail and Summary Outputs (TXT)
* List provided by Baker Corp.
REPORT TAG WISH LIST1. Bridge ID/Bridge Alternate/Structure
ID/Structure Alternate in the header2. PDF version of reports3. Create a summary of load ratings of all
current and existing “Bridge Alternates”
4. Create a comprehensive report of all bridge inputs and outputs to recreate a bridge data file from the report
REPORT TAG WISH LIST5. A report to echo all the input
parameters comprehensive enough to re-create a bridge data file (Enhance BWS Report)
6. List dead loads in separate columns (e.g., DC & DW)
7. Make detailed reports available at Bridge Explorer level too
8. Provide a list of report parts at one place to create a la carte reports (“smart reports”)
REPORT TAG WISH LIST9. Comprehensive report at Bridge
Explorer Level10. Provide Spec. Check Report11. Provide all essential cross-section
properties at critical points12. Summarize moments/shear/axial
forces for various components13. Option to upload a logo file
(jpg/png/gif) for report headers
REPORT TOOL IN BR-DR
VEHICLE RATING SUMMARYShow only
controlling load for LFR
SPECIFICATION CHECK VIEWER FILTER
EXAMPLE OF REPORTS LIST
Marlin-dash
BARS-PC OUTPUT
BARS-PC OUTPUT
BRR REPORT SAMPLE
BRR REPORT SAMPLEClarify if LL DF
has been applied or not
Give breakdown of Impact forces for Moment and shear
CULVERT DETAIL OUTPUT
EXAMPLE OF BRIDGE RATING SUMMARY
Br-Rating
EXAMPLE OF BRIDGE RATING SUMMARYBasic Information
about bridge
EXAMPLE OF BRIDGE RATING SUMMARYGeneral
Information about Load rating
Br-Rating
EXAMPLE OF BRIDGE RATING SUMMARY
Load Rater’s Information
EXAMPLE OF BRIDGE RATING SUMMARYLoad Rating Summary
Load Restriction Recommendations
(optional)
EXAMPLE OF BRIDGE RATING SUMMARY
Mississippi DOT
EXAMPLE OF BRIDGE RATING SUMMARY
Mississippi DOT
CURRENT STATUS
Started in FY 2013• Work in progress
Challenges• Have recommendations in on time• Have Scope of Enhancements finalized• Cost Estimate• Competing with other priority items on
work plan• Mockups for TAG