aashto t 18 bridge management evaluation and rehabilitation · pdf fileaashto t‐18 bridge...
TRANSCRIPT
![Page 1: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/1.jpg)
AASHTO T‐18 BRIDGE MANAGEMENT ,
EVALUATION AND REHABILITATION
Idaho Transportation DepartmentMatt Farrar
![Page 2: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/2.jpg)
Introduction• Matt Farrar
– State Bridge Engineer
– Responsibilities include
• Bridge Design and Construction Support• Bridge Management, Planning and Programming
– AASHTO SCOBS T‐18 Bridge Management, Evaluation, and Rehabilitation‐ Chairman
![Page 3: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/3.jpg)
T – 18 Update• What is T‐18?• AASHTO SCOBS• Subcommittee on Bridges and Structures• 20 Technical Committees• T‐18 is the Technical Committee for Bridge Management, Evaluation, and Rehabilitation
• T‐9 is the Technical Committee for Bridge Preservation
• T‐14 is the Technical Committee for Steel Bridges
![Page 4: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/4.jpg)
T – 18 Update (Continued)
• T‐18 Responsibilities
–Maintain and Update the Manual for Bridge Evaluation (MBE)
–Maintain and Update the NEW Manual for Bridge Element Inspection
![Page 5: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/5.jpg)
T – 18 Update (Continued)
![Page 6: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/6.jpg)
T – 18 Update (Continued)Manual for Bridge Evaluation
![Page 7: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/7.jpg)
T – 18 Update (Continued)
• Revised MBE SECTION 1 – INTRODUCTION
– Reorganization– No Commentary
– “Provisions to support
the NBIS
Requirements”
![Page 8: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/8.jpg)
T – 18 Update (Continued)Ballot Item ‐ Revisions to MBE Sections 1 Introduction
… The purpose of the Manual for Bridge Evaluation (MBE) is to serve as a resource for use in developing specific policy and procedures for the inspection and evaluation of existing highway bridges.
… The MBE is incorporated by reference in the CFR (23 CFR 650 Subpart C)
… Throughout this Manual there are subsections titled in part “ Provisions to support the NBIS Requirements”. These subsections were developed to provide specific guidance and best practices which are considered to be required under the regulations.
![Page 9: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/9.jpg)
T – 18 Update (Continued)Article 1.4.1- PROVISIONS TO SUPPORT THE NBIS REQURIEMENTS
A quality control and quality assurance (QC/QA) program is to include periodic field review of inspection teams, periodic bridge inspection refresher training for program managers and team leaders, QC/QA measures for inventory data, and independent review of inspection reports and computations. The bridge inspection Program Manager is responsible to develop a QC/QA program that generally conforms to the provisions of Section 1.4. Specific details are to be determined by the Bridge Inspection Program Manager.
![Page 10: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/10.jpg)
T – 18 Update (Continued)
• Revised MBE SECTION 2 – BRIDGE FILES (RECORDS)
– Reorganization – No Commentary
– “Provisions to support
the NBIS Requirements”
![Page 11: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/11.jpg)
T – 18 Update (Continued)Ballot Item ‐ Revisions to MBE Sections 2 ‐ Bridge Files and Documentation2.0—INTRODUCTION… The bridge file provides information that directly relates to requirements of the National Bridge Inspection Standards (Article 2.1) and other supplemental information that bridge owners may find useful in managing bridges (Article 2.2).2.1—PROVISIONS TO SUPPORT THE NBIS REQUIREMENTS… Throughout this Manual there are subsections titled in part “ Provisions to support the NBIS Requirements”. These subsections were developed to provide specific guidance and best practices which are considered to be required under the regulations.
![Page 12: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/12.jpg)
T – 18 Update (Continued)Ballot Item ‐ Revisions to MBE Sections 2 ‐ Bridge Files and Documentation2.1—PROVISIONS TO SUPPORT THE NBIS REQUIREMENTS
2.1.1 General File Information
2.1.2 Field Inspection Information
2.1.3 Critical Findings and Actions Taken
2.1.4 Waterway Information
2.1.5 Significant Correspondence
2.1.6 Other Inspection Procedures and Requirements
2.1.7 Load Rating Documentation
2.1.8 Posting Documentation
2.1.9 Scour Assessment
2.1.10 Scour Plan of Action
![Page 13: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/13.jpg)
T – 18 Update (Continued)Ballot Item ‐ Revisions to MBE Sections 2 ‐ Bridge Files and Documentation2.2—SUPPLEMENTAL DOCUMENTATION IN BRIDGE FILE
2.2.1 General
2.2.2 Plans and Drawings
2.2.3 Construction Documentation
2.2.4 Original Design Documentation
2.2.5 Unique Considerations
2.2.6 Utilities and Attachments
2.2.7 Maintenance and Repair History
2.2.8 Additional Waterway Documentation
2.2.9 Traffic Data
![Page 14: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/14.jpg)
T – 18 Update (Continued)
• MBE SECTION 6 – LOAD RATING
– New Gusset Plate Rating Provisions
– New Gusset Plate Analysis Example
![Page 15: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/15.jpg)
T – 18 Update (Continued)New Gusset Plate Rating Provisions
• Guidance on Section Loss due to Corrosion
• Tension Members Reduced Net Area
• Compression Members Uniform and Localized Corrosion
-1/4 inch -1/2 inch -3/4 inch
-1/4 inch
-1/2 inch
![Page 16: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/16.jpg)
T – 18 Update (Continued) New Gusset Plate Rating Provisions
1. Revised variables for shear resistance, Ω (shear reduction factor) and vy (resistance factor for shear yeilding)
2. New provisions for compression resistance, revised Whitmore Width derived from 30 degree angles and Lmid
30°
30°
Whitmore Width
Lmid
![Page 17: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/17.jpg)
T – 18 Update (Continued) New Gusset Plate Rating Provisions
3. New resistance factor for block shear
4. New tension and compression chord splice checks
5. Based on reliability of factor ß of 3.5 for Inventory Rating and 2.5 for Operating Rating
![Page 18: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/18.jpg)
T – 18 Update (Continued) New Gusset Plate Rating Provisions
3. In general, FHWA has indicated re‐rating won’t be required unless there is a change in condition or load.
4. Very compact gussets in compression may have less capacity, although this aspect does not usually control truss capacity, inmy opinion.
5. May see increases in shear yielding and block shear rupture capacities if FHWA guidance was followed
![Page 19: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/19.jpg)
T – 18 Update (Continued)• Other 2013 Manual for Bridge Evaluation Ballot Items (…continued)– Various ballot items to clarify examples, application of distribution factors and load factors
– Ballot item to clarify application of live load factors on buried structures
![Page 20: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/20.jpg)
T – 18 Update (Continued)Major Revisions and Updates to the AASHTO
Guide Manual for Bridge Element Inspection, 1st
Edition
![Page 21: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/21.jpg)
Why Update to the 1st Edition of the AASHTOGuide Manual for Bridge Element Inspection?
• FHWA sponsored training classes “Introduction to Element Level Bridge Inspection”
• Perhaps 5 agencies had begun to implement the new elements
• Comments received have been incorporated into the manual
• Legislation (MAP-21) mandates element level inspection for NHS
T – 18 Update (Continued)
![Page 22: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/22.jpg)
T – 18 Update (Continued)AASHTO GUIDE FOR COMMONLY RECOGNIZED (CoRe) STRUCTURAL ELEMENTS
• AASHTO has Developed a Core Elements to New Elements Data Migrator - FREE
![Page 23: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/23.jpg)
Recap of AASHTO Guide Manual for Bridge Element Inspection, 1st Edition
• Four condition states for all elements.– Follows – Good, Fair, Poor, Serious convention.
• Wearing surfaces separated from deck element.– Deck element units changed to square feet.
• Steel protective coatings separated from steel.
• All smart flags have been incorporated into condition state language.
• New elements for timber trestle and framed/built up tower supports.
T – 18 Update (Continued)
![Page 24: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/24.jpg)
Element TypesNational Bridge Elements (NBE’s)
• Represent the primary structural components of bridges necessary to determine overall condition and safety.
Bridge Management Elements (BME’s)• Elements define secondary bridge components.
Joints, wearing surfaces, protective coatings,etc.
Agency Developed Elements• Supports agency developed elements.
T – 18 Update (Continued)
![Page 25: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/25.jpg)
AASHTO Guide Manual for Bridge Element Inspection, 1st Ed
“Old Element Format”
![Page 26: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/26.jpg)
New AASHTO Manual for Bridge Element InspectionNew Format – The condition state table for each element has been consolidated. The result of this change is a cleaner and easier to read element description.
“Generic labels have been added along with color coding for the condition state titles (Good, Fair, Poor, Severe”
“The defect flags available for any given element have been expanded to include all defined element defects”
![Page 27: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/27.jpg)
New AASHTO Manual for Bridge Element InspectionBridge Management Element
“Generic labels have been added along with color coding for the condition state titles (Good, Fair, Poor, Severe”
“The defect flags available for any given element have been expanded to include all defined element defects”
![Page 28: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/28.jpg)
New AASHTO Manual for Bridge Element Inspection
A number of “Other” Material Elements have been added to capture new materials and unusual materials (FRP, etc.)
![Page 29: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/29.jpg)
New AASHTO Manual for Bridge Element InspectionUpdates of Appendix ,B, C & D
Appendix B – Inspection ExamplesAppendix C – Element GroupingsAppendix D – Materials and Defects
“US Customary UnitsUsed Throughout”
![Page 30: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/30.jpg)
New AASHTO Manual for Bridge Element Inspection
Appendix B –Inspection Examples
Improved Examples including Quantity Bookkeeping
![Page 31: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/31.jpg)
New AASHTO Manual for Bridge Element InspectionUpdates of Appendix A,B, C & DDefect Flags Expanded
“Defect Flags available for any given element have been expanded to include all defined element defects.”
![Page 32: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/32.jpg)
New AASHTO Manual for Bridge Element InspectionAlso in Appendix D -
“Compilation of all defects by material type and condition state descriptions”
![Page 33: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/33.jpg)
New AASHTO Manual for Bridge Element InspectionNew Elements Added “Prestressed Concrete Top Flange
“All prestressed bridge girder top flanges where traffic rides directly on the structural element regardless of the wearing surface or protection system used”
![Page 34: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/34.jpg)
New AASHTO Manual for Bridge Element Inspection1st Edition Substructure Elements and Units
New Substructure Elements and Units
![Page 35: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/35.jpg)
What’s in the future for the T‐18– Revisions to Sec. 4
Inspection – Revisions to Sec. 7 Fatigue
Evaluation– NCHRP 12‐82 Reliability
Based Bridge Inspection Methods
– NCHRP 20‐07 Complex Bridge Inspection Procedures
– NCHRP 20‐68 Advances in Superload Permit Practices
![Page 36: AASHTO T 18 BRIDGE MANAGEMENT EVALUATION AND REHABILITATION · PDF fileAASHTO T‐18 BRIDGE MANAGEMENT , EVALUATION AND REHABILITATION Idaho Transportation Department Matt Farrar](https://reader033.vdocuments.mx/reader033/viewer/2022050916/5a70b26f7f8b9a9d538c34bc/html5/thumbnails/36.jpg)
ConclusionImprovements to the Manual for Bridge Evaluation (MBE) and Manual for Bridge Element Inspection (MBEI) will continue so as to be a more useful tools for bridge inspection and load rating.