aashto-pile
TRANSCRIPT
-
8/10/2019 AASHTO-Pile
1/11
Depth 120 ft N value at toe 50 inputInterval 5 ft outputDivision 24
24 in55 pcf Note
5 ft
5--10 10--15 15--20 20--25 25--30 30--35 35--4021.5 26.5 31.5 36.5 41.5 46.5 51.50.87 0.80 0.74 0.68 0.63 0.57 0.53
32.32 36.7 40.1 42.8 44.8 46.1 46.7 Final Qs = 36.7 76.8 119.6 164.4 210.5 257.3
Total Capacity (Ultimate)-kip = 225.14 265.28 308.12 352.93 399.02 445.75F.S = 2
FINAL FINAL FINAL Total Capacity (Service)-kip 112.57 132.64 154.06 176.46 199.51 222.88
FINAL ANSWER
Use this methodMethod-2qt = 60 Ksf Qt = qt * At
188 Kip
Better not to use this method.Method-1 Ksf qt = 84
(B) Toe resistance- 78
Main Equation Qs = 3.14 * B * yi * Zi * i * zi
Qsi Kip =
yi Effective soil unit weight =zi ith increment of pile length (ft) =
Zi Depth of midpoint of the ith interval (ft) = Load transfer factor of ith interval (ft) =
AASHTO METHOD (1992) Page - 79 Specification for road highway
(A) Skin friction page - 78
B Diameter of pile =
-
8/10/2019 AASHTO-Pile
2/11
40--45 45--50 50--55 55-60 60-65 65-70 70-75 75-80 80-85 85-90 90-95 95-100 100-105 105-110 110-11556.5 61.5 66.5 71.5 76.5 81.5 86.5 91.5 96.5 101.5 106.5 106.5 111.5 116.5 121.50.48 0.44 0.39 0.35 0.31 0.27 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.2546.8 46.2 45.1 43.4 41.3 38.6 37.3 39.5 41.7 43.8 46.0 46.0 48.1 50.3 52.5
304.0 350.2 395.3 438.7 480.0 518.6 555.9 595.4 637.1 680.9 726.9 772.9 821.0 871.3 923.8 kip
492.51 538.72 583.81 627.23 668.49 707.06 744.40 783.91 825.57 869.39 915.38 961.36 1009.50 1059.80 1112.25 kip45.98 48.14 50.30 52.46
246.26 269.36 291.90 313.62 334.24 353.53 372.20 391.95 412.79 434.70 457.69 480.68 504.75 529.90 556.13 kip
196.8845
241.88
-
8/10/2019 AASHTO-Pile
3/11
N SutDepth 120 ft input 0 0Interval 5 ft output 2 0.25Division 24 4 0.5
8 124 in 16 2
16> 25 ft
5--10 10--15 15--20 20--25 25--30 30--35 35--40 40--45
0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.552 2 2 2 1 2 2 2
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.254.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32
4.3 8.6 13.0 17.3 21.6 25.9 30.2F.S 2
7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.077.07 11.38 15.70 20.02 24.34 28.65 32.97 37.29
5.69 7.85 10.01 12.17 14.33 16.49 18.64
Qt/Sut = Nc*At = 28.26Nc = 6.0(1+.2(D/B)) = 9 eq.4.6.5.1.3-2
Qs =3.14*B* *Su*ZiThis values has been
taken from Tank
Load transfer factor of ith interval (ft) =
Sui
Total Capacity (Service)-kip
N Values From Soil Report
Qs Kip
Ultimate capacity of pile
Qsi
B Diameter of pile =
zi ith increment of pile length (ft) =
-
8/10/2019 AASHTO-Pile
4/11
-
8/10/2019 AASHTO-Pile
5/11
-
8/10/2019 AASHTO-Pile
6/11
-
8/10/2019 AASHTO-Pile
7/11
45--50 50--55 55-60 60-65 65-70 70-75 75-80 80-85 85-90 90-95 95-100 100-105 105-110
0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.552 2 2 2 2 2 2 2 2 2 50 50 50
0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00 2.00 2.004.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 34.54 34.54 34.5434.5 38.9 43.2 47.5 51.8 56.1 60.4 64.8 69.1 73.4 107.9 142.5 177.0
7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 56.52 56.52 56.5241.61 45.92 50.24 54.56 58.88 63.19 67.51 71.83 76.15 80.46 164.46 199.00 233.5420.80 22.96 25.12 27.28 29.44 31.60 33.76 35.91 38.07 40.23 82.23 99.50 116.77
-
8/10/2019 AASHTO-Pile
8/11
-
8/10/2019 AASHTO-Pile
9/11
-
8/10/2019 AASHTO-Pile
10/11
-
8/10/2019 AASHTO-Pile
11/11
kip
kipkip