  • 8/10/2019 AASHTO-Pile

    1/11

    Depth 120 ft N value at toe 50 inputInterval 5 ft outputDivision 24

    24 in55 pcf Note

    5 ft

    5--10 10--15 15--20 20--25 25--30 30--35 35--4021.5 26.5 31.5 36.5 41.5 46.5 51.50.87 0.80 0.74 0.68 0.63 0.57 0.53

    32.32 36.7 40.1 42.8 44.8 46.1 46.7 Final Qs = 36.7 76.8 119.6 164.4 210.5 257.3

    Total Capacity (Ultimate)-kip = 225.14 265.28 308.12 352.93 399.02 445.75F.S = 2

    FINAL FINAL FINAL Total Capacity (Service)-kip 112.57 132.64 154.06 176.46 199.51 222.88

    FINAL ANSWER

    Use this methodMethod-2qt = 60 Ksf Qt = qt * At

    188 Kip

    Better not to use this method.Method-1 Ksf qt = 84

    (B) Toe resistance- 78

    Main Equation Qs = 3.14 * B * yi * Zi * i * zi

    Qsi Kip =

    yi Effective soil unit weight =zi ith increment of pile length (ft) =

    Zi Depth of midpoint of the ith interval (ft) = Load transfer factor of ith interval (ft) =

    AASHTO METHOD (1992) Page - 79 Specification for road highway

    (A) Skin friction page - 78

    B Diameter of pile =

  • 8/10/2019 AASHTO-Pile

    2/11

    40--45 45--50 50--55 55-60 60-65 65-70 70-75 75-80 80-85 85-90 90-95 95-100 100-105 105-110 110-11556.5 61.5 66.5 71.5 76.5 81.5 86.5 91.5 96.5 101.5 106.5 106.5 111.5 116.5 121.50.48 0.44 0.39 0.35 0.31 0.27 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.2546.8 46.2 45.1 43.4 41.3 38.6 37.3 39.5 41.7 43.8 46.0 46.0 48.1 50.3 52.5

    304.0 350.2 395.3 438.7 480.0 518.6 555.9 595.4 637.1 680.9 726.9 772.9 821.0 871.3 923.8 kip

    492.51 538.72 583.81 627.23 668.49 707.06 744.40 783.91 825.57 869.39 915.38 961.36 1009.50 1059.80 1112.25 kip45.98 48.14 50.30 52.46

    246.26 269.36 291.90 313.62 334.24 353.53 372.20 391.95 412.79 434.70 457.69 480.68 504.75 529.90 556.13 kip

    196.8845

    241.88

  • 8/10/2019 AASHTO-Pile

    3/11

    N SutDepth 120 ft input 0 0Interval 5 ft output 2 0.25Division 24 4 0.5

    8 124 in 16 2

    16> 25 ft

    5--10 10--15 15--20 20--25 25--30 30--35 35--40 40--45

    0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.552 2 2 2 1 2 2 2

    0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.254.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32

    4.3 8.6 13.0 17.3 21.6 25.9 30.2F.S 2

    7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.077.07 11.38 15.70 20.02 24.34 28.65 32.97 37.29

    5.69 7.85 10.01 12.17 14.33 16.49 18.64

    Qt/Sut = Nc*At = 28.26Nc = 6.0(1+.2(D/B)) = 9 eq.4.6.5.1.3-2

    Qs =3.14*B* *Su*ZiThis values has been

    taken from Tank

    Load transfer factor of ith interval (ft) =

    Sui

    Total Capacity (Service)-kip

    N Values From Soil Report

    Qs Kip

    Ultimate capacity of pile

    Qsi

    B Diameter of pile =

    zi ith increment of pile length (ft) =

  • 8/10/2019 AASHTO-Pile

    4/11

  • 8/10/2019 AASHTO-Pile

    5/11

  • 8/10/2019 AASHTO-Pile

    6/11

  • 8/10/2019 AASHTO-Pile

    7/11

    45--50 50--55 55-60 60-65 65-70 70-75 75-80 80-85 85-90 90-95 95-100 100-105 105-110

    0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.552 2 2 2 2 2 2 2 2 2 50 50 50

    0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 2.00 2.00 2.004.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 4.32 34.54 34.54 34.5434.5 38.9 43.2 47.5 51.8 56.1 60.4 64.8 69.1 73.4 107.9 142.5 177.0

    7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 7.07 56.52 56.52 56.5241.61 45.92 50.24 54.56 58.88 63.19 67.51 71.83 76.15 80.46 164.46 199.00 233.5420.80 22.96 25.12 27.28 29.44 31.60 33.76 35.91 38.07 40.23 82.23 99.50 116.77

  • 8/10/2019 AASHTO-Pile

    8/11

  • 8/10/2019 AASHTO-Pile

    9/11

  • 8/10/2019 AASHTO-Pile

    10/11

  • 8/10/2019 AASHTO-Pile

    11/11

    kip

    kipkip