aae 450 spring 2008 jerald a. balta 3/27/2008 propulsion team/cad final slides
Post on 21-Dec-2015
214 views
TRANSCRIPT
AAE 450 Spring 2008
Jerald A. Balta3/27/2008
Propulsion Team/CADFinal Slides
AAE 450 Spring 2008
Balloon Cost Modifier Balloon Cost Items
– Balloon – Price quote from Aerostar International
– Helium – Priced at $4.87 per cubic meter– Gondola- Constant Price of $13205.30
200g case 1 kg case 5 kg caseBalloon 82,007.00 60,848.00 157,070.00Helium 14,813.00 10,644.00 32,979.00Gondola 13,205.30 13,205.30 13,205.30Total 110,025.30 84,697.30 203,254.30
3<#>
Balloon Cost
AAE 450 Spring 2008
Payload Mass(lbm
Payload Mass(kg Cost
500 226.8 $10,0002000 907.18 $30,0008000 3628.7 $100,000
0
20000
40000
60000
80000
100000
120000
0 1000 2000 3000 4000
Payload Mass (kg)
Cos
t (do
llar)
Cost Trend Equation y = -0.0011x2 + 30.62x +
3111.1 y= Cost x=Balloon Payload
Balloon Model
Free Body Diagram Two forces acting on
Spherical Balloon– Buoyancy Force
• Defined by difference between masses of lifting gas and air multiplied by gravitational constant
– Weight
Buoyancy
Weight
Derivation of Balloon Dimensions
Lifting Coefficient– Ρg is density of lifting
gas
– Ρa is density of air
Boyle’s and Guy Sac laws– Rho is density– P is pressure– T is Temperature
l a gC
l a gC l a gC
0
0 0
TP
P T
Derivation of Balloon Dimensions Continued Combine Equations to
determine lifting coefficient for different heights
Take into account 95% Gas purity and standard excess of 15% lifting gas
Final Equation for Volume of Gas in relation to Mass– V is Volume of lifting gas– M is total Mass
,00
*l lC C
,00
*l lC C
, ,00.85*0.95*l F lC C
, * * *l F TotalC V g M g
Gondola Costs•Structures Cost of $1205.30
•Material•Welding•Riveting
•Avionics Cost of $12000•One Battery•Sensors
Total Gondola Cost of $13,205.30
Provided by Sarah Shoemaker, Structures Group, and Avionics Group
Ground Support and Handling Cost Modifier Handling – Personnel required for handling
of fuels, toxic materials, etc Ground Support – Based on estimation of
salaries of necessary personnel– Assumed $100/hour salary– 6 engineers from all teams and one manager
Cost ModifierStage 1 200g case 1 kg case 5 kg caseHandling 2000 2000 2000Ground Support 14000 14000 14000Total 16000 16000 16000Stage 2Handling 8000 8000 8000Ground Support 14000 14000 14000Total 22000 22000 22000Stage 3Handling 8000 8000 8000Ground Support 14000 14000 14000Total 22000 22000 22000
References Defense Energy Support Center, “MISSILE FUELS STANDARD
PRICES EFFECTIVE 1 OCT 2007,” Aerospace Energy Reference, November 2007
Larson, W.J., Wertz, J.R., "Space Cost Modeling," Space Mission Analysis and Design, 2nd ed., Microcosm, Inc., California and Kluwer Academic Publishers, London, 1992, pp. 715-731.
Smith, Mike, Phone Conversation, Aerostar International, February 15, 2008
Tangren, C.D., "Air Calculating Payload for a Tethered Balloon System," Forest Service Research Note SE-298, U.S. Department of Agriculture - Southeastern Forest Experiment Station, Asheville, North Carolina, August 1980.