a9r1408fa0 145tz2m 3zo - totalweb! lite...despite its foray into other disciplines, muhibbah...

25

Upload: others

Post on 28-Dec-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 2: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 3: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 4: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 5: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 6: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah

Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah is proud to be one of the elite few in this industry to provide a comprehensive, one-stop solution that encompasses its expertise in three distinct sub-divisions:

• Airport, Buildings & Infrastructure• Marine & Port• Oil & Gas

MAJOR RECOGNITIONS INCLUDE:

• ISO 9001:2008 certified (Since 1995)

• ISO 14001:2004 certified (Since 2004)

• OHSAS 18001:2007 certified (Since 2007)

• CIDB International Award 2003 for International Project - Bank of Sudan Complex & Pochentong International Airport

• Best Contractor (<5000 Employees) 2009 - Hamad International Airport, Doha, Qatar

• Safety Award, 11,000,000 Manhour without LTA - Hamad International Airport, Doha, Qatar

• Safety Award 9,000,000 Manhour Without LTA - SKVE Highway Project

• Road Engineering Excellence (REAM) Award 2004 - Seri Wawasan Bridge, Putrajaya

• PAM Architectural Steel Design Award 2004 - Transport Management Centre (TMC), Kuala Lumpur

1 2 3

1. South Klang Valley Expressway

(SKVE), Selangor, Malaysia

2. Petrochemical Jetties and

Related Works for Bulk Liquid

Product Terminal at Jurong Island,

Singapore.

3. Ministry of Transport Headquarters,

Putrajaya, Malaysia.

ENGINEERING AND

CONSTRUCTION

STILL THE GROUP’S

MAINSTAY

ELITE FEW IN

INDUSTRY TO

PROVIDE ONE-

STOP SOLUTIONS

EXPERTISE

IN AIRPORT,

BUILDINGS AND

INFRASTRUCTURE

VAST EXPERIENCE

IN MARINE

AND PORT

ENGINEERING

EXPERTISE IN OIL

& GAS INDUSTRY

SIEM REAP INTERNATIONAL AIRPORT, CAMBODIA KEPPEL TERMINAL, SINGAPORE

UNDERWATER GRP

PIPE LAYING WORKS,

YEMEN

Page 7: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 8: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 9: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 10: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah

Muhibbah Group’s Marine Division provides a substantial list of services that range from building -

nals, Breakwaters and Groynes and Reclamation.

It also provides Port Upgrading Works, Floating Concrete Pontoons, Naval Base, Hydrography Station, Bridge Widening, Oil

Terminals, Concrete Caissons and Inland Lake Dredging.

Northport (Malaysia) Bhd Development of A Multipurpose Wharf and Associated Facilities at

Container Terminal 4 (CT4) as an Extension to Existing Wharf 8 and

Upgrading of Wharf 16

Westports Malaysia Sdn Bhd Construction and Completion of First 300M of CT8 Wharf and

Second 300M of CT8 Wharf, Access Bridges and Associated Works

at Westports, Pulau Indah, Port Klang, Selangor Darul Ehsan

Miri Port Authority Construction and Completion of The Access Road to New Port

Complex at Kuala Baram, Miri Division, Sarawak (Contract No.4)

Tar Macadam road founded on replaced marine clay

Penang Port Berhad Turnkey Project Phase IIA Expansion of North Butterworth Container

Terminal

Pelabuhan Tanjung Pelepas Sdn Bhd The Construction, Completion and Maintenance of Wharf Structure

for Cadangan Pembangunan Pelabuhan Tanjung Pelepas

PSA Corporation Ltd, Singapore Upgrading of Berth K12/13/14 at Keppel Terminal & Dredging Works

PETRONAS EPCIC Alliance for the LNG Regasification unit, Island Berth and

Subsea Pipeline of the LNG Regasification Facilities

TECHNIP (FRANCE/ JGC (JAPAN) Yemen LNG Project – LNG Plant, LNG loading jetty, Water intake/

outfall GRP Pipes Pumping Station and Outfall basin, Electrical

Substation and Navigation Aids

Horizon Singapore Terminal Pte Ltd Bulk Liquid Terminal ( Jetty and related works), Singapore

JTC Corporation, Singapore Offshore Marine Centre, 101, Tuas South Avenue 8, Singapore

1 2

1. WICET GC12 Offshore Marine

Works Jetty and Ship Berth for

Wiggins Island Coal Export

Terminal, (WICET) Gladstone,

Queensland, Australia

2. Container Wharf No. 1, 3 & 4 at

West Port, Selangor, Malaysia.

OFFSHORE MARINE CENTRE, SINGAPORE

Page 11: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 12: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 13: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 14: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 15: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 16: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah

Favelle Favco, a well-known crane manufacturer with over 40 years experience, still continues to lead the industry in crane technology especially in custom-made cranes and high speed heavy lift cranes.

Favelle Favco Berhad was listed on the main board of the Kuala Lumpur Stock Exchange in 2006. Globally, FFC (the manu-

facturer of Favelle Favco cranes and Kroll cranes) is one of the most sought after and trusted crane manufacturers, having

built 9 out of 10 of the world’s tallest buildings.

An important element of sustained growth is research and development. As such, FFC invests considerable resources to

this end. Some examples of FFC’s recent technological advancements include a 1000-ton crane, subsea features and a

concept 2000-ton crane.

OUR PRODUCT RANGE INCLUDES:

• Construction Tower Cranes

• Offshore Pedestal Cranes

• Multipurpose Wharf Cranes

1 2 3

1. Client: Malaysia Marine Heavy

Engineering

Model: PC150 & PC200

Project: Gumusut Kakap

2. 7.5/10K on Jack Up Drilling Rig,

44 Tonne SWL

3. Client: NCC

Model: K130F & K420

Project: Jobsite in Denmark

OVER 40 YEARS

INDUSTRY EXPERIENCE

DIVERSE PRODUCT

RANGE

INVESTMENT IN

RESEARCH &

DEVELOPMENT

LARGEST TOWER

CRANE

CLIENT : JURONG PORT PTE LTD

MODEL : 2XK1203V

PROJECT J

TEST YARD

DECK ASSEMBLY

MACHINERY DECK

FINISHED GOOD AREA

Page 17: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 18: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah

Muhibbah Marine Engineering Sdn Bhd (MME) is a 100% owned subsidiary of Muhibbah Engi-neering (M) Bhd.

MME was incorporated in 1996 and operates as a shipyard to complement Port Klang as a maritime hub in West Malaysia.

It is strategically located at Telok Gong next to South Port in Port Klang, Malaysia. The shipyard has an approximately 850

metres water frontage with depth up to 18 metres.

The yard began its operations constructing barges and tug boats. In the year 2000, MME started building Offshore Support

Vessel for the Oil & Gas Industry. Since then it has built over 60 OSVs, out of which more than 15 of these vessels have

Dynamic Positioning 1 (DP1) and Dynamic Positioning 2 (DP2) capabilities. In 2013, MME delivered a 77m Diesel Electric

Propulsion Platform Supply Vessel, the first ever to be built in Malaysia.

MME’S BUSINESS ACTIVITIES INCLUDE;

• Shipbuilding

• Ship Repair

• Ship Conversion

• Marine Engineering

• Offshore Structure Fabrication

1 2 3

1. Shipyard at Telok Gong,

Klang, Malaysia.

2. JM Cekal

72.8M DP2 Anchor Handling

Tug / Supply Vessel

3. JM Gemilang

62m Anchor Handling Tug Supply

Vessel (AHTS)

STRATEGIC LOCATION

WITH EASY ACCESS TO

STRAITS OF MALACCA

CAPACITY TO BUILD

VESSELS UP TO 120

METRES IN LENGTH

ISO9001: 2008 CERTI-

FIED

BEST AHTS BUILDER

IN 2014

BELAIT BARAKAH - 75M DP2

IDS DARULSSALAM 70M DP2

JM SEPOI 70M DP2

JM GEMILANG 62M DP1

Page 19: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 20: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 21: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 22: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 23: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 24: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah
Page 25: A9R1408fa0 145tz2m 3zo - TotalWEB! Lite...Despite its foray into other disciplines, Muhibbah Group’s mainstay remains within the Construc-tion and Engineering Division. Today, Muhibbah