a275 sheffield green road rev 12.02.16
TRANSCRIPT
A275 Sheffield Green RoadSheffield Park
March 2011
Insitu recycling by
Resurfacing by
Existing carriageway condition prior to start of works
A Scheme 1 mile away was found to contain Tar in the existing carriageway, the planning's were used at
Sheffield Green Road to improve the existing levels . Recycling of Tar bound planning's is one of the few
accepted methods to dispose of tar bound planning's
Spreading of the additional planning's
WRAP and the CSS acknowledge that In-situ recycling is the First choice for dealing with Tar bound materials. MST Recycling Ltd has developed a complete quality protocol uniquely specialised for handling and recycling Tar bound material.
First mix with a Wirtgen Cold recycler
WR 2500 SK
Cutting teeth
After 30 mins work
Grading of planning's and sub-base after first pass of the Wirtgen Cold recycler WR 2500 SK
Spreading of Lime & Cement
Recycling completed. A layer of Bond Coat is applied and then a Bit Grit is spread on top to protect the Bond Coat
and to also allow the area to be trafficked
Bituminous layer 50mm thick of 14mm Superflex 100
Surface course layer
Colbond 50 Hot Applied Bond Coat applied prior to surface course
Completed works Glass Road Stud