APFP Regulation 5(2)(o) and 6(2)
Planning Act 2008
Infrastructure Planning (Applications: Prescribed
Forms and Procedure) Regulations 2009
Volume 2 April 2020
A1 Birtley to Coal House
Scheme Number: TR010031
2.5 Engineering Section Drawings
A1 Birtley to Coal House
Engineering Section Drawings
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
Infrastructure Planning
Planning Act 2008
The Infrastructure Planning (Applications: Prescribed Forms and Procedure - APFP) Regulations 2009
The A1 Birtley to Coal House Development Consent Order 20[xx]
ENGINEERING SECTION DRAWINGS
Regulation Reference: APFP Regulation 5(2)(o) and 6(2)
Planning Inspectorate Scheme Reference
TR010031
Application Document Reference TR010031/APP/2.5
Author: A1 Birtley to Coal House Project Team, Highways England
Version Date Status of Version
Rev 2 20/04/2020 Examination Deadline 4 (Viaduct Options)
A1 Birtley to Coal House
Engineering Section Drawings
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
CONTENTS
1 Introduction ............................................................................................................. 1
1.1 Purpose of this Document ......................................................................................... 1
2 Schedule of Plans included in this Application Document ................................. 3
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
Page 1
A1 Birtley to Coal House
Engineering Section Drawings
1 INTRODUCTION
1.1 Purpose of this Document
1.1.1 The Engineering Section Drawings (the “Drawings”) relate to an application made by Highways England (the "Applicant") to the Secretary of State for Transport under the Planning Act 2008 (the "2008 Act") for a Development Consent Order (DCO). If made, the DCO would grant consent for A1 Birtley to Coal House (the "Scheme"). A detailed description of the Scheme can be found in Chapter 2 of the Environmental Statement (ES) (Application Document Reference: TR010031/APP/6.1).
1.1.2 The drawings have been amended since the previous version by the inclusion of additional land within the Order limits as shown on drawing TRO010031/APP/2.5 (A) to the South of Allerdene Railway Bridge. These drawings also allow the inclusion of additional engineering options within the Order limits as shown on drawing TRO010031/APP/2.5 (A) in relation to the option of narrower lanes on Kingsway Viaduct; and TRO010031/APP/2.5 (B) in respect of a three-span viaduct option for the proposed Allerdene Railway Bridge. The Applicant has submitted a request to the Examining Authority (AS-009) to amend the Order limits to include additional land to be subject to powers of temporary possession that is required for a construction compound and materials stockpile, and to accommodate these additional engineering options. Should the amendments to the application be admitted by the Examining Authority these drawings should be substituted for those shown in the table in Section 2 of this document.
1.1.3 The Drawings comprise part of the suite of Application documentation and are included in the Application in compliance with Regulation 5(2)(o) and 6(2) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, which requires:
“5(2)(o) any other plans, drawings and sections necessary to describe the proposals for which development consent is sought, showing details of design, external appearance and the preferred layout of buildings or structures, drainage, surface water management, means of vehicular and pedestrian access, any car parking to be provided, and means of landscaping;”
“6(2) If the application is for highway related development or for the construction or alteration of a railway, it must be accompanied by section drawings to suitable horizontal and vertical scales which show, by reference to Ordnance Survey or Chart datum:
(a) The levels of the proposed works, including in particular and where relevant
(i) ground levels;
(ii) the height of every proposed bridge, viaduct, aqueduct, embankment, and elevated guideway;
(iii) the depth of every proposed cutting and tunnel;
(iv) the levels of the bed of any tidal waters or inland waterway in which it is proposed that any works should be situated;
(v) the height of every structure or device (including a cable, but not catenary
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
Page 2
A1 Birtley to Coal House
Engineering Section Drawings
and related equipment) intended to be erected above, on or below the surface of, or on or beneath the bed of tidal waters or an inland waterway; and
(vi) drainage outfall details for highways;
(b) A cross section of every intended tunnel and any altered gradient of a carriageway or a way forming part of a guided transport system on either side of every level crossing, bridge, tunnel or underpass which would carry the carriageway or way or through which it would pass.”
1.1.4 These Drawings are also being submitted under Regulation 5(4) of the 2009 Regulations which states:
"Where a plan comprises three or more separate sheets a key plan must be provided showing the relationship between the different sheets."
1.1.5 As the Drawings are part of the Application documentation, they should be read alongside and are informed by the other Application documents. In particular, the Drawings should be read alongside Schedule 1 of the draft Development Consent Order (Application Document Reference: TR010031/APP/3.1), the General Arrangement Plans (Application Document Reference: TR010031/APP/2.6) and the Structures Engineering Drawings and Sections (Application Document Reference: TR010031/APP/2.7).
1.1.6 Following the submission of the Engineering Section Drawings (APP-009) for Deadline 3 (16/03/20), the following amendments have been instigated for Deadline 4. The amendments detailed below have been commissioned by the Applicant following comments received via previous written representation and questions from the Planning Inspectorate and Consultees. The Scheme has also been subject to design changes following technical variations identified by the contractor in accordance with Sections 87(1) and 89 of the Planning Act (2008).
• The key plan has been updated to include an additional area of land within the Order Limits and the option of narrower lanes over the Kingsway Viaduct.
• Sheet 1 has been updated to show the 3-span bridge option.
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
Page 3
A1 Birtley to Coal House
Engineering Section Drawings
2 SCHEDULE OF PLANS INCLUDED IN THIS APPLICATION DOCUMENT
Document Title Document Number Old
Revision New
Revision Change
Engineering Section Drawings – Regulation 5(2)(o), 6(2) & 5(4) – Key Plan
TR010031/APP/2.5(A) Rev 1 Rev 2 Updated to show the additional area of land within the Order Limits and the option of narrower lanes over the Kingsway Viaduct.
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 1 of 9
TR010031/APP/2.5(B) Rev 1 Rev 2 Updated to show the 3-span bridge option.
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 2 of 9
TR010031/APP/2.5(C) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 3 of 9
TR010031/APP/2.5(D) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 4 of 9
TR010031/APP/2.5(E) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 5 of 9
TR010031/APP/2.5(F) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 6 of 9
TR010031/APP/2.5(G) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 7 of 9
TR010031/APP/2.5(H) Rev 1
No change
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.5
Page 4
A1 Birtley to Coal House
Engineering Section Drawings
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 8 of 9
TR010031/APP/2.5(I) Rev 1
No change
Engineering Section Drawings – Regulation 5(2)(o) & 6(2) – Sheet 9 of 9
TR010031/APP/2.5(J) Rev 1
No change
SHEET 1
REFERENCE 1
SHEET 1
REFERENCE 2
SHEET 2
REFERENCE 1
SHEET 2
REFERENCE 2
SHEET 3
REFERENCE 1
SHEET 3
REFERENCE 2
SHEET 4
REFERENCE 1
JUNCTION 66 - EIGHTON LODGE
JUNCTION 67 - COAL HOUSE
SHEET 4
REFERENCE 2
SHEET 7
REFERENCE 1
SHEET 5
REFERENCE 1
SHEET 5
REFERENCE 2
SHEET 6
REFERENCE 1
SHEET 6
REFERENCE 2
SHEET 7
REFERENCE 2
SHEET 8
REFERENCE 1
SHEET 8
REFERENCE 2
SHEET 9
REFERENCE 1
RETAIL WORLD
TEAM VALLEY
LAMESLEY
BIRTLEY
JUNCTION 65
BIRTLEY
A1
A
1
A
1
A
1
A
1
A
1
GATESHEAD
BOROUGH
SUNDERLAND
CITY COUNCIL
JUNCTION 68
LOBLEY HILL
COUNTY DURHAM
UNITARY AUTHORITY
NOTES
1. NO DETAILS HAVE BEEN PROVIDED NORTH OF JUNCTION 67 (COAL HOUSE) AS
THE CARRIAGEWAY IS NOT BEING AMENDED.
2. DO NOT SCALE FROM THIS DRAWING.
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
THE SCHEME (SHOWN FOR ILLUSTRATIVE PURPOSES ONLY)
Suitability Status
TR010031/APP/2.5(A)
Client
WSP Project Number:
PINS Reference Number
Rev. Date
Description By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
S0Work in Progress
70041947 HE551462-WSP-LSI-ZZ-DR-ZL-45000
---PGPGMBFirst Revision28/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
------------28/01/20P05.1
3
A1
1:10000
---
---
---
---
---
---
---
---
P05.1
45000ZLDRZZ
LSIWSPHE551462
KEY PLAN
DRAWINGS
ENGINEERING SECTIONS
A1 BIRTLEY TO COAL HOUSE
Project Title
© Crown Copyright and Database Rights 2020 Ordnance Survey 100030649
0m
SCALE 1:10000
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUE IA IA
2
Application Issue
AW NGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE MB MBJS NGR
20/04/20
n.rawcliffe
20/04/20
m.birkett
20/04/20
m.birkett
20/04/20
a.khaji
2 20/04/20 EXAMINATION DEADLINE 4 UPDATEMB
MBAK NGR
20.744
20.827
20.910
20.993
21.076
21.159
21.242
21.325
21.408
21.491
21.574
21.658
21.776
21.945
22.163
22.432
22.750
23.119
23.519
23.919
24.319
24.719
25.119
25.519
25.915
26.294
26.655
26.997
27.322
27.628
27.916
28.186
28.438
28.672
28.887
29.084
29.263
29.424
29.567
29.691
29.798
29.886
29.956
30.009
30.059
30.109
30.159
30.209
30.259
30.309
30.359
30.409
30.459
30.509
30.559
30.609
30.659
30.709
30.759
30.809
30.859
30.909
30.959
20.654
20.772
20.894
21.012
21.113
21.205
21.304
21.416
21.509
21.599
21.767
21.697
20.663
20.523
20.903
21.349
20.467
18.896
17.760
16.957
16.729
16.755
16.964
16.778
16.801
16.560
16.319
15.650
16.773
16.632
16.802
16.965
17.047
17.233
17.645
17.936
17.829
18.054
18.651
19.020
19.467
19.565
19.664
19.763
19.861
19.701
19.932
20.305
20.393
21.298
21.923
22.858
23.847
25.088
26.079
26.918
27.269
27.513
27.758
28.003
28.247
28.492
28.404
0.089
0.055
0.016
-0.019
-0.037
-0.046
-0.062
-0.091
-0.102
-0.108
-0.194
-0.040
1.114
1.422
1.261
1.082
2.283
4.224
5.759
6.961
7.589
7.964
8.155
8.741
9.113
9.734
10.336
11.348
10.549
10.997
11.115
11.221
11.392
11.438
11.242
11.148
11.435
11.371
10.915
10.671
10.331
10.320
10.292
10.247
10.198
10.409
10.228
9.905
9.866
9.011
8.437
7.551
6.612
5.422
4.480
3.691
3.391
3.196
3.002
2.807
2.612
2.418
2.556
L=281.655m
L=87.523m
L=86.000m
L=86.000m
L=
43.0
00m
R=510.000m
A=43860.0
00 A=43860.000 A=
21930.0
00
æ
G=0.830 G=4.000 G=0.500
L=112.012m L=62.193m L=273.936m
R=2000.000m
R=-5500.000m
L=63.399m
L=192.499m
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:5.000 mAOD
MAINLINE SECTION 2 - Ch10965m TO Ch11600m
LONGITUDINAL SECTION
Southbound Design Speed 85kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
31.009
28.083
2.927
10970.000
10980.000
10990.000
11000.000
11010.000
11020.000
11030.000
11040.000
11050.000
11060.000
11070.000
11080.000
11090.000
11100.000
11110.000
11120.000
11130.000
11140.000
11150.000
11160.000
11170.000
11180.000
11190.000
11200.000
11210.000
11220.000
11230.000
11240.000
11250.000
11260.000
11270.000
11280.000
11290.000
11300.000
11310.000
11320.000
11330.000
11340.000
11350.000
11360.000
11370.000
11380.000
11390.000
11400.000
11410.000
11420.000
11430.000
11440.000
11450.000
11460.000
11470.000
11480.000
11490.000
11500.000
11510.000
11520.000
11530.000
11540.000
11550.000
11560.000
11570.000
11580.000
11590.000
11600.000
PROPOSED CULVERT
STRUCTURE
PROPOSED ALLERDENE
BRIDGE
5.8m MIN. HEADROOM
CU
TLIN
E 2
CU
TLIN
E 1
WORK NUMBER
1a and b
WORK NUMBER 5bWORK NUMBER 20
WORK NUMBER 23
WORK NUMBER
4a and b
WORK NUMBER
4a and 4b
WORK NUMBER 5a
RELATING TO
BLUE HATCH
WORK NUMBER 5a
WORK NUMBER 15
DRAINAGE OUTFALL 8
19.482
19.288
19.101
18.922
18.750
18.586
18.429
18.279
18.137
18.002
17.874
17.754
17.641
17.536
17.438
17.348
17.264
17.189
17.120
17.059
17.005
16.959
16.920
16.889
16.865
16.848
16.839
16.837
16.842
16.855
16.875
16.903
16.938
16.980
17.030
17.087
17.151
17.223
17.302
17.389
17.483
17.585
17.693
17.810
17.933
18.064
18.202
18.348
18.501
18.662
18.830
19.001
19.166
19.325
19.478
19.624
19.765
19.898
20.026
20.147
20.262
20.371
20.473
20.570
20.659
19.430
19.214
19.021
18.824
18.637
18.480
18.354
18.234
18.117
18.002
17.879
17.761
17.641
17.525
17.420
17.335
17.258
17.180
17.100
17.022
16.944
16.869
16.786
16.719
16.722
16.691
16.689
16.741
16.790
16.799
16.824
16.858
16.914
16.990
17.081
17.090
17.161
17.253
17.345
17.468
17.586
17.708
17.828
17.976
18.150
18.348
18.588
18.761
18.885
19.020
19.134
19.254
19.368
19.491
19.604
19.723
19.845
19.976
20.092
20.215
20.320
20.382
20.459
20.507
20.581
0.052
0.073
0.080
0.098
0.114
0.105
0.075
0.045
0.020
-0.001
-0.005
-0.007
0.000
0.012
0.019
0.012
0.007
0.008
0.020
0.038
0.061
0.090
0.134
0.169
0.142
0.157
0.149
0.095
0.053
0.055
0.051
0.045
0.024
-0.010
-0.051
-0.003
-0.010
-0.029
-0.043
-0.078
-0.103
-0.123
-0.134
-0.167
-0.217
-0.284
-0.386
-0.412
-0.384
-0.358
-0.305
-0.254
-0.202
-0.166
-0.126
-0.099
-0.081
-0.078
-0.066
-0.068
-0.058
-0.010
0.014
0.063
0.078
L=231.057m
L=124.143m
L=208.489m
L=100.000m
R=-1440.000mR=-2850.000m
A=41200.000
æ
R=13541.530m
R=-15900.000m
L=626.556m
L=143.557m
JU
NC
TIO
N 67
CO
AL H
OU
SE
MAINLINE SECTION 2 - Ch10320m TO Ch10965m
LONGITUDINAL SECTION
Southbound Design Speed 85kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:5.000 mAOD
10320.000
10330.000
10340.000
10350.000
10360.000
10370.000
10380.000
10390.000
10400.000
10410.000
10420.000
10430.000
10440.000
10450.000
10460.000
10470.000
10480.000
10490.000
10500.000
10510.000
10520.000
10530.000
10540.000
10550.000
10560.000
10570.000
10580.000
10590.000
10600.000
10610.000
10620.000
10630.000
10640.000
10650.000
10660.000
10670.000
10680.000
10690.000
10700.000
10710.000
10720.000
10730.000
10740.000
10750.000
10760.000
10770.000
10780.000
10790.000
10800.000
10810.000
10820.000
10830.000
10840.000
10850.000
10860.000
10870.000
10880.000
10890.000
10900.000
10910.000
10920.000
10930.000
10940.000
10950.000
10960.000
EXISTING KINGSWAY VIADUCT
WITH PROPOSED WIDENING
5.56m MIN. HEADROOM
CU
TLIN
E 1
SC
HE
ME
EX
TE
NT
S / T
IE
IN
WORK NUMBER
1a and b
DRAINAGE OUTFALL 9
DRAINAGE OUTFALL 13
DRAINAGE OUTFALL 11
DRAINAGE OUTFALL 12
WORK NUMBER
1a and b
WORK NUMBER 2
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
WIDENING FOR 3 SPAN VIADUCT OPTION
WIDENING FOR 6 SPAN VIADUCT OPTION
© Crown Copyright and Database Rights 2020 Ordnance Survey 100030649
Suitability Status
TR010031/APP/2.5(B)
Client
WSP Project Number:
PINS Reference Number
Rev. Date
Description By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
S0Work in Progress
70041947 HE551462-WSP-LSI-ZZ-DR-ZL-45001
---PGPGMBFirst Revision26/10/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
------------28/01/20P05.1
3
A1
As Shown
---
---
---
---
---
---
---
---
P05.1
45001ZLDRZZ
LSIWSPHE551462
SHEET 1 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS
A1 BIRTLEY TO COAL HOUSE
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUE IA IA
2
Application Issue
AW NGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE MB MBJS NGR
20/04/20
n.rawcliffe
20/04/20
m.birkett
20/04/20
m.birkett
20/04/20
a.khaji
2 20/04/20 EXAMINATION DEADLINE 4 UPDATEMB
MBAK NGR
59.139
59.668
60.197
60.726
61.255
61.785
62.314
62.843
63.372
63.901
64.430
64.959
65.488
66.018
66.547
67.076
67.605
68.134
68.663
69.192
69.721
70.250
70.771
71.283
71.786
72.280
72.765
73.241
73.707
74.165
74.613
75.053
75.483
75.904
76.316
76.719
77.113
77.498
77.874
78.241
78.598
78.947
79.286
79.616
79.938
80.250
80.553
80.847
81.132
81.407
81.674
81.932
82.180
82.419
82.650
82.871
83.083
83.286
83.480
83.665
83.841
84.007
84.165
84.313
84.453
84.583
59.019
59.540
60.050
60.553
61.077
61.569
62.098
62.601
63.098
63.601
64.140
64.618
65.121
65.634
66.128
66.636
67.135
67.627
68.136
68.682
69.194
69.703
70.219
70.708
71.199
71.700
72.192
72.701
73.197
73.691
74.184
74.630
75.090
75.554
76.016
76.415
76.892
77.275
77.672
78.096
78.430
78.849
79.113
79.468
79.814
80.149
80.469
80.781
81.091
81.378
81.675
81.984
82.262
82.527
82.766
82.973
83.175
83.382
83.593
83.781
83.932
84.114
84.225
84.390
84.504
84.613
0.121
0.129
0.148
0.173
0.178
0.216
0.215
0.241
0.274
0.301
0.291
0.342
0.367
0.383
0.419
0.440
0.470
0.508
0.528
0.511
0.527
0.547
0.553
0.575
0.588
0.580
0.572
0.539
0.510
0.474
0.429
0.423
0.394
0.351
0.300
0.305
0.222
0.224
0.202
0.145
0.168
0.098
0.173
0.149
0.123
0.100
0.083
0.066
0.041
0.030
-0.002
-0.053
-0.082
-0.107
-0.116
-0.102
-0.092
-0.095
-0.113
-0.116
-0.092
-0.107
-0.061
-0.076
-0.052
-0.030
L=709.547mL=29.164m
R=-1720.000mA=70319.754
R=-11000.000m
L=693.133m
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:55.000 mAOD
MAINLINE SECTION 3 - Ch12235m TO Ch12895m
LONGITUDINAL SECTION
Southbound Design Speed 120kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
12240.000
12250.000
12260.000
12270.000
12280.000
12290.000
12300.000
12310.000
12320.000
12330.000
12340.000
12350.000
12360.000
12370.000
12380.000
12390.000
12400.000
12410.000
12420.000
12430.000
12440.000
12450.000
12460.000
12470.000
12480.000
12490.000
12500.000
12510.000
12520.000
12530.000
12540.000
12550.000
12560.000
12570.000
12580.000
12590.000
12600.000
12610.000
12620.000
12630.000
12640.000
12650.000
12660.000
12670.000
12680.000
12690.000
12700.000
12710.000
12720.000
12730.000
12740.000
12750.000
12760.000
12770.000
12780.000
12790.000
12800.000
12810.000
12820.000
12830.000
12840.000
12850.000
12860.000
12870.000
12880.000
12890.000
EXISTING EIGHTON LODGE SLIP ROAD
UNDERBRIDGE TO BE WIDENED
5.03m MIN. PROPOSED HEADROOM
EXISTING CULVERT
STRUCTURE
CU
TLIN
E 4
CU
TLIN
E 3
JU
NC
TIO
N 66
EIG
HT
ON
LO
DG
E
WORK NUMBER
6a and b
DRAINAGE OUTFALL 5
31.009
31.059
31.109
31.159
31.209
31.259
31.309
31.359
31.435
31.560
31.735
31.961
32.236
32.562
32.937
33.362
33.819
34.300
34.804
35.329
35.858
36.387
36.916
37.445
37.974
38.503
39.032
39.562
40.091
40.620
41.149
41.678
42.207
42.736
43.265
43.795
44.324
44.853
45.382
45.911
46.440
46.969
47.498
48.028
48.557
49.086
49.615
50.144
50.673
51.202
51.731
52.260
52.790
53.319
53.848
54.377
54.906
55.435
55.964
56.493
57.023
57.552
58.081
58.610
28.083
28.294
28.556
28.749
28.973
29.329
29.672
30.033
30.404
30.801
31.201
31.618
32.052
32.482
32.910
33.345
33.804
34.258
34.849
35.345
35.907
36.353
36.895
37.430
37.885
38.412
39.021
39.562
40.082
40.609
41.162
41.688
42.181
42.678
43.190
43.743
44.278
44.786
45.331
45.929
46.519
47.090
47.643
48.177
48.727
49.250
49.745
50.266
50.803
51.319
51.806
52.328
52.958
53.515
53.910
54.425
54.926
55.443
55.965
56.476
56.988
57.497
58.007
58.508
2.927
2.766
2.554
2.410
2.237
1.930
1.637
1.327
1.031
0.759
0.534
0.342
0.185
0.080
0.027
0.017
0.015
0.042
-0.046
-0.017
-0.050
0.034
0.022
0.016
0.089
0.091
0.012
0.000
0.008
0.010
-0.013
-0.010
0.027
0.059
0.075
0.052
0.045
0.067
0.050
-0.018
-0.078
-0.120
-0.145
-0.149
-0.170
-0.164
-0.131
-0.123
-0.129
-0.117
-0.074
-0.068
-0.169
-0.196
-0.062
-0.049
-0.020
-0.007
-0.001
0.018
0.035
0.054
0.074
0.101
L=188.901m
L=204.200m
L=86.000m
L=72.000m
R=510.000m
A=43860.000
A=123840.000æ
G=5.291
L=660.375m
R=2000.000m R=4302.200m
L=78.289m
L=37.719m
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:25.000 mAOD
MAINLINE SECTION 3 - Ch11600m TO Ch12235m
LONGITUDINAL SECTION
Southbound Design Speed 85kph - 120kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
11600.000
11610.000
11620.000
11630.000
11640.000
11650.000
11660.000
11670.000
11680.000
11690.000
11700.000
11710.000
11720.000
11730.000
11740.000
11750.000
11760.000
11770.000
11780.000
11790.000
11800.000
11810.000
11820.000
11830.000
11840.000
11850.000
11860.000
11870.000
11880.000
11890.000
11900.000
11910.000
11920.000
11930.000
11940.000
11950.000
11960.000
11970.000
11980.000
11990.000
12000.000
12010.000
12020.000
12030.000
12040.000
12050.000
12060.000
12070.000
12080.000
12090.000
12100.000
12110.000
12120.000
12130.000
12140.000
12150.000
12160.000
12170.000
12180.000
12190.000
12200.000
12210.000
12220.000
12230.000
EXISTING SMITHY
LANE OVERBRIDGE
6.25m MIN. HEADROOM
NO
RT
HB
OU
ND
DE
SIG
N S
PE
ED
T
RA
NS
IT
IO
N
EXISTING UNNAMED
CULVERT
EXISTING UNNAMED
CULVERT
CU
TLIN
E 3
CU
TLIN
E 2
WORK NUMBER
4a and b
WORK NUMBER
6a and b
WORK NUMBER 22
DRAINAGE OUTFALL 6
DRAINAGE OUTFALL 7A
DRAINAGE OUTFALL 7
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
Suitability Status
TR010031/APP/2.5(C)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45002
---PGPGMBFirst Revision06/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45002ZLDRZZ
LSIWSPHE551462
SHEET 2 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
81.452
81.351
81.253
81.168
81.094
81.031
80.981
80.942
80.915
80.900
80.896
80.905
80.925
80.957
81.000
81.056
81.123
81.202
81.292
81.395
81.509
81.635
81.772
81.922
82.083
82.256
82.441
82.637
82.846
83.066
83.298
83.541
83.797
84.064
84.343
84.633
84.933
85.234
85.534
85.835
86.135
86.435
86.736
87.036
87.337
87.637
87.938
88.238
88.539
88.839
89.140
89.440
89.741
90.041
90.342
90.642
90.943
81.457
81.364
81.268
81.186
81.109
81.034
80.979
80.933
80.887
80.876
80.887
80.883
80.903
80.939
80.985
81.038
81.104
81.176
81.278
81.387
81.482
81.612
81.756
81.902
82.056
82.245
82.435
82.606
82.813
83.058
83.289
83.553
83.805
84.068
84.351
84.640
84.944
85.244
85.536
85.833
86.129
86.438
86.730
87.023
87.337
87.639
87.922
88.223
88.531
88.836
89.123
89.424
89.728
90.029
90.325
90.631
90.930
-0.005
-0.014
-0.014
-0.019
-0.015
-0.003
0.001
0.010
0.029
0.023
0.009
0.022
0.021
0.018
0.016
0.018
0.019
0.026
0.014
0.007
0.026
0.023
0.017
0.020
0.028
0.012
0.005
0.032
0.033
0.008
0.008
-0.012
-0.008
-0.004
-0.008
-0.006
-0.011
-0.011
-0.002
0.001
0.007
-0.002
0.006
0.013
0.000
-0.001
0.016
0.015
0.007
0.003
0.016
0.016
0.013
0.013
0.016
0.011
0.012
L=753.960mL=86.000m
A=123840.000
æ
R=8500.000m
L=341.261m
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:70.000 mAOD
MAINLINE SECTION 3 - Ch13475m TO Ch14045m
LONGITUDINAL SECTION
Southbound Design Speed 120kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
13480.000
13490.000
13500.000
13510.000
13520.000
13530.000
13540.000
13550.000
13560.000
13570.000
13580.000
13590.000
13600.000
13610.000
13620.000
13630.000
13640.000
13650.000
13660.000
13670.000
13680.000
13690.000
13700.000
13710.000
13720.000
13730.000
13740.000
13750.000
13760.000
13770.000
13780.000
13790.000
13800.000
13810.000
13820.000
13830.000
13840.000
13850.000
13860.000
13870.000
13880.000
13890.000
13900.000
13910.000
13920.000
13930.000
13940.000
13950.000
13960.000
13970.000
13980.000
13990.000
14000.000
14010.000
14020.000
14030.000
14040.000
PROPOSED REPLACEMENT OF
NORTH DENE FOOTBRIDGE
6.3m MIN. HEADROOM
CU
TLIN
E 6
CU
TLIN
E 5
WORK NUMBER
6a and b
DRAINAGE OUTFALL 2
DRAINAGE OUTFALL 4
WORK NUMBER 18
84.704
84.816
84.919
85.013
85.098
85.174
85.241
85.298
85.347
85.386
85.416
85.437
85.450
85.453
85.447
85.431
85.407
85.374
85.331
85.280
85.219
85.150
85.071
84.983
84.886
84.785
84.684
84.583
84.482
84.381
84.280
84.179
84.078
83.977
83.876
83.775
83.674
83.573
83.472
83.371
83.270
83.169
83.068
82.967
82.866
82.765
82.664
82.563
82.462
82.361
82.260
82.159
82.058
81.957
81.856
81.755
81.654
81.553
84.731
84.861
84.992
85.091
85.158
85.220
85.262
85.258
85.290
85.225
85.348
85.349
85.341
85.333
85.370
85.369
85.288
85.238
85.274
85.232
85.166
85.092
85.006
84.927
84.847
84.762
84.675
84.576
84.476
84.344
84.214
84.110
84.021
83.933
83.838
83.749
83.649
83.543
83.451
83.351
83.247
83.148
83.054
82.959
82.840
82.771
82.736
82.646
82.553
82.448
82.354
82.271
82.164
82.060
81.948
81.791
81.666
81.553
-0.026
-0.045
-0.072
-0.077
-0.059
-0.047
-0.022
0.041
0.057
0.161
0.069
0.088
0.109
0.119
0.076
0.063
0.120
0.136
0.058
0.048
0.053
0.057
0.065
0.056
0.038
0.022
0.009
0.006
0.006
0.036
0.066
0.068
0.056
0.043
0.038
0.025
0.024
0.030
0.020
0.020
0.022
0.020
0.014
0.008
0.026
-0.007
-0.072
-0.083
-0.091
-0.088
-0.094
-0.113
-0.107
-0.103
-0.093
-0.036
-0.013
0.000
L=98.490m
L=346.107m
L=118.490m
L=86.000m
R=-6000.000m
R=1440.000m
A=123840.000
æ
G=-1.010
L=352.664m
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
Datum:65.000 mAOD
MAINLINE SECTION 3 - Ch12895m TO Ch13475m
LONGITUDINAL SECTION
Southbound Design Speed 120kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
12900.000
12910.000
12920.000
12930.000
12940.000
12950.000
12960.000
12970.000
12980.000
12990.000
13000.000
13010.000
13020.000
13030.000
13040.000
13050.000
13060.000
13070.000
13080.000
13090.000
13100.000
13110.000
13120.000
13130.000
13140.000
13150.000
13160.000
13170.000
13180.000
13190.000
13200.000
13210.000
13220.000
13230.000
13240.000
13250.000
13260.000
13270.000
13280.000
13290.000
13300.000
13310.000
13320.000
13330.000
13340.000
13350.000
13360.000
13370.000
13380.000
13390.000
13400.000
13410.000
13420.000
13430.000
13440.000
13450.000
13460.000
13470.000
EXISTING EIGHTON LODGE NORTH
UNDERBRIDGE TO BE WIDENED
5.03m MIN. PROPOSED HEADROOM
EIGHTON LODGE SOUTH
UNDERBRIDGE TO BE WIDENED
5.22m MIN. HEADROOM
EXISTING UNNAMED
CULVERT
CU
TLIN
E 5
CU
TLIN
E 4
PROPOSED EXTENSION OF LONGBANK
BRIDLEWAY UNDERPASS
3.0m MIN. HEADROOM
WORK NUMBER
6a and b
WORK NUMBER 19
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(D)
Client
WSP Project Number:
PINS Reference Number
Rev. Date
Description By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Co
nfid
en
tia
l
HE551462-WSP-LSI-ZZ-DR-ZL-45003
---PGPGMBFirst Revision06/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45003ZLDRZZ
LSIWSPHE551462
SHEET 3 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 27/07/19 APPLICATION ISSUEAW IA IA
0
Application Issue
NGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
Datum:1.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
16.337
16.263
16.156
15.958
15.669
15.290
14.862
14.466
14.081
13.697
13.338
13.012
12.718
12.434
12.151
11.868
11.636
11.488
11.423
11.420
16.329
16.232
16.119
15.963
15.635
15.266
14.853
14.466
14.078
13.696
13.354
13.002
12.706
12.424
12.149
11.867
11.650
11.489
11.443
11.430
0.008
0.032
0.037
-0.005
0.034
0.024
0.010
0.000
0.003
0.001
-0.016
0.009
0.013
0.011
0.002
0.000
-0.014
-0.001
-0.020
HORIZONTAL L=69.883m L=75.465m
L=26.396m
L=10.633m
L
R=-720.000m
R
A
ææ
VERTICAL
G G=-3.848 G=-2.837
G
LL=19.060m
L=30.995m
L
R=-1100.000m
R=3000mR=3000.000m R=1200.000m
L=40.354m
L=16.667m
L=30.333mL=34.039m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
187.377
SOUTHBOUND J67 (COAL HOUSE) OFF SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
A
1
MA
IN
LIN
E
TIE
IN
J67
(C
OA
L H
OU
SE
) T
IE
IN
WORK NUMBER 3a
MAINLINE SECTION 3 - Ch14040m TO Ch14710m
LONGITUDINAL SECTION
Southbound Design Speed 120kph, Northbound Design Speed 85kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
CU
TLIN
E 6
Level Datum:80.000
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
91.243
91.544
91.844
92.145
92.445
92.746
93.046
93.347
93.647
93.948
94.248
94.548
94.849
95.149
95.450
95.750
96.051
96.351
96.652
96.952
97.253
97.553
97.854
98.154
98.455
98.755
99.056
99.356
99.657
99.957
100.258
100.558
100.859
101.159
101.460
101.760
102.061
102.361
102.661
102.953
103.238
103.515
103.784
104.045
104.298
104.543
104.780
105.009
105.230
105.443
105.648
105.846
106.035
106.216
106.389
106.555
106.712
106.862
107.003
107.137
107.262
107.380
107.489
107.591
107.685
107.770
107.848
91.244
91.552
91.857
92.156
92.456
92.745
93.053
93.322
93.627
93.944
94.255
94.572
94.883
95.166
95.473
95.763
96.054
96.357
96.697
96.980
97.260
97.571
97.853
98.161
98.464
98.758
99.056
99.374
99.683
100.006
100.302
100.558
100.825
101.073
101.315
101.505
101.762
102.031
102.438
102.859
103.299
103.723
104.036
104.329
104.656
104.868
104.963
105.089
105.275
105.398
105.708
105.820
105.996
106.108
106.271
106.442
106.624
106.709
106.868
107.039
107.067
107.149
107.232
107.305
107.435
107.558
107.652
-0.001
-0.009
-0.013
-0.011
-0.010
0.000
-0.006
0.024
0.020
0.004
-0.007
-0.023
-0.035
-0.017
-0.023
-0.013
-0.004
-0.006
-0.046
-0.027
-0.008
-0.017
0.000
-0.007
-0.009
-0.003
0.000
-0.017
-0.026
-0.049
-0.045
0.000
0.033
0.087
0.145
0.256
0.299
0.329
0.223
0.094
-0.061
-0.208
-0.252
-0.285
-0.358
-0.325
-0.183
-0.079
-0.045
0.046
-0.059
0.026
0.039
0.108
0.119
0.113
0.088
0.152
0.135
0.097
0.195
0.230
0.258
0.286
0.250
0.213
0.195
HORIZONTALL=753.960m
L=79.594m
L=149.112m
L L=80.619m
L=86.000m
L=51.361m
L L
R=1440.000m
R=580.000m
R
R=600.000m
VERTICAL
G=3.005
L=591.995m
R=-12554.461m
L=641.230m
14050.000
14060.000
14070.000
14080.000
14090.000
14100.000
14110.000
14120.000
14130.000
14140.000
14150.000
14160.000
14170.000
14180.000
14190.000
14200.000
14210.000
14220.000
14230.000
14240.000
14250.000
14260.000
14270.000
14280.000
14290.000
14300.000
14310.000
14320.000
14330.000
14340.000
14350.000
14360.000
14370.000
14380.000
14390.000
14400.000
14410.000
14420.000
14430.000
14440.000
14450.000
14460.000
14470.000
14480.000
14490.000
14500.000
14510.000
14520.000
14530.000
14540.000
14550.000
14560.000
14570.000
14580.000
14590.000
14600.000
14610.000
14620.000
14630.000
14640.000
14650.000
14660.000
14670.000
14680.000
14690.000
14700.000
14710.000
JU
NC
TIO
N 65
BIR
TLE
Y
SO
UT
HB
OU
ND
S
CH
EM
E
EX
TE
NT
S / T
IE
IN
NO
RT
HB
OU
ND
S
CH
EM
E
EX
TE
NT
S / T
IE
IN
EXISTING NORTHSIDE
OVERBRIDGE STRUCTURE
5.1m MIN. HEADROOM
WORK NUMBER
6a and b
DRAINAGE OUTFALL 1
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(E)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45004
---PGPGMBFirst Revision06/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45004ZLDRZZ
LSIWSPHE551462
SHEET 4 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
SOUTHBOUND J66 (EIGHTON LODGE) OFF SLIP
LONGITUDINAL SECTION
Design Speed 70kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
Datum:65.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
70.645
71.066
71.457
71.819
72.151
72.454
72.727
72.971
73.185
73.370
73.525
73.651
73.747
73.809
73.814
73.760
73.648
73.497
73.387
73.327
73.318
73.354
73.407
73.473
73.551
73.641
71.056
71.454
71.818
72.148
72.444
72.729
72.979
73.191
73.377
73.537
73.656
73.749
73.818
73.832
73.775
73.648
73.483
73.360
73.298
73.340
73.384
73.455
73.503
73.551
73.611
0.000
0.011
0.003
0.002
0.003
-0.006
-0.003
-0.008
-0.006
-0.008
-0.012
-0.005
0.000
-0.010
-0.019
-0.014
0.000
0.013
0.033
0.028
-0.023
-0.031
-0.037
-0.029
0.000
0.030
HORIZONTAL L
L=92.708m
L=91.891m
L=30.000m L=27.500m
L=
27.500m
R=-360.000m
R=88.774m
VERTICAL
R=-3389.530m R=-1700.000m
R=2000.000m R=8118.390m
L=124.067m L=39.849m
L=41.209m L=69.604m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
A1
MA
IN
LIN
E
TIE
IN
J66
(E
IG
HT
ON
LO
DG
E) T
IE
IN
WORK NUMBER 7a
Datum:3.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
13.224
13.132
13.141
13.252
13.465
13.766
14.145
14.600
15.132
15.727
16.327
16.927
17.527
18.127
18.727
19.327
19.927
20.527
21.127
21.727
22.310
22.836
23.303
23.711
24.064
24.340
13.170
13.139
13.143
13.275
13.480
13.780
14.219
14.709
15.221
15.785
16.545
17.329
18.219
19.166
20.207
21.248
21.848
21.954
22.115
22.271
22.374
22.439
22.470
22.573
22.383
22.458
0.055
-0.007
-0.003
-0.022
-0.016
-0.013
-0.075
-0.109
-0.088
-0.058
-0.219
-0.402
-0.693
-1.039
-1.481
-1.921
-1.921
-1.428
-0.989
-0.544
-0.064
0.397
0.833
1.138
1.681
HORIZONTAL L=25.779m L=18.605m
L=19.355m
L=122.374mL=31.000m
L=31.000m
R=-106.699m
R=510.000m
A=15810.000A=15810.000
ææ
VERTICAL
G=6.000 G=3.402
L=108.608m L
R=982.640m R=1300.000m
R=-1700.000m
L=39.706mL=44.106m
L=44.165m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
248.114
SOUTHBOUND J67 (COAL HOUSE) ON SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
A1
MA
IN
LIN
E
TIE
IN
J67
(C
OA
L H
OU
SE
) T
IE
IN
WORK NUMBER 3b
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(F)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45005
---PGPGMBFirst Revision06/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45005ZLDRZZ
LSIWSPHE551462
SHEET 5 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
Datum:87.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
97.634
97.967
98.301
98.635
98.968
99.302
99.635
99.969
100.315
100.710
101.155
101.649
102.194
102.785
103.385
103.985
104.585
105.185
105.785
106.385
106.985
107.585
108.185
108.785
109.385
109.985
110.585
111.185
111.785
112.382
112.910
113.339
113.440
98.213
98.463
98.793
99.091
99.433
100.080
100.601
101.204
101.830
102.394
102.887
103.377
103.888
105.259
105.733
106.141
106.459
106.878
107.347
107.953
108.650
109.028
109.483
109.819
110.239
110.673
111.095
111.581
112.052
112.543
113.013
113.360
113.440
-0.580
-0.496
-0.491
-0.457
-0.465
-0.778
-0.965
-1.235
-1.515
-1.683
-1.732
-1.727
-1.695
-2.475
-2.348
-2.157
-1.875
-1.694
-1.563
-1.568
-1.665
-1.444
-1.298
-1.034
-0.855
-0.688
-0.511
-0.397
-0.267
-0.161
-0.102
-0.022
HORIZONTAL L=20.807m
L=84.046m
L=129.315m
L=45.425m
L=
33.0
00m
R=-600.000m
R=-255.000m
A=20145.000A
=8415.0
00
æ
VERTICAL
G=3.336G=6.000
G
L=72.798mL=161.718m L
R=2000.000m
R=-1000.000m
L=53.284m
L=21.005m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
290.000
300.000
310.000
312.593
SOUTHBOUND J65 (BIRTLEY) OFF SLIP
LONGITUDINAL SECTION
Design Speed 70kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
A1
MA
IN
LIN
E
TIE
IN
J65
(B
IR
TLE
Y) T
IE
IN
WORK NUMBER 8a
Datum:70.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
80.872
81.011
81.154
81.304
81.441
81.586
81.726
81.862
82.011
82.142
82.281
82.419
82.558
82.696
82.835
82.973
83.112
83.241
83.338
83.402
83.433
83.430
83.394
83.324
83.231
83.160
80.877
81.026
81.173
81.314
81.455
81.595
81.730
81.860
81.994
82.113
82.224
82.322
82.408
82.489
82.560
82.623
82.681
82.728
82.740
82.736
82.718
82.686
82.646
82.784
82.774
82.718
-0.015
-0.018
-0.010
-0.014
-0.009
-0.003
0.001
0.017
0.029
0.056
0.097
0.149
0.207
0.275
0.350
0.430
0.513
0.598
0.667
0.714
0.743
0.747
0.541
0.458
HORIZONTAL L=44.864m L=117.800mL=84.851m
R=1020.000m
æ æ
VERTICAL
G=1.385
G=-0.939
L=161.602m
L=15.280m
R=-3000.000m
L=69.730m
41.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
287.611
SOUTHBOUND J66 (EIGHTON LODGE) ON SLIP
LONGITUDINAL SECTION
Design Speed 70kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
A1
MA
IN
LIN
E
TIE
IN
J66
(E
IG
HT
ON
LO
DG
E) T
IE
IN
WORK NUMBER 7b
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(G)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45006
---PGPGMBFirst Revision06/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45006ZLDRZZ
LSIWSPHE551462
SHEET 6 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
Datum:3.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
13.350
13.385
13.420
13.479
13.668
13.939
14.286
14.711
15.211
15.734
16.256
16.779
17.301
17.824
18.347
18.869
19.392
19.915
20.434
20.936
21.420
21.886
22.344
22.643
13.350
13.412
13.410
13.482
13.651
13.912
14.237
14.687
15.180
15.682
16.161
16.643
17.132
17.689
18.108
17.461
16.974
16.627
16.438
16.403
16.415
16.359
16.314
16.284
0.000
-0.026
0.011
-0.003
0.016
0.026
0.050
0.024
0.031
0.052
0.096
0.135
0.170
0.135
0.239
1.409
2.418
3.288
3.996
4.532
5.005
5.527
6.031
HORIZONTAL L L=16.750m
L=15.598m
L=129.408m
L
L=16m
L=31.000m
R=100m
R=510.000m
A
A=8160
A=15810.000æ
æ
VERTICAL
G=0.351 G=5.226 G=4.584
L=24.695m L=96.037m
L=17.471m
R R=1300.000m
R=-5500.000m
LL=44.301m
L=35.301m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
226.527
NORTHBOUND J67 (COAL HOUSE) OFF SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
A1
MA
IN
LIN
E
TIE
IN
J67
(C
OA
L H
OU
SE
) T
IE
IN
WORK NUMBER 3c
Datum:0.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
16.285
16.263
16.218
16.174
16.130
16.085
16.041
15.994
15.904
15.754
15.546
15.279
14.954
14.569
14.126
13.624
13.064
12.528
12.069
11.686
11.381
11.153
11.001
10.927
10.929
11.008
11.164
11.398
11.425
16.224
16.119
15.881
15.696
15.525
15.348
15.178
15.004
14.827
14.640
14.431
14.362
14.186
13.985
13.709
13.458
13.143
12.778
12.414
11.959
11.668
11.387
11.184
11.011
10.986
11.074
11.273
11.510
11.532
0.144
0.338
0.479
0.605
0.737
0.863
0.989
1.077
1.115
1.116
0.918
0.768
0.584
0.417
0.165
-0.079
-0.250
-0.345
-0.273
-0.287
-0.235
-0.183
-0.085
-0.057
-0.065
-0.108
-0.113
HORIZONTAL L=66.984m
L=151.948m
L=47.389m
R=-720.000m
R=123.808m
æ
VERTICAL
G=-0.445
L=62.195m
R=-1700.000m
R=1300.000m
L=91.639m
L=112.156m
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
270.990
NORTHBOUND J67 (COAL HOUSE) ON SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
A1
MA
IN
LIN
E
TIE
IN
J67
(C
OA
L H
OU
SE
) T
IE
IN
WORK NUMBER 3d
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(H)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45007
---PGPGMBFirst Revision07/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45007ZLDRZZ
LSIWSPHE551462
SHEET 7 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
Datum:67.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
HORIZONTAL
VERTICAL
NORTHBOUND J66 (EIGHTON LODGE) OFF SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 2
77.641
77.895
78.149
78.404
78.658
78.913
79.167
79.421
79.676
79.930
80.185
80.439
80.693
80.930
81.142
81.329
81.491
81.628
81.740
81.827
81.889
81.926
81.938
81.925
81.887
81.825
81.737
81.624
81.486
81.323
81.301
77.641
77.886
78.133
78.390
78.654
78.912
79.163
79.407
79.672
79.932
80.178
80.435
80.689
80.948
81.156
81.317
81.493
81.571
81.674
81.804
81.790
81.867
81.867
81.864
81.886
81.786
81.704
81.602
81.412
81.318
81.307
0.000
0.010
0.017
0.013
0.004
0.001
0.005
0.014
0.003
-0.001
0.007
0.004
0.005
-0.017
-0.013
0.012
-0.002
0.058
0.067
0.024
0.100
0.059
0.072
0.062
0.002
0.038
0.032
0.021
0.073
0.005
L=148.783m L=79.560m
L=62.858m
R=1995.294m
ææ
G=2.544
L=118.056m
R=-4000.000m
L=173.145m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
290.000
291.201
A1
MA
IN
LIN
E
TIE
IN
J66
(E
IG
HT
ON
LO
DG
E) T
IE
IN
WORK NUMBER 7c
Datum:65.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
75.348
75.801
76.233
76.608
76.924
77.181
77.379
77.518
77.611
77.699
77.788
77.876
77.942
77.971
77.965
77.922
77.842
77.738
77.634
77.529
77.425
77.320
77.216
77.111
77.007
76.902
76.798
76.693
76.589
76.484
76.380
76.275
76.171
76.066
75.961
75.857
75.752
75.648
75.543
75.439
75.334
75.230
75.220
75.072
75.437
75.791
76.122
76.440
76.735
77.002
77.247
77.460
77.625
77.772
77.869
77.953
77.982
77.970
77.921
77.854
77.739
77.655
77.538
77.426
77.323
77.204
77.102
77.000
76.889
76.780
76.671
76.593
76.493
76.354
76.236
76.139
76.028
75.923
75.811
75.696
75.606
75.515
75.413
75.324
75.253
75.220
0.277
0.364
0.442
0.486
0.483
0.446
0.378
0.271
0.151
0.075
0.015
0.008
-0.011
-0.011
-0.006
0.001
-0.011
-0.001
-0.022
-0.009
-0.002
-0.002
0.012
0.009
0.006
0.013
0.018
0.022
-0.004
-0.009
0.026
0.040
0.032
0.038
0.039
0.045
0.057
0.042
0.029
0.025
0.010
-0.024
HORIZONTAL L=72.284m L=63.655mL=79.847m
L=107.213m
L=87.934m
R=793.623m
R=-406.313m
R=-385.697m
ææ
VERTICAL
G=4.528
G=0.885
G=-1.045
L
L=35.128m
L=249.000m
R=-1700.000m R=-2754.120m
L=61.928m L=53.168m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
290.000
300.000
310.000
320.000
330.000
340.000
350.000
360.000
370.000
380.000
390.000
400.000
410.000
410.933
NORTHBOUND J66 (EIGHTON LODGE) ON SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1
NORTHBOUND SLIP SECTIONS
A1
MA
IN
LIN
E
TIE
IN
J66
(E
IG
HT
ON
LO
DG
E) T
IE
IN
WORK NUMBER 7d
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(I)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45008
---PGPGMBFirst Revision07/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45008ZLDRZZ
LSIWSPHE551462
SHEET 8 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1
Datum:93.000 mAOD
DESIGN LEVELS
SURVEY LEVELS
LEVEL DIFFERENCE
CHAINAGE
106.506
106.578
106.651
106.724
106.796
106.869
106.942
107.014
107.087
107.157
107.205
107.223
107.213
107.175
107.108
107.012
106.888
106.735
106.554
106.344
106.106
105.839
105.543
105.229
104.916
104.602
104.288
103.975
103.682
103.464
103.323
103.260
106.506
106.605
106.679
106.744
106.810
106.884
106.958
107.014
107.053
107.090
107.120
107.121
107.125
107.108
107.064
107.045
106.874
106.723
106.558
106.352
106.127
105.856
105.551
105.229
104.916
104.601
104.290
103.966
103.710
103.446
103.319
103.260
0.000
-0.027
-0.028
-0.021
-0.013
-0.015
-0.016
0.000
0.033
0.067
0.085
0.103
0.088
0.067
0.043
-0.033
0.015
0.013
-0.005
-0.008
-0.022
-0.018
-0.008
0.000
0.000
0.001
-0.002
0.008
-0.028
0.018
0.004
HORIZONTAL L=46.476m
L=118.409m
L=124.102m
L
=
2
0
.5
1
2
m
R=584.935m
R=85.000m
A
=
2
0
4
0
.0
0
0
æ
VERTICAL
G=0.726
G=-3.137
L=86.110m
L=51.231m
R=-3500.000m
R=1300.000m
L=135.226m
L=36.932m
0.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
210.000
220.000
230.000
240.000
250.000
260.000
270.000
280.000
290.000
300.000
309.499
NORTHBOUND J65 (BIRTLEY) ON SLIP
LONGITUDINAL SECTION
Design Speed 60kph
Horizontal Scale = 1:1250, Vertical Scale = 1:250
REFERENCE 1A
1
MA
IN
LIN
E
TIE
IN
J65
(B
IR
TLE
Y) T
IE
IN
WORK NUMBER 8b
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE
2. ENGINEERING SECTION DRAWINGS, REGULATION 6(2) SHOULD BE READ IN
CONJUNCTION WITH GENERAL ARRANGEMENT DRAWINGS (DOCUMENT
REFERENCE TR010031/APP/2.6)
3. ALL STRUCTURES AND CULVERT LOCATIONS ARE INDICATIVE
4. PLANS TO BE READ IN CONJUNCTION WITH ALL OTHER PLANS AND
DOCUMENTS IN THE DEVELOPMENT CONSENT ORDER APPLICATION
(DOCUMENT REFERENCE TR010031/APP/3.1)
5. MAINLINE LONG SECTIONS WERE CUT THROUGH CENTRAL RESERVATION,
FOR SPECIFIC DESIGN SPEED INFORMATION SEE INDIVIDUAL LONG
SECTIONS.
6. DO NOT SCALE FROM THIS DRAWING.
7. THE PROPOSED CONSTRUCTION OF ALLERDENE CULVERT (WORKS 20)
ONLY APPLIES TO THE SINGLE SPAN OPTION, THE 6 & 7 SPAN VIADUCT
OPTIONS REQUIRE DITCHES AND THEREFORE ARE NOT SHOWN.
8. THE DRAINAGE OUTFALL DISCHARGE POINTS DO NOT ALL LIE ON THE
MAINLINE, SEE THE WORKS PLANS (DOCUMENT REFERENCE
TR010031/APP/2.3) FOR EXACT LOCATIONS.
KEY
PROPOSED LEVELS
EXISTING LEVELS
STRUCTURES
WIDENING FOR 7 SPAN VIADUCT OPTION
Suitability Status
TR010031/APP/2.5(J)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-45009
---PGPGMBFirst Revision07/11/18P01
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS02/01/19P02
---PGPGSBREVISED TO ALIGN WITH UPDATED DCO COMMENTS17/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
As Shown
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
45009ZLDRZZ
LSIWSPHE551462
SHEET 9 OF 9
REGULATION 5(2)(o) AND REGULATION 6(2)
LONG SECTIONS
ENGINEERING SECTIONS DRAWINGS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
5m0m 25m10m
0m
15m
SCALE 1:250
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1 25/02/20 EXAMINATION DEADLINE 2 UPDATE JS MB MB NGR
J.Singh M.Birkett M.Birkett
25/02/2025/02/20 25/02/20 25/02/20
1