a proposed group 1 for project assessments · happy valley road: 19th avenue to 7th street 2.25 yes...
TRANSCRIPT
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
A Baseline Road: 75th Avenue to 71st Avenue 0.5
Yes Yes
Current
Transit Current Transit
Bicycle Master
Plan 0
Bus stops missing
shade and furniture
B Buckeye Road: 75th Avenue to 59th Avenue 2
Yes Yes
Current
Transit Current Transit
Des.
Employment
Area 4
Missing sidewalks,
6 bus stops non-
compliant for ADA,
and 8 bus stops
without shade
CIndian School Road: 107th Avenue to 91st
Avenue2
Yes Yes
Current
Transit Current Transit
Des.
Employment
Area 0
Missing sidewalks,
2 bus stops non-
compliant for ADA,
and 6 bus stops
without shade
DLower Buckeye Road: 75th Avenue to 19th
Avenue7
Yes Yes
Current
Transit Current Transit
Section is in
the Pimary
Village Core 3
Missing sidewalks,
3 bus stops non-
compliant for ADA,
and many bus
stops without shade
E Baseline Road: 46th Avenue to 43rd Avenue 0.5Yes Yes 2023 Yes
Bicycle Master
Plan 1
F91st Avenue: Thomas Road to Camelback
Road2
Yes Partial 2026 Yes
Des.
Employment
Area 4
Missing sidewalks,
2 bus stops non-
compliant for ADA,
and 3 bus stops
without shade
G83rd Avenue: Buckeye Road to Van Buren
Street1
Yes No 2026 Yes
Des.
Employment
Area 1
H91st Avenue: Lower Buckeye Road to Buckeye
Road1
Yes No 2026 Yes
Des.
Employment
Area 0
Attachment B - Information on Locations of Major New and Expanded Street Construction Projects from Proposition 104 Map
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
Pro
po
se
d G
rou
p 1
fo
r P
roje
ct
As
se
ss
me
nts
Page 1 of 6
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
I Lower Buckeye Road: 91st Avenue to 75th
Avenue2
Yes No 2026 Yes
Des.
Employment
Area 2
JDeer Valley Drive: Cave Creek Road to 56th
Street4.5
Yes No 2031 No
Des.
Employment
Area 1
Incomplete Street -
2 Active
developments
completing one
half, need to
complete other
K Southern Avenue: 51st Avenue to 37th Lane 1.7
Yes
Partial:
43rd to
37th Ln 2033 No No 1
Missing sidewalks,
4 bus stops non-
compliant for ADA,
and multiple bus
stops without shade
L19th Avenue: Happy Valley Road to Jomax
Road1
Yes No
Not planned
for Transit
Service No
Des.
Employment
Area 0
Incomplete Street -
Active development
completing one
half, need to
complete other
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 8
years?
(FY2017-2026)
Safety
Rating/
Information
Location part
of approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Dobbins Road: 51st Avenue to Central Avenue 5.5
Yes
Partial:
15th Ave.
to Central 2036 No
Bicycle Master
Plan 3
43rd Avenue: Lower Buckeye Road to Buckeye
Road1
Yes No 2039 No
Des.
Employment
Area 1
99th Avenue: Indian School Road to
Camelback Road1
Yes No 2039 No
Des.
Employment
Area
99th Avenue: Lower Buckeye Road to Buckeye
Road1
Yes No 2039 No
Des.
Employment
Area
2nd Filter 3rd Filter
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
Pro
po
se
d G
rou
p 1
fo
r P
roje
ct
As
se
ss
me
nts
Gro
up
2 -
Pro
jec
t
As
se
ss
me
nts
to
be
co
mp
lete
d i
n t
he
fu
ture
.
1st Filter
Page 2 of 6
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
Lower Buckeye Road: 107th Avenue to 91st
Avenue2
Yes No 2039 No
Des.
Employment
Area 0
Southern Avenue: 75th Avenue to 51st Avenue 2Yes No 2041 No No
67th Avenue: Baseline Road to Buckeye Road 4
Yes
Partial:
Elwood St.
to Buckeye 2041 No
Des.
Employment
Area 3
Happy Valley Road: 63rd Avenue to 35 Avenue 4
Yes
Partial:
29th Ave to
23rd Ave 2044 No No
91st Avenue: Southern Avenue to Lower
Buckeye Road2.5
Yes No 2044 No
Des.
Employment
Area
99th Avenue: Southern Avenue to Broadway
Road1
Yes No 2044 No No
Happy Valley Road: 19th Avenue to 7th Street 2.25
Yes No 2044 No
Des.
Employment
Area 0
Tatum Boulevard: Union Hills Drive to Deer
Valley Drive2
Yes Yes 2047 No
Pimary Village
Core & Des.
Empl. Area 2
Missing Sidewalks,
1 Bus Stop Non-
Compliant for ADA,
and 3 Bus Stops
without Shade
43rd Avenue: Dobbins Road to Baseline Road 1Yes No 2047 No No 1
Broadway Road: 107th Avenue to 51st Avenue 7Yes No 2047 No
Bicycle Master
Plan
Cave Creek Road: Deer Valley Drive to Tatum
Boulevard4.5
Yes No 2047 No No 1
Dobbins Road: 67th Avenue to 51st Avenue 2.5Yes No 2047 No No 1
Tatum Boulevard: Pinnacle Peak Road to
Dynamite Boulevard3
Yes No 2047 No No
Happy Valley Road: 7th Street to Cave Creek
Road2.5
No No 2050 No n/a No 1 n/a
39th Avenue/43rd Avenue: Pioneer Road to
Jenny Lin Road5
No No
Not planned
for Transit
Service No n/a No n/a
Gro
up
2 -
Pro
jec
t A
ss
es
sm
en
ts t
o b
e c
om
ple
ted
in
th
e f
utu
re.
Page 3 of 6
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
40th Street: Pinnacle Peak Road to Tatum
Boulevard1
No No
Not planned
for Transit
Service No n/a No n/a
43rd Avenue: Dixileta Drive to Carefree
Highway3
No No
Not planned
for Transit
Service No n/a No n/a
51st Avenue: Central Arizona Project alignment
to Pyramid Peak Parkway7
No No
Not planned
for Transit
Service No n/a No n/a
51st Avenue: Estrella Drive to Baseline Road 3.5
Yes No
Not planned
for Transit
Service No No
51st Avenue: Pinnacle Peak Road to Happy
Valley Road1
Yes No
Not planned
for Transit
Service No No
55th Avenue: Pinnacle Peak Road to Happy
Valley Road1
Yes No
Not planned
for Transit
Service No No
56th Street: Deer Valley Drive to Jomax Road 4
No No
Not planned
for Transit
Service No n/a No n/a
64th Street: Bell Road to Jomax Road 6
No No
Not planned
for Transit
Service No n/a
Des.
Employment
Area n/a
75th Avenue: Baseline Road to Southern
Avenue1
Yes No
Not planned
for Transit
Service No No 1
7th Street: Deer Valley Road to Happy Valley
Road2
Yes No
Not planned
for Transit
Service No
Des.
Employment
Area 1
83rd Avenue: Broadway Road to Lower
Buckeye Road1
Yes No
Not planned
for Transit
Service No
Des.
Employment
Area
Anthem Way: Avenue A to Pyramid Peak
Parkway2.5
No No
Not planned
for Transit
Service No n/a No n/a
Avenue A: Desert Hills Drive to New River
Road5.5
No No
Not planned
for Transit
Service No n/a No n/a
Black Mountain Boulevard: Deer Valley Drive
to Cave Creek Road3.5
No No
Not planned
for Transit
Service No n/a No n/a
Gro
up
2 -
Pro
jec
t A
ss
es
sm
en
ts t
o b
e c
om
ple
ted
in
th
e f
utu
re.
Page 4 of 6
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
Black Mountain Boulevard: Tatum Boulevard to
Lone Mountain Road1
Yes No
Not planned
for Transit
Service No No
Daisy Mountain Drive: Avenue A to Interstate
174
No No
Not planned
for Transit
Service No n/a No n/a
Deer Valley Drive: 56th Streeet to Scottsdale
Road2
No No
Not planned
for Transit
Service No n/a
Des.
Employment
Area 2 n/a
Desert Hills Drive: Avenue A to New River
Road1
No No
Not planned
for Transit
Service No n/a No n/a
Dixileta Drive: Pyramid Peak Parkway to
Interstate 174
No No
Not planned
for Transit
Service No n/a No n/a
Dove Valley Road: Pyramid Peak Parkway to
Interstate 174
No No
Not planned
for Transit
Service No n/a No n/a
Dynamite Boulevard: Cave Creek Road to 56th
Street2
Yes No
Not planned
for Transit
Service No No
Dynamite Boulevard: Sonoran Desert Drive to
Cave Creek Road1
No No
Not planned
for Transit
Service No n/a No n/a
Happy Valley Road: Cave Creek Road to
Scottsdale Road5
No No
Not planned
for Transit
Service No n/a No n/a
Jomax Road: Cave Creek Road to Tatum
Boulevard2
Yes No
Not planned
for Transit
Service No No
Jomax Road: Tatum Boulevard to 56th Street 1
No No
Not planned
for Transit
Service No n/a No n/a
Lone Mountain Road: Sonoran Desert Drive to
40th Street1.5
No No
Not planned
for Transit
Service No n/a No n/a
Mayo Boulevard: 40th Street to Tatum
Boulevard1
No No
Not planned
for Transit
Service No n/a
Des.
Employment
Area 2 n/a
New River Road: Pioneer Road to Interstate 17 6.5
No No
Not planned
for Transit
Service No n/a No n/a
Gro
up
2 -
Pro
jec
t A
ss
es
sm
en
ts t
o b
e c
om
ple
ted
in
th
e f
utu
re.
lete
d i
n
Page 5 of 6
Miles
Is there a
roadway
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion in
the next 15
years?
(FY2017-2033)
Safety
Rating/
Information
Part of
approved
Plan or Focus
Area?
Current # of
Intersecting/
Connecting
Transit
Routes Known Gaps?
Locations of Major New and Expanded Street
Construction Projects from Proposition 104 Map
1st Filter 2nd Filter 3rd Filter
North Valley Parkway: Dixileta Drive to
Sonoran Desert Drive1
No No
Not planned
for Transit
Service No n/a No n/a
Pinnacle Peak Road: 19th Avenue to 7th Street 2
Yes No
Not planned
for Transit
Service No
Des. Emp.
Area
Pinnacle Peak Road: Cave Creek Road to
Scottsdale Road6
Yes No
Not planned
for Transit
Service No No
Pioneer Road: New River Road to Gavilan
Peak Parkway5
No No
Not planned
for Transit
Service No n/a No n/a
Pyramid Peak Parkway: Dixileta Drive to
Anthem Way7
No No
Not planned
for Transit
Service No n/a No n/a
Sonoran Desert Drive: North Poloma Parkway
to Sonoran Boulevard3
No No
Not planned
for Transit
Service No n/a No n/a
Tatum Boulevard: Lone Mountain Road to 40th
Street1
No No
Not planned
for Transit
Service No n/a No n/a Gro
up
2 -
Pro
jec
t A
ss
es
sm
en
ts t
o b
e c
om
ple
ted
in
the
fu
ture
.
Page 6 of 6
Miles
Is there a
road-way
now?
Is there
Existing
Transit
Service?
Year of
Transit
Expansion
Is transit
expanstion
in the next 8
years?
(FY2017-
2026)
Safety Rating
(MAG High
Crash
Intersection
Score*)
Part of approved
Plan or Focus Area?
Current # of
Intersecting/
Connecting
Transit
Routes
% of
Families in
Poverty
AA 16th Street and Indian School Road Intersection Yes Yes
Current
Transit
Current
Transit 39 no 2 23%
BB
35th Avenue:Camelback Road to
Glendale Avenues 2 Yes Yes
Current
Transit
Current
Transit
86
(High
Pedestrian
crash location) no 4 36%
CC
59th Avenue:Thomas to Indian School
Roads 1 Yes Yes
Current
Transit
Current
Transit
1 & 84
(Intersection
@ Indian
School is the
highest ranked
location) no 3 34%
DD 67th Ave: McDowell to Indian School Intersection Yes Yes
Current
Transit
Current
Transit 64 No 2 29%
EE
Camelback Road: 19th Avenue to 17th
Avenue 0.25 Yes Yes
Current
Transit
Current
Transit 229
Section is in the
Pimary Village Core,
and adjacent to CEDD
Focus Area and
Neighborhood
Initiative Area
4 including
LRT 33%
FF
Indian School Road: 49th Avenue to
77th Avenue 3.5 Yes Yes
Current
Transit
Current
Transit
Multiple top 10
Intersections
Section is in the
Pimary Village Core 5 35%
GG Thomas Road and 43rd Avenue Intersection Yes Yes
Current
Transit
Current
Transit 61 No 2 36%
* The Maricopa Association of Governments (MAG) generates a safety score annually, which then ransks the high crash intersection list for Maricopa County. The number score represents the
ranking of the intersection on the MAG list (crashes from 2010-2014).
Attachment C - Information on Identified High Crash LocationsP
rop
os
ed
Gro
up
1 f
or
Pro
jec
t A
ss
es
sm
en
ts
Identified High Crash Locations
3rd Filter1st Filter 2nd Filter