a process-centric approach to ngoss
TRANSCRIPT
A Process-Centric Approachto NGOSS
Tim Jacobs
Slide 2
Agenda
• Introductions• The BT Wholesale environment• TCP project• Business issues• IT architecture for Wholesale• Approach to the project• Business benefits & deliverables• Futures
Slide 3
Introduction
• Programme manager, BT Exact– Workflow Services Division– 6 years’ experience in BPM solutions
• TCP– Workflow consultant– Lead supplier– Project manager
Slide 4
BT Wholesale
• Role & responsibilities– Provision of bandwidth to UK operators– Provision of bandwidth to other divisions of
BT: Global Services, Retail, …– In essence, BT’s engine room
• Business strategy– Standardization of systems’ strategy– Emphasis on eBusiness
Slide 5
Network Design and Implementation (ND&I)
• Approximately 5,000 employees nationwide– Regionally based
• Significant 3rd Party involvement– External build agents– Network Build
• Job delivery via “Job Pack”
Slide 6
ND&I: Business Issues
• Hugely complex business process– Even more than typical fixed-line operators
• Slow time to market• Cost• Inflexibility• eBusiness imperatives
Slide 7
TCP: Objectives
• End the ‘Stovepipe’ approach to systems’ development
• Overcome the limitations of incremental development of systems
• Enable national standards for records• Provide systems capability for geographical
independence• Systems design to support radical organizational
change options
Slide 8
TCP: Focus of Project
• Radical new approach– Process-led methodology
• Tracking & control– Process improvement
• Single virtual system– BEA Portal
• “information anywhere”– Seamless systems’ integration
Slide 9
Pre-TCP
Slide 10
Post-TCP
Slide 11
TCP Architecture
Slide 12
Architectural concerns
• ARIS selected to enable definition of processes from business perspective
• BEA selected for Portal and middleware components
• BUT …• The gap between the two was too wide:
– Needed complex process execution software to integrate process, people & technology
Slide 13
Approach to TCP project
• Substantial diligence• References• Proof of Concept
– integration with ARIS– integration with BT Internal Systems– integration with CIMAGE– integration with Process Monitor– transactional integration with WebLogic
• “Proof of Process”
Slide 14
Process Lifecycle
designing, analyzing and optimizing
measuring and evaluation
process-oriented implementation
Slide 15
Integrating ARIS & Staffware
• ARIS models must conform to TIBCO protocols– Attribute mappings– Technical terms
• Needs rigorous change control
Slide 16
Key Features of TIBCO Staffware Process Interchange Manager (SPIM)
• All standard TIBCO features definable• Black box steps• Process version validation
Slide 17
Integrating ARIS & TIBCO
From this…
…to this
TIBCO StaffwareProcess Suite
Slide 18
Stage 1 Converter Functionality
• Aris Process Model designed• SW Converter imports Process
Model into “Internal Model”• Internal Model them modified as
required• Initial SW Process Definition
created• SW Process Definition made
executable (add forms & data)
ARIS ProcessModel
SWConverter
Tool
SW ProcessDefinition
1
2
33
4
55
Slide 19
Change Resolution Functionality
• ARIS (and SW) Process modified• SW Converter imports ARIS
Process Model into “Internal Model”
• SW Converter imports SWProcess Definition into “Internal Model”
• Conflicts on either side are then resolved (i.e. accept change / reject change)
• New SW Process Definition exported
• New Steps in SW Process Definition made executable
ARIS ProcessModel
SWConverter
Tool
SW ProcessDefinition
1
2
44
3
66
5
Slide 20
Sample Portal TIBCO Worklist
Slide 21
Sample TIBCO Portal Work Item
Slide 22
Sample TIBCO Queue Summary
Slide 23
Project strategy & roadmap
• TCP project must be completed by end 2004/2005
• Process automation using TIBCO Staffware Process Suite is key
• Pre-requisite for key sister programmes within BT
Slide 24
TCP: Business Benefits
• Annual cost savings• Process standardization• Geographical independence• Multi-skilling• Improved time to market
Slide 25
Summary
• TCP project crucial to BT Wholesale’s strategy
• TIBCO delivers complex process execution capability
• Major improvements in productivity & much tighter control of the process
• Delivers business agility & enhanced profitability
Slide 26
Futures
• Single sign-on through Portal• Use of rules engine to simplify process• Major project management• Expansion of BPM use within BT?