A PRESENTATION ON : “Consultancy Services for Geometric Design, Structural design, Preparation of drawing, Detailed estimates and Tender documents for construction of approximate 2km long road tunnel near Meer Vihar, Bhagya Vihar in the alignment of UER-II” To 36 th Meeting of UTTIPEC Working Group II-A (Processing & Evaluation of New Projects) Date : 15.06.2016

Upload: others

Post on 02-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

A PRESENTATION ON :“Consultancy Services for Geometric Design,

Structural design, Preparation of drawing, Detailed estimates and Tender documents for construction of approximate 2km long road tunnel near Meer Vihar, Bhagya Vihar in the

alignment of UER-II”To

36th Meeting of UTTIPEC Working Group II-A(Processing & Evaluation of New Projects)

Date : 15.06.2016

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

SECTION -1: PROJECT CONCEPTULIZATION BY

DDA/UTTIPEC

2

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Conceptualization of Tunnel Proposal in UER-II by DDA

3

UER-II is road project of DDA toconnect NH-1 to NH-2 via NH-10& NH-8 [2x(3Lane+BRT Lane)Total length 79.12km, RoW100m] is under construction.

Proposal of 2 Km long tunnelunder habitation & Settlementarea of Madanpur Dabas wasconceived by DIMTS in their pre-feasibility report (Nov 2014).

MoM : 31st Meeting of UTTIPEC (WG) dt. 3.12.15

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Location of 2 Km long Tunnel Road Project on UER-II

4

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Pointwise Compilations of Observations of 35th Meeting, UTTIPEC WG II-A dt 25.05.16

5

1. Kanjhawala Road to NH-10 is part of UER-II and acts as a missing link fromalready constructed portion of UER-II on Northern side of Kanjhawala Road andSouthern side of NH-10. Therefore, this stretch was again discussed in 33rdWorking Group II-A, meeting to provide seamless connectivity of the UER-II

2. DMRC Metro Proposal: DMRC officials have been interacted. It is confirmed thatat present there is a proposal of Metro Line along UER-II, however metroalignment is not coinciding in the proposed tunnel alignment, the same wasconfirmed during meeting held with Sr.DGM DMRC consultancy services on14.06.16 by EE RPD-5 and representative of Geoconsult. MoM has beensubmitted vide letter no F54(13)/RPD-5/A/DDA/2016-17/414 dated 15.06.16 tothe concerned DMRC officials by email.

3. This project of tunnel construction is a part of UER-II (approx. 2km long tunnel,ramps and cut & cover 900m each side, out of 79.12km total length of UER-II).UER is designed as an expressway for through connectivity of motorisedvehicles. Traffic circulation at surface level has been taken into considerationduring design of UER-II by providing service road, interchange/ intersectiondesign and loops/ ramps by DIMTS.

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

6

The Tunnel part is an underground path to cater UER-II traffic by avoiding landacquisition, and any disturbance to existing surface structures and habitations.There is no direct entry and/or exit of local traffic in ramp/tunnel.

Underground structures comprise of ramps, cut & cover sections and tunnel.Ramps are sloping road open to sky with side walls. Cut & Cover sections to bestructurally designed as per relevant standards.

Utilization and management of vacant land at Cut & cover sections will be underDDA and/or its authorised authority by provision of landscaping, parking forvehicles, horticulture, commercial development etc. Drawing is attached.

4. UER-II has been designed as a whole by integrating nearby intersection/junction. Tunnel section is a part of UER-II to cater traffic from one end to otherend through underground structure. Surface traffic will flow using local streetsand road above tunnel section as it is and/or administrated by local authority.There are two existing roads falling on either side of approach ramp. Theseroads are affecting during construction and will be taken care of by providingalternate diversion route. Traffic circulation plan for these two roads have beenprepared and presented in subsequent section.

Pointwise Compilations of Observations of 35th Meeting, UTTIPEC WG II-A dt 25.05.16 (Contd…..)

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

7

5. IRC : SP : 91 – 2010 – Guidelines for Road Tunnels and the European GuidelineEC54:2004 have been referred. Since there is no codal guidance for safedistance between two tunnels, the same will be fixed as per safe structuraldesign during DPR stage. The constraints of the alignment can be taken intoaccount by an improved construction method and additional measures. Thelining must be anyway designed to take the full loads, regardless of code.

6. As per survey, there are approximate 480 nos of mixed types of structure(kuchcha/pucca), single story (150) /G+1(195) / G+2 (125) and G+3 (10) nos,total land area 11.6 Ha, Population 6000 nos, density 45 houses/Ha; 550persons/Ha.). Site photographs have been attached in the presentation. Tunnelplan is also shown on Google Earth image showing existing network andhabitation along project area.

7. Presentation has been modified by rearranging/inserting slides from DIMTSreport.

Pointwise Compilations of Observations of 35th Meeting, UTTIPEC WG II-A dt 25.05.16 (Contd…..)

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

SECTION -2 TUNNEL LAYOUT AND GENERAL

CHARACTERSTICS

8

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

PROPOSED UER-II : RAMP– CC–TUNNEL-CC-RAMP Section

9

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

10

GA Plan and L-section

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

TWIN TUNNEL PLAN UNDERNEATH EXISTING BUILDINGS

11

Total Houses = 480 nos.; Land Area = 10.7 Ha.Kuchcha = 90 nos, Pucca = 390 nos.

G = 150, G+1 = 195, G+2 =125; G +>2 =10 nos.School 2 nos (0.2 Ha). Godown = 1 no (0.7 Ha)

Approximate Population = 6000 nos. Density = 45 houses/Ha ; 550 persons/Ha.

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Existing Urban & Settlement Area and Street network

12

To Mundka Side

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

TWIN TUNNEL SECTION UNDERNEATH EXISTING BUILDINGS

13

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

SECTION -3 TUNNEL ENTRY/EXIT AND TRAFFIC

CIRCULATION

14

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

TRAFFIC CIRCULATION PLAN AND LAND USE OVER C-C SECTION – ROHINI SIDE

15

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

TRAFFIC CIRCULATION PLAN AND LAND USE OVER C-C SECTION – MUNDKA SIDE

16

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Schematic Plan for the Transition from Surface to Underground Ramp

17

Transition (1 in 15)

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

TYPICAL SECTION OF RAMP

18

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

SECTION - 4 TUNNEL X-SECTIONS

19

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Cross Section of 3 Lane DDA Tunnel

20

By providing waterproofing membrane throughout the tunnel periphery, water table in surrounding ground will not be affected.

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Layout of 2 × 3 Lane Tunnel

21

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Cross section of Vehicular Cross Passage

22

GEOCONSULTZT GMBH

GEOCONSULTCONSULTING ENGINEERS

Cross Section of UER-II for Road (Approved by UTTIPEC)

23

Cross Section of Proposed Tunnel

Thank you for your attention!