a new technological tool for patching asphalt pavement

Upload: sekely-feycoh

Post on 01-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    1/45

    A NEW TECHNOLOG ICAL TOOLFOR

    PATCHING ASPHALT PAVEMENT

    by

    Wilson B. BrewerResearch Projec t Manager

    Under the Superv is ion of :

    C. Dwight Hixon, P.E .Research & Development EngineerResearch & Development Divis ion

    Oklahoma Depar tment of Transpor ta t ionOklahoma Ci ty, Oklahoma

    May, 1988

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    2/45

    T h e o p i n i o n s , f i n d i n g s , a n d c o n c l u s i o n s e x p r e s s e d i n t h i sr e p o r t a r e t h o s e o f t h e a u t h o r a n d n o t n e c e s s a r i l y t h o s e o f t h eO k l a h o m a D e p a r t m e n t o f Tr a n s p o r t a t i o n o r t h e F e d e r a l H i g h w a yadminis t ra t ion .

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    3/45

    TABLE OF CONTENTS

    Page

    INTRODUCTION .................. 1

    OBJECTIVE AND COPE .............. 2OPERATING THE PATCH MASTER ............ 5

    METHOD OF CONSTRUCTION ..............

    SAMPLING AND TESTING .............. 8

    CORE ANALYSIS RESULTS .............

    EVALUATION ................... 1 0

    RESULTS ...................... 1 4

    CONCLUSITON ................... 1 5

    REFERENCES ................... 1 6

    APPENDICIES

    A. TRAFFIC & ROADWAY HISTORY .........A-i thru A-3

    B. PATCHING EVALUATION ............B-i thru B-20

    1

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    4/45

    LIST OF F IGURES

    Page

    Figure 1 . Oklahoma Coun ty ............ 3

    Figure 2 . Linco ln oun ty ............. 4

    Figure 3 . Hea t ing D i s t r e s sed Su r f ace ....... 6

    Figure 4 . Leve l ing Hoppe r Ma te r i a l i n Fa i l u r e 6

    Figure 5 . Pa tch ing Eva lua t i on .......... 1 l

    1].

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    5/45

    I N T R O D U C T I O N

    The Pa t ch Mas t e r (PM) t r a i l e r moun ted p a t ch ing mach ine a l l ows

    an ex i s t i ng a spha l t r oadway su r f ace t o be hea t ed and r e juvena t ed .

    T h u s , i t c a n p r o v i d e a p e r m a n e n t p a t c h r e p a i r d u r i n g a n y s e a s o n

    of the year. (1 )

    This report will discuss the use of the PM in several

    d i f f e r e n t a p p l i c a t i o n s . F i r s t l y, i t w i l l b e c o n c e r n e d w i t h t h e

    w a y t h e O k l a h o m a D e p a r t m e n t o f T r a n s p o r t a t i o n ( O D O T ) h a n d l e s

    r o a d w a y r e p a i r s u s i n g t h e P M . S e c o n d l y, i t e x a m i n e s t h e e f f e c t

    o f h e a t i n g o n t h e p h y s i c a l p r o p e r t i e s o f t h e r o a d w a y s u r f a c e

    material. Thirdly, it gives a performance evaluation of the

    a t c h e s m a d e b y t h e P M . F i n a l l y, t h e r e p o r t w i l l p o i n t o u t t h e

    advan tages and d i s advan t ages o f u s ing t he mach ine .

    1

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    6/45

    OBJECTIVE AND SCOPE

    M u c h o f t h e p o t h o l e p a t c h i n g n e e d s a r e m o s t e v i d e n t i n t h e

    w i n t e r s e a s o n . M o s t p a t c h i n g m e t h o d s d o n o t w o r k w e l l i n t h e

    w i n t e r , m a k i n g p a t c h i n g e f f o r t s n e a r l y u s e l e s s . T h e P M o f f e r s a

    m e t h o d o f p a t c h i n g w h i c h c o u l d p r o d u c e a p e r m a n e n t p a t c h , o r a t

    l e a s t m o r e d u r a b l e o n e s . A c r i t i c a l e v a l u a t i o n o f t h e o p e r a t i o n

    of t he PM and the du rab i l i t y o f i t s pa t ches was needed .

    Tw e n t y t e s t s i t e s w e r e s e l e c t e d f o r e v a l u a t i o n u s i n g t h e

    method developed by the ODOT maintenance crew1 These were

    l o c a t e d i n O k l a h o m a a n d L i n c o l n C o u n t i e s . O f t h e Tw e n t y s i t e s ,

    one was de s t royed due t o bridge construction. See Figures 1 and

    2 f o r S i t e Loca t i ons .

    There we re fou r s i t e s i n Ok lahoma Coun ty ; one on 1 -35 , one on

    S H 6 6 a n d t w o o n S H 7 4. I n L i n c o l n C o u n t y t h e r e w e r e s i x t e e n

    s i t e s ; o n e o n U S 6 2 , t w o o n S H 6 6 , f i v e o n S H 1 7 7 a n d e i g h t o n

    SH 99. See Appendix A for Traffic Information and Roadway

    His tory.

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    7/45

    )

    C

    (

    C

    C

    .

    L0 GAN

    0 UNTY

    STATE OF OKLAHOMADEPARTMENT OF TRANSPORTATION

    OKLAHOMA C OUNTYSC LE

    0 IES

    CONTROL SECTION MAP

    Figure 1. Oklahoma County Sites.

    3

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    8/45

    PAYN E OUNT YR3E 4E 5E 6E 1;z

    z

    I-

    >.

    z

    I-

    ). ZI_s II

    SITE 10

    O

    I-

    II 1z E M

    IIII

    o 1S

    Jr

    ol

    ReEj

    STATE OF OKLAHOMADEPARTMENT OF TRANSPORTATION

    LINCOLN OUNTYsca t

    0 64.0

    CONTROL SECTION MAP

    Figure 2. Lincoln County Sites.

    4

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    9/45

    OPERATING THE PATCH MASTER

    T h e P M i s a s s e m b l e d f r o m f o u r m a j o r c o m p o n e n t s , t h e V- s h a p e d

    a s p h a l t m i x h o p p e r, t h e 1 6 h p p r o p a n e p o w e r e d e n g i n e , p u s h b u t t o n

    con t ro l pane l and a l uminous f i r eb r i ck hea t i ng wa l l . See F igu re s

    3 and 4 fo r pho tog r aphs o f t he P a t ch Mas t e r.

    One man can operate the machine but a total of three is

    n e e d e d t o m a k e u p a c o m p l e t e c r e w. T h e o p e r a t i o n o f t h e P M i s

    s i m p l e . F ir s t , y o u r e m o v e a l l t h e c o v e r s . T h e e n g i n e i s l o c a t e d

    i n t h e r e a r o f t h e . P M . O p e n t h e e n g i n e c o v e r a n d l o c a t e t h e

    p a n e l . T h e n o p e n t w o p r o p a n e v a l v e s . Tu r n t h e i g n i t i o n s w i t c h

    o n , e n g a g e t h e s t a r t b u t t o n a n d t h e e n g i n e b e g i n s t o r u n . I t

    p o w e r s t h e b l o w e r f a n . N e x t , e n g a g e t h e w a r n i n g f l a s h e r s a n d

    t u rn on t he con t ro l pane l p owe r.

    M o v e t o t h e s i d e o f t h e m a c h i n e a n d t u r n o n t h e p r o p a n e t o

    t h e l u m i n o u s w a l l . L i g h t t h e p i l o t s o n t h e w a l l a n d r e m o v e t h e

    r e s t r a i n i n g c h a i n s . T h e p a n e l c a n n o w b e l o w e r e d f o r u s e . S e et he ope ra to r ' s manua l f o r a comple t e de t a i l on ope ra t i ng t he PM.

    ( 2 )

    5

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    10/45

    Figure 3. Heating Distressed Surface.

    Figure 4. Leve l ing Hopper M ate r i a l i n Po tho le .

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    11/45

    M E T H O D O F C O N S T R U C T I O N

    T h e O k l a h o m a D e p a r t m e n t o f Tr a n s p o r t a t i o n p u r c h a s e d t h e P M i n

    August of 1985. After some initial trial and error, the field

    c r e w e v o l v e d a m e t h o d o f r e p a i r . I t i s s l i g h t l y d i f f e r e n t f r o m

    the "manual" procedure. Both methods require a survey of the

    d i s t r e s s e d a r e a .

    A f t e r c o m p l e t i n g t h e s u r v e y, m o v e t h e P M i n t o p l a c e . T h e n ,

    lower the wall onto the distressed area and heat it for 30

    seconds, off for 15 seconds, on 30 seconds. Repeat that

    procedure three times. Allow about 15 seconds, for the heat to

    p e n e t r a t e b e f o r e r a k i n g . N o w, r a k e t h e a r e a i n t o l o o s e m a t e r i a l .

    T h e m a i n t e n a n c e c r e w p r o c e d u r e a l l o w e d t h e l o o s e m a t e r i a l t o b e

    d i s c a r d e d b u t t h e m a n u a l c a l l e d f o r t h e r e - u s i n g o f t h e s c a r i f i e d

    loose material in the pothole for a good hot bond. Add

    r e j u v e n a t i n g o i l t o t h e e x p o s e d s u r f a c e a t t h e r a t e o f a b o u t 0 . 1

    g a l p e r s q u a r e y a r d . F i n a l l y, b o t h m e t h o d s r e q u i r e t h e a d d i n g o fa s p h a l t m a t e r i a l f r o m t h e h o p p e r a s n e e d e d . C o m p a c t t h e p a t c h .

    7

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    12/45

    SAMPLING AND TESTING

    State Highway 99, six

    l o ca t i on o f s i t e s 1 8 and 19 .

    A p h y s i c a l a n a l y s i s w a s r a n

    t he co re s . A cond i t i on su rv,

    a l l i ga to r c r ack ing , r u t t i n g ,

    ( 3 )

    miles

    Cores

    on the

    y of

    and a

    s o u t h o f S t r o u d , O K w a s t h e

    w e r e t a k e n f r o m t h e s e s i t e s .

    l i qu id a spha l t ex t r ac t ed f rom

    the area showed block and

    ve ry sma l l amoun t o f r av e l i ng .

    S a m p l e o n e c o r e s w e r e t a k e n p r i o r t o t h e P M t r e a t m e n t . T h e n ,

    t he PM hea t ed t he po tho l e a r ea and i t was r aked . Sample two came

    from the loose raked material. Then, the loose material was

    r e m o v e d a n d d i s c a r d e d . F r e s h m a t e r i a l w a s a d d e d . S a m p l e t h r e e

    cores were taken through the repaired area. It included the

    i n t e r f a c e t h a t b o n d s t h e p a t c h i n g m i x t o t h e o l d p a v e m e n t . S e e

    Tab le 1 fo r t he Abson r ecove ry r e su l t s .

    I EST NAME SITE 8 1 SITE 19

    I Sample Number I n e I wo Three One Three

    Penetra t ion, 25 1mm I 3 9 25 26 2 6

    I uctility, 5 c, m ( 2 I 1 10 1 13

    I iscosity 0 c, Poises 1 1,709 1>100,0001 33,640 I 9,254 23,588

    I Viscosity 135 c, cSf 1 ,085 I 10,0001 1 879 I 807 1,593

    Tab le 1 - Abson Recove ry

    I

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    13/45

    C O R E A N A LY S I S R E S U LT S

    The lab results showed an original aged asphalt roadway

    s u r f a c e w h i c h r e t a i n e d s o m e p e n e t r a t i o n a n d v i s c o s i t y. W h e n t h e

    r o a d w a y w a s h e a t e d b y t h e P M , t h e l o o s e , h e a t e d m i x d e t e r i o r a t ed .

    I t s f l o w v i s c o s i t i e s c o u l d n o t b e m e a s u r e d ( o v e r 1 0 0 , 00 0 P o i s e

    and 10,000 csf). Also, both the penetration and ductility

    properties of the loose material deteriorated significantly.

    Yet, when the loose material is removed and the interface is

    exposed, its Abson test values were similar to those of the

    o r i g i n a l s u r f a c e . ( 4)

    9

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    14/45

    EVALUATION

    A v i sua l eva lua t i on was made on t he 20 pa t ch s i t e s i n Oc tobe r

    1 9 8 7 . E a c h s i t e w a s e v a l u a t e d a s t o i t s t y p e o f d i s t r e s s . S e e

    t h e A ppend ix fo r Pa t ch ing E va l ua t i on Resu l t s .

    P M r e p a i r s w e r e m a d e o n a s p h a l t c o n c r e t e ( A C ) p a v e m e n t s t h a t

    h ad t he fo l l owing f l aw s :

    1. Over l a id Po r t l and cemen t conc re t e (FCC) j o in t b low-up .

    2 . Fa t igue a l l i ga to r c r a ck ing .

    3 . Rut t ing .

    4. Base Fa i lu res .

    The pa t ch pe r fo rmance pa rame te r s needed fo r eva lua t i ng t he PM

    w e r e e s t a b l i s h e d . T h e s e w e r e a s f o l l o w s :

    1 . Roads ide cond i t i on

    2. Lane d imens ions

    3. Rat ing t he deg ree o f roadway d i s t r e s s

    4. Roadway ma te r i a l t ype5 . Weathe r cond i t i on .

    6. The type o f r epa i r u t i l i z ed

    7. Equ ipmen t u sed

    8. Pa tch ing ma te r i a l u t i l i z ed

    9 . Sur face t empera tu re

    10. Tra ff i c

    Due to the many factors used in the investigation, an

    e v a l u a t i o n s h e e t w a s d e v e l o p e d f o r t h e p a t c h p r o c e d u r e a t t h e

    v a r i o u s s i t e s . S e e F i g u r e 5 .

    10

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    15/45

    PATCHING EVALUATION SHEET

    1) ocation &_Project

    21 oadside Conditionsut rae

    Fill itch:Geometri cs: egetation:

    3) Lane DatahouTer wo our utside l ane ddle lane

    No Shoulder ive ix nsi de l ane

    4) Road ConditionsuttTng orrugating ransverse or longitudal crack s

    Shoving leeding ock or al ligat or cr acks ase fail ure

    5) Roadwa Material8/Aq GFC/AC C/PC

    S8/SAC C/SAC BFC/SAC ther:

    6) Weather ConditionWet emperature: FDry ind Speed: H

    7 a tc h i n2 MethodNew TecFnoTogy tandard

    8) ole DimensionsLengtR t x Wdth t x Depth

    2m .

    Jack Hammer hovel rush ake ruck(s)Broom ir Compressor oller atch Master amper

    10) Base RepairLime7FTyash rasher Rock ot ApplicableFlyash ime elect Borrow ther

    11) Patching MaterialtX BAC ACLEAC AC SAC AC

    12) Patching Surf ace Temper at ure

    oT----------- - -------- rm F ot F13) Traffic Count

    T9 M e di u Heavy

    1 4 Soil T X R S

    15) Comments (on reverse side)

    Figure 5. Evaluation Sheet

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    16/45

    The following is an evaluation summary f he ite

    condi t ions :

    1 . Si t e one was a r epa i r o f a FCC b low-up . Af t e r t he f i r s t

    y e a r , t h e r i d e q u a l i t y w a s p o o r . T h e s e c o n d y e a r t h e

    p a t c h h a d f a i l e d . I t p r o d u c e d a p r o n o u n c e d b u m p .

    2 . Si t e two was de s t royed be fo r e i t cou ld be eva lua t ed .

    3 . Site three was another PCC blow-up. After the first

    y e a r , t h e p a t c h w a s i n p o o r c o n d i t i o n a n d r o u g h . T h e

    s e c o n d y e a r t h e p a t c h w a s r e t r e a t e d a n d s t i l l f a i l e d

    wi th a co r r e spond ing sha rp bump .

    4. S i t e s f o u r t h r o u g h s i x w e r e r e p a i r s o f c r a c k s a n d b a s e

    fa i lures . h e f i r s t y e a r, t h e p a t c h e s h a d c r a c k e d b u t

    the rides were still smooth. he roadways were

    r e su r f aced t he s e c o nd yea r.

    5 . Si t e s even was an AC p avemen t t ha t had c r acks and a ba se

    f a i l u r e . A f t e r t h e f i r s t y e a r t h e p a t c h w a s p a r t i a l l y

    r e p a t c h e d a n d p r o d u c e d a r o u g h r i d e . T h e s u r f a c e w a sove r l a i d t he s eco n d yea r.

    6. S i t e e i g h t w a s a s h o v i n g A C p a v e m e n t a b u t t e d t o a P C C

    pavement. The first year, the ride was moderately

    s m o o t h . T h e s e c o n d y e a r a h u m p r e a p p e a r e d a n d c a u s e d

    t h e r i de t o becom e rough .

    7. S i t e n i n e w a s a n A C p a v e m e n t t h a t w a s r u t t i n g , s h o v i n g

    and contained a base failure. After six months, the

    base failure repair had failed and it had to be

    repa tched .

    12

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    17/45

    8 . S i t e t e n w a s a n A C p a v e m e n t w i t h c r a c k s a n d r u t s . A f t e r

    t h e f i r s t y e a r , i t s t i l l h a d a s m o o t h r i d i n g s u r f a c e .

    The s ec ond yea r i t was r e su r f aced .

    9 . S i t e e l e v e n w a s a b r i d g e a b u t m e n t f a i l u r e . fter the

    f i r s t y e a r , i t s t i l l h a d a s m o o t h r i d e w i t h a s i n g l e

    crack. The second year, it still produced a smooth

    ride.

    10. S i t e t w e l v e h a d a c r a c k e d a n d r u t t e d A C s u r f a c e . A f t e r

    t h e f i r s t y e a r , t e n p e r c e n t o f t h e p a t c h w a s r e p a t c h e d

    bu t s t i l l had a mode ra t e ly smoo th r i de .

    11. Sites h i r t e e n h rough ixteen were shoving and

    cracking. ine months after patch repairs, he

    pavemen t s have c r acked bu t a smoo th r i de r ema ins .

    1 2 . Site seventeen was a rutting AC pavement. After six

    months , t he pa t ch f a i l ed and was r epa t ched .

    13. S i t e s e i g h t e e n t h r o u g h t w e n t y w e r e r u t t i n g a n d c r a c k i n g

    A C s u r f a c e s . A f t e r f o u r m o n t h s o f s e r v i c e , t h e y w e r e i ne x c e l l e n t c o n d i t i o n . T h e y a l l h a d s m o o t h r i d e s . ee

    Append ix B fo r Pa t ch ing Eva lua t i on Shee t s fo r e ach s i t e .

    1 3

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    18/45

    R E S U LT S

    T h e r e s u l t s o f t h i s p r o j e c t c a n b e m e a s u r e d b y l i s t i n g t h e

    P a t c h M a s t e r a d v a n t a g e s a n d d i s a d v a n t a g e s .

    Advantages: .

    1 . Seventy five percent of the repairs were made in the

    w i n t e r s e a s o n , w h e n O D O T w a s p r e v i o u s l y u n a b l e t o d o a n y

    pa tch ing .

    2. I t ' s a l o w m a i n t e n a n c e t o o l , o n l y t h e f i r e b r i c k s h a d t o

    b e r e p a i r e d , a t a b o u t $ 65 . 0 0 p e r y e a r.

    3. A large percent of the patches provided a moderately

    smooth riding surface prior to being u b s e q u e n t l y

    over la id .

    4. D i s t r e s s e s c a n b e r e p a i r e d t w i c e a s f a s t w i t h t h e P a t c h

    M a s t e r , t h a n w i t h t h e " c u t - o u t " m e t h o d .

    D i s a d v a n t a g e s :

    1. The Patch Master is limited to the repair of surface

    f a i l u r e s e . g . r u t t i n g a n d s h o v i n g .

    2. Only small size areas 6 x 6 ft of failures can be

    r e p a i r e d p e r h e a t i n g c y c l e .

    Cos t s :

    The average cost to repair each pothole with the PM is

    $36.00. This is derived f r o m a r e n t a l r a t e o f $ 2 0 . 1 8 p e r h o u r,

    p l u s t h e s a l a r i e s o f t h e c r e w.

    14

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    19/45

    C O N C L U S I O N

    The Patch Master has been used and managed according to its

    winter repair capability. Normally, except in emergencies, no

    p o t h o l e p a t c h i n g c o u l d b e p e r f o r m e d u n t i l t h e s p r i n g s e a s o n .

    T h e u s e o f t h e P a t c h M a s t e r a s a t o o l f o r p e r m a n e n t r o a d w a y

    r e p a i r s c o u l d n o t b e f u l l y e s t a b l i s h e d . N o t e n o u g h c o m p a r i s o n s

    could be made to the cut-out method and the use of roller

    compactors. More experience with the procedure should produce

    m o r e d u r a b l e r e p a i r s .

    15

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    20/45

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    21/45

    APPENDIX A

    TRAFFIC DATA & ROADWAY HISTORY

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    22/45

    TRAFFIC DATA AND ROA DWAY HISTORY

    Si t e No . 2

    C o u n t y : O k l a h o m aHighway: 1 - 3 5

    Cont ro l Sec t ion : 44 -55 -07A D T : 5 0 , 0 0 0

    In December 1952 , Aspha l t conc re t e was p l aced . I t was 48 f t .wide, 7in. thick and the b a s e i s u n k n o w n . I t e x t e n d e d f o r 1 . 0mi.

    Si t e No . 8

    C o u n t y : O k l a h o m aH i g h w a y : S H 6 6Cont ro l Sec t ion : 66 -55 -06A D T: 2 0 , 0 00

    I n O c t o b e r 1 9 3 3 , g r a d i n g a n d d r a i n a g e a l o n g w i t h P C c o n c r e t ew a s p l a c e d . I t w a s 1 8 ft wide , and ex t ended 5 .2 mi l e s .

    In December 1937 , m ixed b i t uminous w iden ing ex t ended 5 .9 mi .The p ro j ec t was 6 f t . w ide 1 .5 i n . t h i ck w i th a 6 i n ba se .

    I n A p r i l 1 9 5 6 , A C , 5 4 f t . w i d e w a s l a i d f o r 0 . 2 8 m i . I t w a s5 i n . t h i ck w i th a 7 i n . ba se .

    In 1961, Asphalt Concrete, Concrete System Revision was

    p e r f o r m e d t o 0 . 78 m i . I t w a s 5 4 f t . w i d e , 5 i n . t h i c k a n d h a s a7 in . base .

    Si t e No . 11 & 12

    C o u n t y : O k l a h o m aH i g h w a y : S H 7 4Con t ro l s ec t ion : 74 -55-60ADT: 3,400

    I n 1 9 2 1 , r o c k a s p h a l t o n g r a v e l w a s p l a c e d . T h e j o b w a s 4 4f t . w ide , 1 .5 i n . t h i ck w i th a 4 i n . ba se . I t was 13 .9 mi . l ong .

    I n O c t o b e r 1 9 3 3 , b i t u m i n o u s s u r f a c e t r e a t m e n t w a s c o m p l e t e df o r 0 . 0 4 m i . T h e p r o j e c t w a s 3 6 f t . w i d e , 5 i n . t h i c k w i t h a 8in . base .

    I n 1 9 6 9 , a n a s p h a l t c o n c r e t e o v e r l a y o n s t a b l e a g g r e g a t e w a sp l a c e d f o r 2 . 3 1 m i . T h e p r o j e c t w a s 2 4 f t . w i d e , 4 i n . t h i c kwi th a 4 i n . ba se .

    A- i

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    23/45

    Si t e No . 1 & 10

    C o u n t y : L i n c o l nH i g h w a y : S N 6 6Cont ro l Sec t ion : 66 -41 -06A D T: 2 , 1 0 0

    I n M a r c h o f 1 9 3 2 , g r a v e l w a s l a i d 3 0 f t . w i d e , 3 i n . t h i c kand ex t e nded fo r 5 . 3 m i .

    I n A p r i l o f 1 9 3 3 , P C c o n c r e t e ( f u l l y r e i n f o r c e d ) w a s p o u r e d .T h e j o b w a s 4 i n . t h i c k a n d h a s a 5 i n . b a s e . T h i s w a s d o n e i nfou r s ec t i ons . They a r e 2 .4 , 2 . 3 , 2 . 4 and 1 .7 mi . l ong .

    I n D e c e m b e r 1 9 7 1 , a 1 i n . o v e r l a y 2 . 9 m i . l o n g w a s l a i d . I twas 24 f t . w ide , 2 i n . t h i ck w i th a 7 i n . ba se .

    Si te No. 3

    C o u n t y : L i n c o l nH i g h w a y : U S 6 2C o n t r o l S e c t i o n : 6 2 - 41 - 0 2A D T : 2 , 0 0 0

    In Oc tobe r o f 1929 , PC conc re t e (pa r t l y r e in fo rced ) was l a id .T h e p r o j e c t w a s 7 7 f t . w i d e a n d 9 x 6 x 9 f t . s l a b a n d 0 . 1 7 m i .long.

    In 1967, Aspha l t C onc re t e Sys t em Rev i s ion was d one . t was48 f t . w ide w i th a 8 i n . ba se . The p ro j ec t ex t ended 0 .3 mi .

    Si t e No . 4 5 6 , 7 & 9

    C o u n t y : L i n c o l nH i g h w a y : S N 1 7 7C o n t r o l S e c t i o n : 1 7 7- 41 - 2 0

    I n N o v e m b e r 1 9 7 1 , r e s u r f a c i n g a n d w i d e n i n g f o r 1 7 . 5 m i . w a sp e r f o r m e d . I t w a s 2 4 f t . wide, 1 i n . t h i ck w i th a 6 i n . ba se .

    I n J u l y 1 9 7 8 , 1.5 in . of asphalt concrete overlay waspe r fo rmed fo r 6.0 m i. I t was 24 f t . wide , 2 . 5 i n . t h i ck w i th a 6in . base .

    A-2

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    24/45

    Si t e No . 13 , 14 , 18 , 19 & 20

    C o u n t y : L i n c o l nH i g h w a y : S H 9 9C o n t r o l S e c t i o n : 9 9 - 4 1 - 2 8A D T: 3 , 2 0 0

    In June o f 1 937, m ixed b i t uminous on g rave l was l a id fo r 17 .8mi . I t was ' 22 f t . w ide , 2 i n . t h i ck and has a 4 i n . ba se .

    I n M a y 1 9 7 0 , r e s u r f a c i n g w a s p u t d o w n o n a P C c o n c r e t e b a s efor 12.5 mi. It was 24 ft. wide, 1.5 in. thick with a 2 in.base.

    Si te No. 15 , 16 & 17

    C o u n t y : L i n c o l nH i g h w a y : S H 9 9C o n t r o l S e c t i o n : 9 9 - 4 1 -3 0A D T: 3 , 6 00

    I n M a y 1 9 3 7 , m i x e d b i t u m i n o u s w a s l a i d f o r 2 . 8 m i . T h e j o bwas 22 f t . w ide , 2 i n . t h i ck w i th a 7 i n . ba se .

    I n S e p t e m b e r o f 1 9 4 7, m i x e d b i t u m i n o u s w a s l a i d . I t w a s 2 2f t . w ide , 2 i n . t h i ck w i th a 7 in. base.

    I n J u l y 1 9 7 8 , a n d o v e r l a y w a s p u t d o w n f o r 1 3 . 2 m i . I t w a s24 f t . w ide 3 i n . t h i ck and has a ba se o f 6 i n .

    In May of 1986, 1.5 in. of asphalt concrete overlay was

    p l a c e d , 2 4 f t . w i d e , 4 i n . t h i c k , w i t h 6 i n . o f b a s e a n d e x t e n d s3.2 mi .

    A-3

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    25/45

    APPENDIX B

    PATCHING EVALUATION

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    26/45

    PATCHING EVALUATION SHEETa a a a a a a = = a a a a a a = = a a a= = = = = = = a = a = a = = a = a a a = a = = = = = a = = a a a =

    1) ;

    2) Roads ide Condi t I .o1 i3 .-----------

    F i l l i t ch : Jc'ef'G e o r n e t r i c s : -

    - ---- - Veation:

    3 ) Lane Datah o u Te r our utside l a n e iddle lan

    Shoulii i v e i x nside lane

    4) Road Conditionsu t t T n g o r r u g a t i n g r a n s v e r s e o r l o n g i t u d a l c r a c k s

    S h o v i n g l e e d i n g l o c k o r a l l i g a t o r c r a c k a s e f a i l u r e

    5 ) R o a d w a y M a t e r i a lTA - - - - - - - - - - SB/Ag GFC/AC

    AC/SAC BFC/SAC ther:

    6) Wga-tI'reiCondition- emperature:

    Dry ind Speed: ----- R P H

    7) PatchingNewTec T tandard

    1

    8 ) H o l e D i m e n s i o n sLength ft x Width ft x Depth jd

    9) E q uipmentJack Hammer h o v e l rush ake ,rj.ckLsjB r o o m ir Compressor o l l e r aa e a m

    1 0) B a s e R e p a i rL i m e 7 F Ty a s h r a s h e r R o c k o t A p p l i c a b l eF l y a s h i m e e l e c t B o r r o w t h e r

    11) Patching MaterialLW. CBAC A CL E A C AC S A C AC

    12) Patching Material Temperature F o t

    13) Tr a f f i c C o u n tLTgfit e d i u m H e a v y

    4) 9ll_IQ5) Comments (on reverse s ide) y l d~ YW

    L. l owed

    --I

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    27/45

    -i75PATCHING EVALUATION SHEET

    622 Z a==== 23222 3=

    1)Location &P J' rC -44i

    2) Roads ide Cond i t i ons- 'ty -------- tFe

    / D i t c h :e o rne t r i c s : -- - Vegetat ion:

    3 ) L aLShOU1C.-) wo Four jsi4e lane ddle lane

    No Shoulder ive nsideTi

    4) Road Conditionsj orrugat ing ransverse r a c k s

    Shoving leeding lock or alligator cracks ase failure

    5) Roadway Mater ia lSB/Ag GFC/AC C/PC

    S 8 / S A C C/SAC BFC/SAC t h e r :

    6) Weather ConditionWe t - emperature: 2

    ind Speed: 0- RPH

    7) Patching MethodeWTogj tandard

    8 ) tole QiT iQn..e n g t h ------- ft x Width t x Depth 2fl i ,

    9)EquipmentJack Hammer h o v e l r u s h kj2 cuLs)'

    B r o o m ir Compressor o l l e r

    1 0) e 2 a i rLime7FTyash rasher Rock ot ApplicableF l y a s h i m e elect Borrow t h e r f / o . i r _

    11) Patching MaterialL C AC9 RAC BAC :jALEAC A C SAC A C

    2 ) atching Material Temperature arm - - ot

    3) Traffic CountL T F edium ----------Havy 4) _I21 5 ) omments on reverse side)

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    28/45

    -

    PATCHING EVALUATION SHEET

    ) Loca t ion & _ P r o j e iTE 3 1f2c/,l

    2 ) Roadside Condi t ions

    Ditch P

    Geometrics [i_J: L------Vegetation3 ) Lane D a t a

    Four utside lane ddle laneNo Shoulder i v e ix nside lane

    4) Road Condi tions _LuttTng Q . . r u g a t l n g . . ransverse or longitudal cracks

    S h r i -m g leedTng lock or al l igator cracks ase fa i lure

    5) RoadwaterialSB/Ag GFC/AC C P

    SB/SAC C/SAC BFC/SAC ther:6) Weather Condi t ion

    W e t emperature: Fr y ind Speed:

    7) Patching MethodeecnooD tandard

    8 ) Hole DimensionsLength ------- ft x Width t x D e p t h

    9 )E9uipment

    Jack Hammer hovel rush ieJ Truc sBroom i r Compressor oller Patch e _ T a i i

    10) Base Repai rLime7FTyash rasher Rock o t & p p j t c a 1 e Flyash ime elect Borrow ther

    1 ) atchin2 Materialt A BAC A CLEAC A C SAC

    12) Patching Material Temperaturearm - - - / 5 F o t

    13) Traff ic CountMedium Heavy

    4 ) 2 LI21 5 ) omments on reverse side)

    - 3

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    29/45

    -

    PATCHING EVALUATION SHEET==C =

    1)L 2 __fr S F 4 j /77 JLCf /

    2 ) Roadside Condi t ionsu t - - - - - - - - -trae

    161 7 itch: zL L.ji_

    eornetrics: ; Lj- - - - - - - - -Vege ta t ion :

    3 ) Lane DataShou l F o u r utside lane iddle laneNo Shoulder i v e i x nside lane

    4) Road Conditions'u t tTng orrugating r a n s v e r s e o r i o n 4 - t - a 1 _ r a c k i _ . _Shoving leeding TEkTr al l igator cracks 5sfai1ure'

    5 ) Roadway MaterialSB/Ag GFC/AC C/PC

    SB/SAC C/SAC BFC/SAC ther:

    6) Weather Condi t ionW e t - - emperature:

    Wind Speed: :::: P H

    7) Pat;hina Methodew Tec no 09j tandard

    8 ) Hole DimensionsLength t x Width ft x Depth

    9) Equip me n tJ a c k Hammer hovel rush (lg.jji ~~ _ _room i r Compressor oller atchMter i1jjE

    1 0) Base Repairime7FTyash rasher Rock ot Applicable

    Flyash ime elect Borrow ther - - - -

    11) Patchinq MaterialtA B A C A C

    L E A C AC SAC

    1 2 ) Patching Material TemperatureTr_::::::_: - ----2--r a - -a r m- - _ F o t3 ) raff ic Count

    LTgHt edium

    4) S o _I2

    1 5 ) omments on reverse side) 4j

    B-4

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    30/45

    PATCHING EVALUATION SHEET

    1 5r7 1/.- i77

    2) Roadside ConditionsAt rae

    F 111 1 t C h:eometrics: --- Vegetation:

    3 ) Lane Datah o u Te r wo o u r utside lane iddle lane

    No Shoulder ive i x nside lane

    4) Road ConditionsuttTng or ruga t ing .Trans ve r. seo rHongJ tuda1 c racks

    Shoving leeding 1ock or al l igator cracks e fa i lu

    ) oad a aterialSB/Ag GFC/AC C/PC

    7AC C/SAC BFC/SAC ther:

    6) Weather ConditionWet - - emperature:

    Wind Speed: -----

    7) Pat chin,et hod_JijechTgL. tandard

    8 ) Hole Dimension sLength t x Widthft x Depth

    -

    Jack Hammer hovel rush kBroom i r Compressor oller EFffflter aii>

    1 0 ) ase Repai r1 1 me7FTyash rasher Rock ot ApplicableFlyash ime elect Borrow ther _ _ _

    i i ) atchin2 MaterialC8AC A C

    LEAC A C SAC

    2 ) atching Mater ia l TemperatureNTF 5_ F ot

    1 3 ) raff ic CountMedium

    4 ) 2 LIQ1 5 ) omments on reverse side)

    cf c c

    3-6

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    31/45

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    32/45

    PATCHING EVALUATION SHEET

    1.) Location &ProJ,ec ~ T T' 7 ii /77 11CC/I n Vr )LJ, 1 ( 1 (C" ay i y 7 , A /

    2 ) Roadside Condit ions_u t A t r aae

    F i l l i t c h : -J,1

    Geometrics: t/ ( ---- Vegetation:3) Lane Data

    h o u Te r ___ o u r utside lane iddle laneN o i v e i x nside lane

    4) Road Condit ionsuttTng orrugating ransverse orLqn.Ltudal crack-s- - -

    Shoving leeding lock or a l l ig a t o r c r a I Base fai lur5 ) Roadway Material

    SB/Ag O G F C / A C C/PC

    SB/SAC C/SAC BFC/SAC ther:6) Weather Condi t ion

    W e t emperature: -D r y ind Speed: P H

    7) P a t c h i n M e t h a dNew TecT tandard

    '- ---------------- p -

    B ) ole DimensionsLength ------- _ f t x Wi d t h t x D e p t h 2

    9 ) E u i 2 m e n tJack Hammer hovel rush r u ck ( s LBroom i r Compressor oller a tch Master ' mie

    10) Base RepairLime7FTyash rasher Rock ot ApplicableFlyash ime elect Borrow ther

    11) Patchin2 Mater ia l t ___ A C

    LEAC A C SAC

    12) Patching Mater ia l Tempera turea r m - - - o t

    13) Traff ic CountLTght edium

    14) .2ll_T y pe

    15) Comments on reverse s i d e )-

    ten 0f1

    - ec J7tf l 3m,n 1S.

    y / B-7

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    33/45

    PATCHING EVALUATION SHEET

    L o c a t i o n & _ P r o j ~ Sj 51

    2 ) Roadside Condi t ionsu t - - - - - - - - -tFae

    F i l l itch: 'ii:

    _ _ _ _ L Yeometricsegetation:

    3 ) L a n e D a t aTwo .-r-- ..OktUe lane iddle lane

    No Shoulder ive i x nside lane

    4) Road Condit ionsuttTng orrugat ing r ansve r se o r I o g uda l c r ack s

    S h o v i n - - - - - - . B l e e d i n g ase fai lure

    5) RoR UT -4~e r i a 1----- B/Ag GFC/AC

    SB/SACC/SAC

    BFC/SAC Tier:

    6) Weather ConditionWet emperature:

    Wind Speed: ::_: -------7) Patch ethod

    Newecnoog tandard

    8 ) Hole DimensionsLength - - - - - ft x Width ft x Depth

    9 ) Equipment-

    Ja c k Ha mmer hoveJ r u s h . . . L e . ) r u c k s 3Broom i r Compressor oller

    10) BaseRe2airLime7FTyash rasher Rock gAppiciTeThFlyash ime elect Borrow ther

    Ii) atching Material"CA ---- 7NA BAC A C

    LEAC A C SAC A C

    12) Patching Mater ia l TemperatureN O T2 --- arm- --Hot F

    13) Traff ic CountLTgit - - - - - - - Medium Heavy

    14 oil_I2

    1 5 ) omments on reverse side)

    L rLL4,1c

    B-8

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    34/45

    PATCHING EVALUATION SHEET

    L. ca n rojeSj LT 7 l1) oadside ConditionsJLL - -- t rae

    D i t c hG

    -r)

    eornetrics:

    __ _ y.L----------------Ve g e t a t i o n :

    3 ) Lane DatahouTer o u r utside lane iddle lane

    'FTve i x n s i d e l a n e

    4) Road Conditionscorrugating ransverse or longitudal cracks

    S h o v i n g leeding lock or alligator cracks ase failure

    ) oadway MaterialSBiAg G F C / A C C / P C

    S B / S A C A.cJSAC- 8FC/SAC ther:

    6) Weather ConditionWe t - emperature:

    Wnd Speed: :::::::: R P H

    7) P a t c h i n e t h o djwTecnoogy tandard

    8)Hl e - Di men,s i ons.. /L e n g t h ft x Width ft x Dept h

    9 ) E9ui2mentJack Hammer h o v e l r u s h T ruck - .j L3B r o o m ir Compressor o l l e r tch Mr iiIjiZ

    1 0) Base Repairime7FTyash rasher Rock ot Applicable

    F l y a s h i m e elect Borrow ther

    i i ) atchin2 MaterialE A U- -- A M R A C B A C AGLEAC AC SAC < 1A

    12) Patching MaterialTem2erature

    sO F o t

    i75 ----

    13 ) Traffic CountLT g F t - - - - - - - - edium Heavy

    14) S oil . M

    15) Comments on reverse side)

    ~c ~ , e c i 4 c4 A 5 p ~I n 5

    B - 9

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    35/45

    PATCHING EVALUATION SKEET

    2 ) Roadside Conditions

    t rael i t c h :G e o m e t r i c s : e g e t a t i o n :

    3 ) L a n e D a t ahuTer w o utside lane iddle lane

    ive i x n s i d e l a n e

    4) Road Conditions'uttTng orrugating "--Lransverse or longitudal cracksS oL4 l e e d i n g l o c k 1ligtor cracks ase failure

    5) aNdlS B / A g G F C / A C C / P C

    S B / S A C C/SAC B F C / S A C

    6) Weather ConditionWe t emperature: F

    Wind Speed; - - - - - -

    7) PatchinMethodN e w TecEnT tandard

    --- f8) Hole Dimensions

    L e n g t h t x Width _ft x Depth ll

    9 ) EquipmentJack Hammer h o v e l r u s h e_

    room ir Compressor o l l e r asteL

    10) Base RepairLime7FTyash rasher Rock ot ApplicableFlyash ime elect B o r r o w t h e r

    11) Patching MaterialE X---- 7 N A BAC A GL E A C J

    12) Patching Material Temperature- - - - a r m F o t --

    13) Traffic CountLTgt ----- Medium e a v y

    4) Soil I2

    15) omments on reverse side)

    B - i O

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    36/45

    PATCHING EVALUATION SHEET5 2 5 2 2 5 2 = = = 2 2 32222 2 = 3 3 222 = =22222 233

    3 = = 5 3 = = = 5 = 3 = 5 3 = = 5 2 2 = 5

    1) fTE LI cH7

    RoadsideSotions

    J

    2 ) R o a d i onditions

    EJJ i t C h :

    Geometrics egetation3 ) Lane Data

    - - o u r utside lane iddle laneS h o u l d e r i v e i x nside lane

    4) Road Condi t ionsuttTng orrugating r ansve r se o r1ongJ tuda1 c rack

    S o - - - - c - g leeding ocko r a l l i g a t o r c r a ZE?_B a s e f a i l u r e '

    5 ) Rod wraterialSB/Ag GFC/AC C / P C

    SB/SACC/SAC BFC/SAC h:

    6) Weather Condi t ionW e t emperature: 5 OF

    Wind Speed: :::::::: P H

    7) Patching MethodewIogy. tandard

    8 ) Hole DimensionsLength __-Lft x Width t x Depth _.

    9) Eq uipmentJ ack Hammer hovel r u s h c..jjjT r u c i ir o o m ir Compressor oller a c s te

    10) BaseRepa i rLime7FTyash rasher Rock ot ApplicableFlyash ime elec t Borrow ther --------

    1 1 ) Patching Mater ia ltA BAC ACLEAC A C SAC I A 1 T

    12) Patching Material Temperature )C F o t

    13) Traff ic Count- l ----- edium

    1 4) S o 1_I

    15) Comments on reverse side)

    I 5e 1 4 1 i ieJ /

    3-11

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    37/45

    PATCHING EVALUATION SHEET= ;c = = = = a

    7 4 J

    2 ) R o a d s i d e C o n d I t 4 _ a i i-------------

    F i 1 1 i t c h :G e o r n e t r i c s &Eation

    3 ) Lane DatahIer o u r utside lane iddle lane

    _ o Shou1der ' i v e i x n s i d e - l a n e4) Road Condi t ions

    r u t t T n g- 7 r r u j t i n g ransverse or longi tudal c racks1oT9 Te e d i n g ock or al l igator cra?Ri ase fa i lur

    5) Roadwy Mate r i a l- - - - - - - - - - SB/Ag GFC/AC C/PC

    SB/SAC C/SAC 8FC/SAC ther:

    6) Weather Condi t ionW e t emperature:

    iIEI ind Sp eed : - - - - - -- - - - -7) Patching Method

    Standard

    8 ) Hole Dimensionsft x Width t x D e p t h

    9) EquipmentJ a c k Hammer o v e l rush 'ruckisLBroom i r Compressor oller beT

    10) Base Re2airLime7FTyash rasher Rock ot ApplicableFlyash ime elect Borrow ther

    i i ) atching Material"tA --- R Z 9 7 N A C BAC A C

    LEAC A C SAC 1K

    1 2 ) P a t c h i n M a t e r i a1 Te m p e r a t u r eroTa arm F ot

    13) Traff ic Count

    Medium - - - - - - - - -eavy -

    4) So 1_I21 5 ) omments on reverse side)

    CA _ ~ 00 I L

    -12

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    38/45

    -

    PATCHING EVALUATION SHEET

    1) = = =LTE / ,,ic/,i cye iJ eI

    2 ) Roadside Cond

    ------

    F i l l t c h :Geometrics: eV e" iget a t i o n : 7, 4

    3 ) Lane Datah o u Te r Jo_) o u r utside lane iddle lane

    KTNfoulder) ive i x nside lane

    4) Road Condit ionsuttTng rrugating r a n s v e r s e o r l o n g i t u d a l c r a c t s _ ,

    5ng leeding l o c k o r a l l i g a t o r c r a c k s . a s e f a r e

    5) Roadwa Mate r i a lz B[Ag GFC/AC C/PC

    SB/SAC BFC/SAC t h e r : -

    6) Weather Condi t ion- emperature:

    D r y ind Speed: P H

    7) Pat h i n ethodStandarde I n~ l o~

    8 ) H o l e D i m e n s i o n sx Wi d t h ft x Depth 2

    9 kI4mmer hovel rushBroom i r Compressor oller P a t c h M a s t

    10) Base_ea1rLime7FTyash rasher Rock ot ApplicableFlyash ime elec t Borrow ther

    11) Patchin M a t e r i a lN A C

    LEAC A C SAC

    1 2 I2 ra SOr o Ta rm ot

    13) Traffic CountMedium

    14) So il I2

    1 5 ) Comments (on reverse s ide )

    B-13

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    39/45

    --

    PAT C H I N G E VA L U AT I O N S H E E T

    I ocation&Project snr' /4 S 7f A

    , cv

    2) Roadside Condi t ionsGr a d e -)

    F i 1 1 i t c h :Geometrics: ---- egetation:

    3) Lane DataSE-O d N e r w o u r utside lane iddle laneNo Should i - i v e i x nside lane

    4) Road Condi t ionsZflIj, orrugating ransverse_oc io i ig i tu4&Lracks

    Shoving leeding j j cko r a l l i ga to r c r a c k s ase fai lure

    5) Roadwa aterialOGFC/AC C/PC

    SB/SAC BFC/SAC ther:

    6) Weather Condi t ionW e t emperature: .5 Dry ind Speed: -------

    7) P a t c h i n M e t h o dew ecEnoj tandard

    8) Hole DimensionsLength ___Q__ft idth ft x Depth

    9 ) E9ui2mentJack HammerSj3D rushBroom i r Compressor o l l e r Pjth Master

    10) Base Re a i rLime7FTyash rasher Rock ot ApplicableFlyash ime elec t Borrow ther

    11) Patchina MaterialCBAC A C

    LEAC A C SAC

    12) Patching Mater ia l TemperatureOTa arm F ot

    3 ) Tr a f f i c C o u n tLTgt edium Heavy -

    14) Soil_I2

    15) Comments on reverse side)

    4( r4 f

    B-14

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    40/45

    PATCHING EVALUATION SHEET

    J,i ho

    2) Roads ide Cond i t i ons

    Fill i tch:Geometri cs: --- Vegetat i n :

    3) Lane Da t aj3uTer w) our uts ide l ane i dd l e l ane

    Five ix nside lane

    4) Road Cond i t i ons -or ruga t ing ransverse or longiicraiT

    Shoving l eed ing lock orTigtorracks ase f a i l u r

    5 ) Road way Ma te r i a lJA GFC/AC C/PC

    SB/SAC BEC/SAC ther :

    6) Weather ConditionWet emperature: 5 F

    ____ ind Speed: iih

    7) Pat chin ethodStandard

    8 ) Hole D imens ionsLength 2t x Width O ft x Depth

    9 ) EquipmentJack Hamme r 1EiIjD ush ' ae_; ruck sBroom i r Com p res so r o l le r atch aster e

    1 0) Base Repa i rLime7FTyash ra she r Rock 1 Q J ApjJ_caFlyash ime elect Borrow ther

    i i ) a t ch ing Ma te r i a lt BAC ACLEAC AC SAC

    12) Patching Material TemperatureNO1:: :: --------------- /95F ot

    13) Traffic Count

    Medium ----------Heav y

    14) Soil _I2

    15) Comments on reverse side)

    +o L

    -15

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    41/45

    PATCHING EVALUATION SHEET$ 333= = = 332 2333 233 = = 3333 = 33 = = 2 = = = 23 33 33

    = 3= = = =

    1)ocat i n _1r2i..c TE ft, 1110L1

    nd) R o a d s i d e C o _ I t i o n s------------- 2EL .

    F i l l itch: e _ fGeometrics: 'j------------Vegetation:

    3) Lane DataiTer o u r utside lane iddle laneShoTdt' i v e i x nside lane

    4) Road Condi t ionslongitudal cracs_______

    Shoving leeding lock or al l igator cracks _B a s e _failu5 ) Roadway Material

    Mz B/Ag . G F C / A C C/PCSB/SACLAL - OBFC/SAC ther:

    6) Weather Condi t ionW e t emperature:

    Wind Speed: P H7) Patchin h o d

    TTeEEiioogy tandard

    8 ) Hole DimensionsLength - - - - - - - - - ft x Width f t x D e p t h

    9 ) 9 . . 1 2 m D .Jack Hammer hovel rush ake ruck(s)Broom i r Compressor oller atch Master am

    10) Base Repai rLime7FTyash rasher Rock ot ApplicableFlyash ime elect Borrow ther _

    11) Patchin2 Mater ia lBAC AC

    LEAC A C SAC A C

    12) Patching Mater ia l TemperatureHot

    13) Traff ic CountLTgt - - - - - - - Medium Heavy -

    14) S o U_I215) Comments o n reverse side)

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    42/45

    1 -

    PATCHING EVALUATION SHEET

    1) 2) Roads ide Cond i t i ons-

    -

    F i l l itch:e o r n e t r i c s : - Vegetat ion:

    3) Lane Datahou.Iaer. our utside lane iddle lane

    Shoulde ive i x nside lane

    4) RoaConditions. orrugating ransverse or ingi tudal cracksShoving leeding T7or al igaor cracks ase failuri

    5) Roadway MaterialSB GFC/AC C/PC

    SB/SAC AC/SAC B it- C/SAC ther:

    6) Weathe r Cond i t i one t emperature: 8

    Wind Speed: -------

    7) P a t i-ILing Methodew Tec no oy,y tandard

    8) Hole Dimens ionsLen gth;ft idth t epth

    9 quipment -Jack. Hammer rush ake kBroom i r Compresso r oller a tch Maste Tamp

    10) Base Repai rLime7FTyash rasher Rock ot Appl icableFlyash ime elect Borrow ther J 0

    11) -atchin ater ial

    tA--- 7A BAC A CLEAC AC SAC JD

    12 P a t c h i n g Mate r i a l Tempera tu rea00 F ot

    1 3 ) Tra ff i c Coun t rT::::____ edium eavy

    14)

    1 5 ) Comments on reverse s ide)6

    - 4OOF io Z

    Q

    7 F(U 4 ( . ) ~ . e d j c i . ) I j e f 6 -17

    d 4C

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    43/45

    PATCHING EVALUATION SHEET

    I ocation roject

    E l li

    2 ) Roadside Condi t i n s

    F T 1 1 itch:Geometrics.

    j-

    -

    Vegetation. - - - - - -3 ) Lane Data

    houIBer wo o u r utside lane iddle laneN o S h o u l d e , ' i v e i x nside lane

    ) oad Condit ionsT ' g orrugating ransverse or longitudal cracks

    Shoving leeding 1kora11igatorcracks ase fai lur

    5 ) Roadway MaterialMz 5 1 & 9 . . GFC/AC C/PCSB/SAC BFC/SAC

    ther:

    n) Weather Condi t ionW t empera ture :D r y ind Speed: - - - - - - -

    7) Patching Method~ ewecro1on o To g tandard

    8 ) Hole DimensionsLength - - - - - - - - ft x Width t x D e p t h

    9 ) 2mn.Jack Hammer rush aiijT u _ C k sBroom i r Compressor oller . 2 a t h M a s t e

    1 0) Base Re2airime7FTyash rasher Rock oTibli

    Flyash ime elect Borrow

    11) Patchin2 Material"tA BAC A C

    LEAC A C SAC T

    1 2 ) Patching Mater ia l Tempera tureN O T E arm o t 410---- 13) Traff ic Count

    - edium_4 ) 11_I2

    1 5 ) omments on reverse side)J b e . ; 1 4 4 N e Y e d 1 5~ 1 0 c ~10 d L

    1 'B-iS

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    44/45

    PATCHING EVALUATION SHEET=a Z3 = = 3 33 3 3 3 3 = 3 3 = 3 3 = = = 3 = 3 3 3 3 = = = = = = =3 3 = 33

    I ocation&Poect

    2) Roads ide Condi t ionst t

    -

    F i l l i tch:

    Geometr ics egetat ion3) Lane Data

    houjjr 1 w . . a _ our utside lane idd le laneFive i x nside lane

    4) Road C ond i t i onsu ttTng rrugati ng ransverse or lqnJ j cracks

    Shoving leeding r - al 1 igator cracks ase f a i l u r e

    ) Roadwq MaterialB A GFC/AC C/PC

    SB/SAC S BFC/SAC ther:6) Weather Condition

    Wet emperature:Wind Speed:

    7) Patching MethodwecI 2 tandard

    8 ) Hole D imens ionsx Width 3t x D eph

    9) E g y _ j p m e n tJack Hammer hovel rush --, Tr-41 kThAir CoFso r ol1 e r Mast er -----

    10) Base Repairime7FTyash rasher Rock ot Applicable-'

    Flyash ime elect Borrow ther

    I ) atchin2 MaterialEAU- -- AMRAC 8AC _J4ACLEAC AC SAC

    12) Patching Material Temperaturearm -- - ot

    13) Traffic Count-- ET::_ :: edium Heavy

    4) Soil -1Yzt15) omments o n reverse side)

    I 5

    B-19

  • 8/9/2019 A New Technological Tool for Patching Asphalt Pavement

    45/45

    PATCHING EVALUATION SHEET==

    2 1 20 i7C,,

    2 ) Roadside Cont t t to . .n . . j

    /Fi l l

    tch: Zt'ei

    Georne t r i c syJ-----------

    V'ge ta t ion 1- d ~ S

    3 ) L a n e D a t a _h o u Te r o u r utside lane iddle lane

    Fi ve ix n s i d e l a n e

    4) Road Conditionsu t t T n g orrugating - -1tjjverse or longitui'cracks

    S h o v i n g l e e d i n g lock oiatrigatbr cracks ase failure

    ) oadway _MaterialFUZ BJA.g G F C / A C C / P CS B / S A C ,'C' 8FC/SAC ther:

    6) Weather ConditionWe t emperature: --

    ind Speed: -------

    7) P a t c h i n ethodS t a n d a r d

    8 ) Hole DimensionsL e n g t h ' ft x Wdth -t x Depth Z

    9 ) E9ui2mentJ a c kHamme r Povji) 1Biu i i

    mer o o m ir Compressor o l l e r

    10) Base RepairL i m e 7F yash rasher Rock J3 AppiiLe.)F l y a s h i m e elect Borrow ther_____ _

    11) Patchinq MaterialEA U- -- AMNAt 8AC ACL E A C A C S A C

    2) Patching Material Temperature

    -_:::_:::: arm-- -- H o t 5c) O F13) raffic Count

    LTgt _ edium Heavy

    4) So t1 I2