a handbook of english for oil drilling
TRANSCRIPT
-
8/12/2019 A Handbook of English for Oil Drilling
1/49
A Handbook of English for Oil Drilling
Drilling P1
1. Carry out drilling operation in accordance with the drilling program.
.
. Prepared bell nipple. ! ! .
". #ake up $oints of drill pipe. .
%. &reak out this connection. .
'. (un hole opener to sea bed.
). #i* gel fluid for drilling conductor hole. !" .
+. #ake up bottom hole assembly. # $ %
,. Check and reset crown-sa er on e ery tour. & '() *+ ,- . / ./. 0umber stands on trip out and trip in. 0 12 .
1 . Pick up &HA and run to seafloor. $ % .
11. Pick up stands. 12
1 . Don2t drill faster than 1' minutes for 1 stand. 3! 4 1' 5 1 12
1". Drop 3O3CO. 6 478 5 9
1%. 6ish 3O3CO with o ershot. : ; 0 9
1'. (esume drilling to 3.D. ?@ AB
. 7se spinning tong. C
1. Operate the air winch. D
. 8ay down '+ $oints of '! drill pipe. '+
". Pick up drill stem test tool. E0 F%
%. Circulate mud for hours. = " G
'. #o e string during circulation. H= IJK %
). Circulate hole clean. = L
+. Circulate bottoms up. = " M
,. 6ill up e ery ' stands. & ' 2N" >O
/. Check mud weight e ery 1' minutes. & 1' 5 " P*
" . (e erse out e*cess cement. Q= RSTUB"
"1. Change9replace old mud by new mud. +B" R S B"
" . :top drilling. VW
"". Drilling ahead.
"%. Pull out of hole bit. 0S
"'. Change bit.
"). (un the wear bushing. XY Z"+. 3he bit thread type is regular pin. [\ ]
-
8/12/2019 A Handbook of English for Oil Drilling
2/49
-
8/12/2019 A Handbook of English for Oil Drilling
3/49
, . (etrie e wear bushing. SXY Z
,". &leed off pressure. 4 5i 4b 5
,%. ?eep ' wraps on the drum. ;^ ' A
,'. :et slips. ^ s
,). Bf tight hole repeat wiper trip. * ,+. :etback bottom hole assembly. $ %1 n
,,. #ake sure all alarms are on. {?@B (
,/. 8ay down 3D: spinner. $ B
/ . (un in hole bit 1' to bottom. 1'
/1. (un in hole to casing shoe. u v
/ . Pick up same bit and &HA. ^ B % #
/". 8ay down '! H; drill pipe. '! y*
/%. #o e string e ery hours. & G K %>O
/'. ?eep area around shaker clean. {|
/). Control trip gas. 0
/+. (eam if needed. )
/,. :elect the best penetration rate. 3!
//. 6i* the tra eling assembly.
1 . Check power tongs and spinning rope are on drill floor. b [H
1 1. ;hat2s the weight on bit= [Tz =
1 . ;hat is the &HA of this well= B $ % # =
1 ". Drill out cement. "
1 %. Drill out ! casing shoe. !u v
1 '. 8atch the ele ator. 1 ). 7nlatch the ele ator.
1 +. :et the slips. i s
1 ,. Ad$ust the crown-o-matic 4crown sa er5. ,. -
1 /. 8ock the hook pin. `
11 . Check OD of stabili@er. \ B
111. Perform leak off test. 4 5
11 . Connect kill and choke line. ^ i
11". (e erse out the drill pipe. Q= L
11%. #ake a short trip. 0
11'. Change the cutters.
11). :lug the pipe. N*"
11+. Drill the stand down. 12
11,. :tart9run the shale shaker.
11/. :tart the desanders.
1 . :tart the desilters. "
1 1. Change it with a % mesh screen. %
1 . :hut it off.
1 ". Pull it to the cat ramp. h ^
1 %. #ake a fast connection. )t1 '. Don2t dump the mud into the sea. d)h" }i
-
8/12/2019 A Handbook of English for Oil Drilling
4/49
1 ). Disconnect it with a chain tong.
1 +. Put a thread protector. y> 4 5
1 ,. Can we use the power slips= lC b s =
Casing and Cementing u P+
1 /. (un in hole to bottom for wiper trip.
1" . 3his is the casing program. [u
1"1. Prepare for running casing. u
1" . #ake e erything ready for running +! casing. o +!u B
1"". #ake cementing $ob.
1"%. Displace cementing with mud pump. " R"
1"'. :et cement plug from /% to +/ m. H /% +/ x:"
1"). Pick up cementing head. "
1"+. Cement samples are hard. "
1",. Pump in " cubic meters of spacer. I "
1"/. Pump down the plug. 4 5
1% . ;ait on cement.
1%1. 3he guide shoe will be connected. v
1% . Connect the floor collar.
1%". Connect the air line to the casing stabbing board. ou \B
1%%. (un casing with the "' 3 slip ele ator. "' s u
1%'. Clean and dry ! casing threads with rags. !u1%). ;here is the rabbit for drifting the casing= u H =
6ishing : P,
1%+. 3he bit cutters ha e been lost in the hole.
1%,. (un in the re erse-circulation basket. Q= :
1%/. 3here is a lot of $unk in the hole. @ T
1' . 3he fish is "'.%) meters long. ! "'.%)
1'1. 3he fish top is at %+,."% meters. / %+,."%
Coring P,
1' . :top drilling for coring. V
1'". #ake up core bit.
1'%. ;hat type of core bit is it= [ B =
1''. (un in a diamond core bit.
1'). 8et2s drop the ball for coring. l6 1'+. 3he core has been broken off. g!
-
8/12/2019 A Handbook of English for Oil Drilling
5/49
1',. Put the core in the bo*es. h Hn
1'/. Don2t brake suddenly. d)
1) . 3ake out the core. S;
1)1. How long is the core= T
1) . 3he core reco ery is /, . [ /,1)". (un in the core barrel again. ; 4 ; 5
1)%. (un in hole core barrel. ;
1)'. Drop ball. 6
1)). (eco er core. S
1)+. 7se same parameters as for core 1. C 1 B "#
6reeing :tuck Pipe P/
1),. 3he down-hole problems are ery complicated. $
1)/. 3he hole is tight. g
1+ . O er pull while tripping out. 0 4o er pull 4 b 5
1+1. 3he formation is unstable. d
1+ . 3he wall ca ing is se ere. *%
1+". 3here are many return cuttings. S8 T
1+%. 3he mud returns ha e decreased. S" z
1+'. 3he hole is enlarged. `g
1+). 3he pipe2s stuck. g
1++. Pull up to 1' tons. ^E 1'1+,. :lack off to ' tons. i '
1+/. (eam down all the tight points. H?@
1, . 3he rotary table can2t rotate. d
1,1. ;here is the sticking point= H .
1, . #ake a tensile test.
1,". &ack it off abo e the free point. H ^
1,%. ;here is the back-off position= /H& .1,'. Plug the well for side tracking. :"
Abnormal ;ell Condition and ;ell Control P1 ' $
1,). 3he mud is gas out. " @
1,+. 3he pit has lowered
-
8/12/2019 A Handbook of English for Oil Drilling
6/49
1/". Cut down the hydrostatic pressure. z (
1/%. 3he gas smell is strong. - !
1/'. 3here2s some trace of oil. @
1/). 3he pump pressure is fluctuating. d
1/+. Bt is a @one of abnormal pressure. [ b'1/,. 3he hole 4well5 is kicking> >.
1//. :hut in the &OP> . .
. :ound the general alarm t S # .
1. 3he stand pipe pressure is 1 kg9cm . 1 b 1 ] 9
. 3he casing pressure is ' kg9cm . u '1 ] 9
". 6ill out the kill sheet. )*
%. ?ill the well.
'. 3here2s a combination of lost returns and the kick. $
). (e erse the gas out of the hole. Q= }
+. ;hat2s the lag time= [Tz .
,. 3he well is now stable. H
&OP and subsea E
-
8/12/2019 A Handbook of English for Oil Drilling
7/49
"". #o e the &OP to the moonpool door. . BK ^
"%. (un the test plug.
"'. Close the upper pipe ram. ^$ .
"). Open the kill line al e.
"+. 3he compensation capacity is % pounds. b[ %",. 3he locking load is 1 pounds. 1
"/. :upport the riser.
% . (emo e the hose bundles.
%1. Assure the self-controlled rotation. {
% . :et the 8#(P on the test pump. $. i ^ +
%". Connect the fle* $oint to the riser.
%%. 8and the &OP onto the well head. .
%'. (un the subsea 3G for monitoring.
%). (emo e all the riser running tools. S?@B F%
%+. &OP carrier. .
%,. 8ower the uni ersal guide frame. i
%/. Paint mark the top ) meters of " ! conductor white. H " ! B $ ) ^,
' . Check ade
-
8/12/2019 A Handbook of English for Oil Drilling
8/49
/
+'. :witch to alternate control pod. h
+). Fuidelines are slacked off. $ g
++. :lack off drill pipe and release running tool. i $ F%
+,. (un subsea 3G to obser e bit entering the 3F&. [ +/. Don2t rotate until hole opener passes through the 3F&. H % d)
, . Position permanent guide base 4PF&5 below rotary table. H qi &'
,1. #onitor riser le el ia trip tank. c ( B0
, . Pressure test to ' psi. ' psi
,". Pick up test mandril and place in &OP. 0 . .
:afety and 6irefighting qr ) . P1)
,%. Fet a ;ork Permit before you can start the hot work. l * +
,'. ;elding is not allowed. d
,). Put on your 4safety5 helmet. ^qr ,
,+. Bt2s a high oltage area. [
,,. 3hat2s against the rule. [ -
,/. Don2t walk under the crane load. d)H .
/ . 3he repairing is under way. \H
/1. ?eep your hands clear> 4?eep you hands off> Do not touch>5 d) 1 .
/ . ;ear and secure your safety belt. ^ oqr/". 8ife $acket must be worn when working outboard or o erhead. / ) 012
/%. Ha e your breathing apparatus near you. {|i 3 %H 45
/'. Bt2s a drill. [ 6
/). Bt was a &OP drill. [. 6
/+. Fet in the lifeboat in order. 017
/,. Put on life $acket> o 012 .
//. Abandon the essel> 82 ." . :ound the abandonment alarm> S 8 2 ." 1. Fo to the helideck> 9: # .
" . Aboard the lifeboat. ; ^ 017
" ". Aboard the supply boat to shore> .
" %. Check life sa ing apparatus periodically. ? 01
" '. Bt2s for fire fighting. [ ) . B
" ). :tart the fire pump. ) .
" +. 3his rope is too small. f g
" ,. Bt should be function tested.
" /. A warning notice should be set up. ) @A3
"1 . Do you ha e an emergency program 4contingency plan5= @ @ B 4 5 =.
"11. Bt must be ready in an emergency condition. C {| oB B ."1 . ;ill the typhoon hit our rig= ) D B =.
-
8/12/2019 A Handbook of English for Oil Drilling
9/49
"1". ;e will ha e to e acuate the rig. D ) E
"1%. Personnel on board 4PO&5. H 8F #
"1'. :ound fire alarm. ) .
"1). 3his is a fire drill. [ ) . 6
"1+. conduct abandon ship drill. 86 2"1,. (elease the boat hooks. i 017
"1/. &oard the life boat. ;017
" . (emo e the rust and paint with anti-corrosi e primer. # ^.
" 1. 3hree rafts are located near life boat station port side. H G/017H45 I i@ " 0
1J
" . ;ear work ests when working below the cellar deck. H F F
012
" ". 3he station bills need to be updated. B $ K +
" %. Check the e*piry date for all foam e*tinguisher. ?@ LM + B ?
" '. Close all the water-tight doors. ?@
" ). :afety procedure shall be followed at all the times. H N ( OP qr
" +. Anchor wires should ha e a :pelter type socket at anchor side. Q B> R C6
" ,. Colour code all the connection at the loading station. H S H T UV
" /. Gerify that a high le el alarm is installed on the sludge tank. q @
"" . Don2t switch on during drilling operation. ? d#
""1. Pro ide two independent means to start the emergency generator engine. B W
@ u 1B0 7"" . Ha e the boom pennant wires of port crane re-certified. *+ G/ X 8
""". Clean the internals of the emergency switchboard. B $
(epair and #aintenance P1/
""%. Ha e an o erall check. r
""'. #PB the brake linkage system. YZ[
""). Demonstrate that the make-up cathead can pull + lbs. U ^ a +
""+. Determine the origin of the air leak and rectify this. S B9
"",. Ad$ust the brake band e
-
8/12/2019 A Handbook of English for Oil Drilling
10/49
-
8/12/2019 A Handbook of English for Oil Drilling
11/49
",). :omeone is in$ured. #edic> @ Fz g 1?
",+. Call for the medic. { 1?
",,. Fet a stretcher please. | @ 0
",/. 0o more than % persons. d4 %F
"/ . Drinking li
-
8/12/2019 A Handbook of English for Oil Drilling
12/49
Bnterpreter 4translator5 D
Chief :teward
Cook E
:teward FE
8aundry #an L 2 F
. ] F 4 Operator2s Personnel and :er ice Company Personnel5 P '
Drilling :uperintendent
Company #an 4Operator2s (epresentati e5 ]
Feologist
#ud 8ogging Engineer 4#ud logger5 " F
:ample Catcher F
#ud Engineer " F
(OG Engineer FF
Cementer F
Cement Engineer F
3esting Engineer F
Coring Engineer F
;ire line 8ogging Engineer F
4 b ) P '
> . 4Drilling E
-
8/12/2019 A Handbook of English for Oil Drilling
13/49
6ishing 3ool : F%
Power 3ong b`
Air ;inch 4air tugger5
Crown-O-#atic 4Crown :a er5 . -
. " 4#ud :ystem5 P )
#ud Pump "
:hale shaker
#ud Cleaner "
Desilter "
Desander
Degasser
Centrifuge Z
#ud Agitator "
#ud #i*ing :ystem " #
Centrifugal Pump Z
:tandpipe #anifold 1
(otary Hose
&ulk Air :ystem and 3ank (
c . 4;ell Control E
-
8/12/2019 A Handbook of English for Oil Drilling
14/49
Jacking :ystem p
:kidding :ystem m
;indlass
Anchor
Pendant&uoy
8ifting and Handling E
-
8/12/2019 A Handbook of English for Oil Drilling
15/49
. op 4 Others5 P ,
Cementing 7nit /
;ell 3esting E
-
8/12/2019 A Handbook of English for Oil Drilling
16/49
3hruster (oom
;arehouse 4:tore5
Paint (oom 4paint locker5
8eg
Jacking House p Column 12
:ack :torage Area I
#ud pit "
Cellar Deck
(iser (ack Area }i
Pipe (ack Area }i
Pipe :lide m
(amp
:pud 3ank j
Pontoon j
#oonpool ` 9
Pump (oom
:hale :haker House
Coffee (oom IJ
(ig Office ]
#ess 4dining5 (oom
(ecreation (oom
3G (oom
Change (oom F 2?itchen E
4 . % F% : F% P"1
Drill Pipe
Drill Collar
Hea y ;eight Drill Pipe y*
Ele ator
3ong `
#ake-up 3ong ^ `
&reak-out 3ong `
#ud &o* " . n
Casing :tabbing &oard u \
:lips s
:pider
#ouse Hole Gjk 4 5
?elly :pinner
?elly Cock Chain 3ong
-
8/12/2019 A Handbook of English for Oil Drilling
17/49
-
8/12/2019 A Handbook of English for Oil Drilling
18/49
6uel W
Helifuel
8ubricant 48ube98ube oil5 m
Frease -
3hread Dope&allast ;ater
&ilge ;ater
Fasoline
#ud "
&entonite
Additi e y
Caustic :oda
;eight #aterial y*
3hinner
O*ygen
0itrogen
Hydrogen :ulphide ~
Acetylene
Compressed Air
Hydraulic 6luid
:panner
Hammer
:crew Dri er
#ultimeter ;elding #achine
&ar M
:hackle
:ling 4 5 u
Container : j
4 . * P""
&HA bottom hole assembly $ % #
DP drill pipe
DC drill collar
H;DP hea y weight drill pipe y*
&OP blowout pre enter .
3D total depth # V
:hut down the pump after one meter drilled. Tz # V
How many meters ha e to be drilled before pump shut down= V
3he pump is stopped.
+' # F
Please assist the logging crew to lift logging tools.
+) IJqr d) Y
Ensure safety in operation and don2t act rashly.qr >
:afety first.
++ )C qrl B u 6
7se safety and reliable rope socket. udl 6
3his rope socket is not reliable.
+, *>)@ &e sure to use guideline when lift any weights.
-
8/12/2019 A Handbook of English for Oil Drilling
28/49
V @ d 0 5
:top don2t lift without guideline.
+/ ^
;ater has been run out on the well site. Please notify for water supply.
g 4Ha e you notified for water supply=
@ )V g 5
3here is no water we ha e to stop drilling.
, ) "#
Drill with parameters as re
3ake care>
, " @ ~ @ " F
3ell the mud engineer in time if mud property changed.D @ " F
B2 e told the mud engineer.,"
Giolator will be dismissed.p @ Q 5
He didn2t iolate any rule.
,% ^) U }c
3he pump rate and weight on the bit should be indicated in the record. ^@}c
Bs the pump rate indicated in the record= ^ @ U }c 5
3he pump rate isn2t indicated in the record.
,' r W F .
;alking under the rotation radius of crane boom is prohibited.
,) h B
;e ha e to try to get the gas to the open pit o er there. >
3ry it.
,+ ^ F
;e can2t do any drilling on the rig floor now please gi e your instruction.
^ 5 (;hy stop the operation on the rig floor=
-
8/12/2019 A Handbook of English for Oil Drilling
29/49
,, )IJ. . Z
3hese materials ha e to be pre ented against moisture and sunshine.h iHqrB
Put these materials in a safety place.
,/ h: F% o >'l): Fet the fishing tools ready this shift is e*pected to do fishing. >'l:
Bs this shift e*pected to do fishing=
/ D [ Yg [
B think that the bit2s gone.D d l Yg
B2m not sure. #aybe the bit2s gone.
/1 ^>' B
Bt was changed last shift. B
;hen did you change the bit=
/ D h" F { t 0
Fet me the mud man G
About an hour.
/' c G \
;e2ll gi e it three hours and see.D c G f g
B think that three hours are too long.
/) 0 h (}iog
;e2 e pulled out and stacked the pipe. (}iog
Has the pipe been stacked=
/+ iHjk
:et the kelly in the rathole.)h iH
;here to set the kelly=
/, `'\H: [>
3he toolpusher is fishing a cutter.
`'H S;hat is the toolpusher doing=
-
8/12/2019 A Handbook of English for Oil Drilling
30/49
: B[
;hat is it to be finished=
// @ 5
3here is nothing wrong with the generator.
@ hi:omething wrong with the generator.
1 D d Zg @ \
B don2t think we ha e to worry let2s go ahead to make hole.D Z" @ @
B worry about the mud.d Z @
Don2t worry.
P',
accumulator anchor annular
back off E bail ; bailer K bent sub
. blowout pre enter bo* brake
breakout bridge plug cablea catheada cat line chain tongW check al e collar coneZ Z core
coupling crosso er sub- crown block " cyclone
dead line degasser
derrick desander
-
8/12/2019 A Handbook of English for Oil Drilling
31/49
" desilter drawworks
drift gauge ; drum
ele ator ele ator linksy e*ternal upsett fast lineS flow line foundation- F gin pole] girder ` hook hose ` hydraulic tongs
$ack $ar G^ $unk : $unk basket Z kelly bushing liner K li e line
location
lost circulation^ make up` Z master bushing meshGjk mouse hole mud pump" . n mud sa er no@@le
pin
pipe rack 1 n pipe setback " pit d u pump liner
racking board. ramjk rat hole reamer ' reducing nippleqr relief al e
V rig downtime roller bit
-
8/12/2019 A Handbook of English for Oil Drilling
32/49
rotary>O0 round trip screen cloth shaker
s slip solid control spent mud spinner spinning line spool stab12 stand1 stand pipe swi el
thread " throttle manifoldu tie back F% toolhouse tool $oint
_ tor
-
8/12/2019 A Handbook of English for Oil Drilling
33/49
+D g " t )^ `
Nes B do ha e " packs of cigarettes do B ha e to pay duty on them=
, D l >
#ay B check it=
l :Certainly.
g l . g 4
Ok you may go.
/ ; ^o S
Food morning. 3icket and passport please.
1 [?@B
Here are all the ticket and passports.
11 @Tz F4
How many people are there in the group. 1' F
6ifteen in all.
1 Tz 4
How many pieces of baggage do you want to check=
1" & F [Tz
3wo for each of us what2s the baggage allowance=
1% & + & * %'
:e enty pounds for each passenger and the weight limit for each piece is forty-fi e pounds.
1' 4* D ^ 5
0ot o erweight let me put on the baggage tags.1) [ B ; 4
Nour boarding cards and passports.
1+; [ t 1 4
3he boarding gate is si*. Ha e a good flight gentlemen.
1, -B [Tz Q
;hat2s the temperature today=! - [ Q 1+ !
3he lowest temperature is se enteen degrees below @ero in the winter.
1/ D [ B ` ^M g> W N0
B am 8iu dagang from China. B reser ed a room here last week. @ B 4
Oh yes we do ha e your reser ation. ^ 4 a
How many nights will you stay here=
1 ; H q )*0
;ould you please fill out the arri al form and sign your name here= ,1' 5
Operator e*tension ,1' please.
" " # 1 b#ay B speak to #r. :mith=
-
8/12/2019 A Handbook of English for Oil Drilling
34/49
%p $ F dH c d
He is not in shall B take a message=
' d0 w o 4
E*cuse me would you please speak slowly=
> % o ;ould you please repeat it again=
) D - " # 1O
B2d like to meet #r. :mith this afternoon.
+ d0 " # 1 - @ U -^ 4 1 0
B2m sorry #r. :mith will be engaged this afternoon. Could you come tomorrow morning at 1
o2clock=
, o D # \
3hat2s fine it suits me ery well.
/ D / " 5 & 4
B2ll pick you up in the hotel at / " .
" [ ' D ( ` 1c
#ay B introduce #r. 8iu Dagang=
"1 o c c
How do you do please to meet you.
" } ) [ IJ
;hat would you like tea or coffee=
"" H D > E B 0
8et2s discuss some points raised by your side.
D g> #@ B B2d like to clear up some points about the contract.
"% H F % { FB S
Bt is necessary to ensure water supply on the site before the start of work.
"' b @ FBr$
3he owner shall hand o er all the geological information of the site to the contractor.
") HC @ @ N
Are there any restrictions on the use of the public road=
"+ @ * [ .W 5 =
0o there2re not but you must pre ent them from damage.
", D hF D 4
;e2d like to know when you will deli er the site to us.
"/ + HF F % " -)hF F
According to the practice the site is usually a ailable to the contractor " days before the
commencement of the work.
% u # @ c
Ha e you any 0K 0
Come at se en in the morning and work with #r. ;ang.
D y' 4 aB want you to work o ertime tonight.
-
8/12/2019 A Handbook of English for Oil Drilling
35/49
% Hl . g 4
Nou can go home now.
%" / d) HF
Bt is dangerous keep away please.
%%q d stBt2s not allowed to smoke here.
%' r - D
Giolation of regulations is strictly forbidden.
%) ) U D
6ollow the instruction to operate.
%+ D B D e 0
;atch carefully. 6ollow me.IJ d)
&e carefully. Don2t do it like that.
%, C :
:tart. 3urn on the switch.h
3urn off the power. 0
:witch off the power.
%/ | | o 4
Nou take that end. Hold it properly.
' E0 0 f
8ift it up and raise a bit.1 ^
#o e it up.1 B G 4
#o e to your left 4right5.1 #
Fo back a little.h i
Put it down.
'1 d) 2 g
Don2t touch it.d)
Don2t force it.
' h 0
3ake it apart and take that off.
'" ) ,
3he ground needs le eling.hS
Clean the outlet.
'% B ww 03ake your time.
-
8/12/2019 A Handbook of English for Oil Drilling
36/49
t 3
Hurry up> ;atch your step.
'' g XA
;hat2s happen=
@ ;hat2s the problem=
') D g
;e repaired the pump this afternoon.
'+ o 4
;hen will you be ready=>G #D u o
;e shall be ready in an hour.
', C
;hen does it begin=
'/ 45 \
Are you Ok=
) @T
How long is it=
)
Bt2s si* meters long.f g
Bt2s too long.
)1 4 1
3hey should be one meter apart.) d ) g
Bt stopped turning and needs fi*ing.D )>
B need a spanner.
)" d
;ell done.
)% 1 U -^ 4 , y> " O
#r. 8iu please attend a meeting at , o2clock tomorrow morning. H] B O O
3he meeting will be held in the meeting-room of the company.
)' F ! O
3he pro$ect progress will be discussed in the meeting.
)) BF \ 5
3he work on the site is getting along pretty well.>l
E erything is going along on schedule.
)+ 6 - 7 F ?z
3he construction is behind schedule because of ad erse weather.
), - D BF 8 d` 0Our work has not ad anced much these days.
-
8/12/2019 A Handbook of English for Oil Drilling
37/49
)/ yt F ! 9 # ? F 4
#easures should be taken to speed up the construction and get on schedule.
+ @ 4
;hat do you think about this problem=
+1D : ;e2ll think o er your proposal.
+ D
;e should change the e
-
8/12/2019 A Handbook of English for Oil Drilling
38/49
B2m not feeling well.
,/ D DF g G k
B ha e a cold and chills.
/ p g H
He got malaria./1 H i I i
Bt2s an infectious disease.
/ p ) -
He needs intra enous drip for two days.
/" D J
B ha e headache and feel di@@y.D KJ
B ha e a stomachache.D LJ
B ha e a sore eye.
/%D ) ] M j
B want to buy kilos of tomato.
/' Du ) Tz
B2ll take this one how much is it= N Tz 4
Any discount= How much do you charge=
/)
Please gi e me a receipt.
/+ D > O B2d like to change some 7: dollar.
/, -B [Tz
Could you tell me today2s rate of e*change=
// ) B
How would you like the change=
1 1 ' O B P B
Please gi e me ten fi e-dollar notes and the rest in small change.
P+"
N international tra elQ ] airlineQ ' flight number ` airport terminal A sign
E j2j suitcase j carton
R B` duty-free V stopo er
-
8/12/2019 A Handbook of English for Oil Drilling
39/49
S transitB destination
Q ' direct flightQ G T stewardess
airsick U $et lag tabletV W orange $uiceXY beef Z fried chicken colleague
] : local company F F construction crew F construction plan pro$ect manager [ [ assistant F site management\ technical data\ specification ] on a turn-key basis5 sublet ^
-
8/12/2019 A Handbook of English for Oil Drilling
40/49
U lighting power ?@ F land owner b $ authorityg delay
h ^ at the price of spare partsF $ob siteV parking lot
repair shop] metric system
&ritish system{ natural protection area
procurement F purchasing clerk k sales manager ^ in
-
8/12/2019 A Handbook of English for Oil Drilling
41/49
s clarification\ amend
finali@e: t typing mistake
? e*pire automaticallyP E % ahead of schedule deli eryu authori@e ac
-
8/12/2019 A Handbook of English for Oil Drilling
42/49
R free transportation representati e
b owner F labour issues
} labour officer F d working condition6 in estor
deductionsF payroll F take-home payS turnout1 F producti ity { work protectionF working hours lunch break ~ @ acation with pay~ @ i sick lea e with pay@ B U? alid medical e idence] ~ public holidayF F B 5 worker2s warfarec d J consultation ? +O O regular meeting q site security
y " participant F construction acti ity^ upstream
downstream- weather forecast flooding
re ision of the schedule% B H specific measureA obstacle.$ status
radio communication system site coordination and management
bT mutual efforts critical factor
c
-
8/12/2019 A Handbook of English for Oil Drilling
43/49
\ skillsb capacity drawing general drawing
outline drawing working drawingF contract drawing > ) N first priority 0 remedy GB minor written confirmationP ' F watchman boundary` main gate F professional{q F security guard @A warning sign/ ha@ardous materials {v sturdy shoes + fire e*tinguisher B0H first aid station
H? medical station F ? medical staff
7 accident suffocation electric shock 0 ambulance S { en ironmental implementationd ad erse impact I contaminationp settlement garbage4rubbish5 sewage} outlet ditch / filtering de ice
payment# ^ contract price item ! r progress payment&' F permanent work F temporary work
$O accounting department bank account
-
8/12/2019 A Handbook of English for Oil Drilling
44/49
r ad ance payment^ alue" working capital
issuing bank
6 { f bid guaranteel { f performance guaranteeF r U balance due F statement at completion
taking-o er certificate ? maintenance period N? defects liability period
claimdlXb force ma$eure
claim calculation honor the claim1f0 correspondence
] # B fair and e
-
8/12/2019 A Handbook of English for Oil Drilling
45/49
'. At 3D circulate round a ' bbl Hi- is pill. # : ' "
). Circulate until the shakers are clean.= S"
+. Do not drop 3otco sur ey.d)6
,. (ig up wireline logging tools.q
/. (un electric logs as per program.
1 . (ig down logging eO"
. ;hen the landing ring lands on mudline suspension unit use 6ranks circulate to final depth. :
u H" ^ 3 6(A0?: F%=
1. POOH lay down ,! DC and $ar.0 ,!
. Pick up the ' t spider and install on the rig floor.0 ' q ^
". Bnstalling centrali@ers as re
-
8/12/2019 A Handbook of English for Oil Drilling
46/49
+. Perform 1" "9,!cement $ob.
,. :chlumberger left one caliper arm in the hole.@> H
/. Bt is a piece of metal %m long "cm wide and 1."cm thick.[> % " 1." B ^
" . (un in hole ream the tight hole section. x
"1. Pump a ' bbls high iscosity pill when on bottom. # ' "
" . 3ag bottom with to " tons and rotate slowly.
-" [ w
"". Pump a ' bbls weighted pill and pull out of hole.: ' *" 0
"%. :tart at ' spm and work up to spm in 1 stroke increment. 6 C BP ' P 95 y P 95 &O y 1 P
"'. Pressure test the cement line to " psi for 1 minutes. " P:B {| 1 5
"). Perform pump efficiency test while circulating..= B^
"+. 89D cement head and lines. "
",. P97 1 19%!&OP stack.
0 1 19%!. "/. Bnstall 1" "9,! casing hanger.q 1" "9,! u 3
% . (ough cut the 1" "9,!casing and 89D e*cess casing. 1" "9,! u TUB$5
%1. 89D all casing running e
-
8/12/2019 A Handbook of English for Oil Drilling
47/49
%/. Displace and clear cement lines with /bbls tail slurry mi* water.
/ # L P
' . :witch to mud pumps and displace the cement with ++'bbls mud .
++' " R"
'1. Displace at ma*imum rate until ' bbls before plug is due to bump then slow to %'spm.`}c R" % ' }c %' P 95
' . &ump plug with ' psi o er displacement pressure. P R b ' P:B
'". Do not e*ceed " psi hold for ' minutes. bd4 " P:B ){| ' 5
'%. Bf plug does not bump after ))+' strokes stop displacement lock in the pressure and ;OC for
hours. ))+' # @ VWR b G P 5 #
''. &leed off pressure and check that the float are holding. v{|
').0ipple up 1" '9,! &OP stack and lines.q 1" "9,! .
'+.6unction test all &OP opening9closing functions from all stations.?@F H . W
',. Pressure test &OP choke manifold standpipe.. " 1
'/. Annular pre enter to ' 9" psi. . ' 9"' P:B
) . All rams choke manifold kill and choke line side outlet al e to ' 9" psi.
" " ^B ' 9' P:B )1. 3op dri e standpipe mud pump lines to ' 9% psi. 1 " ' 9% P:B
) . 3he low pressure test is to be for ' minutes. ' 5
)". 3he high pressure test is for 1 minutes.
1 5
)%. Close the blind rams and pressure test the rams and casing to psi for " minutes.r u P:B {| " 5
)'. Bnstall the wear bushing and lock down the same.q .Yu
)). ;hile picking up the drill pipe change the liners in the mud pump to ' 19 !.0 h" d u ' 19 !
)+. (eset the pop-off al es to I9-% psi.*+ qr b % P:B
),. On last stand m9u top dri e and circulate slowly down and tag the cement plugs on top of the
float collar. # >2 ww= i [ Y B"
)/. Drill out the shoe track following engineer2s instruction. F u v
)/.(eaming from the shoe to 3D at least three times.u v z c O W
-
8/12/2019 A Handbook of English for Oil Drilling
48/49
+ .Drill " meters of new hole and circulate and condition mud to get in balance. " + # = " ]
+ . Pull back into shoe close the annular pre enter and rig up to perform formation integrity test.0 u v . ,
+1. Drill ahead using +' FP# and I9-' (P# at surface. }c +' y 95 3 ' 95
+ . 8imit ;O& to a ma*imum of klb. H
+". 3he instantaneous (OP does not e*ceed " m9hr. 3d4 " 9G
+%. Circulate for ' minutes prior to making a connection. % = ' 5
+'. 3ake #;D sur ey while circulating.= c R
+). Circulate bottoms up work pipe full stand.= >M K % > 12
++. Drop single shot sur ey.6 9
+,. (eco er sur ey with wireline unit and o ershot. : ; S 9
+/. ;atch attenti ely for mud losses.IJ " $
, . #ud man will check the mud weight e ery minutes.
" F & " 5 c>OP* ,1. Bnstruct rig personnel to make e ery effort to reduce non-producti e rig time. F ` b z z 1 B
, . ;hile drilling one floorman will permanently watch the shale shaker and the mud cleaning
e F " ~
,". 3he trip tank will be emptied and cleaned at the end of each trip.&O0 # L0 c (
,%. :low pump rate will be performed and recorded on the drilling report e ery % hours.& %G >O P
,'. :et up &OP wing al es and choke manifold al es. /. " B
,). :lip and cut + meters of drilling line. + `
,+. &e e*tremely careful in the open hole section. x>)GZ
,,. Pump hea y slug and POOH.:*" 0
,/. 8ay down one $oint of H;DP. > y*
/ . Change out bit and make up new PDC #% G .+ PDC #% G
-
8/12/2019 A Handbook of English for Oil Drilling
49/49