DISTRIBUTION: Committee Members: His Worship the Mayor B A Carter D E Challis H van Eyk G Laurich B A Keane P Paterson B Pirie P Johnstone R D Young Council Rep: D H Swales Councillors (alternates): J H Thorp P Buckthought Staff: Ian McLeod Bruce Stephens Adrian de Laborde Council Secretary A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE DATE: Tuesday, 29 November 2016 TIME: 10.30am VENUE: Council Office William Street PAEROA MEMBERS: B A Carter (Chairperson) D E Challis H van Eyk G Laurich B A Keane P Paterson B Pirie P Johnstone R D Young Cr D H Swales J P Tregidga (Mayor)

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

DISTRIBUTION: Committee Members: His Worship the Mayor B A Carter D E Challis H van Eyk G Laurich B A Keane P Paterson B Pirie P Johnstone R D Young Council Rep: D H Swales Councillors (alternates): J H Thorp P Buckthought Staff: Ian McLeod Bruce Stephens Adrian de Laborde Council Secretary

A G E N D A WESTERN PLAINS DRAINAGE DISTRICT

COMMITTEE

DATE: Tuesday, 29 November 2016 TIME: 10.30am VENUE: Council Office William Street PAEROA

MEMBERS: B A Carter (Chairperson) D E Challis H van Eyk G Laurich B A Keane P Paterson B Pirie P Johnstone R D Young Cr D H Swales J P Tregidga (Mayor)

Page 2: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Delegations: Western Plains Drainage Committee (WPDD)

Membership

Advisory Committee consisting of one Councillor (with an alternate) and representation as scheduled from each of the following Drainage Areas within the Drainage District: A representative (or alternative) of Waitakaruru/Miranda

A representative (or alternative) of Pipiroa

Two representatives (or alternatives) of

Rawerawe/Ngatea/Pahunga

A representative (or alternative) of Kaihere/Torehape

Two representative (or alternative) of Patetonga/Mangawhero

A representative (or alternative) of Pouarua/Maukoro

Meeting frequency The last Thursday in the month commencing at 10.30am

The Council delegates to the Drainage Committee the following powers, duties and responsibilities: To make recommendations to the Council on all matters relating to Land Drainage within

their District.

The Western Plains Drainage Committees can also make recommendations to Council on urban stormwater matters within their district.

To make recommendations on Council’s operational and capital estimates for Council’s

Draft Long Term Plan and Draft Annual Plans. To provide input to Land Drainage asset planning matters and Land Drainage rating

reviews in their respective areas. To generally oversee and monitor the Council’s annual work programmes within the

nominated areas; and to assist as necessary or as appropriate in the implementation of approved programmes.

To facilitate the flow of information between ratepayers and staff.

Page 3: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

HAURAKI DISTRICT COUNCIL WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE AGENDA THURSDAY, 27 April 2017 – 10.30am – Council Office, William Street, Paeroa Order of Business Pages

1. Apologies

2. Declarations of Late Items

3. Confirmation of Minutes - 30-03-17 (2187004)

4. Drainage Managers Report for April 2017 and Financial Report for the period 7 months to 31 January 2017 (2175399)

4

6

Page 4: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

1 WPDD Minutes – 30-03-17 Doc. Ref: 2189059

HAURAKI DISTRICT COUNCIL

WESTERN PLAINS DRAINAGE DISTRICT MINUTES OF A MEETING OF THE WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE HELD IN THE COUNCIL CHAMBERS, WILLIAM STREET, PAEROA ON THURSDAY 30 MARCH 2017 COMMENCING AT 10.30 AM PRESENT Messrs B A Carter (Chairperson), H van Eyk, R D Young (from 10.40am),

B Pirie (from 10.40am), P Paterson and Cr J Thorp (Alternative Council Rep for Cr D H Swales)

IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and

Ms C Black (Council Secretary) APOLOGIES

RESOLVED THAT the apology for absence of B Keane, P Johnstone, Laurich and Cr D H Swales and for the lateness of B Pirie and R Young be received and sustained.

WPDD17/05 Paterson/van Eyk CARRIED LATE ITEMS There were no late items. B Pirie and R Young attended the meeting at 10.40am CONFIRMATION OF MINUTES MEETING HELD ON THURSDAY 23 FEBRUARY 2017 (2187004) RESOLVED

THAT the minutes of the meeting of the Western Plains Drainage District Committee held on Thursday 23 February 2017 be taken as read and confirmed.

WPDD17/06 Paterson/van Eyk CARRIED DRAINAGE REPORT – MARCH 2017 (2187520)

The Drainage Manager’s monthly report and financial report on the operations of the Western Plains District Drainage Committee for March 2017 and the financial report for the 8 months to 28 February 2017 were presented. RESOLVED

THAT the report be received. WPDD17/07 Thorp/Paterson CARRIED

WPDD Agenda - 27-04-17 Page 4

Page 5: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

2 WPDD Minutes – 30-03-17 Doc. Ref: 2189059

Proposed Muggeridge Pump Station

The Drainage Manager presented an update on the status of the project. The next steps are:

• Gain responses from Pouarua Farms and DOC • Finalise consent application and lodge • Send a letter to landowners updating them on the project and providing a copy of the

Revised Economic Evaluation • Confirm detailed design proposal with AECOM • Hold PSG meeting – set for 18 May, 9.00-10.30am in Paeroa (meeting invite to follow)

Duffin Detention Dam, Back Miranda Road

Council’s Corporate Services Manager has advised that Council will need to get the dam entered into the asset register, and get it valued to include in the next valuation round. This will require a survey to determine its dimensions and volume.

The Drainage Manager has initiated the process for securing protection for the dam, spillway and pond on the three titles that they cover. The legal mechanism may be by way of easements, or some other means of registration on the separate titles.

Consultation with the three landowners involved has been initiated.

Drainage Committee Elections

Members were advised that nominations for Drainage Committee candidates will close at 4pm on Friday, 31 March. In the event of there being more candidates than required in any area, a ratepayer election may be held.

The meeting closed at midday. CONFIRMED B A Carter Chairperson 27 April 2017

WPDD Agenda - 27-04-17 Page 5

Page 6: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 1 M219 4269 WPDD Drainage Manager Report Mar 2017

Report

To: Western Plains Drainage District Committee

From: Drainage Manager

Date: 28 March 2017

File reference: Document M219 4269

Meeting date: 27 April 2017

Subject: WPDD Drainage Manager Report April 2017 Recommendation: THAT the report be received.

1.0 OPERATIONS

1.1 Chemical spraying

128.3 km of drains have been sprayed to date. Details are shown in the attached tables.

1.2 Machine cleaning 16.1 km of drains have been machine cleaned in the year to date.

1.3 Maintenance/Fencing/Culverts Routine maintenance items undertaken. The Mangawhero debris trap was cleared

1.4 Pump operation Regular inspection runs were undertaken in this period. Pump hours in March were 2,976, over 10 times the monthly average. The total to the end of March of 14,145 is 136% of the annual average hours. The summary for the 2016-17 year to date is attached. 92 man-hours were spent on weed screen cleaning in the period. A mobile pump was deployed in the School outlet catchment in Waitakaruru and ran for 32 hours.

1.5 Floodgates Floodgate inspections were completed. School outlet, Smythes, Karito high level, Indian and Costello outlets were de-silted.

WPDD Agenda - 27-04-17 Page 6

Page 7: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 2 M219 4269 WPDD Drainage Manager Report Mar 2017

1.6 Stopbanks

A small amount of fill will be placed on the Mahuta Drain stopbank south of the access race when ground conditions are suitable.

2.0 BYLAW APPROVALS

Bylaw approvals were granted in the period as follows:

2.1 Culverts: Nil 2.2 Other: Nil

3.0 SUBDIVISIONS COMMENTED ON

Subdivisions commented on during the period as follows: Nil

4.0 RAINFALL The table and graphs of the Ngatea Monthly Rainfall depths since 1993 is attached. The rainfall total for March was 341 mm which is over five times the average, and is the highest monthly total recorded since regular records have been reported from 1993. The year to date total from July 1 of 1078mm is 145% of the average year to date total.

5.0 GENERAL 5.1 Proposed Muggeridge Pump Station

The WRC Project Manager advised that the consent was lodged on Tuesday 18 April.

5.2 Possible Drainage Pump on Phillips Road West Pending the outcome of the ratepayer consultation, and the finalisation of the proposed construction programme of the Muggeridge pump, no further work has been done on the possible temporary pump on Phillips Road. Subsequent to the March and April flood events, staff are looking at deploying a mobile pump to provide some relief to the ponded area.

5.3 Drainage Bylaw Review The Bylaw review will be undertaken in mid 2017. Committee members are requested to consider the current bylaw and to provide input into the review.

5.4 Long Term Plan projects The Chief Executive has advised that any improvements to the flood protection assets in the F3 area of the WPDD will need a business case to be prepared.

WPDD Agenda - 27-04-17 Page 7

Page 8: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 3 M219 4269 WPDD Drainage Manager Report Mar 2017

This will involve a benefit/cost analysis, estimates of rating impacts, and consultation with the affected landowners.

5.5 Drainage Committee Elections Nominations closed at 4.30 on Friday 31 March. In the case of the WPDD, all sitting members were the only nominees in their respective areas. So there will be no requirement for an election.

Drainage Area Nominee1 (Waitakaruru Miranda) Harry van Eyk 2 (Pipiroa) Brian Keane 3A (Rawerawe) Gavin Laurich 3B (Ngatea Puhunga) Peter Johnstone 4 (Pouarua Waikumete) Brian Pirie 5 Kaihere Torehape) Pat Leonard 6 Patetonga Mangawhero) Peter Paterson Ross Young 7 (Pouarua Maukoro) Brian Carter

It has been recommended to Council that Council confirms the appointment of the above members to the committee.

5.6 Election of Committee Chair and Deputy Chair

Following the committee elections, the Committee is now required to elect a Chair and Deputy Chair. The successful members will be recommended to the next scheduled Council meeting.

5.7 Flood events in March

There were two separate significant rainfall events in March. Ngatea rainfalls for the two events were:

7-12 March 212 mm 26-29 March 112mm

There were a number of instances of electrical and diesel problems at the pumps at H-Drain (Roger Harris), Alexander’s, Stocks and Mill Road stations. There was a large flow in the Waitakaruru Stream, and a mobile pump was deployed in the School Outlet catchment. These events have been reported briefly to Council. However, two further storm events in April have compounded the flooding and ponding issues, and staff have necessarily been involved in all of the storms, so a more detailed report will be compiled covering both month’s events, and will be presented to the next meeting. Members’ reports and comments on the effects of the prolonged bad weather in their areas are welcomed.

Ian McLeod Drainage Manager

WPDD Agenda - 27-04-17 Page 8

Page 9: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 4 M219 4269 WPDD Drainage Manager Report Mar 2017

STAFF CONTACT DETAILS Drainage Manager Ian (Mac) McLeod 07 862 5073 027 496 9558 email: [email protected] Drainage Overseer Bruce (Goldy) Stephens 027 281 6924 email: [email protected]

WPDD Agenda - 27-04-17 Page 9

Page 10: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 5 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 1

No Name Type LengthSpray Mechanical Clean

CommentsDate sprayed

Length sprayed

Date cleaned

Length cleaned

A 1 BOOMS NORTH B 2925 A 2 INDIAN C 1240 A 3 HOT SPRINGS X 1240 A 3.1 HOT SPRINGS OUTLET O 480

A 4 HILL-HENDERSON B 1765 A 5 HILL CATCHMENT C 2765 1/03/2017 2765 A 6 JUDD B 2310 A 7 KARITO CANAL O 2345 1/03/2017 2345 A 7.1 KARITO OUTLET O 675

A 8 MIRANDA BORROWPIT C 3390 A 9 MIRANDA ROAD NO 1 A 310 A 10 STRETTON B 2415 A 11 SMYTHE BORROWPIT C 3075 A 12 WOWSER C 2200 A 13 KARITO EXTN B 1105 A 14 DUFFIN CREEK B 665 A 15 EVANS CREEK B 655 A 16 MIRANDA RD NO 3 A 620 1/03/2017 620 A 17 BOOM SOUTH B 3585 A 18 CANAL ROAD B 3875 A 19 HUDSON OUTLET O 1680 1/03/2017 1680 A 20 MAHUTA B 3310 A 22 SWALE-DOUGLAS A 890 A 23 WYLIE-MARSHALL A 450 A 25 WAITAKARURU STREAM O 4200 1/03/2017 4200 A 26 WAITAKARURU TOWNSHIP A 425 A 27 CASTLE A 600 A 28 STRETTON EXTN C 590 A 34 HOT POOLS B 440

A 63 WAITAKARURU SCHOOL OUTLET A 570

A 77 COSTELLO OUTLET B 370 A 78 YEAGER A 1315 A 87 HILL CATCHMENT EXTN B 740

Total Drain length 53220 Total Drain

Sprayed 11610 Percentage sprayed 22% Total Drain

Cleaned 0 Percentage cleaned 0%

WPDD Agenda - 27-04-17 Page 10

Page 11: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 6 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 2

No Name Type LengthSpray Mechanical Clean

CommentsDate sprayed

Length sprayed

Date cleaned

Length cleaned

A 21 RESERVE B 690

A 24 PIPIROA-WAITAKARURU B 2855

A 33 DONAGHY B 820

A 36 HOPAI NORTH B 2340 8/02/2017 2340

A 37 FRENCH B 1050

A 43 PIPIROA ROAD STH B 2100

A 44 PIPIROA ROAD NTH B 1705

A 45 POUARUA WEST B 1425

A 47 FORESHORE CANAL O 10730 1/03/2017 10730

A 49 SETTLER EAST O 2350 1/03/2017 2000

A 50 SCOTT B 1160

A 51 SETTLER WEST O 2900

A 56 APPLETREE C 820

A 57 APPLETREE EXTN B 1775

A 61 MARTINOVICH B 820

A 62 DALE ESTATE A 690

A 65 FACTORY A 1000

A 66 DONAGHY EXTN B 1290

A 67 COOPER B 570

A 72 MARTINOVICH PUMP FEEDER C 1415

A 80 STANFIELD A 530

A 84 BUCHANAN A 570

Total Drain length 39605 Total Drain

Sprayed 25800 Percentage sprayed 65% Total Drain

Cleaned 0 Percentage cleaned 0%

WPDD Agenda - 27-04-17 Page 11

Page 12: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 7 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 3

No Name Type LengthSpray Mechanical Clean

CommentsDate sprayed

Length sprayed

Datecleaned

Length cleaned

A 29 RAWERAWE PUMP AREA C 4210

A 30 WESTERN INTERCEPTOR B 485

A 31 DAVIDSON C 1750 28/03/2017 700

A 32 DUCK CREEK C 1800 1/03/2017 1800

A 32 DUCK CREEK C 1800 28/03/2017 600

A 35 HOPAI SOUTH B 4020 15/02/2017 4020

A 38 NGATEA URBAN A A 2000

A 39 ORCHARD WEST NTH B 1515

A 40 ORCHARD WEST STH C 2295

A 41 PAUL-LEONARD C 1090 24/03/2017 1090

A 42 PAUL WHARF A 295 1/02/2017 295

A 46 EQUALISER B 505 19/01/2017 505

A 48 TOWN DRAIN C 1080 19/01/2017 1080

A 52 RIVER ROAD A 1330 1/02/2017 1330

A 53 RAWERAWE ROAD STH B 3280 2/02/2017 3280

A 54 RAWERAWE ROAD NTH B 2940 16/08/2016 2940

A 54 RAWERAWE ROAD NTH B 2940 1/02/2017 2940

A 55 NGATEA URBAN B B 4000 19/01/2017 4000

A 58 NGATEA-PIPIROA WEST B 1100 16/08/2016 1100

A 58 NGATEA-PIPIROA WEST B 1100 1/02/2017 1100

A 59 NGATEA-PIPIROA EAST A 280 16/08/2016 280

A 59 NGATEA-PIPIROA EAST A 280 1/02/2017 280

A 60 NEATE A 725 28/03/2017 725

A 64 BOURKE B 935

A 68 WHEELER B 1150

A 69 ROBINSON C 1920

A 70 SOUTHERN C 1220

A 71 PHILLIPS ROAD C 3530

A 75 PAUL-LEONARD EXTN A 1010 24/03/2017 500

A 76 JORDAN B 2190

A 79 DUCK CREEK EXTN B 705 28/03/2017 705

A 83 DUDLEY A 510

A 85 FINLAY B 925

A 86 HAYWARD B 665

Total Drain length 49460 Total Drain

Sprayed 29270 Percentage sprayed 59% Total Drain

Cleaned 0

WPDD Agenda - 27-04-17 Page 12

Page 13: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 8 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 4

No Name Type LengthSpray Mechanical Clean

CommentsDatesprayed

Length sprayed

Date cleaned

Length cleaned

B 2 WILLOW B 935 B 3 BUCHANAN A 685 B 4 WAIKUMETE ROAD EAST B 1760 B 5 UPPER MAHUTA C 1250 B 6 GUBB O 3170 1/03/2017 2000 B 7 ROUNTREE B 2630 B 8 SECTION 6 B 600 B 9 WAIKUMETE C 3685 B 10 MCDONALD C 2735 B 11 THOMPSON C 2840 B 12 TOREHAPE NTH SIDE O 2950 B 26 WALKER-BOWEN B 1600

B 45 MAUKORO-CENTRAL NORTH B 1360

B 49 MAUKORO-CENTRAL SOUTH B 1360

B 50.1 POUARUA CANAL O 10180 1/03/2017 10180

B 50.2 POUARUA CANAL DESILT O 400

B 51 CARTER B 620 B 52 RAILWAY CANAL C 1410 B 53 CENTRAL ROAD NTH B 1960 13/02/2017 1960 B 54 CENTRAL ROAD WEST B 1655 15/02/2017 1655 B 57 ORCHARD WEST NORTH B 1525 B 58.1

CENTRAL ROAD SOUTH WEST B 2325

B 59 CENTRAL ROAD SOUTH EAST B 1465

B 61 MUGGERIDGE EXT B 2300 B 62 HOPAI ROAD WEST NTH B 570 15/02/2017 570 B 63 HOPAI ROAD WEST STH C 2770 15/02/2017 2770 B 64 RAWERAWE ROAD NTH B 1380 15/02/2017 1380 B 66 PHILLIPS ROAD WEST B 1415 B 67 PHILLIPS ROAD STH A 345 B 68 MUGGERIDGE B 1570 B 69 PUHUNGA ROAD WEST C 3170 3/03/2017 3170 B 70 HUGHES B 1600 B 71 HOPAI NORTH FEEDER C 1245 B 75 HOPAI SOUTH FEEDER C 3000 15/02/2017 3000 B 76 TOREHAPE NORTH 2 A 1950

Total Drain length 70415 Total Drain

Sprayed 26685 Percentage sprayed 38% Total Drain

Cleaned 0 Percentage cleaned 0%

WPDD Agenda - 27-04-17 Page 13

Page 14: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 9 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 5

No Name Type Length Spray Mechanical Clean

CommentsDate sprayed

Length sprayed

Date cleaned

Length cleaned

B 13 TOREHAPE STH B 1630 B 14 COLLINS B 1945 B 15 COWDRAY B 420 B 16 WAIKOURA O 6760 1/03/2017 6760 B 17 MCINDOE B 1480 B 18 KAIHERE ROAD NTH O 5610 B 19 KAIHERE ROAD STH B 2680 B 20 CENTRAL O 4300 1/03/2017 3000 B 58.2

CENTRAL SOUTH WEST B 2350

B 60 TOWNSHEND C 3420 1/03/2017 3420 B 72 TOREHAPE FEEDER B 1600 B 73 STITCHBURY B 2330 1/03/2017 2000 B 74 NGARUA ROAD B 1575 B 77 TOREHAPE SOUTH 2 A 965

B 78 POUARUA ROAD WEST B 4590 1/03/2017 4590

B 79 TOREHAPE EQUALISER B 1225

B 80 KAIHERE RD STH EAST B 2690

Total Drain length 45570 Total Drain

Sprayed 19770 Percentage sprayed 43% Total Drain

Cleaned 0 Percentage cleaned 0%

WPDD Agenda - 27-04-17 Page 14

Page 15: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 10 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT Area No. 6

No Name Type LengthSpray Mechanical Clean

CommentsDate sprayed

Length sprayed

Date cleaned

Length cleaned

B 21 SECTION 7 B 420 B 22 MANGAWHERO ROAD NTH O 3540 B 23 MANGAWHERO ROAD STH B 1135 B 24 TAKO O 3300 1/03/2017 3300 B 24.1 MANGAWHERO SILT TRAP 1600

B 25 HILL B 2695

B 27 PATETONGA ROAD WEST NTH B 3285

B 28 HARRIS B 2345 B 29 WOODYARD A 1100 B 30 TAYLOR-REID B 1680 B 33 HUNTER B 585 B 34 TRAMLINE ROAD NTH B 3680 B 35 TRAMLINE ROAD STH B 2345 B 36 BOATSWAIN-CLARKIN B 830 B 37 CLARK O 8980 1/03/2017 6000 B 38 WAIKAKA STREAM C 2525 B 39 1000 ACRE C 2860 B 41 MAUKORO OUTLET O 3220 1/03/2017 2000 B 42 PATERSONS OUTLET C 2190 B 46 AITCHISON OUTLET B 2440 B 47 MCHARDIE-AITCHISON B 585 B 48 MCHARDIE-PATERSON B 585 B 55 CASSEY C 2300 1/03/2017 2300 B 56 DUDDING B 1880 1/03/2017 1600

Total Drain length 56105 Total Drain

Sprayed 15200 Percentage sprayed 27% Total Drain

Cleaned 0 Percentage cleaned 0%

WPDD Agenda - 27-04-17 Page 15

Page 16: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 11 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT – PUMP RUNNING HOURS 2016-17 PUMP HOURS RUNWestern Plains DD Jul-16 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Total AverageNo 5 Rawe Rawe East 105 80 36 81 0 0 0 0 77 379 282No 6 Ngatea 13 10 0 17 0 0 0 0 30 70 84No 7 Kaihere 334 243 120 212 0 0 0 0 171 1080 543No 8 Torehape 115 130 4 45 0 0 0 0 25 319 347No 9 Phillips Road 210 193 65 199 0 0 0 0 110 777 407No 11 Robinson 29 40 27 43 0 0 0 0 30 169 159No 12 Julians 234 165 118 159 0 0 0 0 102 778 231No 17 Pouarua No 1/1 326 206 109 20 99 0 0 0 144 904 747

Pouarua No 1/2 235 48 61 341 0 0 0 0 323 1008 589No 18 Stitchbury 75 58 27 55 0 0 0 0 34 249 169No 21 Appletree/1 204 35 0 64 0 0 0 0 0 303 473

Appletree/2 53 91 0 119 0 0 0 0 0 263 375No 22 Paul Leonard 29 25 17 44 0 0 0 0 37 152 119No 23 Ngarua Central 133 105 67 95 17 0 3 0 92 512 302No 24 Mangawhero/1 134 71 76 100 0 0 0 0 110 491 533

Mangawhero/2 143 226 83 92 0 0 0 0 124 668 615No 25 Waikaka North 94 79 48 52 9 0 1 0 59 342 282No 26 Waikaka South/1 47 109 11 37 8 0 2 0 50 264 498

Waikaka South/2 204 110 123 99 11 0 35 0 55 637 498No 27 Pouarua No 2/1 62 53 21 61 0 0 0 0 171 368 270

Pouarua No 2/2 113 133 116 115 0 0 0 0 129 606 314No 29 Rawe Rawe West 146 153 87 127 8 0 0 0 238 759 500No 70 Miranda/1 214 21 25 35 14 0 0 0 335 644 468

Miranda/2 196 138 156 125 0 0 0 0 166 781 473No 73 Hopai West/1 122 75 116 159 20 0 1 0 209 702 364

Hopai West/2 124 83 0 0 0 0 0 0 0 207 294No 74 Martinovich/1 50 43 35 37 7 0 1 0 41 214 157

Martinovich/2 54 47 40 40 8 0 1 0 45 235 169No 75 Central North/1 105 37 16 36 1 0 0 0 69 264 101

Central North/2 0 0 0 0 0 0 0 0 0 0 593903 2807 1604 2609 202 0 44 0 2976 0 0 0 14145 10424

21 Stations 136%30 Pumpsets

Capacity m3/s

1.1

0.6

0.3

1.0

0.6

0.3

0.3

0.8

0.8

0.8

0.4

0.4

1.1

1.7

1.7

1.7

1.1

1.0

1.0

1.7

1.7

1.0

0.4

0.4

1.0

1.0

0.5

0.5

0.5

0.5

25.9

0 200 400 600 800 1000 1200

Rawe Rawe East

Ngatea

Kaihere

Torehape

Phillips Road

Robinson

Julians

Pouarua No 1/1

Pouarua No 1/2

Stitchbury

Appletree/1

Appletree/2

Paul Leonard

Ngarua Central

Mangawhero/1

Mangawhero/2

Waikaka North

Waikaka South/1

Waikaka South/2

Pouarua No 2/1

Pouarua No 2/2

Rawe Rawe West

Miranda/1

Miranda/2

Hopai West/1

Hopai West/2

Martinovich/1

Martinovich/2

Central North/1

Central North/2

WPDD Pump hours 2015-16

Jul-16 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

WPDD Agenda - 27-04-17 Page 16

Page 17: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 12 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT, ANNUAL PUMP RUNNING HOURS

0

5,000

10,000

15,000

20,000

25,000

1996-97

1997-98

1998-99

1999-00

2000-01

2001-02

2002-03

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

WPDD Annual pump hours

Series1Series2

ANNUAL PUMP RUNNING HOURS, ALL DISTRICTS

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Annual pump hours, all land drainage districts

Series2 Series1 5 per. Mov. Avg. (Series2) Linear (Series2)

WPDD Agenda - 27-04-17 Page 17

Page 18: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 13 M219 4269 WPDD Drainage Manager Report Mar 2017

Ngatea Monthly Rainfall Haywards Road (to 1999). HDC Depot (2000 on)

Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals1993 36.0 28.5 95.0 50.0 123.0 181.5 8.0 111.0 58.0 37.0 100.0 28.5 8571994 81.0 47.5 51.5 64.0 78.0 116.0 155.0 100.5 153.0 112.5 30.0 26.5 10161995 37.0 71.0 196.5 245.5 88.5 181.0 203.5 74.0 73.0 94.0 136.5 128.5 15291996 29.5 89.5 88.5 227.5 82.0 166.5 137.5 147.0 149.0 34.0 72.5 222.0 14461997 4.5 51.0 195.0 58.0 97.5 138.5 64.5 65.5 221.5 61.0 39.0 49.0 10451998 12.0 97.0 67.0 48.0 56.5 97.0 299.0 104.0 48.0 100.0 85.0 89.0 11031999 81.0 28.0 81.0 91.0 45.0 94.5 142.0 132.0 88.0 53.0 206.5 109.5 11522000 60.0 11.5 52.5 171.0 85.0 75.5 154.5 114.0 97.5 48.0 96.5 79.0 10452001 16.5 156.5 49.0 169.0 165.5 50.0 74.5 121.0 47.5 134.0 114.0 177.0 12752002 117.0 39.5 50.5 62.0 61.0 168.5 135.0 79.0 75.5 73.0 34.5 54.0 9502003 110.0 105.0 102.0 134.0 73.0 124.5 101.5 58.5 155.0 107.0 36.5 111.5 12192004 98.5 230.0 11.5 21.0 175.5 106.5 120.5 112.0 119.0 80.0 56.0 130.5 12612005 30.5 32.0 32.5 7.0 147.5 118.0 152.5 59.0 87.0 145.5 65.5 107.0 9842006 37.0 47.5 34.5 120.0 82.0 86.0 76.0 108.0 57.0 90.5 64.0 36.0 8392007 56.0 27.0 146.0 45.0 41.0 92.0 281.0 95.0 68.5 76.0 40.0 53.0 10212008 2.0 35.0 40.5 146.5 71.0 152.5 253.0 166.0 52.0 94.0 47.0 61.0 11212009 59.0 120.0 30.0 72.0 91.0 150.0 124.0 91.0 85.0 119.0 35.0 81.0 10572010 63.0 4.0 13.0 44.0 139.0 230.5 90.0 229.0 146.0 18.0 28.0 62.0 10672011 270.0 9.0 172.0 85.0 101.0 110.0 127.0 57.0 74.0 76.0 15.0 157.0 12532012 63.0 82.0 130.0 39.0 111.0 52.0 179.0 130.0 85.0 69.0 71.0 64.0 10752013 2.0 17.0 23.0 128.0 162.0 117.0 48.0 122.0 133.0 41.0 104.0 96.0 9932014 41.0 8.0 35.0 98.0 42.0 237.0 109.0 110.0 137.0 73.0 50.0 72.0 10122015 10.0 44.0 79.0 114.0 136.0 59.0 121.0 185.0 96.0 51.0 125.0 19.0 10392016 103.0 167.0 39.0 51.0 96.0 137.0 152.0 100.0 162.0 82.0 66.0 50.0 12052017 24.0 107.0 341.0 472Ave. 58 66 86 95 98 127 138 111 103 78 72 86 1117Max 270 230 341 246 176 237 299 229 222 146 207 222 1529Min. 2 4 12 7 41 50 8 57 48 18 15 19 839Kim's 21 142 98 136 117 76 50 640

0

50

100

150

200

250

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Current year compared to average (1993-2012)

0

50

100

150

200

250

300

350

400

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Current year compared to average (1993-2014)

0

200

400

600

800

1000

1200

Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun

Ngatea Rainfall Annual accumulation

WPDD Agenda - 27-04-17 Page 18

Page 19: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 14 M219 4269 WPDD Drainage Manager Report Mar 2017

Western Plains Drainage DistrictFinancial Report for 9 months to 31 March 2017

Item Total Budget Budget YTD Actual YTD VarianceActual % of YTD Budget

Actual % of Total Budget

DRAINAGE OPERATIONSVegetation ControlArea 1 13,500 4,887 3,254 1,633 67% 24%Area 2 10,000 5,411 2,399 3,012 44% 24%Area 3 15,500 10,287 3,564 6,723 35% 23%Area 4 16,100 11,456 2,961 8,495 26% 18%Area 5 9,600 6,674 3,337 3,337 50% 35%Area 6 12,301 3,902 3,964 (62) 102% 32%TOTAL 77,001 42,617 19,480 23,137 46% 25%

Mechanical CleaningArea 1 14,000 10,503 65 10,438 1% 0%Area 2 10,400 10,400 555 9,845 5% 5%Area 3 13,800 2,568 0 2,568 0% 0%Area 4 16,700 12,528 1,110 11,418 9% 7%Area 5 10,000 3,646 0 3,646 0% 0%Area 6 12,800 9,603 7,108 2,495 74% 56%TOTAL 77,700 49,248 8,839 40,409 18% 11%

Maintenance/Fencing/CulvertsArea 1 860 648 65 583 10% 8%Area 2 860 648 5,775 (5,127) 891% 671%Area 3 860 648 1,451 (803) 224% 169%Area 4 860 648 1,666 (1,018) 257% 194%Area 5 860 648 0 648 0% 0%Area 6 860 648 0 648 0% 0%TOTAL 5,160 3,888 8,957 (5,069) 230% 174%TOTAL DRAIN MAINTENANCE 159,861 95,753 37,276 58,477 39% 23%

PumpsGeneral 15,140 11,718 19,895 (8,177) 170% 131%WPDD Pumps 120,202 142,102 39,022 103,080 27% 32%TOTAL 135,342 153,820 58,917 94,903 38% 44%

Floodgates (D) 13,979 10,476 4,407 6,069 42% 32%TOTAL 13,979 10,476 4,407 6,069 42% 32%

Stopbanks(D) Tributary Banks 0 0 0 0TOTAL 0 0 0 0

OtherWeather Events 3,000 3,000 3,061 (61) 102% 102%Asset Liaison 4,000 2,475 2,281 194 92% 57%Data Collection 0 0 0 0Data Maintenenance 4,000 2,997 0 2,997 0% 0%Design 0 0 0 0Drain Inspection 7,500 6,000 4,504 1,496 75% 60%Pump Operation 0 0 0 0Rates 0 0 0 0Appointed Member Expenses 0 0 0 0Meeting Expenses 4,501 3,562 1,193 2,369 33% 27%Insurance 3,000 2,250 2,483 (233) 110% 83%TOTAL 26,001 20,284 13,523 6,761 67% 52%TOTAL OPERATING 335,183 280,333 114,123 166,210 41% 34%

WPDD Agenda - 27-04-17 Page 19

Page 20: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 15 M219 4269 WPDD Drainage Manager Report Mar 2017

OverheadsOverheads 103,765 77,823 77,824 (1) 100% 75%TOTAL 103,765 77,823 77,824 (1) 100% 75%

DepreciationDepreciation (D) 93,300 69,975 69,975 0 100% 75%Depreciation (P) 0 0 0 0TOTAL 93,300 69,975 69,975 0 100% 75%

InterestInterest (D) (61,416) (46,062) (46,062) 0 100% 75%TOTAL (61,416) (46,062) (46,062) 0 0%

TOTAL EXPENDITURE 470,832 382,069 215,860 166,209 56% 46%

Item Total Budget Budget YTD Actual YTD VarianceActual % of YTD Budget

Actual % of Total Budget

FLOOD PROTECTION OPERATIONS

Floodgates (F1) 3,060 2,295 980 1,315 43% 32% (F2) 1,080 810 0 810 0% 0%TOTAL 4,140 3,105 980 2,125 32% 24%

Stopbanks(F1) Waitak Stm Left Bank 600 450 0 450 0% 0%(F1) Foreshore 0 0 0 0(F1) Miranda 500 378 395 (17) 104% 79%(F1) Karito/Hill Catchment 0 0 0 0(F2) Maukoro Left Bank 0 0 0 0(F2) Waitak Stm Right Bank 2,100 1,575 0 1,575 0% 0%(F2) Gubbs Outlet Bank 0 0 0 0TOTAL 3,200 2,403 395 2,008 16% 12%

DepreciationDepreciation (F1) 35,400 26,550 26,550 0 100% 75%Depreciation (F2) 15,204 11,403 11,403 0 100% 75%TOTAL 50,604 37,953 37,953 0 100% 75%

InterestInterest (F1) (21,816) (16,362) (16,362) 0 100% 75%Interest (F2) 0 0 0 0TOTAL (21,816) (16,362) (16,362) 0 100% 75%

TOTAL FLOOD PROTECTION 36,128 27,099 22,966 4,133 85% 64%

WPDD Agenda - 27-04-17 Page 20

Page 21: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 16 M219 4269 WPDD Drainage Manager Report Mar 2017

Item Total Budget Budget YTD Actual YTD VarianceActual % of YTD Budget

Actual % of Total Budget

NGATEA URBAN STORMWATER

Vegetation Control 2,000 1,503 1,350 153 90% 67%Mechanical Cleaning 2,000 1,984 555 1,429 28% 28%Maintenance/Fencing/Culverts 2,300 1,728 2,652 (924) 153% 115%

TOTAL DRAIN MAINTENANCE 6,300 5,215 4,557 658 87% 72%

PumpsNo. 6 Ngatea Town 1,000 747 252 495 34% 25%No. 2 Paul Leonard 900 675 266 409 39% 30%TOTAL 1,900 1,422 517 905 36% 27%

SW ReticulationReticulation Maintenance 4,732 3,546 814 2,732 23% 17%TOTAL 4,732 3,546 814 2,732 23% 17%

FloodgatesFloodgates 360 270 0 270 0% 0%TOTAL 360 270 0 270 0% 0%

OtherWeather Events 1,200 1,200 0 1,200 0% 0%Routine Inspections 0 0 0 0Asset Liaison 2,301 1,728 1,316 412 76% 57%Consent Monitoring 1,961 1,467 1,277 190 87% 65%Data Collection 0 0 0 0Data Maintenenance 1,075 810 0 810 0% 0%Design 600 600 0 600 0% 0%Drain Inspection 2,490 2,442 860 1,582 35% 35%Mowing 2,400 1,800 3,924 (2,124) 218% 164%Rates 12,000 12,000 0 12,000 0% 0%Meeting Expenses 119 90 0 90 0% 0%Insurance 4,000 2,997 1,782 1,215 59% 45%TOTAL 28,146 25,134 9,158 15,976 36% 33%TOTAL OPERATING 41,438 35,587 15,047 20,540 42% 36%

OverheadsOverheads 26,280 19,710 19,710 0 100% 75%TOTAL 26,280 19,710 19,710 0 100% 75%

DepreciationDepreciation (SW) 64,404 48,303 48,303 0 75%TOTAL 64,404 48,303 48,303 0 100% 75%

InterestInterest (SW) 4,680 3,510 3,510 0 75%TOTAL 4,680 3,510 3,510 0 100% 75%

TOTAL EXPENDITURE 136,802 107,110 86,570 20,540 81% 63%

WPDD Agenda - 27-04-17 Page 21

Page 22: A G E N D A WESTERN PLAINS DRAINAGE DISTRICT COMMITTEE · IN ATTENDANCE Mr I D McLeod (Drainage Manager), B Stephens (Drainage Overseer) and ... CONFIRMATION OF MINUTES MEETING HELD

Page 17 M219 4269 WPDD Drainage Manager Report Mar 2017

WESTERN PLAINS DRAINAGE DISTRICT WORKS AREAS and PUMP LOCATIONS

WPDD Agenda - 27-04-17 Page 22