› eng › download.php?filename=wooyang hc... · introduction ceo jin tae kim foundation date...

92
PREQUALIFICATION WOOYANG HC will never stop in pursuing clients’ satisfaction through continuous quality management and technology improvement.

Upload: others

Post on 03-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

PREQUALIFICATION WOOYANG HC will never stop in pursuing clients’ satisfaction

through continuous quality management

and technology improvement.

Page 2: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Contents

Products

- Major Experiences - Top 5 Records

03 Introduction

- Management Philosophy - History - Location & Shop Layout - Organization Chart

01

Other Business 04 - Power Plant Business - Local Plant Business

Capacity

- Certificates & Client Vendor Registration - Design & Fabrication Capacity - Major Facilities

02

Grand Prizes 05

Page 3: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

1 Introduction

(1) Management Philosophy (2) History (3) Location & Shop Layout (4) Organization Chart

Page 4: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

S.Q.D.C.D

3

Safety Quality Delivery

Cost & Competitiveness

S.Q.D.C.D Customer Oriented First and Foremost Attention

Development Differentiation Do it

Page 5: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

EHS Performance

Consider Safety In Facility Design Conduct Safety Inspection With All Employees Continuous Safety Training Improve EHS Awareness

Zero Injuries & Illness

EHS Activities

“EHS Performance First! In Wooyang HC based on our culture”

4

Page 6: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction

CEO

Jin Tae Kim

Foundation Date

March, 1993

Main Business

- Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical and Oil Refineries Plant - Module Plant (On/Offshore) & Local Plant EPC

Manpower - Total Employees : 580 - Employees : 280 - Sub Contractors (In-house) : 300

Shop Area

- Plant Area : 191,956 ㎡ - Under Roof : 61,783 ㎡ (with Moving Shelter)

5

Page 7: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

History

6

1993 - Established Wooyang Corporation

1996 - Renamed to Wooyang Industrial Co., Ltd.

2000 - ISO 9001 Accredited

2002 - Hold ASME stamps “S” & “U”

2006 - Hold ASME stamps “U2” & “PP” - Renamed to Wooyang HC Co., Ltd.

2008 - C.S.L. H/E License Agreement (Chiyoda Kosho) - ISO 14001 / OHSAS 18001 Accredited 2011 - 3D Modeling System Introductions 2012 - Completed No.2 Plant

2014 - Completed No.3 Plant

2019 - 1st. Phase Expansion of No.3 Plant

Page 8: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Guide Map

Busan Sea / Air Port

Korea

Center of

Seoul Incheon Air Port

Ulsan Sea / Air Port

70km 80km

350km

311km

380km

Masan Sea Port

From Wooyang HC to the Port

- Pyeongtaek Sea Port: 30m

- Center of Seoul : 70km

- Incheon Air Port : 80km

- Ulsan Sea/Air Port : 350km

- Busan Sea/Air Port : 380km

- Masan Sea Port : 311km

Location 88, Poseunggongdan-ro 118beon-gil, Poseung-eup, Pyeongtaek-si, Gyeonggi-do, 17960 Korea

Tel.: +82 31 680 9300 Fax.: +82 31 680 9397 Homepage: http://www.wooyang.co.kr

7

Page 9: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Guide Map From Wooyang HC to the Pyeongtaek Port

2nd Factory (49,263m2) 1st Factory (49,055m2)

3rd Factory (93,638m2) 250m Pyeongtaek

International Sea Port

30m

8

Page 10: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

No.1 Plant

9

Page 11: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

No.2 Plant

Heat Treatment Furnace

10

Clean Room

Page 12: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

No.3 Plant

Special Ground Level Area

11

Page 13: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

12

Organization Chart

Business Control Center

Chemical Process Equipment Div. Local Plant & Power Plant Div.

Administration Center

Safety & Maintenance

Center

Administration

Finance

Computerization

Environment & Safety

Factory Affairs PM

Design

Procurement

Production Control

Sales

Quality Assurance/Control Auditing

CEO

Page 14: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

2 Capacity

(1) Certificates & Client Vendor Registration

Page 15: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

ASME Stamp

U / U2 / PP / S / R NB

ISO Certificate

ISO 9001 ISO 14001 OHSAS 18001

Construction & SEL & Lloyd

Local Construction Certificate Special Equipment License of China Lloyd’s Class 1 / 2.1

14

Certificates

Power Plant Certificate

Local Power Plant Certificate

Page 16: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

2 (2) Design & Fabrication Capacity

Capacity

Page 17: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Design Software

SSC Design for Steam Surface Condenser

FWH Design for Feedwater Heater

FRAN Design for Feedwater Heater

DEA Design for Deaerator

JET Pump Design for Water Jet Pump ( Ejector )

HEM016K Design for Compact Screw Lock type Heat Exchanger

SolidWorks 3D Modeling System

HTRI Design for Heat Exchanger

HTFS Design for Heat Exchanger

ANSYS Fatigue and Stress Analysis by FEM

NISA Fatigue and Stress Analysis by FEM

FE Pipe FEA for Pressure Vessel and Piping System

Compress Mechanical Design for Pressure Vessel, H/EX

PV Elite Mechanical Design for Pressure Vessel, H/EX

Microstation Drafting for Detail Drawing

Auto CAD Drafting for Detail Drawing

Software Utility

16 In-house Developed Program

Page 18: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Carbon Steels & LTCS SA515 & SA516 Gr.55 / Gr.60 / Gr.65 / Gr.70 SA537 Gr.1 / Gr.2

Low Alloy Steels SA387 Gr.11 / Gr.22 / Gr.5 / Gr.9 SA203-E / SA302-B

Stainless Steels SA240-304L / 316L / 317L / 321 / 405 / 410 /430

Clad Steels C.S & L.A + 304L / 316L / 321 / 405 / 410 / 430 C.S & L.A + Alloy 20 Cu-Ni, Inconel, Titanium, Monel

Nickel Alloy Steels Hastelloy B-2 / B-3 / C-4 / C-22 / C-276 Incoloy 800 / 800H / 800HT / 825, Nickel 200/201, Inconel 625, Monel 400/600

Specialty (Ti, Duplex, etc.) UNS S31803 / S31254 / S32750 / S32760 / S32250 SB265 / SB209

17

Experienced Material

Page 19: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Fabrication Capacity

Description Max. Diameter Max. Length Max. Unit Weight Max. Thickness

Experience Φ 9.15 m 106.5 m 1,926 Ton 220+3 mm (Plate) 404 mm (Forged)

Capacity Φ 15 m 130 m 3,200 Ton 266 mm (Plate)

410 mm (Forged)

Item Heat Exchanger

Column / Tower

Pressure Vessel Reactor Others Total

Ton / Year 12,000 8,000 10,000 10,000 5,000 45,000

Per Items

Per Size

18

Page 20: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

2 (3) Major Facilities

Capacity

Page 21: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

20

Major Facilities

Gantry Crane 300(200+100) Ton

Gantry Crane 150(100+50) Ton

Over Head Crane 120(100+20) / 60(50+10) Ton

Page 22: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

21

Major Facilities

Turning Roller 1,500, 1,000 and 800 Ton

Jack-up System (Max 3,200 Ton)

Page 23: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

22

Major Facilities

Welding Machine Tandem (2 Pole) SAW Automatic Circle Welder (Nozzle “D” Joint)

Page 24: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

23

Overlay Welding

Page 25: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

24

Insulation and Tray assembly

Page 26: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

25

Major Facilities

Welding Positioner 50 Ton & 30 Ton

U-Groove Machine Y : 1,450 mm, Z : 850 mm

Page 27: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

26

CNC Vertical Turning Machine O.D. 4,800/5,500 x 55/20 Ton

3D CNC Plano Miller 2,700(W) x 5,000(L) x 2,500(H) / 20 Ton

800(W) x 1,700(L) x 700(H)

CNC Gantry Drilling Machine Spec. : O.D 6,000 x t 1,000

CNC BTA Drilling Machine O.D. 4,800 x HoleΦ100 x t 1,000

Major Facilities

Page 28: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

27

Plate Bending Roller t200 x w4,000 (mm) t100 x w3,500 (mm) t80 x w3,100 (mm)

Hydraulic Press 500, 1000, 2000, 5000 Ton

Cold : 150 mm Hot : 300 mm

Major Facilities

Page 29: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

28

Auto Grinding Machine O.D. 10,000

Spinning Machine I.D. 7,000 x t 50

Major Facilities

Page 30: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

29

Heat Treatment Furnace 15.5m(W) x 16m(H) x 40m(L)

Heat Treatment Furnace 7m(W) x 6.5m(H) x 18m(L)

Car Bottom Type Heating Furnace 6.8m(W) x 4.7m(H) x 8.5m(L)

Major Facilities

Page 31: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

30

Major Facilities

Painting Shop 30m(W) x 16.5m(H) x 40m(L) 20m(W) x 16.5m(H) x 40m(L)

Shot Blast Shop 20m(W) x 16.5m(H) x 40m(L) 15m(W) x 16.5m(H) x 40m(L)

Shot Blast Shop Painting Shop

RT Room

Page 32: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

31

Major Facilities

1st SHOP - RT Room 10m(W) x 10m(H) x 20m(L)

2nd SHOP - RT Room

20m(W) x 16.5m(H) x 40m(L)

3rd Shop - RT Room 21m (W) x 10m(H) x 14m(L)

16m(W) x 13.5m(H) x 35m(L) 10m(W) x 10m(H) x 17m(L)

Page 33: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Laboratory Test Facilities

Laboratory

Weld Material Control

32

Impact, Tension Test

PMI(Spectro type) Test Ferrite Test Hardness Test

Weld Gauge Test Micro Test

Page 34: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

3 Products

(1) Experience Photos

Page 35: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

34

Wash Tower Largest “Wash Tower” in the world

Client : JUPC (Jubail United Petrochemical Company) / SABIC Customer : Samsung engineering Project : JUPC EO/EG Plant III Item : Wash tower Size : T 58/69+3 x ID 8,600 x L 100,535(mm) Material : SA516-70N+304L Clad Weight : 1,794 Ton (Shipping Weight : 1,926 Ton) Site : Saudi Arabia / 2019.07.05

Page 36: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

35

Tower & Column

Client : KNPC (Kuwait National Petroleum Co.) Customer : Daelim Industrial Project : LPG Train-4 Project Item : De-Methanizer Size : 74/100T x 5,486/4,115ID x 70,765L Material : SA240-316L Weight (Hydro. Test) : 753 Ton (1,849 Ton) Site : Kuwait / 2012

Page 37: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

36

Tower & Column Client : Jurong Aromatics Corporation Customer : SK E&C Project : Jurong Aromatic Complex Project Item : Xylene Splitter Size : 34/50T x 8,000 ID x 106,500 L (mm) Material : SA516-70 Weight (Hydro. Test) : 1,100 Ton (6,450 Ton) Site : Singapore / 2012

Page 38: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

37

Tower & Column

Client : SABIC (Saudi Basic Industries Corp.) Customer : Daelim Industrial Project : Saudi Kayan Polycarbonate Project Item : Column Size : 36T x 7,350 ID x 48,130L / 585 Ton Material : SA240-304 Weight : 3,400 Ton (36 Sets) Site : Saudi Arabia / 2008

Page 39: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

38

Tower & Column Client : Chevron Phillips Chemical Company Customer : JGC & Fluor Project : USGC Petrochemicals Project Item : C2 Splitter Size : 27/35T x 6,096 ID x 76,767 L / 465 Ton Material : SA240-304 Weight : 465 Ton Site : USA / 2014

Page 40: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

39

Project Experience Client : Chevron Phillips Chemical Company Customer : Technip FMC, JGC & Fluor Project : USGC Project Items : Loop Reactor, Column, Vessel, Heat Exchanger Material : SA516-70 / SA240-304 / SA387-11 Weight : 10,206 Ton (124 Sets) Site : USA / 2015

Client : KNPC Customer : Daelim Industrial Project : LPG Train 4 MAA Refinery Project Items : Column, Vessel, Heat Exchanger Material : SA516-70 / SA240-304 Weight : 8,175 Ton (82 Sets) Site : Kuwait / 2012

Client : Petron Bataan Refinery Customer : Daelim Industrial Project : RMP-2 Project Items : Column, Reactor, Heat Exchanger Material : SA516-70/60N (HIC) / SA387-11 Gr.2 Weight : 7,682 Ton (227 Sets) Site : Philippines / 2013

Page 41: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

40

Client : Cameron LNG LLC Customer : CB&I Chiyoda JV Project : Cameron LNG Project Item : In-Line(Chained) Heat Exchanger Size : 17~61T x 1,194~4,623 ID x 6,200~12,621 L (mm) 4 Sets (Chained Length 34,061 L / 44,714 L) Material : SA537-1 / 304(L) / SA334-6 Weight : 1,657 Ton (24 Sets) Site : USA / 2016

In-Line(Chained) Heat Exchanger

Page 42: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

41

Heat Exchanger Client/Customer : Reliance Project : J3 Program – MEG Project Item : Heat Exchanger Size : 44/30 + 3T x 4,576 ID x 14,717 L (Tube : 15,235 Ea) Material : SA240-304L / SA516-70N + 304L / B111-C70620 Weight : 212 Ton Site : India / 2014

Client : KNPC Customer : Daelim Industrial Project : LPG Train 4 Refinery Project Item : Heat Exchanger Size : 98T x 2,692 ID x 11,476L Material : SA516-60N Weight : 107 Ton Site : Kuwait / 2012

Client : DOW / ARAMCO Customer : Daelim Industrial Project : SADARA Mixed Feed Cracker Project Item : Heat Exchanger Size : 20T x 2,580 ID x 19,298L Material : SA516-70 / B111-C70620 (CuNi Tube) Weight : 123 Ton Site : Saudi Arabia / 2013

Page 43: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

42

Heat Exchanger

Client : North West Redwater Partnership Customer : Fluor Canada Project : North West Redwater Partnership Sturgeon Refinery Item : HELIX Heat Exchanger Size : 19/25T x 1,041/1,250 ID x 8,825L Material : SA516-70N / SA213-TP304 / 304L Weight : 20.7 Ton Site : Canada / 2014

Client : Shintech Louisiana, LLC Customer : Toyo Engineering Project : Shintech Ethane Cracker Plant Item : HELIX Heat Exchanger Size : 19T x 1,930 ID x 15,451L Material : SA516-70N / SA516-70N / SA179 Weight : 74.3 Ton Site : USA / 2016

Page 44: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

43

Client : Petrobras Customer : Modec Project : FPSO Cidade de Itaguai MV26 Item : Reinjection Discharge Coolers Size : 15T x 478 ID x 10,230 L Material : SA789-S31803(Tube) / SA516-70N(Shell) Weight : 22 Ton Site : Brazil / 2014 Test Pressure : 900 barg

Pressure Test (900 barg)

90 Mpa (900 barg)

High Pressure Cooler (900 barg)

Page 45: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

44

Compact Screw Lock (CSL) Type Shell & Tube Heat Exchanger

High Pressure and High Temperature Service Easy & Quick Maintenance No Welding required during Re-installation of Channel Part License Agreement With Chiyoda Kosho (Japan)

Compact Screw Lock Heat Exchanger

Page 46: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

45

TLX Heat Exchanger

Client/Customer : LG Chem Project : VCM Project Item : TLX Heat Exchanger (Transfer-Line Heat Exchanger) Size : 13T x 1,570 ID x 5,000 L Material : SA516-60 / SA312-TP347H Weight : 84.9 Ton Site : Korea / 2010

Page 47: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

46

Pressure Vessel

Client : ADMA OPCO Customer : Hyundai E&C Project : Satah Al Razboot(SARB) Field Development Project Item : Pressure Vessel Size : 64 + 3T x 3,000 ID x 12,820L (mm) Material : SA516-70N + N06625 Weight : 127 (63.5 x 2 Sets) Ton Site : UAE / 2015

Client : Hyundai & Shell Base Oil Customer : Hyundai Engineering Project : LBO(Lube Base Oil) Project Item : Pressure Vessel Size : 134T x 2,200 ID x 13,270L (mm) Material : SA336-F22 Gr.3 (Forged Shell) SA387-22 Gr.2 (Head) Weight : 87.6 Ton Site : Korea / 2013 Stamp : ASME “U2”

Page 48: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

47

Heavy Wall Equipment

Client : NSRP Ltd. Customer : Chiyoda JV Project : NSRP Project Item : Cold High Pressure Separator Size : 181 + 3T x 2,500 ID x 11,950L Material : SA765-Gr.2 + Alloy625 Weight : 89.5 Ton Site : Vietnam / 2014

Client : NSRP Ltd. Customer : Chiyoda JV Project : NSRP Project Item : High Pressure H2S Absorber Size : 166 + 3T x 2,300 ID x 24,680L Material : SA765-Gr.2 + 304L Weight : 198 Ton Site : Vietnam / 2014

Page 49: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

48

Heavy Wall Equipment

Client : ADMA OPCO Customer : Hyundai E&C Project : Satah Al Razboot(SARB) Field Development Project Item : Pressure Vessel Size : 220/218 + 3T x 1,900 ID x 8,900 L (mm) Material : 350-LF2(TOP)/350-LF2+316L (BTM) Weight : 250.8 (83.6 x 3 Sets) Ton Site : UAE / 2015

Client : Petrobras Customer : EBR Project : Petrobras FPSO P-74 Project Item : Suction Scrubber Size : 220 + 3T x 1,785 ID x 3,869 L (mm) Material : SA765-III + SS316L W.O Weight : 63 Ton Site : Brazil / 2015

Page 50: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

49

Stainless Steel Pressure Vessel

Client : KNPC Customer : Daelim Industrial Project : LPG Train 4 MAA Refinery Project Item : Pressure Vessel (Stacking Type) Size : 140T x 3,404 ID x 20,645L (mm) Material : SA240-316L Weight : 536(268/268) Ton Site : Kuwait / 2012

Page 51: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

50

OC Reactor

Client/Customer : LG Chem Project : VCM 201-D Project Item : OC Reactor Size : 15T x 4,800/5,600 ID x 11,900 TL (mm) Material : SA240-304L Weight : 230 Ton Site : Korea / 2009

Coil to U-Bend Welding Material : Hastelloy (C-276) Size : 3”Sch. 80 -650EA Welding Process : GTAW

Page 52: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

51

Loop Reactor

Client : Chevron Phillips Chemical Customer : Daelim Industrial Project : Saudi NCP South Plot Project Item : Loop Reactor Size : 13/19/50T x 700/745 ID x 60,000/70,000L Material : SA516-70N + S5 Weight : 3,338 Ton (36 Legs) Site : Saudi Arabia / 2010

Client : Chevron Phillips Chemical Customer : Technip FMC Project : USGC Petrochemicals Project Item : Loop Reactor Size : 19/54T x 560/698.5 ID x 61,189L Material : SA516-70N + S5 / SA516-70N Weight : 2,993 Ton (32 Legs) Site : USA / 2014

Page 53: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

52

Reactor

Client : S-OIL Corporation Customer : Daelim Industrial (DDJV) Project : S-OIL Residue Upgrading complex Item : Oxidation Reactor Size : 51 + 3.5Tx 8,000 ID x 38,100L Material : SA516-70N + 304L Weight : 526.3 Ton x 6 Sets Site : Korea / 2017

Page 54: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

53

Agitator type Equipment

Client : Hanwha Chemical Customer : Hanwha E&C Project : CNP Project Item : Reactor (With Agitator) Size : 24.5T x 4,200 ID x 8,850 L Material : SA516-70 + 316L Weight : 74 Ton x 8 Sets Site : China / 2009

Customer : Reliance Industries Ltd. Project : Butyl Rubber Plant Project Item : Strippers (With Agitator) Size : 16 + 3T x 4,000/4,500ID x 14,260L Material : SA516-70 + S31803 Weight : 41 Ton (209 Ton / 6 Sets) Site : India / 2014

Page 55: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

54

Chamber and Reactor Client/Customer : Shell China Project : New Grease Manufacturing Project Item : Reactor (Autoclave) Size : 20T x 2,000 ID x 4,597L Material : SA516-70 + 316L Weight : 10 Ton / 10 Sets Site : China / 2011

Client/Customer : Samsung Total Project : SM Expansion Project Item : Reactor Size : 26T x 4,268 ID x 23,285L Material : SA516-70 + SUS 304L Weight : 235 Ton Site : Korea / 2007

Client : Jurong Aromatics Co. Customer : SK E&C Project : Jurong Aromatic Complex Project Item : Chamber Size : 56T x 7,400 ID x 28,100L Material : SA516-70 Weight : 316 Ton Site : Singapore / 2012

Page 56: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

55

Onshore Module Plant

Client : SABIC(Saudi Basic Industries Corp.) Customer : Jord International Project : Saudi Kayan Polycarbonate Project Item : Module Plant Size : 6,300(W) x 4,500(L) x 38,900(H) 6,000(W) x 7,900(L) x 29,000(H) 5,000(W) x 6,300(L) x 33,500(H) Material : SA240-316/304, Etc. Weight : 94/95/73 Ton Site : Saudi Arabia / 2009

Page 57: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

56

Client : Petrobras Customer : Natco Japan Project : FPSO Cidade de Angra dos Reis MV22 Project Item : Module Plant (FPSO) Size : 6,500(W) x 12,250(L) x 10,420(H) Material : SA516-70, Etc. Weight : 568.3 Ton Site : Brazil / 2009

Offshore Module Plant (FPSO)

Page 58: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

57

Offshore Plant (FPSO)

Client : Petrobras Customer : Modec Project : FPSO Cidade de Mangaratiba MV24s - Project Item : FPSO Plant Size : 105 + 3T x 3,900 ID x 8,350 L Material : SA516-70 + 316 Clad Weight : 1,207 Ton (9 Sets) Site : Brazil / 2014

Page 59: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

58

IGCC Project

Slag Accumulator Flyash Sluice Vessel

Client : Korean Western Power Customer : Doosan Heavy Industries & Construction Project : TAEAN IGCC Power Project Items : Coal Feed Vessel / Flyash Sluice Vessel / Slag Acuumulator / Flyash Blow-Egg Vessel / Etc. Material : SA516-60,70, HIC / SA240-316 HASTELLOY C-276 / S31254 /S31803 Weight : 1,112 Ton (39 Sets) Site : Korea / 2013

Page 60: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

59

Client : Lotte Chemical Louisiana LLC Customer : Samsung Engineering Project : LA MEG Item : Deaerator Size : 9/10T x 2,200 ID x 3,740L 15/17T x 3,700 ID x 11,967L Material : SA240-304 / SA516-70 Weight : 40.2 Ton Site : USA / 2017

Client : Hanwha Chemical Customer : Hanwha E&C Project : China Ningbo PVC Project Item : Steam Generator Size : 44T x 2,500 ID x 12,000L Material : SA516-70 Weight : 130.6 Ton Site : China / 2009

Deaerator & Steam Generator

Page 61: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

60

Waste Heat Boiler

Client : KNPC Customer : Tecnimont S.p.A Project : AGRP Project Item : Waste Heat Boiler Size : 72T x 3,658 ID x 18,509 L (mm) Material : SA516-70N Weight : 142 Ton Site : Kuwait / 2011

Client : State Concern Turkmen Gas Customer : Hyundai Engineering (Hanyang Industry) Project : Turkmenistan Gas Item : Waste Heat Boiler Size : 140/70T x 5,430/2,500 ID x 8,375 L (mm) Material : SA516-65N Weight : 210 Ton Site : Turkmenistan / 2011

Page 62: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

61

Other

Client : PetroPeru Customer : Tecnicas Reunidas Project : PMRT Project Item : Reactor & Heat Exchanger (Stacking Type) Size : 40T x 7,650ID x 15,300L (mm) Material : SA516-70 / SA789-S32750 Weight : 331(298.5 + 32.5) Ton Site : Peru / 2016

Client : JSC Yamal LNG Customer : Technip FMC Project : Yamal LNG Project Item : Column Size : 24 + 3/28T x 2,800ID x 28,310L (mm) Material : SA537-1 + 316L Weight : 109.9 Ton Site : Russia - TRCU(GOST) Certification / 2015

Page 63: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

3 (2) Top 5 Records

Products

Page 64: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

63

Top 5 of Experience

No. End User Customer Project Name Description Material

Size (mm) Weight (Ton)

Press. (kgf/㎠)

Temp. (℃) Shipment

Th’k I.D L

1 Petrobras EBR Petrobras

FPSO P-74

Injection Gas Compression –

Suction Scrubber

SA765 Gr.III + 316L W.O 220+3 1,785 3,869 63 358.2 -77

/70 2015.05

2 ADMA-OPCO Hyundai E&C

Satah AL Razboot (SARB)

Field Development

Injection Compressor 3rd Stage Suction

Scrubber

SA350-LF2 / SA350-LF2 +

316L W.O 220 1,900 9,000 83.5 299 180 2015.09

3 Exxonmobil TR

Chemical And Refinery

Integrated Singapore

(Crisp)

CS colums

SA765 Gr.IV + 304L W.O / SA 516-70 304L W.O

202+4 2,133 36,529 572.8 199.7 182 2020.08 (E)

4 NSRP Ltd. Chiyoda JV NSRP Cold High Pressure

Separator

SA765 Gr.II + N06625 W.O 181+3 2,500 11,950 89.5 181.5 260 2014.10

5 GS Caltex

GS E&C HOU

Recycle Gas Compressor K.O.

Drum SA516-70 172 2,570 6,750 63.7 170 260 2006.11

Heavy Thickness

Page 65: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

64

Top 5 of Experience

No. End User Customer Project Name Description Material

Size (mm) Weight (Ton)

Press. (kgf/㎠)

Temp. (℃) Shipment

Th’k I.D L

1 Gulf Coast

Growth Ventures LLC

Chiyoda Yosemite

Olefins Recovery

Tower SA516-70N 27~34 9,144 48,158 393 4.9 371.1 2019.12 (E)

2

M/S. Jubail United

Petrochemicals Company

Samsung Engineering

United EO/EG III Project

Wash Tower SA516-70N + 304L Clad 58~69 8,600 100,535 1,794 20.537 120 2019.07

3 Chevron Phillips

Chemical Company

JGC & Fluor USGC Petrochemicals

Quench Water Tower SA516-70N 26~29 8,382 30,327 427 5.2 204 2015.01

4 Reliance Reliance Jamnaga 3 Program

-Rog Cracker

Quench Water Tower SA516-70N 23~42 8,300 37,000 490 3.5 + H.V 250 2014.06

5 Jurong

Aromatic Complex

SK E&C Jurong

Aromatic Complex

Xylene Splitter SA516-70N 34~50 7,400/

8,000 106,500 1,100 9.5 + F.V 315 2012.11

Large Diameter

Page 66: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

65

Top 5 of Experience

No. End User Customer Project Name Description Material

Size (mm) Weight (Ton)

Press. (kgf/㎠)

Temp. (℃) Shipment

Th’k I.D L

1 Jurong

Aromatic Complex

SK E&C Jurong

Aromatic Complex

Xylene Splitter SA516-70N 34~50 7,400/ 8,000 106,500 1,100 9.5 + F.V 315 2012.11

2 LG

Petro Chemical

LG Petro Chemical M2 Fractionator SA516-70N

SA537-1+S5 31/38 4,000 103,000 460.0 20 - 2005.11

3

M/S. Jubail United

Petrochemicals Company

Samsung Engineering

United EO/EG III Project

Wash Tower SA516-70N + 304L Clad 58~69 8,600 100,535 1,794 20.537 120 2019.07

4 Hanwha Total Hanwha E&C HTC NCC Side Cracker

Propylene Fractionator SA516-70N+S5 37~55 4,500 99,420 528.9 20.6 -48/75 2018.01

5 Petron Bataan

Refinery

Daelim Industrial

Petron Bataan Refinery

Propane /Propylene

Splitter SA516-60N+S5 31~61 5,500 98,250 626.5 13.7 66 2012.10

Long Columns

Page 67: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

66

Top 5 of Experience

No. End User Customer Project Name Description Material

Size (mm) Weight (Ton)

Press. (kgf/㎠)

Temp. (℃) Shipment

Th’k I.D L

1

M/S. Jubail United

Petrochemicals Company

Samsung Engineering

United EO/EG III Project

Wash Tower SA516-70N + 304L Clad 58~69 8,600 100,535 1,794 20.537 120 2019.07

2 Chevron Phillips

Chemical Company

Technip FMC USGC Petrochemicals

Loop Reactor SA516-70N 19~54

Shell Φ560 Jacket Φ698.5

979 m 1,433 63 + F.V 148 2014.08

3 Jurong

Aromatic Complex

SK E&C Jurong

Aromatic Complex

Xylene Splitter SA516-70N 34~50 7,400/ 8,000 106,500 1,100 9.5 + F.V 315 2012.11

4 Chevron Phillips

Chemical Company

Daelim Industrial Saudi NCP Loop

Reactor SA516-70N+S5 Shell 19 Jacket 13~15

Shell Φ610 Jacket Φ745

785 m 1,023 63.3 166 2009.12

5 Chevron Phillips

Chemical Company

Daelim Industrial Saudi NCP Loop

Reactor SA516-70N+S5 Shell 19 Jacket 13~15

Shell Φ560 Jacket Φ700

670 m 833 63.3 150 2009.12

Heavy Weight

Page 68: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

4 (1) Power Plant Business

Other Business

Page 69: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Product List

01 Turbine Exhaust Steam Condenser

- Steam Surface Condenser

02 Heater

- Low Pressure Feedwater Heater - High Pressure Feedwater Heater - District Heating Heater

03 Deaerator

- Tray Type Deaerator - Spray Type Deaerator

04 Closed Cooling Water Cooler

- Shell & Tube Type CCW - Air Fin Cooler Type CCW

05 Fuel Gas Heater for Gas Turbine

06 Air Preheater for Combustion air for Furnace and Incinerator

68

Page 70: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

69

Steam Surface Condenser

Definition of SSC

The surface condenser is to condense low pressure turbine exhaust steam. The coolant can be either water or seawater. When coolant is normal water, the tube material can be stainless steel. In case of seawater, titanium tubes are used to protect tubes from corrosion. Depending on the capacity, the shape of casing can be either “Cylindrical” or “Rectangular“.

SSC is consist of :

Tube Bundles Shell Hotwell Water Box Vacuum Pump & Steam Jet Ejector Bypass System Water Spray System Expansion Joint

Page 71: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

70

Steam Surface Condenser

Client : PVN (PETRO Vietnam) Customer : Daelim Industrial Project : Thai Binh II Thermal Power Plant Item : Steam Surface Condenser Power plant type : 2 x 600MW CFPP Material : SA516-70 / B265-1 Weight : 743 Ton x 2 Sets Site : Vietnam / 2014

Client : Sarangani Energy Corporation Customer : JGC Project : SEC210-1x105MW Coal Fired Power Item : Steam Surface Condenser Power plant type : 105MW CFPP Material : 70/70 + 304L Clad / SA249-TP304L Weight : 163 Ton Site : Philippines / 2017

2 x 600MW SSC

Page 72: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

71

Heater

Definition of FWH

Feedwater Heaters are to heat boiler Feedwater with extracted steam from the turbine. Depending on the steam pressure, they can be “three zone”, “ two zone” or “ single zone”. DH heaters are to heat district heating water with turbine extract steam. ※ Feedwater Heaters are for Coal-fired Power Plant.

Low Pressure Feedwater Heater District Heating Heaters are for Cogeneration Power Plant

High Pressure Feedwater Heater

Page 73: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

72

Client : Power&Water Utility Company Customer : Hanwha E&C Project : Marafiq STG Units 5&6 Project Item : H.P. Heater for Power Plant Size : 16T x 1,370 ID x 10,200 L Material : SA516-70 / SA213-TP304N Weight : 35/35/34/34 Ton (4 Items) Site : Saudi Arabia / 2011 Test Pressure : 430 barg 43 MPa (430 barg) Hydro. Expander

High Pressure Heater (430 barg)

Page 74: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

73

Deaerator

Definition of Deaerator Deaerators are to remove the dissolved air (Oxygen) in the Boiler Feedwater. Oxygen can cause boiler tube corrosion.

Page 75: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

74

Definition of Closed Cooling Water Heater

Lubricating oil for the rotating parts is cooled by closed circulating water. This circulating water is then cooled either by shell-and-tube cooler or by air-fin cooler. ※ Fans are located underneath of hoods but top of bundles.

Definition of Fuel Gas Heater

Fuel gas is preheated by using hot water from a Boiler economizer. The gas is heated in shell side and hot water in tube side.

Closed Cooling Water (Shell & Tube Type) Fuel Gas Heater (Shell & Tube Type)

C.C.W & Fuel Gas Heater

Page 76: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

75

Air Preheater

Definition of Air Preheater

Combustion air is preheated to improve combustion efficiency. The heat source is usually auxiliary steam.

Air Preheater is consist of :

Tube Bundles Air Duct System Blower (This can be a main air moving blower)

Page 77: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Major Experiences

76

No Clients Projects Item Location Year of Built

1 Hyundai Heavy Industries Dangjin Thermal Power Plant Units 7&8 Water Cooled Condenser Korea 2005

2 Kawasaki Heavy Industries Mindanao 211 MW Power Plant Steam Air Preheater Philippines 2005

3 Kawasaki Heavy Industries Mindanao 212 MW Power Plant HP/LP Preheater Philippines 2005

4 Kawasaki Heavy Industries Mindanao 211 MW Power Plant Deaerator Philippines 2005

5 Daelim Industrial SPE Water Cooled Condenser Korea 2007

6 Daelim Industrial Hyundai Green Power Plant Units 1~4 CCW Heat Exchanger Korea 2008

7 GS E&C LGPC B2 (ARP) Water Cooled Condenser Korea 2008

8 Daewoo Engineering BPEX Water Cooled Condenser Thailand 2008

9 Hyudai E&C Daejeon South-west Energy Facility DH Heater Korea 2009

10 Hanwha Chemical 300,000 T/Y PVC Plant Steam Generator China 2009

11 Hanwha E&C GP Deaerator Korea 2009

12 GS E&C C3 Splitter Water Cooled Condenser Korea 2009

13 Hanwha E&C MOC Cracker Water Cooled Condenser Thailand 2009

14 Hanwha E&C Arzew Refinery Rehabilitation & Adaptation Deaerator Algeria 2010

15 Hanwha E&C Saudi Marafiq STG Units 5&6 Feedwater Heater Saudi Arabia 2011

16 Hanyang Industry Turkmenistan Gas Desulfurization Plant Waste Heat Boiler Trukmenistan 2011

17 Tecnimont AGRP Waste Heat Boiler Kuwait 2011

18 Kepco E&C Ghana Takoradi T2 Power Plant Expansion EPC Steam Surface Condenser Ghana 2013

19 Takuma KBS Deaerator Korea 2013

Page 78: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Major Experiences

77

No Clients Projects Item Location Year of Built

20 Daelim Industrial Ulsan No.4 Combined Cycle Power Plant Deaerator Korea 2013

21 Daelim Industrial The Pyeong-taek Combined Cycle Power Plant Deaerator Korea 2013

22 Daelim Industrial Taean Thermal Power Plant Units 9&10 Steam Coil Air Heater Korea 2014

23 Hyundai E&C Hyundai Green Power Plant Units 5~8 CCW Heat Exchanger Korea 2012

24 Daelim Industrial Thai Binh II Thermal Power Plant Steam Surface Condenser Vietnam 2014

25 Daelim Industrial Thai Binh II Thermal Power Plant Feedwater Heater Vietnam 2014

26 Daewoo E&C Algeria Ras DJINET CCPP Fuel Gas Heater Algeria 2014

27 Daelim Industrial SM200 Power Station Phase I Steam Surface Condenser Philippines 2014

28 Sumitomo Heavy Industries CFPP In Pomalaa Indonesia Feedwater Heater, Deaerator Indonesia 2014

29 Daelim Industrial Umm Wu'al EPC -Ammonia Plant Steam Surface Condenser Saudi Arabia 2015

30 Fuji Electric Shizuoka Feedwater Heater Japan 2015

31 Fuji Electric VN3 Co-Generation Station, Vietnam Feedwater Heater Vietnam 2015

32 Posco E&C Khabat Thermal Power Plant Units 1&2 Steam Surface Condenser Iraq 2015

33 Hyundai E&C Ute Punta Del Tigre CCPP CCW Heat Exchanger Uruguay 2015

34 Samsung Engineering Chile Kelar Steam Surface Condenser Chile 2015

35 Samsung Engineering Socar Fertilizer Deaerator Azerbaijan 2015

36 Daewoo International NNK2 Feedwater Heater, Deaerator Japan 2015

37 Daewoo E&C Pocheon CCPP Steam Surface Condenser Korea 2015

38 JGC SEC210-1x105MW Coal Fired Power Steam Surface Condenser Feedwater Heater, Deaerator Philippines 2017

Page 79: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

4 (2) Local Plant Business

Other Business

Page 80: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Local EPC

Pharmaceutical Plant

Customer : SK Biophamaceuticals Co., Ltd. Project Name : CMS Pilot Plant Site : Korea (Deajeon) Condition : Turn-Key Delivery : Sep. 23, 2013 ~ Nov. 29, 2013

79

Page 81: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

80

Local EPC

Hydrogen Peroxide Plant Customer : Hansol Chemical Co.,Ltd. Project : HPC Project Site : Korea(Jeonju) Condition : Turn-Key Delivery : Aug. 24, 2011 ~ Dec. 31, 2011

Page 82: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Clients Projects Item Q’ty Location Year of Built

Electronic Material Exp.

81

1 Kyeongin Yanghan Kyeongin Yanghan -1 Double Conical Dryer, Hot Water Tank, Receiver Tank, Piping 1 Lot Korea 2002. 02

2 Sungpo Chemical Sungpo Chemical Reactor, Tank, CRT, H/EX 1 Lot Korea 2002. 09

3 Kyeongin Yanghan Kyeongin Yanghan-2 Vaccum Dryer & Water Generator Tank 1 Lot Korea 2003. 08

4 Yuil Pharm New Reactor, Tank, CRT, H/EX, Buc.Elevator Structure & Piping & Electric Parts 20 Sets Korea 2005. 05

5 Miwon Specialty Chemical Miwonchemical-1 Dryer 4m3 Full Sets Structure & Civil & Piping 4 Sets Korea 2006. 09

6 Miwon Specialty Chemical Miwonchemical-2 Double Cone Dryer Structure & Civil & Piping 1 Lot Korea 2008. 02

7 Miwon Specialty Chemical Miwonchemical-3 Mobile Nuche Filter 1 Lot Korea 2006. 02 ~ 2006. 05

8 LG Chem 2Factory New Reactor, Tank, H/EX, Structure & Piping 51 Sets Korea 2006. 02

~ 2006. 06

9 Miwon Specialty Chemical Miwonchemical-4 Dryer 1m3 Full Sets Structure & Civil & Piping 1 Lot Korea 2011. 01

~ 2011. 06

10 Kyeongin Yanghan Kyeongin Yanghan-3 Double Conical Dryer, Hot Water Tank, Receiver Tank Piping 1 Lot Korea 2001. 08

~ 2002. 02

Page 83: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

1 Deahan Pharm Deahan Pharm Sus304 Reactor 2m3 1 Set Korea 2001. 08 ~ 2002. 02

2 Dongkook Pharm Reactor 0.2m3 PILOT Reactor, Tank, H/EX, Structure & Piping 1 Lot Korea 2002. 08 ~ 2003. 01

3 Joongang Bio Tech SUS304 Reactor Fullset Reactor, Tank, H/EX, Structure & Piping 1 Lot Korea 2002. 05 ~ 2002. 10

4 Ildong Ildong SUS316 Reactor 2M3 1 Set Korea 2002. 07 ~ 2002. 11

5 JW Pharm Purified Water System WFI Tank 10m3 1 Set Korea 2002. 11 ~ 2003. 02

6 Bookwang Bookwang Reactor, Tank, H/EX, storage, Tank Nuche Filter 1 Lot Korea 2003. 06 ~ 2003. 11

7 JW Pharm JW Pharmaceutical Pw Tank, Etc. 6 Sets Korea 2005. 04 ~ 2005. 08

8 Hanmi Hanmi Reactor & PW Tank 7 Sets Korea 2006. 04 ~ 2006. 09

9 Yoohan Yoohan Container 55 Sets Korea 2007. 02 ~ 2007. 09

10 Yungjin SEPA Meterial Engineering 1 Lot Korea 2012. 04

Pharmaceutical Plant Exp.

82

Clients Projects Item Q’ty Location Year of Built

Page 84: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

83

Fine Chemical Exp. (1/4)

1 Heesung Catalysts Hee-ii Tank, H/EX 1 Lot Korea 1999. 08 ~ 1999. 12

2 Dongyang P&G Dongyang P&G STS316L Reactor 0.5m3 1 Set Korea 2001. 11 ~ 2002. 03

3 Adeka Chemical Adeka Chemical Reactor, Tank, H/EX, Storage Tank, Bag Filter, Decanter 50 Sets Korea 2005. 03

~ 2005. 08

4 Eagon EPC Reactor, Tank, CRT, H/EX,

Buc.Elevator Structure & Piping & Electric Parts

50 Sets Korea 2005. 01 ~ 2006. 02

5 Dongyang Ink Kettle T Erection Reactor, Tank, CRT, H/EX,

Buc.Elevator Structure & Piping & Electric Parts

1 Lot Korea 2005. 02 ~ 2005. 05

6 Miwon Specialty Chemical 25m3 Monomer / 13m3 Monomer

Reactor, Tank, CRT, H/EX, Structure & Civil & Piping 80 Sets Korea 2006. 01

~ 2006. 12

7 LG Chem AD Project Reactor, Tank, CRT, H/EX, Structure & Piping 25 Sets Korea 2006. 01

~ 2006. 03

8 Korea Shell Korea Shell Sts304 Reactor 2m3 3 Sets Korea 2006. 04 ~ 2006. 10

9 Songwon Industrial Songnox Reactor, Tank, CRT, Dryer, H/EX , Structure & Civil & Piping 169 Sets Korea 2006. 05

~ 2006. 11

10 Songwon Industrial AP Reactor, Tank, CRT, H/EX, Buc.Elevator, Structure & Piping 63 Sets Korea 2006. 06

~ 2006. 12

Clients Projects Item Q’ty Location Year of Built

Page 85: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

84

Fine Chemical Exp. (2/4)

11 DAC Dac New Factory Reactor, Tank, CRT, H/EX, Structure & Piping & Electric Parts 46 Sets Korea 2006. 12

~ 2007. 06

12 Dansuk Industrial Glyceline Distillation Reactor, Tank, CRT, H/EX, Piping 1 Lot Korea 2007. 04 ~ 2007. 04

13 Yungil Chemical Ansan Now Factory Reactor, Tank, CRT, H/EX,

Buc.Elevator, Structure & Piping & Electric Parts

10 Sets Korea 2008. 01 ~ 2008. 08

14 Miwon Specialty Chemical Monomer 50m3 Third Fabrication

Reactor, Tank, CRT, H/EX, Structure & Civil & Piping 43 Sets Korea 2008. 02

~ 2008. 07

15 Hansol Chemical E3 Reactor, Tank, CRT, H/EX, Structure & Piping & Electric Parts 12 Sets Korea 2008. 04

~2008. 08

16 Jord Polycabonate Reactor, Tank, CRT, H/EX, Module, Piping & Electric Parts 16 Sets KSA 2008. 04

~ 2008. 12

17 Hanwha E Reactor, Tank, CRT, H/EX, Buc.Elevator, Structure & Piping & Electric Parts 22 Sets Korea 2009. 01

~ 2009. 06

18 Miwon Specialty Chemical 25M^2 Reactor FABRICATION

Eactor, Tank, CRT, H/EX, Buc.Elevator, Structure & Piping & Electric Parts 50 Sets Korea 2009. 11

~ 2010. 03

19 Hanwha AETF TFT Test Cell, Diffuser, Settling Chamber, Main Piping 1 Lot Korea 2009. 12

~ 2010. 07

20 Hansol Chemical Latex Factory Reactor, Tank, CRT, H/EX, Structure & Piping & Electric Parts 2 Sets Korea 2010. 04

~ 2010. 07

Clients Projects Item Q’ty Location Year of Built

Page 86: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

85

Fine Chemical Exp. (3/4)

21 J S I EPS Reactor, Tank, CRT, H/EX, Structure & Piping & Electric Parts 61 Sets Korea 2010. 07

~ 2010. 11

22 J S I EPS Engineering 1 Lot Korea 2010. 11 ~ 2012. 01

23 Kookdo Chemical PSL2, PSE2-Plant Reactor, Tank, CRT, H/EX, Structure & Piping 7 Sets Korea 2010. 08

~ 2010. 11

24 CJ Bio C Cristalizer, Piping 18 Sets USA 2010. 12 ~ 2011. 03

25 Hansol Chemical HPC Turn-key 1 Lot Korea 2011. 07 ~ 2012. 02

26 Yungil Chemical SC Turn-key 1 Lot Korea 2011. 08 ~ 2012. 05

27 Miwon Specialty Chemical 60m3 Monomer Reactor, Tank, CRT, H/EX, Structure 30 Sets Korea 2011. 12

28 Hanwha KSLV-ii High Pressure Vessel 30 Sets Korea 2012. 04

21 J S I EPS Reactor, Tank, CRT, H/EX, Structure & Piping & Electric Parts 61 Sets Korea 2010. 07

~ 2010. 11

22 J S I EPS Utility, Piping, Electric, Etc. 1 Lot Korea 2010. 11 ~ 2012. 01

Clients Projects Item Q’ty Location Year of Built

Page 87: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

86

23 Hansol Chemical New Electronic Material Turn-key 1 Lot Korea 2013. 06 ~ 2013. 11

24 Hanwha Chemical EA Pilot Plant Turn-key 1 Lot Korea 2013. 06 ~ 2013. 12

25 KPX Green Chemical AM Pilot Plant Turn-key 1 Lot Korea 2013. 10 ~ 2013. 12

26 Hansol Chemical 1500F & TOC Bed Turn-key 1 Lot Korea 2014. 01 ~ 2014. 09

27 Hansol Chemical N Turn-key 1 Lot Korea 2014. 09 ~ 2014. 11

Clients Projects Item Q’ty Location Year of Built

Fine Chemical Exp. (4/4)

Page 88: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Introduction Capacity Products Other Business Grand Prizes

5 Grand Prizes

Page 89: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

88

List of Grand Prizes No Date Customer Subject

1 Dec. 2007 GS Caltex Appreciation plaque for successful completion of No.2 HOU project

2 Mar. 2008 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

3 Mar. 2009 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

4 Mar. 2009 Samsung Engineering Appreciation plaque for outstanding subcontractor (Great Partnership and Performance)

5 Dec. 2009 Chevron Phillips Chemical

Appreciation plaque for successful completion of Saudi NCP Purge project (High quality and on-time delivery / Loop Reactors)

6 Mar. 2010 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

7 Feb. 2011 Hyundai Engineering Appreciation plaque for outstanding subcontractor (Superior technology and great partnership)

8 Mar. 2011 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

9 Mar. 2011 Hanwha Appreciation plaque for successful fabrication

10 May. 2011 GS Caltex Appreciation plaque for successful completion of No.3 HOU project

11 Mar. 2011 Hanwha Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

Page 90: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

89

List of Grand Prizes No Date Customer Subject

12 Mar. 2012 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

13 Apr. 2012 Youngil Chemical Appreciation plaque for outstanding subcontractor (Superior technology and diligence)

14 Mar. 2013 Samsung Engineering Appreciation plaque for outstanding subcontractor (Contribution to enhancing global competitiveness and performance)

15 Mar. 2013 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

16 Apr. 2013 Petron Appreciation plaque for successful completion of SRMP-2 project (High quality and on-time delivery / Propane/propylene Splitter)

17 Mar. 2014 Daelim Industrial Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

18 Nov. 2015 Chevron Phillips Appreciation plaque for successful completion of USGC project (High quality and predictability)

19 Jan. 2017 JGC Appreciation plaque for high quality and being dedicated partner (2nd JGC Quality Forum)

20 Jul. 2018 Hanwha Appreciation plaque for outstanding subcontractor (High quality and on-time delivery)

21 Nov. 2018 Bechtel Appreciation plaque for outstanding subcontractor (Outstanding contributions and commitment to the Bechtel Team)

22 Jan. 2019 SABIC/UNITED /Samsung Engineering

Award of appreciation (In recognition of the dedicated contribution towards its successful outcome of manufacturing)

Page 91: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

Photos of Grand Prizes

90

Page 92: › eng › download.php?filename=WOOYANG HC... · Introduction CEO Jin Tae Kim Foundation Date March, 1993 Main Business - Fabrication of Equipment for Power Plant - Oil & Gas, Petrochemical

IPN-WHC-1381

Thank You 88, Poseunggongdan-ro 118beon-gil,

Poseung-eup, Pyeongtaek-si, Gyeonggi-do, 17960 Korea

Tel. : +82-31-680-9300 Fax : +82-31-680-9397