a crisis within crisis in pakistan: the idp's of swat and buner districts
DESCRIPTION
Sohail Jehangir Malik, Chairman, Innovative Development Strategies (Pvt.) Ltd 12th August, International Food Policy Research Institute (IFPRI), Washington D.C.TRANSCRIPT
A Crisis within the Crises in PakistanThe IDPs of Swat and Buner Districts
IFPRI Panel Discussion
Sohail Jehangir MalikChairman
Innovative Development Strategies (Pvt.) LtdInnovative Development Strategies (Pvt.) Ltd
August 12, 2009
Swat BunerArea (sq km) 5337 1865
Area and population of Swat and Buner
Area (sq km) 5337 1865Population ‘000’ (2004-05) 1577 656
May 20091. Armed Taliban back on
Mingora Swat roads as the TNSM rejects Darul Qaza
2. Taliban slap ‘curfew’, blow
8. Taliban ‘shaving beards’ to flee Swat
9. IDPs swell to over 1.4m: UN.10. Thousands flee as curfew p ,
up schools 3. Taliban in control of 90% of
Swat’. 4. PM orders all-out war, tells
l l b
relaxed 11. Pakistan facing one of
world’s worst displacement crises: UN.,
army to eliminate Taliban once and for all.
5. Operation Rah-e-Rast is launched
h d fl
12. Troops fight Taliban on Swat streets
13. UN issues $543m appeal for IDPs .
6. Thousands flee Swat7. NWFP govt. seeks global
emergency aid for IDPs
14. MQM wants ban on IDPs’ entry into Sindh.
May 2009 (contd.)
15. “IDPs leaving NWFP won’t get aid” Rahman Malik Min for Interior.
20. UN pleads for more cash for Swat displaced.
21. IDPs selling relief goods in h16. IDPs complain of not
receiving int’l and US aid. 17. 6,000 pregnant women in
Peshawar .22. IDPs protest closure of food
distribution points.camps.
18. IDPs exceed 2.9million - NA committee told. ICRC d id ti iti 19. ICRC suspends aid activities in Swat .
June 200923. UN awaits Govt nods for
li f k i B32. About 15,000 IDPs have come
to karachi says Sindh CMrelief work in Buner.24. Trapped residents emerge,
seek food in Swat.25. NWFP to engage NADRA,
UNHCR for the registration of
to karachi, says Sindh CM.33. IDPs being registered on war
footing.34. Jeay Sindh protest against
influx of IDPUNHCR for the registration of IDPs.
26. UN chief warns of severe crisis due to funding shortage.
27 IDPs number distorted by
35. US warns against diseases outbreak in IDPs.
36. Govt urged to devise rehabilitation plan for di l d f27. IDPs number distorted by
duplication in registeration28. Holbroke assures full help in
reconstruction phase.29. US offers to increase IDPs aid
b $
pdisplaced farmers..
37. IDPs registration temporarily stopped.
38. Only 25% of estimated aid for IDPs received: UNby $200m
30. Food shortage worsening in restive Malakand areas.
31. 2.5 million IDPs expected to i i i 2009
IDPs received: UN39. IDPs being registered on war
footing.40. Displaced persons face
discrimination at IDP campsremain in camps in 2009. discrimination at IDP camps
Only 1.96 million of 4.61 million registered IDPs Eligible on July 11, 2009g J y ,
Total w ith CNIC not available , 0.17
Total w ith multiple registerations 1 46registerations, 1.46
Total Eligible, 1.97
Total w ith CNIC Invalid, 0.29
Total w ith Multiple pidentities/aliens, 0.01
Total from outside affected areas , 0.27
Total w ith duplicate w ithin families , 0.45
Only a Small Proportion of IDPs i C J l 11 2009were in Camps on July 11, 2009
In Camps9%
Off CampOff-Camp 91%
Crops What happenedp Wheat Vegetables
pp Not harvested Not harvested
Tobacco Maize
Ri
Not harvested Cannot Plant
C Pl Rice SugarcaneHorticulture
Cannot Plant Cannot Plant
Horticulture Fruits/orchardsLivestock
Not Harvested Lost, Killed, Livestock Lost, Killed,
Marble/China Clay Gemstones
Closed down – no power! No market – high risk Gemstones
Forest and Timber Products
No market high risk No permissions – high risk
Household Crafts No resources – no market
Forced Repatriation Increased Physical Insecurityy y Strict Government Approvals required to function
– outsiders NOT permitted easily - Restrictions on local activities local activities
Poor or No Infrastructure Electricity for eight to ten hours onlyy g y No landline telephone and only UFONE cellular in some
places Virtually non functioning health, sanitation and y g ,
education system Ill functioning or closed markets Inadequate and ill designed relief mechanisms Inadequate and ill designed relief mechanisms -
95,462 IDPs families provided with Rs. 25,000 ATM Relief Cards
A 2008 Asian Development Bank Study of 32 Asian Countries Study of 32 Asian Countries
ranked Pakistan 2nd last in terms f it S i l P t ti of a composite Social Protection
Index
30
41
3030
3741
3633
29
38
3228
3540
45
nt (%
)
2622
29
22
28
15
2025
30
y he
adco
un
0
510
15
Pove
rty
0Punjab Sindh NWFP Balochistan Pakistan
1998-99 2000-01 2004-05
Source: World Bank
“Currently 77 million people, almost half the population, is food insecure in Pakistan - daily
l i i t k b l th i i d d calorie intake below the minimum recommended level”
-Report of the Prime Minister’s Task Force on Food Security (2008)Security (2008)
Punjab produces on average 16 to 17 million mt against consumption requirements of 12.5 million mt
NWFP largest wheat deficit and most vulnerable
i d hi h t ll ti required highest allocation -almost 2.3 million mt in 2007/08
Changes in domestic wheat marketing policies immediately g p yaffect NWFP supply situation
Porous borders with Afghanistan - large share of the allocated wheat does not reach intended wheat does not reach intended Provincial consumers
a recent nine pillared Poverty Reduction Strategy a recent nine pillared Poverty Reduction Strategy a Social Protection Strategy approved a couple of years agoy g
But No capacity or intent to implement
and No effective pressure or conditionality for it to do
so
Serious information asymmetries, moral hazard, adverse selection, insufficient property rights, no accountability or access to justice etc. all leading to accountability or access to justice etc. all leading to market and government failure
Very limited opportunity, security or empowermentP d i l d d l d Poor and manipulated data, poorer analyses and no voice or ownership of the people
Virtually no Monitoring and Evaluation Virtually no Monitoring and Evaluation Serious disconnects between what is stated and
what is actually intended, between existing and envisaged capacity and hence between what is envisaged capacity and hence between what is planned and what is eventually implemented
No processes for informed independent policy p p p ydebate and discussion
These once proud people have lost their di it d th i bilit t t t it L tdignity and their ability to protect it – Let us not forsake them.
Thank You So Much