A Cost Model for KM3NeT
Uli KatzPhysics InstituteUniversity Erlangen-Nuremberg
KM3NeT WP2 MeetingOct. 24, 2006, Marseille
Based on a presentation by Alexander Kappes at thePCC meeting in Rome, Sept. 28, 2006
24. Oct. 2006 KM3NeT WP2 Meeting, Marseille
2Uli Katz University Erlangen
General Considerations Aim of Design Study:
Develop detector design optimized for physics sensitivity Figure of merit: Physics sensitivity relative to costs
requires cost model comprising (no personnel): Detector Infrastructure Sea operations Operation of detector Maintenance
Question to cost model: What will be the costs for a specific detector design at a specific site assuming a certain lifetime?
needed to compare different KM3NeT options(together with physics-sensitivity information from WP2)
Responsibility: WP1 (Management)
24. Oct. 2006 KM3NeT WP2 Meeting, Marseille
3Uli Katz University Erlangen
Specific Requirements for Cost Model High flexibility:
allow for easy combination of components (units) to different detector setups at different sites
Reliable cost estimates to allow comparison of different KM3NeT options: detailed cost breakdown structure WPs have to provide accurate price tags
for each component, operation etc.
Interface to simulation software:access to cost information through simulation software
24. Oct. 2006 KM3NeT WP2 Meeting, Marseille
4Uli Katz University Erlangen
Vari-Calc
Difficult search - only one suitable product found:
Vari-Calc from Kutzner Software (originally developed in EU FP3 project)
Costs: about 10 kEuro (including installation and adaptation to our specific needs)
Server-Client architecture with SQL-Server Direct access to database possible
… can be interfaced by other programs Demo version available
(buggy, improved version promised)