A Comprehensive Approach to Carbon and Energy Problems (Or Making the Rocket Equation Work for Us ) H. Keith Henson, Founder L5 Society. $ per kg. Design to cost goals power Sat solution:. Raise millions of tons a year to GEO at a cost of less than $100/kg - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/1.jpg)
A Comprehensive Approach to Carbon and Energy
Problems (Or Making the Rocket Equation Work for Us)
H. Keith Henson, Founder L5 Society
![Page 2: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/2.jpg)
2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
100
200
300
400
500
600
700
800
Row 43
![Page 3: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/3.jpg)
2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
100
200
300
400
500
600
700
800
Row 43
$ per kg
![Page 4: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/4.jpg)
![Page 5: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/5.jpg)
Design to cost goalspower Sat solution:
• Raise millions of tons a year to GEO at a cost of less than $100/kg
• Space based solar power for a 1-2 cents a kWh, synthetic fuels made from that power for $1 a gallon (easy)
• Excess energy (300TW-years) to put carbon back in the ground if we need to
• Danger of storing 470 cubic km of CO2• We know how to make synthetic oil
![Page 6: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/6.jpg)
![Page 7: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/7.jpg)
![Page 8: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/8.jpg)
![Page 9: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/9.jpg)
http://www.ilr.tu-berlin.de/koelle/Neptun/NEP2015.pdf
![Page 10: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/10.jpg)
290 t booster, 40t laser stage,14.5 t payload to GEO
1.1 g, miles vertical axis, NM horizontal
0
50
100
150
200
250
0 500 1000 1500 2000 2500 3000 3500 4000
Series1
![Page 11: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/11.jpg)
Bounce mirrors after 15 hrs
Bounce mirrors after 5 hrs
GEO
Hohmann transfer orbit 5 hr
320km perigee
Credit Dr Stuart Eves
![Page 12: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/12.jpg)
Geometry/Geography• GTO injection about 2600
NM down range• Needs to be on Equator • Best 5000km water to east• Good choices for US, EU
![Page 13: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/13.jpg)
![Page 14: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/14.jpg)
Location GPS of our private airport: S. 00º 06’ W. 049TH 35'
![Page 15: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/15.jpg)
Lasers 45 deg to the West
![Page 16: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/16.jpg)
![Page 17: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/17.jpg)
![Page 18: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/18.jpg)
$40 billion for the lasers• $60 billion for the rockets• Long build up time to get the lasers
installed and focusing mirrors in place, limited bootstrapping possible (does meet <$100/kg)
• Not impossible, but not compelling• Can we improve on the ISP of the
first stage and reduce front end cost? Yes!
![Page 19: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/19.jpg)
Reaction Engines SABRE
“peaking at about 2800 seconds within the atmosphere”
![Page 20: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/20.jpg)
Skylon and Lasers
Takes off from runway, 12 t to LEO
![Page 21: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/21.jpg)
Laser stage 12 t• Mass ratio 2• 6 t propellant, 6 t payload• LEO to GEO 4.1 km/sec• Modest ISP of 600 • 6MW of laser, $60 million
takes 24 hrs LEO-GEO• First mirror is a problem
![Page 22: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/22.jpg)
Eventually (after much buildup)
• 50 t laser stage, 25 t payload to GEO
• Skylon sub orbital, contributes 4-5 km/sec delta V
• 8 GW laser (8 years @ a GW/ year) contributes 9-10 km/sec
![Page 23: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/23.jpg)
After 8 years, a Skylon flight every 15 minutes
• 96 flts/day, 60-100 rockets• 800,000 t/year to GEO• Growth with more laser• Skylon life up to 500 flights• Fleet size at 1.5 flights/day• Other sub orbitals work too
![Page 24: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/24.jpg)
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
Cargo to GEO/qtr
![Page 25: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/25.jpg)
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
100
200
300
400
500
600
700
800
Power sats GW/qtr
![Page 26: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/26.jpg)
2008 2010 2012 2014 2016 2018 2020 2022-70000
-60000
-50000
-40000
-30000
-20000
-10000
0
10000
20000
30000
Power sat sales at $1/watt net, $1.5-2 B/GWCumulative PL (low point = peak financ-ing)
2 centsper kWh
![Page 27: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/27.jpg)
Cost/kg to GEO
• Initial figured at twice the per flight depreciation of a $450 M vehicle and 6 t to GEO ~$750/kg
• Mature figured at twice the per flight depreciation of a $292 M vehicle and 25 t to GEO ~$46/kg
• Design to cost goal met <$100/kg
![Page 28: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/28.jpg)
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
20000
40000
60000
80000
100000
120000
Cumulative GW
![Page 29: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/29.jpg)
Invar
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 20550
200000
400000
600000
800000
1000000
1200000
1400000
1600000
1800000
World nickel productionInvar use, t/quarter
![Page 30: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/30.jpg)
![Page 31: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/31.jpg)
2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 2055350
360
370
380
390
400
410
420
430
440
450
CO2 level ppm
![Page 32: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/32.jpg)
$ per kg to GEO
0
100
200
300
400
500
600
700
800
2010 2020 2030 2040 2050 2060
Series1
![Page 33: A Comprehensive Approach to Carbon and Energy Problems](https://reader035.vdocuments.mx/reader035/viewer/2022062816/568155c0550346895dc39236/html5/thumbnails/33.jpg)
The Skylon to LEO or sub orbital and laser to GEO concept is less two weeks old. So please nitpick the
physics and [email protected]
www.htyp.org/dtc