a brief presentation of - dana · a brief presentation of. 2 people & test rigs • 1 manager...
TRANSCRIPT
![Page 1: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/1.jpg)
1
Off-Highway Europe EngineeringA brief presentation of
![Page 2: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/2.jpg)
2
People & Test Rigs
• 1 Manager
• 1 Workshop & Logistics Supervisor
• 6 Test Engineers
• 8 Test Technicians
• 1 Clutch test rig
• 2 Fatigue test rigs
• 2 Dynamometer test rigs
• 4 Functional transmission test rigs
• 5 Hydraulic test rigs
• 7 Engine (Endurance) test rigs
![Page 3: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/3.jpg)
3
Classification of tests
• “Device Under Test ”– Component– Subassembly & assembly– Transmission– Vehicle
• Duration– Functional– Life time (Endurance)
• Source– New Product Development– Product Engineering– Production– Service & Warranty– Purchasing
![Page 4: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/4.jpg)
4
Goals of tests
• Validating design models
• Defining accurate values forthe parameters of the design models
• Checking functionality of prototypes
• Checking life time behavior of prototypes
• Checking supplier information
• Validating production methods
• Making testing obsolete …
![Page 5: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/5.jpg)
5
Types of tests …
The standard component & (sub) assembly’s tests are:
• Clutch– Closing– Inching– Drag measurement– Fatigue
• Valve behaviour
• Shaft– Distribution of oil flows (static & dynamic)– Fatigue (torque, bending, torque & bending)
![Page 6: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/6.jpg)
6
Types of tests (2)
The standard transmission tests are:
• Functional
• Drag & efficiency measurement
• Noise measurement
• Gear & Bearing , using a brake as static load
• Forward-Reverse , using a flywheel as dynamic load
• Range , using a brake as dynamic load
• Inching : continuous or intermittent, blocked or loaded
• Power Take Off : loaded by a hydraulic load
![Page 7: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/7.jpg)
7
Hydraulic Test Rigs
• Designed & built by TTC personnel• Can operate in manual or automated mode• Computer controlled• Loads components with oil pressure & flow
![Page 8: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/8.jpg)
8
Fatigue Test Rigs
• Torsion (25 kNm) & Bending
• Shafts & Clutch Drums
• Supplier of 1st: MTS (USA)
![Page 9: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/9.jpg)
9
Dynamometer Test Rigs
• Electric drives:– 150 kW– 300 kW
• Electric brakes:– 215 kW– 350 kW
• Tests:– G&B– Efficiency– Noise
![Page 10: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/10.jpg)
10
Engine Transmission Test Rigs
• Diesel engines from 75 to 320 kW• Flywheels till 120 kg.m²• Electric, low inertia brake of 260 kW• Eddy current brakes till 1200 kW• F/R, G&B, Range, PTO, Kick down & Inching tests
![Page 11: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/11.jpg)
11
Test Track
• 140 m long
• 2 roundabouts
• 15% hill of 15 m
![Page 12: A brief presentation of - Dana · A brief presentation of. 2 People & Test Rigs • 1 Manager • 1 Workshop & Logistics Supervisor • 6 Test Engineers • 8 Test Technicians •](https://reader035.vdocuments.mx/reader035/viewer/2022062916/5ec849e7c1b0f765ed63cc36/html5/thumbnails/12.jpg)
12
Measurement equipment