a b c d e - deutschlands größtes beschleunigerzentrum · school lab physik.begreifen safety group...

1
October 2016 Parking on the DESY premises is at your own risk. All city traffic regula tions are valid and a speed limit of 30 km/h is allowed. Upon leaving the DESY premises random spot checks will be made at both gates. Please halt at the red traffic signal or the horn signal for inspection. Laboratory 1 Directorate Press and public relations Company medical officer Seminar room 3a-5 Library Laboratory 2a, Theory Computer centre, UCO Radiation Protection D3 Storage building Auditorium (DESY), entrance building 6 Administration building Post, Guest services Administration building Guest house 8 Canteen, cafeteria, bank Bistro Workshop Purchasing department Central warehouse Social counselling / works council Gate lodge Notkestraße (main gate) Gate lodge Luruper Chaussee (side gate) Gas service Vacuum laboratory CSSB MKK / Power station Cooling plant DESY II Heating plant Site service yard Carpenters’ building Synchrotron building Power house DESY LAOLA Laboratory of the Universities of Hamburg and Lübeck REGAE LINAC II PIA DORIS experimental hall Office and laboratory building EMBL FS office and laboratory 1 Detector laboratory FS office and laboratory 4 FS office and laboratory 5 & 2 Experimental hall I / LINAC III FLA laboratory DESY testbeam / experimental hall II Testing area Experimental hall III Cryogenic hall FLASH tunnel FLASH experimental hall „Albert Einstein“ FLASH experimental hall „Kai Siegbahn“ FLASH2 undulator building FLASH laser hut Iron removal plant Accelerator control room (BKR) / SINBAD Supplying hall Accelerator operation building ARGUS detector Accelerator components building Guest house 2 Kindergarten Guest house 3 Training area 01-01e (B3) 01 (B3) 01 (B3) 01a (B3) 01b (B3) 01d (B3) 02a (B3) 02b (B3) 03 (D4) 03b (D4) 05 (B4) 06 (B4) 06 (B4) 07 (B4) 07a (A4) 09 (B4) 09a (B4) 10 (B4) 11 (C4) 11a (C4) 11a (C4) 12 (C5) 12a (E3) 13a,b (C3) 14 (C4) 15 (D3) 16 (C3) 16d (C3) 17 (C3) 18,18a (D3) 19 (D3) 20 (C3) 20c (C3) 22 (C3) 22a (C3) 23 (C3) 24 (D3) 24a (D3) 25 (C2) 25a (C2) 25b (D2) 25c (C2) 25d (C2) 25e, f (D2) 26 (C3) 26a (C3) 27 (C3) 27a (C2) 28 (C2) 28a (C2) 28b (C2) 28c (C1) 28k (C1) 28i (C1) 28g (C1) 29 (C2) 30 (C2) 30a (C2) 30b (C3) 30e (C4) 31a (C2) 32 (C5) 32c (C5) 33 (C5) 34 (B3) (C3) 34a (C3) 35 (B2) 36 (B2) 37 (C2) 38 (C4) 41, 41a (B4) 42, 42a-c (A4) 43, 43a-b (A2) 44 (A1) 45, 45a-c (B1/C1) 46a-c (C1) 46g (C1) 47 (D1-2) 47c (D1) 47d (D2) 48, 48e (D3) 48f (C1) 49, 49a (B2) 50 (B2) 54 (B2) 55 (B2) 55a 61-69 (D3) 61 (D3) 62 (D3) 65 (D3) 66 (D3) 67 (D-E2) 67-68 (E3) 69 (C2) 70 (B1) 71 (B1) 72 (D4) 80b-g (E2) 90 (D2) 99 (E2) 90 (D2) 222 (D/E4) 600 (A2) 702 (A2) 703 (B2) 700 School lab physik.begreifen Safety group / SAVE communication engeneering Preparation hall / experimental hall V Assembly hall Storage building PETRA halls SO PETRA halls S PETRA halls SW PETRA halls W PETRA halls NW PETRA halls N PETRA III experimental hall „Paul P. Ewald“ PETRA halls NO PETRA III experimental hall “Max von Laue” PETRA III cooling plant PETRA halls O / EMBL PETRA III experimental hall „Ada Yonath“ Office and laboratory building HERA hall W Refrigeration technology hall (Cryogenic control room) Magnet measurement hall Proton vacuum building University Hamburg Auditorium (university) Institute of experimental physics Workshop HZG Helmholtzzentrum Geesthacht SALOME Institute of experimental physics Institute of laser physics Module test hall CMTB XTL mock up AMTF hall Storage buildings Centre for optical quantum technologies (ZOQ) CFEL Light & Schools (School lab) FS laser CHyN European XFEL entrance European XFEL modulator hall European XFEL injector entrance Off-site buildings: HERA hall N HERA hall E HERA hall S Project management agency Finance departement (Notkestr. 15) 51 52 53 (E3) AER21 (E4) NKS15 A B C D E 1 1 2 2 3 3 4 4 5 5 46a 46b 46c 49 28c 47 47c 48 67 68 69 65 66 61 62 64c 12a AER21 80b 80c 80d 80e 03b 32c 03 33 32 12 04 11 11a 11b 42a 42c 42b 06 05 09 09a 07a 07 43a 43b 43 02g 02a 01a 02b 01b 01e 01 10 13 34a 34 13b 13a 16d 14 16 26 44 41a 41 17 18 18a 19 35 20 20b 20a 27 20c 23 22 30c 22a 27a 30b 25c 30a 30 28 24 25e 25a 25b 25 25f 28b 28a 16f 28g 31a 46d 70 38 29 37 36 71 50 55 54 55a 45a 45b 45c 45 16e 72 47d 25d 24a 48e 49a 26a Main Gate Side Gate 01c 01d XHM XHEE XSE 99 80f 80g 30e 90 36a 03a 16h 231 231 238 234 228 04a 206 232 222 237 229 230 30d 218 28f 16c 221 217 29a 28d 28e 28h 28i 28i 28k 28m 28l 212 47e 215 46e 49b 49c 49d 46h 72a 233 47h 47i 224 45d 240 44c 44a 44b 43c 43d 20d 21 16g 239 48a 48b Building Floor Room 01 First floor 021 01e Ground floor 528 02b Basement 011b 03 Third floor 323 05 Ground floor 005 07 Third floor 309 09a First floor 106 10 First floor 116 11 Basement 006 15 First floor 259 25b Ground floor 029 25c Ground floor 004 25f Ground floor 063 28c Ground floor 025a 30 Second floor 223b 30b First floor 165b 34 Ground floor 006 46g Ground floor 016 47c First floor L112a 48f Basement 014 50 Seventh floor 733 55 Ground floor 007 72 Ground floor 005 99 Ground floor 017 Sports ground Wilhelmshöh DESY sports ground 223 225 67b 46g 48f 15 Baustelle MPG 600

Upload: truongnga

Post on 04-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

October 2016

Parking on the DESY premises is at your own risk. All city traffic regula­tions are valid and a speed limit of 30 km/h is allowed.Upon leaving the DESY premises random spot checks will be made at both gates. Please halt at the red traffic signal or the horn signal for inspection.

Laboratory 1Directorate

Press and public relations Company medical officer

Seminar room 3a-5Library

Laboratory 2a, TheoryComputer centre, UCORadiation Protection D3

Storage buildingAuditorium (DESY), entrance building 6

Administration building Post, Guest servicesAdministration building

Guest house 8Canteen, cafeteria, bank

BistroWorkshop

Purchasing departmentCentral warehouse

Social counselling / works councilGate lodge Notkestraße

(main gate)Gate lodge Luruper Chaussee

(side gate)Gas service

Vacuum laboratoryCSSB

MKK / Power stationCooling plant DESY II

Heating plantSite service yard

Carpenters’ buildingSynchrotron buildingPower house DESY

LAOLA Laboratory of the Universities

of Hamburg and Lübeck REGAE

LINAC IIPIA

DORIS experimental hall Office and laboratory building EMBL

FS office and laboratory 1Detector laboratory

FS office and laboratory 4FS office and laboratory 5 & 2Experimental hall I / LINAC III

FLA laboratory DESY testbeam / experimental hall II

Testing areaExperimental hall III

Cryogenic hallFLASH tunnel

FLASH experimental hall „Albert Einstein“

FLASH experimental hall „Kai Siegbahn“

FLASH2 undulator buildingFLASH laser hut

Iron removal plantAccelerator control room (BKR) /

SINBADSupplying hall

Accelerator operation buildingARGUS detector

Accelerator components buildingGuest house 2

KindergartenGuest house 3

Training area

01-01e (B3)01 (B3)01 (B3)01a (B3)01b (B3)01d (B3)02a (B3)02b (B3)03 (D4)03b (D4)05 (B4)06 (B4)06 (B4)07 (B4)07a (A4)09 (B4)09a (B4)10 (B4)11 (C4)11a (C4)11a (C4)12 (C5)

12a (E3)

13a,b (C3)14 (C4)15 (D3)16 (C3)16d (C3)17 (C3)18,18a (D3)19 (D3)20 (C3)20c (C3)22 (C3)22a (C3)

23 (C3)24 (D3)24a (D3)25 (C2)25a (C2)25b (D2)25c (C2)25d (C2)25e, f (D2)26 (C3)26a (C3)27 (C3)27a (C2)28 (C2)28a (C2)28b (C2)28c (C1)

28k (C1)

28i (C1)28g (C1)29 (C2)30 (C2)

30a (C2)30b (C3)30e (C4)31a (C2)32 (C5)32c (C5)33 (C5)34 (B3)

(C3) 34a(C3) 35

(B2) 36

(B2) 37 (C2) 38 (C4) 41, 41a (B4) 42, 42a-c (A4) 43, 43a-b (A2) 44 (A1) 45, 45a-c (B1/C1) 46a-c(C1) 46g

(C1) 47 (D1-2) 47c

(D1) 47d (D2) 48, 48e (D3) 48f

(C1) 49, 49a (B2) 50 (B2) 54

(B2) 55 (B2) 55a 61-69(D3) 61 (D3) 62 (D3) 65 (D3) 66

(D3) 67(D-E2) 67-68 (E3) 69 (C2) 70 (B1) 71 (B1) 72 (D4) 80b-g (E2) 90

(D2) 99 (E2) 90(D2) 222 (D/E4) 600(A2) 702 (A2) 703(B2) 700

School lab physik.begreifen Safety group / SAVE communication engeneering Preparation hall / experimental hall VAssembly hallStorage buildingPETRA halls SOPETRA halls SPETRA halls SWPETRA halls WPETRA halls NWPETRA halls NPETRA III experimental hall„Paul P. Ewald“PETRA halls NOPETRA III experimental hall “Max von Laue”PETRA III cooling plantPETRA halls O / EMBLPETRA III experimental hall„Ada Yonath“Office and laboratory buildingHERA hall WRefrigeration technology hall(Cryogenic control room)Magnet measurement hallProton vacuum buildingUniversity HamburgAuditorium (university)Institute of experimental physicsWorkshopHZG Helmholtzzentrum Geesthacht SALOMEInstitute of experimental physicsInstitute of laser physicsModule test hall CMTBXTL mock upAMTF hallStorage buildingsCentre for optical quantum technologies (ZOQ)CFELLight & Schools (School lab)FS laserCHyNEuropean XFEL entranceEuropean XFEL modulator hallEuropean XFEL injector entrance

Off-site buildings:HERA hall NHERA hall EHERA hall SProject management agency Finance departement (Notkestr. 15)

51 52 53(E3) AER21(E4) NKS15

A B C D E

11

22

33

44

55

46a 46b46c

49

28c

47

47c

48

67

68

69

65

6661

6264c

12a

AER21

80b

80c

80d80e

03b

32c

03

333212

0411

11a11b

42a42c42b

060509

09a

07a07

43a

43b43

02g

02a

01a

02b

01b

01e

0110

13

34a3413b 13a 16d

14

16

26

44

41a

41

17

18

18a

19

3520

20b20a

27

20c

23

2230c

22a

27a30b

25c

30a30

28

24

25e

25a

25b25

25f28b

28a

16f

28g

31a

46d

7038

29

3736

71

50

5554

55a

45a45b 45c

45

16e

72 47d

25d

24a

48e

49a

26a

Main Gate

Side Gate

01c

01d

XHM

XHEEXSE

99

80f80g30e

90

36a

03a

16h

231231

238 234

228

04a

206

232

222

237

22923030d

21828f16c

221

217

29a

28d28e

28h

28i

28i

28k

28m

28l212 47e

21546e

49b49c49d

46h

72a

233

47h

47i

224

45d

240

44c

44a

44b

43c

43d

20d 21

16g

239

48a48b

Building Floor Room01 First floor 02101e Ground floor 52802b Basement 011b03 Third floor 32305 Ground floor 00507 Third floor 30909a First floor 10610 First floor 11611 Basement 00615 First floor 25925b Ground floor 02925c Ground floor 00425f Ground floor 06328c Ground floor 025a30 Second floor 223b30b First floor 165b34 Ground floor 00646g Ground floor 01647c First floor L112a48f Basement 01450 Seventh floor 73355 Ground floor 00772 Ground floor 00599 Ground floor 017

��

Sports groundWilhelmshöh

DESY sports ground

223

225

67b

46g

48f

15

BaustelleMPG

600