July 8,2015 The Manager Robinsons Land Corporation Level 2 Robinsons Building Cagayan de Oro City Philippines 9000 Dear Sir /Madam: We are pleased to submit for your consideration of our proposal for the propose Entrance gate landscaping at Bloom fields Subdivision, Located at Lumbia Cagayan de Oro City. Attached here are the perspective and the quotation of the said project. Please disregards my perspective if you don’t like it and I will honor and follow your own designed. We are very much open for the negotiation on the above given number. THANK YOU…. And God Bless!!! Submitted by: VIRGIE BARDOQUILLO Project Manager / Contractor

Upload: ramon-chito-s-pudelanan

Post on 26-Jan-2016

212 views

Category:

Documents


0 download

DESCRIPTION

file

TRANSCRIPT

Page 1: 9999

July 8,2015

The ManagerRobinsons Land CorporationLevel 2 Robinsons BuildingCagayan de Oro City Philippines 9000

Dear Sir /Madam:

We are pleased to submit for your consideration of our proposal for the propose Entrance gate landscaping at Bloom fields Subdivision, Located at Lumbia Cagayan de Oro City.

Attached here are the perspective and the quotation of the said project. Please disregards my perspective if you don’t like it and I will honor and follow your own designed.

We are very much open for the negotiation on the above given number.

THANK YOU…. And God Bless!!!

Submitted by:

VIRGIE BARDOQUILLOProject Manager / Contractor

Page 2: 9999

March 16, 2015 Project: INSTALLATION OF CONCRETE FENCE BARBED WIRE.Location: CAMAMAN-AN CAGAYANDE ORO CITY.

ITEMIZED COST BREAKDOWNITEM

DESCREPTION QTY. UNIT PRICE AMOUNT

1.0 Clearing and preparation of the area 500 Sq.m. 100.00 5,000.001.2)Digging of hole for the post ( 0.35 depth)(0.25m.x0.25m.width)

52 holes 150.00 7,800.00

2.0 Making of post2.0 ) 10 mm . R.Bars 52 Pcs. 165.00 8,580.002.1) 8mm. 20 Pcs. 98.00 1,960.002.2) tie wire 5 Kls. 68.00 340.002.3) cement 35 sacks 250.00 8,750.00 2.4) mix sand 6 cubic 800.00 4,800.002.5)Barbed Wire 6 roll 1,850.00 11,100.00

3.0 Materials for making post3.0)Ord. Fly wood 4 sheets 600.00 2,400.00 3.1) common nails # 1/2 2 Kls. 72.00 144.00 3.2) Common nails # 4 1 Kls. 64.00 64.00

4.0 Man power within (20 days)4.0) Mason 1 person 400.00 8,000.00 4.1) helper 2 person 300.00 12,000.00 4.2) formam 1 perosn 500.00 10,000.00

5.0 Others Vat 12 % 9,712.56

TOTAL :Php. 90,6550.56

Submitted by:

VIRGIE BARDOQUILLOProject Manager / Contract