888 first street ne re: mountain valley pipeline, llc ... · pipeline project, cultural resources...

5
625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844-MVP-TALK | [email protected] www.mountainvalleypipeline.info January 16, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 Re: Mountain Valley Pipeline, LLC Docket No. CP16-10-000 Request for Notice to Proceed No. 2 Dear Ms. Bose: On October 13, 2017, the Federal Energy Regulatory Commission issued an order granting a Certificate of Public Convenience and Necessity to Mountain Valley Pipeline, LLC for the Mountain Valley Pipeline Project in this docket. Mountain Valley submitted and supplemented its Implementation Plan for the Project on various dates. In addition, Mountain Valley has received all permits and authorizations required under federal law to construct the Project. Mountain Valley requests that the Director of the Office of Energy Projects issue a Notice to Proceed with all construction activities for the facilities listed in Attachment A, including all tie- ins and appurtenant facilities associated with such activities. Attachment B includes information relevant to new access road MVP-BR-105.04. Mountain Valley has received landowner permission for all construction activities requested herein. Mountain Valley respectfully requests that this Notice to Proceed be issued by January 18, 2018. If you have any questions, please do not hesitate to contact me at (412) 553-5786 or [email protected]. Thank you. Respectfully submitted, MOUNTAIN VALLEY PIPELINE, LLC by and through its operator, EQM Gathering Opco, LLC By: Matthew Eggerding Counsel, Midstream Attachments cc: All Parties Paul Friedman, FERC Lavinia DiSanto, Cardno, Inc. Doug Mooneyhan, Cardno, Inc.

Upload: others

Post on 24-Sep-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 888 First Street NE Re: Mountain Valley Pipeline, LLC ... · Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West

625 Liberty Avenue, Suite 1700 | Pittsburgh, PA 15222 844-MVP-TALK | [email protected]

www.mountainvalleypipeline.info

January 16, 2018

Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426

Re: Mountain Valley Pipeline, LLC Docket No. CP16-10-000 Request for Notice to Proceed No. 2

Dear Ms. Bose:

On October 13, 2017, the Federal Energy Regulatory Commission issued an order granting a Certificate of Public Convenience and Necessity to Mountain Valley Pipeline, LLC for the Mountain Valley Pipeline Project in this docket. Mountain Valley submitted and supplemented its Implementation Plan for the Project on various dates. In addition, Mountain Valley has received all permits and authorizations required under federal law to construct the Project.

Mountain Valley requests that the Director of the Office of Energy Projects issue a Notice to Proceed with all construction activities for the facilities listed in Attachment A, including all tie-ins and appurtenant facilities associated with such activities. Attachment B includes information relevant to new access road MVP-BR-105.04. Mountain Valley has received landowner permission for all construction activities requested herein.

Mountain Valley respectfully requests that this Notice to Proceed be issued by January 18, 2018.

If you have any questions, please do not hesitate to contact me at (412) 553-5786 or [email protected]. Thank you.

Respectfully submitted,

MOUNTAIN VALLEY PIPELINE, LLC by and through its operator, EQM Gathering Opco, LLC

By:

Matthew Eggerding Counsel, Midstream

Attachments

cc: All Parties Paul Friedman, FERC Lavinia DiSanto, Cardno, Inc. Doug Mooneyhan, Cardno, Inc.

Page 2: 888 First Street NE Re: Mountain Valley Pipeline, LLC ... · Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West

Name County State LocationCultural Survey Status

Cultural Resources

Identified Y/NReport Title (Date)

Date Report Filed with

FERC

SHPO Clearance Date

Date SHPO Letter Filed with FERC

MOBLEY INTERCONNEC

T LODWetzel West Virginia Mobley IC Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume I, Wetzel, Harrison, Doddridge and Lewis Counties, West Virginia (Espino et.al. September 2015)

9/12/2015 10/06/2015 10/23/2015

MVP-LY-024 Wetzel West Virginia Mobley IC Complete NoMountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Espino et.al., Novemeber 2016)

12/22/2016 12/7/2016 12/22/2016

MVP-WE-000 Wetzel West Virginia Mobley IC Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume I, Wetzel, Harrison, Doddridge and Lewis Counties, West Virginia (Espino et.al. September 2015)

9/12/2015 10/06/2015 10/23/2015

BRADSHAW COMPRESSOR STATION LOD

Wetzel West Virginia Bradshaw CS Complete

46WZ123 (Not Eligible);

46WZ163 (Not Eligible)

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume I, Wetzel, Harrison, Doddridge and Lewis Counties, West Virginia (Espino et.al. September 2015); Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Espino et.al., Novemeber 2016); Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 2 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Lackett et.al., July 2017)

9/12/2015; 12/22/2016; 7/20/2017

10/06/2015; 12/7/2016; 8/17/2017

10/23/2015; 12/22/2016;

9/5/2017

MVP-RD-001B Wetzel West Virginia Bradshaw CS Complete NoMountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Espino et.al., Novemeber 2016)

12/22/2016 12/7/2016 12/22/2016

MVP-RD-001A Wetzel West Virginia Bradshaw CS Complete NoMountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Espino et.al., Novemeber 2016)

12/22/2016 12/7/2016 12/22/2016

MVP-WE-008.02 Wetzel West Virginia Bradshaw CS Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Espino et.al., Novemeber 2016); Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 2to Volume I, Wetzel, Harrison, Doddridge and Lewis Counties (Lackett et.al., July 2017)

12/22/2016; 7/20/2017

12/7/2016; 8/17/2017

12/22/2016; 9/5/2017

HARRIS COMPRESSOR STATION - WB INTERCONNEC

T LOD

Braxton West Virginia Harris CS Complete

46BX117 (Not Eligible); 46BX122

(Isolated Find, Not Eligible)

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume II, Braxton and Webster Counties, West Virginia(Espino et.al. October 2015)

10/12/2015 11/16/2015 1/19/2016

MVP-BR-105.03 Braxton West Virginia Harris CS Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume II, Braxton and Webster Counties, West Virginia(Espino et.al. October 2015)

10/12/2015 11/16/2015 1/19/2016

MVP-BR-105.02 Braxton West Virginia Harris CS Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume II, Braxton and Webster Counties, West Virginia(Espino et.al. October 2015)

10/12/2015 11/16/2015 1/19/2016

ATTACHMENT A

Page 1 of 2

Page 3: 888 First Street NE Re: Mountain Valley Pipeline, LLC ... · Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West

Name County State LocationCultural Survey Status

Cultural Resources

Identified Y/NReport Title (Date)

Date Report Filed with

FERC

SHPO Clearance Date

Date SHPO Letter Filed with FERC

MVP-BR-105.04* Braxton West Virginia Harris CS Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume II, Braxton and Webster Counties, West Virginia(Espino et.al. October 2015)

10/12/2015 11/16/2015 1/19/2016

STALLWORTH COMPRESSOR STATION LOD

Fayette West Virginia Stallworth CS Complete

46FA540 (Isolated Find, Not Eligible);

46FA553 (Isolated Find, Not Eligible)

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume III, Nicholas, Greenbrier, and Fayette Counties, West Virginia (Espino et al.December 2015 ); Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West Virginia (Espino et al. January 2017)

12/24/2015; 1/22/2017

01/27/2016, 02/08/2017

3/24/2016; 2/17/2017

MVP-LY-025 Greenbrier West Virginia Stallworth CS Complete

46GB541 (Not Eligible); 46GB542 (Avoided); 46GB544

(Isolated Find, Not Eligible)

Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 2 to Volume III, Nicholas and Greenbrier Counties (Espino et.al., August 2017)

8/4/2017 9/26/2017 9/28/2017

MVP-GB-190.01 Greenbrier West Virginia Stallworth CS Complete No

Mountain Valley Pipeline Project, Cultural Resources Survey, Volume III, Nicholas, Greenbrier, and Fayette Counties, West Virginia (Espino et al.December 2015 ); Mountain Valley Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West Virginia (Espino et al. January 2017)

12/24/2015; 1/22/2017

01/27/2016, 02/08/2017

3/24/2016; 2/17/2017

* Access Road MVP-BR-105.04 has been added to the Project. See the additional information in Attachment B.

Page 2 of 2

Page 4: 888 First Street NE Re: Mountain Valley Pipeline, LLC ... · Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West

Begin MP End MP Description Parcel IDLandowner Approval

New Landowners Affected?

Residences within 50 feet of Construction 

Work Area?

Within Original Study 

Corridor?

Description of New Route Land 

Use/Cover

Existing Land Use/Cover Type

Length of Forested Area Crossed (feet)

Length of Interior 

Forested Area Crossed (feet)

Cultural Resource/Federally 

Listed Species Affected by Deviation

Environmentally Sensitive Areas 

Within/Abutting Area of Deviation

Waterbodies Crossed and Width 

(feet)

Length of Wetlands Crossed by Type (PFO, 

PSS, PEM) (feet)

Nationwide 12 Permit Modifications

Alignment Sheet NumberRoanoke Logperch 

ImpactCandy Darter 

ImpactMussel Impact RPBB Impact Plant Impact

Total Change +/‐ in LOD (acres)

MYSO ‐ Known Summer Use Habitat (acres)

MYSO ‐ Known Use Spring Staging/Fall Swarming Habitat 

(acres)

MYSO ‐ Suitable Unoccupied 

Summer Habitat (acres)

MYSO ‐ Unknown Use Spring Staging/Fall Swarming Habitat 

(acres)

MYSO ‐ Unknown Use Summer Habitat (acres)

NLEB Known Use Spring Staging/Fall Swarming Habitat 

(acres)

77.3 77.3

Added access road MVP‐BR‐105.04, which is an existing road within the certificated LOD.  Plan to improve rock access from public road and widen road up to 25 

feet.  Road is approximately 375 feet 

in  length.

WV‐BR‐046.02Yes (Mountain Valley owns property)

No No Yes

Developed Open Space; Decidious Forest; Cultivated 

Crops

Developed Open Space; Decidious Forest; 

Cultivated Crops

0 0 None None None N/A

Additional impacts to USACE Jurisdictional Features will not 

occur.

PA‐BRWV‐H601‐01No Effect ‐ Outside RLP 

RangeNo Effect ‐ Outside candy darter range

No effect on mussels ‐ variance does not occur 

at instream Project crossing

No effect (see note 1) No effect (see note 2) 0 0 0 0 0 0 0

1 No individuals or populations are known to occur at the parcel  New access road is within historic range and has potential habitat for RPBB; however any clearing and revegetation will increase habitat connectivity and quality of foraging habitat, thus benefitting RPBB.2 Outside known ranges of running buffalo clover, shale barren rockcress, small whorled pogonia, Virginia spiraea, smooth coneflower.

Total Change (+/‐) in Clearing of Trees by Species Habitat TypeAttachment B

Page 5: 888 First Street NE Re: Mountain Valley Pipeline, LLC ... · Pipeline Project, Cultural Resources Survey, Addendum 1 to Volume III, Nicholas, Greenbrier, and Fayette Counties, West

P

P

P

P

P

P

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

P

/

L

P

/

L

P

/

L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

P

/L

R

/

W

R

/

W

R

/

W

R

/

W

R

/W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/W

R/W

R/W

R/W

R/W

R/W R/W R/W

R/W

R/W

R

/W

R

/

W

R

/

W

R

/W

R

/W

R

/W

R

/

W

R

/

W

R

/

W

R

/

W

R

/W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/

W

R

/W

R/W

R/W

R/W

R/W

R/W R/W R/W

R/W

R/W

R

/W

R

/

W

R

/

W

R

/W

R

/W

R

/W

W

E

L

L

LM

LM

LM

WW

PWR

PWR

PWR

PWR

LM

T

S

8

T

S

8

T

S

8

T

S

1

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXXXXX

R

/

W

R

/

W

R

/

W

R

/W

X

X X

X

1215

22

0 H

oo

ve

r B

ou

le

va

rd

, S

uite

2

Ho

lla

nd

, M

ich

ig

an

4

94

23

-3

76

6

6

16

-3

92

-5

93

8

6

16

-3

92

-2

11

6

26

55

5 E

ve

rg

re

en

R

d. S

uite

. 4

30

So

uth

fie

ld

, M

ich

ig

an

4

80

76

T 2

48

-8

27

-7

32

2 F

2

48

-8

27

-7

54

9

ww

w.hollandengineering.com

BRAXTON COUNTY, VIRGINIA

00+

00

1

1215'

1

00+

00

12+

00

12+

00

RIGHT-OF-WAY &

OWNERSHIP DATA

PLAN VIEW

WORK SPACE

EN

VIR

ON

ME

NT

AL

PIP

EL

IN

E A

LIG

NM

EN

T

MO

UN

TA

IN

V

AL

LE

Y P

RO

JE

CT

- H

60

1 L

IN

E

DRAWN BY: HEI(DRF)

DRAFTING CK:

ENGINEERING CK:

DRAWING NO.:

DATE OF PLOT:

SHEET OF 1

HORZ. SCALE: 1" = 100'

AFE/P.O.NO.:

HEI PROJECT NO.: 14-10-052

REV.

PA-BRWV-H601-01

MA

TE

RIA

L S

UM

MA

RY

RE

VIS

IO

NS

MK

. N

O.

QT

Y.

DE

SC

RIP

TIO

NR

EV

.D

AT

EB

YD

ES

CR

IP

TIO

N

AP

PR

OV

ED

FO

R B

ID

DIN

G

AP

PR

OV

ED

F

OR

CO

NS

TR

UC

TIO

N

RE

V.

BY

DA

TE

DE

SIG

N

0' 50' 100' 200'

PIPE / COATING

CLASS LOCATION / HCA

WETLAND / STREAM

.

.

SLOPE DISTANCE

CONSTRUCTION CK:

ENVIRONMENTAL CK:

RE

V.

BY

DA

TE

AP

PR

OV

ED

FO

R F

ER

C

RE

V.

BY

DA

TE

AE

RIA

L P

HO

TO

GR

AP

HY

D

AT

E: A

PR

IL

2015 &

JA

NU

AR

Y 2016

PROFILE

CONSTRUCTION METHOD

CONSTRUCTION

EXCLUSION

LEGEND

REFERENCE DRAWINGS

DRAWING NO. DESCRIPTION

HORIZONTAL

STATIONING

Mo

un

tain

V

alley

CONSTRUCTION METHOD KEY

1.1 - TYPICAL R/W WORKING SIDE LEFT

PERMANENT EASEMENT

TEMPORARY

WORK SPACE(TWS)

ADD. TEMPORARY

WORK SPACE(ATWS)

EXISTING PIPELINE

PROPOSED PIPELINE

ACCESS ROAD

TEMPORARY WORK SPACE

EXISTING PIPELINE

PROPOSED 42"PIPELINE

WORK SPACE LIMITS

TEMPORARY ACCESS RD

PERMANENT ACCESS RD

PROPERTY LINE

OVERHEAD POWER

P/L

OVERHEAD TELEPHONE

P

DELINEATED STREAM

T

C/L ROAD

C/L RAILROAD

DELINEATED WETLAND

PI SYMBOL

POWER/TELE POLE

GUY ANCHOR

GAS VALVETANK

WELL - GAS/OIL/WATER/

MONITORING

POST - GATE/FENCE

ELEC/GAS/WTR METER

TELPWR

TANK

GW

CATCH BASIN - CULVERT

WW

FENCE LINE

X

ANCILLARY SITE

OW

TREE

PROPOSED TEST STATION

ROAD RIGHT-OF-WAY

R/W

ABOVE GROUND FACILITY

LINE MARKER - VENT PIPE

GP

ADDITIONAL TEMPORARY

WORK SPACE(ATWS)

WMGMEM

T

S

#

LM

PEDESTAL - UTILITY

EPPED TEP FOP TVP

NON-SURVEYED C/L

500' TICK MARK

MNWWELL

FP

POST

TOWER LEG

TWR

SIGN

MH - SANITARY/WATER

SAMH WMH

MAILBOXMB

PERMANENT EASEMENT

STUDY CORRIDOR

BARRICADE FENCE

COUNTY LINE

LIMITS OF DISTURBANCE

0R

RR

09

-0

3-1

6

0H

EI

09

-0

3-1

6R

EV

. 4

.1

.1

3 IS

SU

ED

F

OR

B

ID

1R

RR

10

-1

4-1

6

1H

EI

10

-1

4-1

6O

CT

OB

ER

2

01

6 P

RO

PO

SE

D R

OU

TE

- IS

SU

ED

T

O F

ER

C

6JJS

11

-2

7-1

7

ISSUED FOR CONSTRUCTION

6JJS

11

-2

7-1

7

2H

EI

11

-2

7-1

7IS

SU

ED

F

OR

C

ON

ST

RU

CT

IO

N

3H

EI

01

-1

1-1

8A

DD

ED

T

EM

PO

RA

RY

A

R M

VP

-B

R-1

05

.0

4 A

ND

R

EN

UM

BE

RE

D

DR

AW

IN

G F

RO

M P

A-P

IV

A-H

60

1-0

1 T

O P

A-B

RW

V-H

60

1-0

1

05/09/15

.

.

1 1 3

.

.

ST

A. 0

0+

00

T

O S

TA

. 1

2+

00

SA

LT

L

IC

K D

IS

T., B

RA

XT

ON

C

O., W

V.

01/12/18 8:00 AM

.

.

.

.

TY

PE

8 T

ES

T S

TA

TIO

N - P

IP

ELIN

E

124"O

.D

. X

0.500"W

.T

., X

-65, F

US

IO

N B

ON

DE

D E

PO

XY

TY

PE

1 T

ES

T S

TA

TIO

N - P

IP

ELIN

E

CAUTION! PIPELINE

00+

00

12+

00

WV-BR-046.03.001

HARRIS COMPRESSOR STATION

MP

0.22

CAUTION! PIPELINE

1.1

X

WB INTERCONNECT

PROPOSED 42" H600 MOUNTAIN VALLEY PIPELINE

PROPOSED HARRIS

COMPRESSOR STATION SITE

SEE PLOT PLAN

DWG# P-W-H600-1100-10A

PROPOSED TCO WB

INTERCONNECT AREA

PROPOSED

MAIN LINE VALVE

MVP-MLV-09

P-AA1

W-AA3

W-AA4

MVP-BR-105.02

PROPOSED 24" H601

WB IC PIPELINE

MVP-BR-105

CO RTE 24/5 -

MILROY ROAD

S-AA12-EPH

PROTECT ENVIRONMENTALLY

SENSITIVE AREA WITH FENCING

ALONG WORK SPACE LIMITS

PROPOSED 42" H600

MOUNTAIN VALLEY PIPELINE

MP

0.0

0

S-AA15

S-AA11

W-AA2

W-AA1

01+

20

WV-BR-046.03.001

120 LF

120 SLOPE

WV-BR-046.02

WV-BR-0457.01

WV-BR-046.02

1080 LF

1095 SLOPE

MVP-MLV-09

62.5'

25.0'

25.0'

12.5'

P-AA1

W-AA4

62.5'

25.0'

25.0'

12.5'

MVP-BR-105.03

MVP-STR-158

MVP-STR-159

MVP-STR-160

MVP-STR-161

MVP-STR-162

MVP-STR-163

WV-BR-046.02.001

PA-WVBR-H600-13 ALIGNMENT SHEET

MVP-BR-105.03

MVP-BR-105.02

P-W-H600-1204-01 CATHODIC PROTECTION

STANDARD DRAWING

P-W-H600-1204-02 CATHODIC PROTECTION

STANDARD DRAWING

P-W-H600-1100-10A MAIN LINE VALVE 09 &

HARRIS C.S. PLOT PLAN

P-W-H600-1153-01 COLUMBIA INTERCONNECT

PLOT PLAN

1 3

PROPOSED 24" H604

MVP PIPELINE(92')

92

24"O

.D

. X

0.562"W

.T

., X

-65, F

US

IO

N B

ON

DE

D E

PO

XY

1.1

COLUMBIA TAP

SEE PLOT PLAN

DWG# P-W-H600-1153-01

COLUMBIA TAP

SEE PLOT PLAN

DWG# P-W-H600-1153-01

PROPOSED 24" H604

MVP PIPELINE(92')

TIME OF YEAR RESTRICTION: NO CLEARING JUNE 1 - JULY 31

SEE TREE CLEARING PLAN FOR FURTHER DETAILS

MVP-BR-105.04