8843026 building technology reviewer qa (1)

Upload: jettsoriano

Post on 02-Jun-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    1/490

    A roofing tile which has the shape of an S laid on its side is a

    Mission tile

    pantile

    French tile

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    2/490

    A roofing tile which has the shape of an S laid on its side is a

    Mission tile

    pantile

    French tile

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    3/490

    That part of the building foundation which forms the permanent

    retaining wall of the structure below grade is a

    foundation course

    grade beam

    foundation wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    4/490

    That part of the building foundation which forms the permanent

    retaining wall of the structure below grade is a

    foundation course

    grade beam

    foundation wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    5/490

    Joint employed to reduce restraint by accommodating movement of

    masonry walls are known as

    cold joints

    control joints

    block outs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    6/490

    Joint employed to reduce restraint by accommodating movement of

    masonry walls are known as

    cold joints

    control joints

    block outs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    7/490

    A system of framing a building in which the studs are continuous to

    roof supporting second floor joints is known as

    post and beam

    western framing

    balloon framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    8/490

    A system of framing a building in which the studs are continuous to

    roof supporting second floor joints is known as

    post and beam

    western framing

    balloon framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    9/490

    Rough plaster finish obtained by flinging plaster on a wall with a

    hand operated machine is

    tryolean finish

    trowel finish

    broom stripped finish

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    10/490

    Rough plaster finish obtained by flinging plaster on a wall with a

    hand operated machine is

    tryolean finish

    trowel finish

    broom stripped finish

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    11/490

    A principal member of the truss which extends from one end to the

    other primarily to resist bending is a

    web member

    girt

    chord

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    12/490

    A principal member of the truss which extends from one end to the

    other primarily to resist bending is a

    web member

    girt

    chord

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    13/490

    A protein: the chief nitrogenous ingredient in milk is

    Casein

    Tempera

    alabaster

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    14/490

    A protein: the chief nitrogenous ingredient in milk is

    Casein

    Tempera

    alabaster

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    15/490

    a composition of two or more metals fused together usually to

    obtain a desired property

    annealing

    alloy

    built-up

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    16/490

    a composition of two or more metals fused together usually to

    obtain a desired property

    annealing

    alloy

    built-up

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    17/490

    The horizontal distance from the face of a lock or latch to the center

    of the knob or lock cylinder

    Backset

    backfill

    built-up

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    18/490

    The horizontal distance from the face of a lock or latch to the center

    of the knob or lock cylinder

    Backset

    backfill

    built-up

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    19/490

    A commercially pure iron of fibrous nature, valued for its corrosion

    resistance and ductility is

    cast iron

    black iron

    wrought iron

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    20/490

    A commercially pure iron of fibrous nature, valued for its corrosion

    resistance and ductility is

    cast iron

    black iron

    wrought iron

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    21/490

    The Filipino term for horizontal stud is

    Pabalagbag

    Tahilan

    pilareta

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    22/490

    The Filipino term for horizontal stud is

    Pabalagbag

    Tahilan

    pilareta

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    23/490

    The Filipino term for riser

    Muldura

    takip silipan

    planehuelda

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    24/490

    The Filipino term for riser

    Muldura

    takip silipan

    planehuelda

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    25/490

    The Filipino term for collar plate is

    Hardinera

    Guililan

    sinturon

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    26/490

    The Filipino term for collar plate is

    Hardinera

    Guililan

    sinturon

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    27/490

    The Filipino term for temper (metal work)

    Suban

    Espolon

    poleva

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    28/490

    The Filipino term for temper (metal work)

    Suban

    Espolon

    poleva

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    29/490

    The Filipino term for plumb line is

    Pantilya

    Asintada

    hulog

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    30/490

    The Filipino term for plumb line is

    Pantilya

    Asintada

    hulog

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    31/490

    A beam that projects beyond one or both its support

    continuous

    cantiliver

    tie

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    32/490

    A beam that projects beyond one or both its support

    continuous

    cantiliver

    tie

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    33/490

    A wall (bearing or non-bearing) designed to resist lateral forces

    parallel to the wall

    non-bearing

    prefabricated

    shear

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    34/490

    A wall (bearing or non-bearing) designed to resist lateral forces

    parallel to the wall

    non-bearing

    prefabricated

    shear

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    35/490

    Using stair tread-riser proportion formula RT = 75, given riser

    equals 6 how many risers will there be between two floors

    having floor line to floor line distance of 7.8125 feet?

    15

    17

    19

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    36/490

    Using stair tread-riser proportion formula RT = 75, given riser

    equals 6 how many risers will there be between two floors

    having floor line to floor line distance of 7.8125 feet?

    15

    17

    19

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    37/490

    A modern method of installing wood parquet flooring on wooden

    boards sub-flooring is by

    gluing/pasting

    nailing into battens

    wainscoting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    38/490

    A modern method of installing wood parquet flooring on wooden

    boards sub-flooring is by

    gluing/pasting

    nailing into battens

    wainscoting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    39/490

    The standard height of window sills for office rooms in upper floors

    is

    1.2 meters

    0.60 meters

    0.90 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    40/490

    The standard height of window sills for office rooms in upper floors

    is

    1.2 meters

    0.60 meters

    0.90 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    41/490

    The dimension of commercial acoustic boards for aluminum T-

    runners used for dropped-ceiling in offices is

    30 x 60 x 1

    24 x 50 x 7/8

    24 x 48 x

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    42/490

    The dimension of commercial acoustic boards for aluminum T-

    runners used for dropped-ceiling in offices is

    30 x 60 x 1

    24 x 50 x 7/8

    24 x 48 x

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    43/490

    The total floor area 16 feet wide by 60 feet deep needs one inch

    (1) x 4(commercial size) T & G flooring. Assuming that the

    available T & G is 1 x 4 x 16 and the effective width is 3.5 , the

    total board feet needed is

    1,280 bf

    1,098 bf

    1,330 bf

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    44/490

    The total floor area 16 feet wide by 60 feet deep needs one inch

    (1) x 4(commercial size) T & G flooring. Assuming that the

    available T & G is 1 x 4 x 16 and the effective width is 3.5 , the

    total board feet needed is

    1,280 bf

    1,098 bf

    1,330 bf

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    45/490

    In the design of a large shopping centers where space is required,

    intervals of columns can be wider than the ordinary by adopting a

    structural method of construction called

    compressioning

    post-tensioning

    pre-casting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    46/490

    In the design of a large shopping centers where space is required,

    intervals of columns can be wider than the ordinary by adopting a

    structural method of construction called

    compressioning

    post-tensioning

    pre-casting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    47/490

    Humidification and condensation in exterior walls can be minimized

    by

    providing stud space between exterior finish and interior finish

    providing building paper sheathing

    providing building paper sheathing and space filled

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    48/490

    Humidification and condensation in exterior walls can be minimized

    by

    providing stud space between exterior finish and interior finish

    providing building paper sheathing

    providing building paper sheathing and space filled

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    49/490

    Heat gain through the structure of a habitable room occur in tropical

    region at walls and roofs by conduction. This can be minimized by

    the use of

    wood

    concrete

    steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    50/490

    Heat gain through the structure of a habitable room occur in tropical

    region at walls and roofs by conduction. This can be minimized by

    the use of

    wood

    concrete

    steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    51/490

    A material used to remedy vapor flow

    glossy surfaced asphalt saturated paper, 50 lbs or more

    wall paper

    asbestos cement board

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    52/490

    A material used to remedy vapor flow

    glossy surfaced asphalt saturated paper, 50 lbs or more

    wall paper

    asbestos cement board

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    53/490

    Dry walls do not require appreciable amount of moisture and they

    are customarily finished with

    mortar and cement

    plywood on studs

    lath and plaster

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    54/490

    Dry walls do not require appreciable amount of moisture and they

    are customarily finished with

    mortar and cement

    plywood on studs

    lath and plaster

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    55/490

    Wallboards or plywood maybe applied over studs. They can also

    be applied over CHB masonry wall by using

    wood battens

    furring

    sheathing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    56/490

    Wallboards or plywood maybe applied over studs. They can also

    be applied over CHB masonry wall by using

    wood battens

    furring

    sheathing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    57/490

    Identify the miter joint from the following

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    58/490

    Identify the miter joint from the following

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    59/490

    To turn back water whenever joints occur in which dissimilar

    materials come together, it is necessary to provide

    flashing material

    binding material

    counter flushing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    60/490

    To turn back water whenever joints occur in which dissimilar

    materials come together, it is necessary to provide

    flashing material

    binding material

    counter flushing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    61/490

    The part of a foundation system which supports the exterior walls of

    a superstructure and bears directly on the column footing is a

    foundation course

    grade beam

    foundation wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    62/490

    The part of a foundation system which supports the exterior walls of

    a superstructure and bears directly on the column footing is a

    foundation course

    grade beam

    foundation wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    63/490

    A narrow strip of wood applied to cover a joint along the edges of

    two parallel boards in the same plane is a

    fillet

    cant strip

    batten

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    64/490

    A narrow strip of wood applied to cover a joint along the edges of

    two parallel boards in the same plane is a

    fillet

    cant strip

    batten

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    65/490

    The stressing of unbounded tendons after concrete has cured is

    post-tensioning

    pre-casting

    lift slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    66/490

    The stressing of unbounded tendons after concrete has cured is

    post-tensioning

    pre-casting

    lift slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    67/490

    The boxing in of covering a joist, beam or girder to give the

    appearance of a larger beam is known as

    beam formworks

    beam blocking

    grade beam

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    68/490

    The boxing in of covering a joist, beam or girder to give the

    appearance of a larger beam is known as

    beam formworks

    beam blocking

    grade beam

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    69/490

    A system of framing a building on which floor joists of each storey

    rest on the top plates of the storey below and the bearing walls and

    partitions rest on the subfloor of each storey is known as

    balloon framing

    flank framing

    western framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    70/490

    A system of framing a building on which floor joists of each storey

    rest on the top plates of the storey below and the bearing walls and

    partitions rest on the subfloor of each storey is known as

    balloon framing

    flank framing

    western framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    71/490

    Pressure exerted against the underground portion of a building

    created by the presence of water in the soil is known as

    soil bearing pressure

    hydrostatic pressure

    atmospheric pressure

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    72/490

    Pressure exerted against the underground portion of a building

    created by the presence of water in the soil is known as

    soil bearing pressure

    hydrostatic pressure

    atmospheric pressure

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    73/490

    A window which projects outside the main line of a building and the

    compartment in which it is located extends to the floor is known as

    bay window

    hopper window

    oriel window

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    74/490

    A window which projects outside the main line of a building and the

    compartment in which it is located extends to the floor is known as

    bay window

    hopper window

    oriel window

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    75/490

    A form of brick bond in which each course is alternately composed

    of entirely of headers or of stretchers is known as

    common bond

    flemish bond

    english bond

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    76/490

    A form of brick bond in which each course is alternately composed

    of entirely of headers or of stretchers is known as

    common bond

    flemish bond

    english bond

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    77/490

    A joint formed when a concrete surface hardens before the next

    batch of concrete is placed against it is

    block out

    cold joint

    control joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    78/490

    A joint formed when a concrete surface hardens before the next

    batch of concrete is placed against it is

    block out

    cold joint

    control joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    79/490

    An iron alloy usually including carbon and silicon which has high

    compressive strength but low tensile strength is

    pig iron

    cast iron

    wrought iron

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    80/490

    An iron alloy usually including carbon and silicon which has high

    compressive strength but low tensile strength is

    pig iron

    cast iron

    wrought iron

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    81/490

    The Filipino term for plastered course is

    lastilyas

    moneyka

    kusturada

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    82/490

    The Filipino term for plastered course is

    lastilyas

    moneyka

    kusturada

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    83/490

    The Filipino term for bottom chord is

    barakilan

    sibe

    estunyo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    84/490

    The Filipino term for bottom chord is

    barakilan

    sibe

    estunyo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    85/490

    The Filipino term for perlin is

    tahilan

    balangkas

    reostra

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    86/490

    The Filipino term for perlin is

    tahilan

    balangkas

    reostra

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    87/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    88/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    89/490

    The Filipino term for top chord is

    tahilan

    baytang

    sinturon

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    90/490

    The Filipino term for top chord is

    tahilan

    baytang

    sinturon

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    91/490

    The capacity of a wall to hold moisture is important in the design of

    dwelling units. Select the best material which will reduce moisture

    in a wall when used

    CHB S-cut joint finish

    1 thick V-cut wood boards

    Synthetic adobe finish on R.C. wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    92/490

    The capacity of a wall to hold moisture is important in the design of

    dwelling units. Select the best material which will reduce moisture

    in a wall when used

    CHB S-cut joint finish

    1 thick V-cut wood boards

    Synthetic adobe finish on R.C. wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    93/490

    Plaster or plywood ceiling on nailers or joists below a ventilated

    roof space may show pattern staining on the ceiling. This can be

    prevented by

    cleaning

    adequate insulation

    re-painting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    94/490

    Plaster or plywood ceiling on nailers or joists below a ventilated

    roof space may show pattern staining on the ceiling. This can be

    prevented by

    cleaning

    adequate insulation

    re-painting

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    95/490

    Heat gain through the walls in buildings exposed to afternoon sun

    intensifies discomfort of inhabitants because of conductivity.

    However, this can be minimized by the use of

    combination of wood boards and plywood with cavity between

    thick reinforced concrete wall

    steel sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    96/490

    Heat gain through the walls in buildings exposed to afternoon sun

    intensifies discomfort of inhabitants because of conductivity.

    However, this can be minimized by the use of

    combination of wood boards and plywood with cavity between

    thick reinforced concrete wall

    steel sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    97/490

    Sound or noise between bedrooms may be reduced by using less

    expensive materials with the application of construction techniques

    double wall plywood on horizontal and vertical studs with absorbents

    solid 6 R.C. wall

    sawali on 2 x 2 studs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    98/490

    Sound or noise between bedrooms may be reduced by using less

    expensive materials with the application of construction techniques

    double wall plywood on horizontal and vertical studs with absorbents

    solid 6 R.C. wall

    sawali on 2 x 2 studs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    99/490

    The staircase of a house has a total run of 3 meters and a total rise

    of 2.16 meters, the tread width is 11 inches and riser is 7 7/8,

    therefore, the stringer length is

    3.20 meters

    3.69 meters

    3.75 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    100/490

    The staircase of a house has a total run of 3 meters and a total rise

    of 2.16 meters, the tread width is 11 inches and riser is 7 7/8,

    therefore, the stringer length is

    3.20 meters

    3.69 meters

    3.75 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    101/490

    Dry walls are customarily finished with

    lath and plaster

    mortar and hollow blocks

    reinforced concrete

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    102/490

    Dry walls are customarily finished with

    lath and plaster

    mortar and hollow blocks

    reinforced concrete

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    103/490

    The riser of a stair is 6 inches. What is the run using formula R/T

    = tan (R-3) x 8 degrees

    12.2247 inches

    12.1000 inches

    11.8975 inches

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    104/490

    The riser of a stair is 6 inches. What is the run using formula R/T

    = tan (R-3) x 8 degrees

    12.2247 inches

    12.1000 inches

    11.8975 inches

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    105/490

    One method of leveling batterboards without the transit is the use

    of

    plastic hose filled with water

    eyesight

    plumb bob

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    106/490

    One method of leveling batterboards without the transit is the use

    of

    plastic hose filled with water

    eyesight

    plumb bob

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    107/490

    A manual method of squaring the corners of a building lines in

    building layout, is the use of

    2-3-4 multiples with the use of transit

    3-4-5 multiples with the use of steel tape measure

    4-5-4 multiples and strings

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    108/490

    A manual method of squaring the corners of a building lines in

    building layout, is the use of

    2-3-4 multiples with the use of transit

    3-4-5 multiples with the use of steel tape measure

    4-5-4 multiples and strings

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    109/490

    When dry conditions are demanded of asphalt tile floor finishes on

    concrete over earth, apply the waterproofing (WP) steps

    felt paper below sub-slab then WP on top of the sub-slab

    felt paper below the top slab then WP the earth

    WP the earth under slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    110/490

    When dry conditions are demanded of asphalt tile floor finishes on

    concrete over earth, apply the waterproofing (WP) steps

    felt paper below sub-slab then WP on top of the sub-slab

    felt paper below the top slab then WP the earth

    WP the earth under slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    111/490

    Due to temperature effects in materials, concrete walls, slabs of

    long buildings, new buildings adjoining existing buildings should be

    provided with

    flashing

    welded joints

    expansion joints

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    112/490

    Due to temperature effects in materials, concrete walls, slabs of

    long buildings, new buildings adjoining existing buildings should be

    provided with

    flashing

    welded joints

    expansion joints

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    113/490

    A typical block or panel type insulating material used in flat roof of

    commercial or industrial building

    corkboard

    acacia lumber

    washed pebbles

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    114/490

    A typical block or panel type insulating material used in flat roof of

    commercial or industrial building

    corkboard

    acacia lumber

    washed pebbles

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    115/490

    What is the height of the RC curtain wall surrounding a water tank

    located at the penthouse whose capacity is 5000 U.S. gallons. The

    diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30

    meters. The wall shall be as high as the water tank.

    4.00 meters

    4.19 meters

    4.16 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    116/490

    What is the height of the RC curtain wall surrounding a water tank

    located at the penthouse whose capacity is 5000 U.S. gallons. The

    diameter of the tank is 2.5 meters (I.D.) and freeboard of 0.30

    meters. The wall shall be as high as the water tank.

    4.00 meters

    4.19 meters

    4.16 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    117/490

    Select the grouping one subject of which is a criterion used by

    architects in planning and design of buildings

    columns, splices, materials, lot

    roofing sheets, function, elevation

    concrete, lumber, steel, cement

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    118/490

    Select the grouping one subject of which is a criterion used by

    architects in planning and design of buildings

    columns, splices, materials, lot

    roofing sheets, function, elevation

    concrete, lumber, steel, cement

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    119/490

    Narrow, high ceiling spaces where ceiling area is small compared

    to wall area, will normally require acoustical treatment of the

    wall or part of several walls

    floor and ceiling

    ceiling only

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    120/490

    Narrow, high ceiling spaces where ceiling area is small compared

    to wall area, will normally require acoustical treatment of the

    wall or part of several walls

    floor and ceiling

    ceiling only

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    121/490

    A ferrous metal that offers great resistance to abrassion and finds

    important use in the cutting edges of heavy digging tools is a

    alloy steel

    nickel steel

    manganese steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    122/490

    A ferrous metal that offers great resistance to abrassion and finds

    important use in the cutting edges of heavy digging tools is a

    alloy steel

    nickel steel

    manganese steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    123/490

    A building stone of igneous origin and composed of quartz,

    hornblende and mica is a

    travertine

    serpentine

    granite

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    124/490

    A building stone of igneous origin and composed of quartz,

    hornblende and mica is a

    travertine

    serpentine

    granite

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    125/490

    A form of brick bond in which the course consists of alternate

    stretchers and headers in known as

    flemish bond

    english bond

    common bond

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    126/490

    A form of brick bond in which the course consists of alternate

    stretchers and headers in known as

    flemish bond

    english bond

    common bond

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    127/490

    A system of framing a building on which floor joist of each storey

    rests on the top plates of the storey below and the bearing walls

    and partitions rest on the subfloor of each storey is known as

    western framing

    balloon framing

    flank framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    128/490

    A system of framing a building on which floor joist of each storeyrests on the top plates of the storey below and the bearing walls

    and partitions rest on the subfloor of each storey is known as

    western framing

    balloon framing

    flank framing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    129/490

    The Filipino term for rabbet

    palitada

    asintada

    vaciada

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    130/490

    The Filipino term for rabbet

    palitada

    asintada

    vaciada

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    131/490

    The Filipino term for projection is

    alahado

    bolada

    asinta

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    132/490

    The Filipino term for projection is

    alahado

    bolada

    asinta

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    133/490

    Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be

    between two levels having a vertical distance of 9-0

    18 risers

    16 risers

    17 risers

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    134/490

    Given a riser equals six inches and using the stair tread-riserproportion formula 2R + T = 25, how many risers wil there be

    between two levels having a vertical distance of 9-0

    18 risers

    16 risers

    17 risers

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    135/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    136/490

    A geological or ground condition considered in determining the sizeand type of foundation of the building

    soil chemistry

    soil bearing pressure

    particle size distribution

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    137/490

    These are materials excellent as vapor barrier in the roofing systemof residential buildings

    particle board

    lawanit boards

    aluminum foil sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    138/490

    These are materials excellent as vapor barrier in the roofing systemof residential buildings

    particle board

    lawanit boards

    aluminum foil sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    139/490

    The chief structural materials, used for tall buildings are

    built-up beams, girders, foundations

    cement, deformed wrought iron, gravel and sand

    reinforced concrete and high grade steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    140/490

    The chief structural materials, used for tall buildings are

    built-up beams, girders, foundations

    cement, deformed wrought iron, gravel and sand

    reinforced concrete and high grade steel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    141/490

    These are classified as good and less expensive insulatingmaterials used in buildings

    glass blocks, 5000 psi concrete

    porous concrete, glass fibers, guilt materials

    steel plates, marble slabs, granite

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    142/490

    These are classified as good and less expensive insulatingmaterials used in buildings

    glass blocks, 5000 psi concrete

    porous concrete, glass fibers, guilt materials

    steel plates, marble slabs, granite

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    143/490

    This is a material that holds less moisture, is very light, less waterabsorptive capacity and is very good in sidings of dwelling units

    vinyl shingles

    asbestos-cement shingles

    wood boards

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    144/490

    This is a material that holds less moisture, is very light, less waterabsorptive capacity and is very good in sidings of dwelling units

    vinyl shingles

    asbestos-cement shingles

    wood boards

    The toilet bathroom floor finish is designed to be at least one inch

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    145/490

    g

    below the bedroom floor finish. What should be the vertical

    distance between the bedroom floor finish and the top line of the 2

    x 6 yacal floor joists which carry the toilet bath floor system

    assuming that thick mosaic vitrified tiles will be used in the toilet

    bathroom on 4 RC slab with membrane waterproofing, using

    standard acceptable measurement of materials for residential

    houses

    3 inches

    3 inches

    6 inches

    The toilet bathroom floor finish is designed to be at least one inch

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    146/490

    g

    below the bedroom floor finish. What should be the vertical

    distance between the bedroom floor finish and the top line of the 2

    x 6 yacal floor joists which carry the toilet bath floor system

    assuming that thick mosaic vitrified tiles will be used in the toilet

    bathroom on 4 RC slab with membrane waterproofing, using

    standard acceptable measurement of materials for residential

    houses

    3 inches

    3 inches

    6 inches

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    147/490

    A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3

    horizontal. What is the total length of the top chord, if the span of

    truss is 12 meters and the eave is 1.5 meters horizontally?

    7.555 meters

    7.906 meters

    7.567 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    148/490

    A Howe Truss is being considered to support the roofing system ofa residential building. The pitch of the truss is 1 vertical 3

    horizontal. What is the total length of the top chord, if the span of

    truss is 12 meters and the eave is 1.5 meters horizontally?

    7.555 meters

    7.906 meters

    7.567 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    149/490

    The finished frame surrounding a door is a

    door frame

    door jamb

    door casing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    150/490

    The finished frame surrounding a door is a

    door frame

    door jamb

    door casing

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    151/490

    A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a

    knob bolt

    knob latch

    knob lock

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    152/490

    A door lock with a spring bolt controlled by one or both knobs anddead bolt controlled by a key is a

    knob bolt

    knob latch

    knob lock

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    153/490

    A door consisting of two separate leaves, one above the other, thisleaves may operate independently or together is a

    dwarf door

    dutch door

    window door

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    154/490

    A door consisting of two separate leaves, one above the other, thisleaves may operate independently or together is a

    dwarf door

    dutch door

    window door

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    155/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    156/490

    A joint formed by overlapping the edges of metal sheet or platedand joining them by riveting, soldering or brazing is a

    lap joint

    lap seam

    lap splice

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    157/490

    A clay roofing tile approximately semi cylindrical in shape laid incourses with units having their convex side alternately up and down

    is a

    pantile

    mission tile

    roman tile

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    158/490

    A clay roofing tile approximately semi cylindrical in shape laid incourses with units having their convex side alternately up and down

    is a

    pantile

    mission tile

    roman tile

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    159/490

    The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a

    grade beam

    foundation wall

    foundation course

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    160/490

    The part of a foundation system which supports the exterior wall ofthe super structure and bears directly on the column footing is a

    grade beam

    foundation wall

    foundation course

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    161/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    162/490

    The wall of Intramuros is

    an aqueduct

    a fortification

    a moat

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    163/490

    The wall of Intramuros is

    an aqueduct

    a fortification

    a moat

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    164/490

    The Filipino term for rafter is

    guililan

    sepo

    kilo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    165/490

    The Filipino term for rafter is

    guililan

    sepo

    kilo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    166/490

    The Filipino term for baseboard is

    rodapis

    perdano

    batidora

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    167/490

    The Filipino term for baseboard is

    rodapis

    perdano

    batidora

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    168/490

    A climatic factor that is considered in the structural andarchitectural design of tall buildings

    thunderstorm

    gusts

    lightning

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    169/490

    A climatic factor that is considered in the structural andarchitectural design of tall buildings

    thunderstorm

    gusts

    lightning

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    170/490

    This is a ground condition that determines the size, type and shapeof the building footing/foundation

    soil bearing pressure

    loam and clay formation

    adobe underlay

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    171/490

    This is a ground condition that determines the size, type and shapeof the building footing/foundation

    soil bearing pressure

    loam and clay formation

    adobe underlay

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    172/490

    What is the height of a curtain wall for a downfeed water tank at thedeck roof with 60,000 gallons capacity and diameter of 3 meters,

    freeboard of 0.30 meters, shall be as high as the water tank

    3.513 meters

    3.550 meters

    3.625 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    173/490

    What is the height of a curtain wall for a downfeed water tank at thedeck roof with 60,000 gallons capacity and diameter of 3 meters,

    freeboard of 0.30 meters, shall be as high as the water tank

    3.513 meters

    3.550 meters

    3.625 meters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    174/490

    Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings

    colored roofing sheets, esthetics, symmetry of windows

    columns, doors, windows, split type

    concrete, steel and wood, type of floor finish

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    175/490

    Select the grouping one subject of which is a general criterion usedby architects in planning and design of buildings

    colored roofing sheets, esthetics, symmetry of windows

    columns, doors, windows, split type

    concrete, steel and wood, type of floor finish

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    176/490

    The most common materials used for roofing of urban residentialhouses

    R.C. slabs

    wood shingles

    G.I. sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    177/490

    The most common materials used for roofing of urban residentialhouses

    R.C. slabs

    wood shingles

    G.I. sheets

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    178/490

    For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested

    economical solutions

    pre-stressed concrete

    reinforced concrete

    space frames, light steel skeleton structures

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    179/490

    For very large roof spans (for auditoria, transport buildings,exhibition halls) of over 150 ft these structures are suggested

    economical solutions

    pre-stressed concrete

    reinforced concrete

    space frames, light steel skeleton structures

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    180/490

    Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of

    two consecutive steps is the

    going

    string

    newel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    181/490

    Rise is the vertical distance between the upper surface of twoconsecutive steps. The horizontal distance between the nosing of

    two consecutive steps is the

    going

    string

    newel

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    182/490

    Noise inside the building is o two kinds, namely, airborne noise andimpact noise . Insulation must be provided against both of these by

    internal walls and floors. Examples of better sound insulation are

    concrete hollow block walls

    double wall on 2 x 4 studs

    asbestos board walls on wooden studs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    183/490

    Noise inside the building is o two kinds, namely, airborne noise andimpact noise . Insulation must be provided against both of these by

    internal walls and floors. Examples of better sound insulation are

    concrete hollow block walls

    double wall on 2 x 4 studs

    asbestos board walls on wooden studs

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    184/490

    When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be

    used which is installed beneath the concrete slab is

    pitch or bituminous felt

    gravel coarse

    aluminum foil

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    185/490

    When the soil beneath the building is not exceptionally well drainedand it is necessary to exclude dampness, the best material to be

    used which is installed beneath the concrete slab is

    pitch or bituminous felt

    gravel coarse

    aluminum foil

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    186/490

    This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in

    tropical regions

    asbestos cement shingles

    vinyl shingles

    wood shingles

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    187/490

    This material holds less moisture, is very light with less absorptivecapacity and is very good in exterior sidings of residential houses in

    tropical regions

    asbestos cement shingles

    vinyl shingles

    wood shingles

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    188/490

    Standard size overlap for corrugated G.I. roofing is

    2 corr.

    2 corr.

    3 corr.

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    189/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    190/490

    A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

    alcove

    ductwork

    chase

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    191/490

    A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

    alcove

    ductwork

    chase

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    192/490

    A twisting force is

    torsion

    shear

    moment

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    193/490

    A twisting force is

    torsion

    shear

    moment

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    194/490

    A barrier or diaphragm formed to prevent the movement of soil tostabilize foundation, etc. is

    pile foundation

    sheet piling

    retaining wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    195/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    196/490

    The term stone-cut refers to a

    masonry finish

    adobe stone work

    wood siding

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    197/490

    The term stone-cut refers to a

    masonry finish

    adobe stone work

    wood siding

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    198/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    199/490

    Wood with metal cladding is called

    channel strip

    reinforced wood

    kalamein

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    200/490

    The Filipino term for floor joist is

    suelo

    guililan

    soleras

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    201/490

    The Filipino term for floor joist is

    suelo

    guililan

    soleras

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    202/490

    The Filipino term for bottom chord is

    tirante

    tahilan

    madre

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    203/490

    The Filipino term for bottom chord is

    tirante

    tahilan

    madre

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    204/490

    Standard concrete mix for beams, girders, slabs, stairs andcolumns is

    AA

    A

    B

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    205/490

    Standard concrete mix for beams, girders, slabs, stairs andcolumns is

    AA

    A

    B

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    206/490

    Chord splice connectors for trusses is

    split-ring

    wood block

    fish plate

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    207/490

    Chord splice connectors for trusses is

    split-ring

    wood block

    fish plate

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    208/490

    A vertical line check uses a

    meter stick

    try square

    plumb bob

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    209/490

    A vertical line check uses a

    meter stick

    try square

    plumb bob

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    210/490

    A specialized fastener used to pull on to hold mitered jointstogether is

    vise

    wood screw

    clamp nail

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    211/490

    A specialized fastener used to pull on to hold mitered jointstogether is

    vise

    wood screw

    clamp nail

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    212/490

    Most waterproofed type of mortar joints for wall is

    raked

    struck

    weathered

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    213/490

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    214/490

    Rafters laid diagonally from corner of a plate or girts to the ridge

    jack rafter

    valley plate

    hip rafter

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    215/490

    Rafters laid diagonally from corner of a plate or girts to the ridge

    jack rafter

    valley plate

    hip rafter

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    216/490

    The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called

    form boards

    box boards

    batter boards

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    217/490

    The horizontal boards nailed to corner post to assist in the accuratelayout of foundation and excavation lines are called

    form boards

    box boards

    batter boards

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    218/490

    Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is

    lally

    composite

    cast-in-place

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    219/490

    Columns in which a concrete core is reinforced with a steel or cast-iron core designed to support a part of load is

    lally

    composite

    cast-in-place

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    220/490

    The Filipino term for ceiling joist is

    kostilyahe

    tirante

    espejo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    221/490

    The Filipino term for ceiling joist is

    kostilyahe

    tirante

    espejo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    222/490

    The Filipino term for concrete beam is

    biga

    guilihan

    kilo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    223/490

    The Filipino term for concrete beam is

    biga

    guilihan

    kilo

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    224/490

    Instrument or tool capable of vertical and horizontal line check iscalled

    plumb bob

    spirit level

    try square

    caliper

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    225/490

    Instrument or tool capable of vertical and horizontal line check iscalled

    plumb bob

    spirit level

    try square

    caliper

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    226/490

    The vertical and horizontal surface is reinforced concrete whereconcreting was stopped and continued later is called

    expansion joint

    control joint

    cold joint

    construction joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    227/490

    The vertical and horizontal surface is reinforced concrete whereconcreting was stopped and continued later is called

    expansion joint

    control joint

    cold joint

    construction joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    228/490

    A twisting force is

    shear

    bending

    moment

    torsion

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    229/490

    A twisting force is

    shear

    bending

    moment

    torsion

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    230/490

    A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

    alcove

    chase

    ductworks

    pipeline

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    231/490

    A continuous recess built into a wall to receive pipes, ducts, etc. iscalled

    alcove

    chase

    ductworks

    pipeline

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    232/490

    It is a special type of plate girder consisting of tees, angles andmultiple web

    box girder

    hybrid girder

    T-flange girder

    bridging

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    233/490

    It is a special type of plate girder consisting of tees, angles andmultiple web

    box girder

    hybrid girder

    T-flange girder

    bridging

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    234/490

    When the ratio of short span to the long span of a slab is less than0.50, slab is a

    one-way slab

    slab on fill

    two-way slab

    cantilever slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    235/490

    When the ratio of short span to the long span of a slab is less than0.50, slab is a

    one-way slab

    slab on fill

    two-way slab

    cantilever slab

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    236/490

    Longitudinal beams which rest on the top chord and preferably atthe joints of the truss

    purlins

    jack rafter

    rafters

    girders

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    237/490

    Longitudinal beams which rest on the top chord and preferably atthe joints of the truss

    purlins

    jack rafter

    rafters

    girders

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    238/490

    A three-dimensional structural system without bearing wallscomposed of interconnected laterally supported so as to function as

    a complete self-contained unit with or without the aids of horizontal

    diaphragms or floor-bracing system

    box system

    space frame

    freeform

    braced frame

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    239/490

    A three-dimensional structural system without bearing wallscomposed of interconnected laterally supported so as to function as

    a complete self-contained unit with or without the aids of horizontal

    diaphragms or floor-bracing system

    box system

    space frame

    freeform

    braced frame

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    240/490

    Concrete slab should have a minimum clearance of

    20 mm

    40 mm

    15 mm

    30 mm

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    241/490

    Concrete slab should have a minimum clearance of

    20 mm

    40 mm

    15 mm

    30 mm

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    242/490

    It is designed to resist lateral forces parallel to the plane of the wall

    bearing wall

    curtain wall

    grade wall

    shear wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    243/490

    It is designed to resist lateral forces parallel to the plane of the wall

    bearing wall

    curtain wall

    grade wall

    shear wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    244/490

    The section of which the moment changes from positive to negativeis called

    neutral axis

    inflection point

    section of zero shear

    maximum moment

    Th i f hi h h h f i i i

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    245/490

    The section of which the moment changes from positive to negativeis called

    neutral axis

    inflection point

    section of zero shear

    maximum moment

    What is the appropriate painting material type for wood surfaces?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    246/490

    zinc chromate

    alkyd

    latex

    polyurethane

    What is the appropriate painting material type for wood surfaces?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    247/490

    zinc chromate

    alkyd

    latex

    polyurethane

    Commercially made corrugated G.I. sheets, of gauge 26, having

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    248/490

    standard corrugation are coated both sides with

    aluminum coating

    laminations

    paints

    pure virgin spoiter

    Commercially made corrugated G.I. sheets, of gauge 26, having

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    249/490

    standard corrugation are coated both sides with

    aluminum coating

    laminations

    paints

    pure virgin spoiter

    Wood flooring finishing material

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    250/490

    7 & 6 wood planks

    V cut wood planks

    gypsum board

    ply board panel

    Wood flooring finishing material

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    251/490

    7 & 6 wood planks

    V cut wood planks

    gypsum board

    ply board panel

    What hardware/material is needed to fasten an asphalt strip roof

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    252/490

    shingle on wooden sheets/planks?

    CV nail

    staple wire

    tekscrew

    fin nail

    What hardware/material is needed to fasten an asphalt strip roof

    hi l d h t / l k ?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    253/490

    shingle on wooden sheets/planks?

    CV nail

    staple wire

    tekscrew

    fin nail

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    254/490

    The time required for the removal of a form works of a concrete

    f ti

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    255/490

    footing

    24 hours

    36 hours

    48 hours

    12 hours

    Identify which figure is a dado wood joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    256/490

    Identify which figure is a dado wood joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    257/490

    Identify which figure is flemish (double stretcher) brickwork

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    258/490

    Identify which figure is flemish (double stretcher) brickwork

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    259/490

    Wall partition wooden framing is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    260/490

    joist

    jambs

    studs

    nailers

    Wall partition wooden framing is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    261/490

    joist

    jambs

    studs

    nailers

    How many corrugation is required as the minimum side lap of an

    ordinary standard G I sheet roofing?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    262/490

    ordinary standard G.I. sheet roofing?

    1

    2

    2

    1

    How many corrugation is required as the minimum side lap of an

    ordinary standard G I sheet roofing?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    263/490

    ordinary standard G.I. sheet roofing?

    1

    2

    2

    1

    Identify which letter in the target is a valley jack rafter?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    264/490

    Identify which letter in the target is a valley jack rafter?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    265/490

    What is the appropriate paint material for G.I. sheet roofing?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    266/490

    alkyd type

    acrylic latex type

    lacquer type

    urethane

    What is the appropriate paint material for G.I. sheet roofing?

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    267/490

    alkyd type

    acrylic latex type

    lacquer type

    urethane

    Identify which figure is a dado wood joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    268/490

    Identify which figure is a dado wood joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    269/490

    The paint finishing material of long-span pre-painted roofing sheet

    is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    270/490

    is

    acrylic paintduco paint

    polyester paint

    automotive paint

    The paint finishing material of long-span pre-painted roofing sheet

    is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    271/490

    is

    acrylic paintduco paint

    polyester paint

    automotive paint

    What hardware/material is needed to fasten corrugated asbestos

    cement roofing sheet on a steel purlin

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    272/490

    cement roofing sheet on a steel purlin

    metal screwL hook bolt

    m bolt

    aluminum screw

    What hardware/material is needed to fasten corrugated asbestos

    cement roofing sheet on a steel purlin

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    273/490

    cement roofing sheet on a steel purlin

    metal screwL hook bolt

    m bolt

    aluminum screw

    A common paint film defect where progressive powdering from the

    surface inward occurs. It is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    274/490

    blisteringpeeling

    chalking

    alligatoring

    A common paint film defect where progressive powdering from the

    surface inward occurs. It is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    275/490

    blisteringpeeling

    chalking

    alligatoring

    Identify which figure is a blind and sub-mortise and tenon joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    276/490

    Identify which figure is a blind and sub-mortise and tenon joint

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    277/490

    A joint where two successive placement of concrete meet is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    278/490

    truss jointcontraction joint

    construction joint

    expansion joint

    A joint where two successive placement of concrete meet is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    279/490

    truss jointcontraction joint

    construction joint

    expansion joint

    A wall which supports vertical loads in addition to its weight without

    the benefit of a complete vertical load carrying space frame is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    280/490

    p y g pcalled

    retaining wallcurtain wall

    shearing wall

    bearing wall

    A wall which supports vertical loads in addition to its weight without

    the benefit of a complete vertical load carrying space frame is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    281/490

    called

    retaining wallcurtain wall

    shearing wall

    bearing wall

    A type of concrete floor which has no beam is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    282/490

    flat slab2-way slab

    one way slab

    ribbed floor

    A type of concrete floor which has no beam is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    283/490

    flat slab2-way slab

    one way slab

    ribbed floor

    A one-way concrete slab are used when

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    284/490

    the slab is being supported by two parallel beamsthe slab has no cantilevered portion

    the concrete slab is reinforced on the near bottom side

    the concrete slab is sloping to all side

    A one-way concrete slab are used when

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    285/490

    the slab is being supported by two parallel beamsthe slab has no cantilevered portion

    the concrete slab is reinforced on the near bottom side

    the concrete slab is sloping to all side

    Level tool is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    286/490

    tool used for guiding and testing the work to a vertical and horizontal positiona tool for checking height elevation

    tool used to check the water level

    the tool designated the different ranking of tool usage

    Level tool is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    287/490

    tool used for guiding and testing the work to a vertical and horizontalposition

    a tool for checking height elevation

    tool used to check the water level

    the tool designated the different ranking of tool usage

    Steel square is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    288/490

    a small try squaretool for testing and for framing work

    a steel square for use of signage

    tool of the steel man

    Steel square is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    289/490

    a small try squaretool for testing and for framing work

    a steel square for use of signage

    tool of the steel man

    The vertical surface on face of a stair step is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    290/490

    stair clipstair head

    nosing

    riser

    The vertical surface on face of a stair step is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    291/490

    stair clipstair head

    nosing

    riser

    Tin shear is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    292/490

    painter toolmasonry tool

    tinsmithry tool

    electrical tool

    Tin shear is a

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    293/490

    painter toolmasonrytool

    tinsmithry tool

    electrical tool

    Auger bit is part of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    294/490

    fastener toolguiding testing tool

    bearing tool

    rough facing tool

    Auger bit is part of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    295/490

    fastener toolguiding testing tool

    bearing tool

    rough facing tool

    The complete records of test conduction (slump, compression test,

    etc.) shall be preserved and made available for inspection duringthe progress of construction and after completion of the projects for

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    296/490

    the progress of construction and after completion of the projects for

    a period of not less than

    5 years3 years

    4 years

    2 years

    The complete records of test conduction (slump, compression test,

    etc.) shall be preserved and made available for inspection duringthe progress of construction and after completion of the projects for

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    297/490

    the progress of construction and after completion of the projects for

    a period of not less than

    5 years3 years

    4 years

    2 years

    Wood board should have a thickness specification of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    298/490

    not less than 2 thick x 5 and up widenot less than 1 thick x 4 and up wide

    not less than 2 thick x 4 and up wide

    not less than 3 thick x 7 and up wide

    Wood board should have a thickness specification of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    299/490

    not less than 2 thick x 5 and up widenot less than 1 thick x 4 and up wide

    not less than 2 thick x 4 and up wide

    not less than 3 thick x 7 and up wide

    Wood plank is a piece of lumber that is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    300/490

    2 to 5 thick6 to 8 thick

    5 to 7 thick

    8 up thick

    Wood plank is a piece of lumber that is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    301/490

    2 to 5 thick6 to 8 thick

    5 to 7 thick

    8 up thick

    The distance from the first to the last riser of a stair flight is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    302/490

    spandrelpitch

    run

    rise

    The distance from the first to the last riser of a stair flight is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    303/490

    spandrelpitch

    run

    rise

    A high-speed rotary shaping hand power tool used to make smooth

    cutting and curving on solid wood is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    304/490

    surface plannerdado place

    portable hand router

    lathe machine

    A high-speed rotary shaping hand power tool used to make smooth

    cutting and curving on solid wood is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    305/490

    surface plannerdado place

    portable hand router

    lathe machine

    The major horizontal supporting member of the floor system is

    called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    306/490

    raftergirder

    purlin

    girt

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    307/490

    Wood defects are heart shake, cup shake, star shake and

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    308/490

    knotsdiscoloration

    deterioration

    rotten

    Wood defects are heart shake, cup shake, star shake and

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    309/490

    knotsdiscoloration

    deterioration

    rotten

    Dressed lumber is referred to

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    310/490

    covered with plastic for shipmentlumber of exact measurement

    smoothed or planed lumber

    lumber used for fine carpentry works

    Dressed lumber is referred to

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    311/490

    covered with plastic for shipmentlumber of exact measurement

    smoothed or planed lumber

    lumber used for fine carpentry works

    The other kind of handsaw other than rip-cut saw is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    312/490

    diagonal cut sawcross-cut

    circular saw

    coping saw

    The other kind of handsaw other than rip-cut saw is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    313/490

    diagonal cut sawcross-cut

    circular saw

    coping saw

    Walls that support weight from above as well as their own dead

    weight

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    314/490

    load bearing wallscurtain walls

    shoring walls

    none of the above

    Walls that support weight from above as well as their own dead

    weight

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    315/490

    load bearing wallscurtain walls

    shoring walls

    none of the above

    It refers to the occupancy load which either partially or fully in place

    or may not be present at all is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    316/490

    live loaddead load

    concentrated load

    distributed load

    It refers to the occupancy load which either partially or fully in place

    or may not be present at all is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    317/490

    live loaddead load

    concentrated load

    distributed load

    The distance between inflection point in the column when it breaks

    is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    318/490

    development lengthcross sectional area

    effective length

    equivalent distance

    The distance between inflection point in the column when it breaks

    is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    319/490

    development lengthcross sectional area

    effective length

    equivalent distance

    The amount of space measured in cubic units

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    320/490

    none of theseperimeter

    volume

    area

    The amount of space measured in cubic units

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    321/490

    none of theseperimeter

    volume

    area

    An expansion joints adjacent parts of a structure to permit expected

    movements between them is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    322/490

    contraction jointtruss joint

    construction joint

    conduction joint

    An expansion joints adjacent parts of a structure to permit expected

    movements between them is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    323/490

    contraction jointtruss joint

    construction joint

    conduction joint

    To find the volume of water in a cylindrical tank, multiply the area of

    its base by its

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    324/490

    diameterradius

    height

    none of these

    To find the volume of water in a cylindrical tank, multiply the area of

    its base by its

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    325/490

    diameterradius

    height

    none of these

    The most important component to determine the strength of a

    concrete mix is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    326/490

    cementsand

    gravel

    lime

    The most important component to determine the strength of a

    concrete mix is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    327/490

    cementsand

    gravel

    lime

    A beam that projects beyond one or both its support is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    328/490

    overhanging beamcontinuous beam

    intermediate beam

    cantilever beam

    A beam that projects beyond one or both its support is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    329/490

    overhanging beamcontinuous beam

    intermediate beam

    cantilever beam

    Jack rafter is used for

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    330/490

    hip roof supportlong span beam

    cantilevered truss

    none of these

    Jack rafter is used for

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    331/490

    hip roof supportlong span beam

    cantilevered truss

    none of these

    The total of all the tread widths in a stair is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    332/490

    total risertotal run

    winder

    none of these

    The total of all the tread widths in a stair is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    333/490

    total risertotal run

    winder

    none of these

    The face or front elevation of a building

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    334/490

    facadefront view

    face plate

    frontal approach

    The face or front elevation of a building

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    335/490

    facadefront view

    face plate

    frontal approach

    A pit in a basement floor made to collect water into which a pump is

    placed to pump the liquid to the sewer pipe

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    336/490

    sumpdrain hole

    slump

    none of these

    A pit in a basement floor made to collect water into which a pump is

    placed to pump the liquid to the sewer pipe

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    337/490

    sumpdrain hole

    slump

    none of these

    Prefabrication refers to

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    338/490

    design of a factorypre-construction of components as a part of a whole

    a system of material audit

    preliminary building procedure

    Prefabrication refers to

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    339/490

    design of a factorypre-construction of components as a part of a whole

    a system of material audit

    preliminary building procedure

    An opening in the roof for admitting light is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    340/490

    natural lightingocules lighting

    none of these

    skylight

    An opening in the roof for admitting light is called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    341/490

    natural lightingocules lighting

    none of these

    skylight

    Wood coming out from trees with needle leaves, rather than broad

    leaves are called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    342/490

    ironwoodmahogany

    softwood

    hardwood

    Wood coming out from trees with needle leaves, rather than broad

    leaves are called

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    343/490

    ironwoodmahogany

    softwood

    hardwood

    A kind of brick used for high temperature

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    344/490

    fly-ash brickthermal brick

    firebrick

    cinder block

    A kind of brick used for high temperature

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    345/490

    fly-ash brickthermal brick

    firebrick

    cinder block

    The building frame construction system that uses one piece

    structural stud from the foundation to the roof

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    346/490

    balloon framinglath framing

    wall framing

    upright framing

    The building frame construction system that uses one piece

    structural stud from the foundation to the roof

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    347/490

    balloon framinglath framing

    wall framing

    upright framing

    A nailer strip incorporated in rough concrete wall to be plastered to

    act as guide and support for finish trim around openings and nearthe base of the wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    348/490

    none of theseplaster ground

    gravel stop

    trimming guard

    A nailer strip incorporated in rough concrete wall to be plastered to

    act as guide and support for finish trim around openings and nearthe base of the wall

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    349/490

    none of theseplaster ground

    gravel stop

    trimming guard

    The distance between two structural supports

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    350/490

    overall distancebay

    span

    none of these

    The distance between two structural supports

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    351/490

    overall distancebay

    span

    none of these

    The scientific name for wood is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    352/490

    CITEMXYLEM

    APTG

    TANG

    The scientific name for wood is

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    353/490

    CITEMXYLEM

    APTG

    TANG

    In designing a stair, to find the height of the riser, divide the height

    of the stair by the number of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    354/490

    newel postrisers

    balustrade

    balusters

    In designing a stair, to find the height of the riser, divide the height

    of the stair by the number of

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    355/490

    newel postrisers

    balustrade

    balusters

    A kind of roof that has four sloping sides

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    356/490

    gable roofmansard roof

    hip roof

    lean to

    A kind of roof that has four sloping sides

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    357/490

    gable roof

    mansard roof

    hip roof

    lean to

    Stone placed on a slope to prevent erosion

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    358/490

    rip-rap

    embankment

    flag stone

    border stone

    Stone placed on a slope to prevent erosion

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    359/490

    rip-rap

    embankment

    flag stone

    border stone

    A tough used for carrying off water

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    360/490

    gutter

    none of these

    moat

    valley duet

    A tough used for carrying off water

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    361/490

    gutter

    none of these

    moat

    valley duet

    The process of removing concrete forms from the cured concrete

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    362/490

    stripping

    clearing

    none of these

    deforming works

    The process of removing concrete forms from the cured concrete

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    363/490

    stripping

    clearing

    none of these

    deforming works

    A structural member spanning from truss-to-truss or supporting

    rafters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    364/490

    floor joist

    purlin

    girts

    girder

    A structural member spanning from truss-to-truss or supporting

    rafters

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    365/490

    floor joist

    purlin

    girts

    girder

    A threaded steel bent inserted of masonry construction for securing

    wood or metal plates to concrete construction

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    366/490

    anchor bolt

    U-bolt

    gusset plate

    strut

    A threaded steel bent inserted of masonry construction for securing

    wood or metal plates to concrete construction

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    367/490

    anchor bolt

    U-bolt

    gusset plate

    strut

    A horizontal piece of wood, stone, steel or concrete across the top

    of door or window opening to bear the weight of the walls above theopening

  • 8/11/2019 8843026 Building Technology Reviewer Qa (1)

    368/490

    none of these

    lintel

    transome beam

    transverse rafter

    A horizontal piece of wood, stone, steel or concrete across the top

    of door or window