813p, 833p applicator quick setup guide · • pull scv ii backward to fold flip wings up into...
TRANSCRIPT
-
1-30-2020 Page 1 o f 3
813P, 833P APPLICATOR QUICK SETUP GUIDERefer to Operators Manual for Complete Setup Instructions
Set Up Tractor Hydraulics - All MachinesImportant: Check hydraulic oil level. Fill if necessary. Set SCV flow rates and detent times as shown in table.
SCV Function Flow Detent TimeI Main Lift Wing Kick 5 ContinuousII Main Fold 12 ContinuousIII
Pump 8Continuous
IVFlip Fold 5
Continuous
Unfolding the Toolbar -- from Transport Position to Field Position• Push SCV I forward to lower the main wing.• Push SCV II forward to unfold main wings down from transport to field position.• This remote must be left in the FLOAT position during field application to allow the main wings to flex up
and down. Not the centered (neutral) position.• Push SCV III forward to unfold flip wings down into field position.
Folding the Toolbar -- from Field Position into Transport Position• Pull rearward on SCV I to raise the main wing.• Pull SCV II backward to fold flip wings up into transport position.• Push SCV III all the way forward into FLOAT mode to fold the main wings up into transport position.
https://www.youtube.com/watch?v=YCYqRj-eGlA
-
1-30- 2020 Page 2 o f 3
Adjust Center Section Height• Place machine on level surface in field• Unfold toolbar and lower until coulter blades are 2-4” in the
ground• Install required number of depth stops (A) on main lift
cylinders to set the center section to desired depth• While applying fertilizer, operate SCV I in continuous down
mode. This will keep the center section against the depthstops and supply oil to the down pressure valve(s)
Adjust Gauge Wheel Height• With center section height set, adjust the inner and outer gauge
wheels so that the coulter blades are 2-4” in the ground• Adjust gauge wheel (B) by removing spring clip (D) and retaining
pin (C) and moving the gauge wheel up or down• Reinstall pin and retaining clip
Set Toolbar Main Wing and Flip Wing Down-Pressure (If Equipped)Important: Toolbar down pressure should read between 700 - 1000 psi but can be adjusted from 0 - 1500psi. Down pressure should not exceed 1500 psi. Do not use more down-pressure than necessary or excessive wear and damage to machine could result.
• Adjust down-pressure to initial setting by turning the socket • head screw on the down pressure valve. Tighten to increase
pressure, loosen to decrease pressure.• Once set, lock screw in position with jam nut.• Make a trial pass in field. If coulter to ground engagement is
not satisfactory, adjust hydraulic pressure as needed• If equipped, use Flip Wing down pressure valve in the same manner to adjust Flip Wing down
pressure.
Product Plumbing Setup and Calibration• Refer to Operators Manual for complete product plumbing setup, calibration, and servicing.
-
813P
AN
D 8
33P
DO
UB
LE
BA
R T
RA
CT
OR
RE
MO
TE
FU
NC
TIO
NS
Qui
ck R
efer
ence
She
et
TR
AC
TO
R R
EM
OT
E #
1
TR
AC
TO
R R
EM
OT
E #
2
TR
AC
TO
R R
EM
OT
E #
3
1)Lo
wer
s the
mai
n w
ing
kick
func
tion
1)U
nfol
ds m
ain
win
gs d
own
from
trans
port
to fi
eld
posi
tion
2)Th
is re
mot
e m
ust b
e le
ft in
the
float
posi
tion
durin
g fie
ld a
pplic
atio
n to
allo
w th
e m
ain
win
gs to
flex
up
and
dow
n. N
ot th
e ce
nter
ed (n
eutra
l)po
sitio
n.1)
Unf
olds
flip
win
gs d
own
into
field
pos
ition
1)K
icks
the
mai
n w
ings
up
1)Fo
lds m
ain
win
gs u
p in
totra
nspo
rt po
sitio
n1)
Fold
s flip
s win
gs u
p in
totra
nspo
rt po
sitio
n
1-30- 2020 Page 3 o f 3
Slide Number 1Slide Number 2