Page 1: 8 Test Features and Diagnostic

02/2007 1

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Power Transmission and DistributionCommunication in Substations with IEC 61850Commissioning & DiagnosticsMarkus Spangler, Siemens AG, PTD EA 13

Page 2: 8 Test Features and Diagnostic

05/2007 2

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Recommended Commissioning and Diagnostic Tools

1.) Networkview to visualize all participants in the network

2.) WEB Monitor to have access to commissioning aids supportedby SIPROTEC-devices

3.) IEC Browser to communicate, based on MMS communication, between client and server

4.) TFTP to get or load the configuration file of the switch

5.) EN100 homepage shows commisioning data, error data and statisticdata as well

6.) module infodisplay shows module parameter

7.) SNMP8) Ethereal9.) Kema Analyzer/Observer10.) PING11.) Firmware update

Page 3: 8 Test Features and Diagnostic

05/2007 3

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

1.) Networkview www.networkview.com

Start\Programs\networkview

The program identifies all IP-addressesConfigurations can be saved and printed outDirect access to all participants with right mouse-click via telnet or http

Page 4: 8 Test Features and Diagnostic

05/2007 4

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

1.) Networkview www.networkview.com

License:

The program can be run without any license (old version V 2.03)

There will be some hints that you are using an unregistered version

If you have a registered license, the key must be copied in installation-roote.g. C:\program files\networkview\

Page 5: 8 Test Features and Diagnostic

05/2007 5

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

1.) Networkview www.networkview.com

Creating a new file

File => NewSelection of the IP-address range

Remove the hooks forquick processing

Page 6: 8 Test Features and Diagnostic

05/2007 6

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

The Online Mode

Edit => Monitor Nodes ( adjust the scanning cycle for the polling of all devices)

The recommended polling cycle (10 s ) depends on the no. of devices. Theshorter the polling time the higher the network data flow, i.e. if you have200 devices you should set the polling time to 60-120 seconds. The default timeout shouldn‘t be changed

Page 7: 8 Test Features and Diagnostic

05/2007 7

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

The Online Mode

Page 8: 8 Test Features and Diagnostic

05/2007 8

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

The Online Mode / Recommendation for a fast switchdiagnosis

Page 9: 8 Test Features and Diagnostic

05/2007 9

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Expanding an existing Configuration

This can be done only in offline mode:

Edit => Add node ( insert address or range of addresses for the new devices)

Page 10: 8 Test Features and Diagnostic

05/2007 10

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

2.) Web Monitor of SIPROTEC (directly or withnetworkview)

Page 11: 8 Test Features and Diagnostic

05/2007 11

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser

Start => Programs => IEC_Browser => IEC_Browser.exe

Files => Fault Records

Description of the switchgear with 5 logical devices:CTRL ControlDR Disturbance RecorderEXT extendedMEAS MeasurementPROT Protection

Page 12: 8 Test Features and Diagnostic

05/2007 12

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser

GGIO = user defined indicationsLLN0 = common indication of logical nodeLPHD = common indication of logical node

physical deviceCILO = Control interlockingsCSWI = Control SwitchesXCBR = class switching devices X; CBR=Q0

Page 13: 8 Test Features and Diagnostic

05/2007 13

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser

CF = Configuration CO = ControlDC = DescriptionEX = Extended definitionRP = Unbuffered reportST = Status information

FC=FunctionalConstraint

Page 14: 8 Test Features and Diagnostic

05/2007 14

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser (Feedback DPI of Q1)

01 = OFF

Page 15: 8 Test Features and Diagnostic

05/2007 15

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser (Actualizing the information)

Attention:Please check the correct time stamp of all indications.Only that information is valid and actual whichis allocated in DIGSI to system interface IEC61850

Page 16: 8 Test Features and Diagnostic

05/2007 16

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

3.) IEC Browser (Get fault records)

Page 17: 8 Test Features and Diagnostic

05/2007 17

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

4.) TFTP Trivial File Transfer Program

to get the configuration file of the switch

To get the file:tftp 192.168.1.21 get config.csv c:\temp\config.csv

IP-Address Destination Folder

Editing the config.csvwe recommend Excel or notepad

For diagnosis (syslog.txt and crashlog.txt):i.e. tftp 192.168.1.21 get syslog.txt c:\temp\syslog.txt

IP-Address Destination Folder

Page 18: 8 Test Features and Diagnostic

05/2007 18

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

4.) TFTP Trivial File Transfer Program

to load the configuration file to the switch

Attention:In the switch (IP Services) the tftp-access must beEnabled

To load the file:tftp 192.168.1.21 put c:\temp\config.csv config.csv

IP-Address Source Folder

Editing the config.csvwe recommend thenotepad-program

For diagnosis (syslog.txt and crashlog.txt):i.e. tftp 192.168.1.21 get syslog.txt c:\temp\syslog.txt

IP-Address Destination Folder

Page 19: 8 Test Features and Diagnostic

05/2007 19

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

5.) EN100 module homepage

e.g. 192.168.1.99/home

Page 20: 8 Test Features and Diagnostic

05/2007 20

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

module-homepage – Error Buffer

Page 21: 8 Test Features and Diagnostic

05/2007 21

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

EN100-Homepage – FEC-Statistics

Page 22: 8 Test Features and Diagnostic

05/2007 22

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

FEC-Statistics

RSTP-Role Chan1/2 = Alternate/RootIf theSIPROTEC 4 devices are arranged in a ring, and the ring is closed

and connected to the external switches which are also on, one device on the FEC side must always display the above text. If none of the devices in the ring does, the ring is physically broken.FilterSymErrCntChan1/2 = 0/2753

If these two counters are incremented during stable operation of thedevice, and with neither of the two adjacent devices turned off, there is a poor FO connection. This can be due to an excessive attenuation by thecoupling devices, or to a defective cable.FNS queue overflow = 0If this display is not equal zero, this suggests that there are circulatingbroadcast telegrams.Frames Loss = 0A value that is not zero indicates circulating multicast telegrams.

Page 23: 8 Test Features and Diagnostic

05/2007 23

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Module-Homepage – Dump

Page 24: 8 Test Features and Diagnostic

05/2007 24

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Modul-Homepage – Print Buffer

Page 25: 8 Test Features and Diagnostic

05/2007 25

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Modul-Homepage – Print Buffer

All shown pages can be saved with the used Internet Browser as a HTMLfile (e.g. for troubleshooting in case of failures)

Page 26: 8 Test Features and Diagnostic

05/2007 26

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

6. Diagnostic – module informationpage

Menu ->Test/Diagnostic -> moduleinfos -> Port B

line 1 to 7 (network configuration)same for EN100 optical and electric7 Phy1 100 MBit Full-Duplex (electr. EN100)

Zeilen 8-10 (status of interface)Zeilen 12 bis 21 (Parameter optical interface)

see EN100 manual chapter 7.3 foradditional information

Page 27: 8 Test Features and Diagnostic

05/2007 27

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

7. SNMP

possible with FW >= 3

SNMP:Simple Network Management Protocol

for displaying use a mib browser,e.g. iReasoning(www.ireasoning.com)

necessary file: SipEthernet.mibMIB, ManagementInformation Basedownload under www.siprotec.com

RSTP

link Status

IP-address

Page 28: 8 Test Features and Diagnostic

05/2007 28

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

8. Ethereal

Read the Ethernetframes on the bus

for investigating detailed ethernet knowledge is necessary

Ethereal with GOOSE-Filter available

Freeware

Page 29: 8 Test Features and Diagnostic

05/2007 29

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

8. Ethereal

Page 30: 8 Test Features and Diagnostic

05/2007 30

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

8. Ethereal

12

6

4

5

7

8

3

9

10

Page 31: 8 Test Features and Diagnostic

05/2007 31

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

2

1

3

45 6

7

sending device

10

Page 32: 8 Test Features and Diagnostic

05/2007 32

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

receiving device

1

9

3

4

8

6 7

1

10

Page 33: 8 Test Features and Diagnostic

05/2007 33

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

System configurator – „properties“

45

Page 34: 8 Test Features and Diagnostic

05/2007 34

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

9.) KEMA Observer/Analyzer

Read the Ethernetframes on the bus

A frame will be viewed in one line (Observer)

the captured file can be investigated with the analyzer by ourdevelopment

The Observer ist Freeware, the Analyzer costs more than 4.000,- EUR.

Page 35: 8 Test Features and Diagnostic

05/2007 35

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

KEMA UNICA Observer

Page 36: 8 Test Features and Diagnostic

05/2007 36

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

KEMA UNICA Analyzer

Page 37: 8 Test Features and Diagnostic

05/2007 37

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

10.) PING

multiple transmission of ICPM Echo Requests

Page 38: 8 Test Features and Diagnostic

05/2007 38

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Firmware update – EN100 module

1.) download the firmware of the relevant device under www.siprotec.com.2.) the update will be done via Siprotec Firmware-update tool3.) if updating an existing optical EN100 module with FW <= 3.04, an update of theBootfirmware to V01.02.04 has to be done first

Page 39: 8 Test Features and Diagnostic

05/2007 39

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Firmware update – Ruggedcom switches

1.) download updatetool and firmware under www.ruggedcom.com2.) insert the IP-addresses of the relevant switches or import from an existing table3.) insert Admin-Passwort4.) choose the firmware-file (.bin), start upload (if uploading a config-file (.csv), just one IP-address possible)

Page 40: 8 Test Features and Diagnostic

05/2007 40

Power Transmission and Distribution

Power AutomationProgress. It‘s that simple.

Backup the configuration – Ruggedcom switches

1.) in section „Download“ tag thedata for backup2.) select the destination folder

background:

Data backup and recoverytroubleshooting