Page 1: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

8 October 2019 A presentation by: Andrew Demetriou

Page 2: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

The EuroAsia InterconnectorAn Overview

Andrew DemetriouLLB (Hons.), Barrister at Law, FCI. Arb. Chartered Arbitrator,

Accredited Mediator, Registered Trusts and Estates PractitionerDirector Ioannides Demetriou LLC

Page 3: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

• Legal Background relating to Submarine Cables within the Cyprus EEZ – Application Process

• The Project Specification• An Energy Highway – Project Objectives• Project Timeline• The Construction Process• Overview of Construction Specifics

Page 4: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Legal Background relating to Submarine Cables within the Cyprus EEZ

• Exclusive Economic Zone and the Continental Shelf Law (64(Ι)/2004)• license requirement

• Submarine Cables Regulations of 2014 (578/2014)• regulation of licensing procedure

Page 5: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Application

• submitted to competent authority Minister of Transport, Communications and Works

• reviewed by the Submarine Cables Committee

Page 6: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

SUBMARINE CABLES COMMITTEE

Ministry of DefenceMinistry of Labour, Welfare and Social

Insurance

Ministry of Energy, Commerce, Industry and

Tourism

Ministry of Agriculture, Rural Development and Environment

Ministry of Transport, Communications and

Works

Coordinator:Department of Electrical and Mechanical Services

Page 7: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Consultation on proposed route to ensure:• operation and capacity to repair existing cables/pipelines/other

installations;• safety of navigation;• carrying out of scheduled maritime works;• exploration and exploitation of natural resources;• conservation of natural resources;• protection of marine environment and underwater cultural heritage; • protection of national security/public interest.

Page 8: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister
Page 9: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Project Specification

electricity interconnection between the grids of Israel, Cyprus and Crete-Attica, Greece (Europe) through a sub-sea DC cable and with HVDC with onshore converter stations at each connection point – four in total.with a total capacity of 2000MW

Page 10: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

An Energy Highway

The project is an energy highway bridging Asia and Europe, with a total length of 1518km.

It creates a reliable alternative route for the transfer of electricity to and from Europe.

Page 11: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

EuroAsiaInterconnector contributes to

following energy objectives:

• end of Energy Isolation of Cyprus

• creation of electricity highway: Israel-Cyprus-Crete-Attica,

Greece (Europe)

• security of the energy supply of Greece, Cyprus and Israel

• contribution to security of EU energy supply

• promotion of substantial development of Renewable Energy

Sources

• contribution to reduction of CO2 emissions

• economic and geopolitical benefits to the three countries

• contribution to the EU target for 10% of electricity

interconnection between Member States

Page 12: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Project Timeline

January 2012 Project AnnouncementMarch 2012 Endorsement from IsraelOctober 2014 European Energy Commission includes Project in

Infrastructure Funding ListJuly 2016 Government of Cyprus Accepts NotificationFebruary 2017 FEED Commenced

Page 13: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Project Timeline [cont.]

December 2017 Cyprus Government ApprovalMarch 2019 Joint Governmental Declaration of USA, Israel,

Greece and CyprusClouds from Greece on the Horizon

June 2019 Land Concession Agreed EU Funding Application Submitted

July 2019 Tender Preparation

Page 14: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

The Construction Process

• EuroAsia Interconnector VSC-HVDC Converter Stations• EuroAsia Interconnector HVDC Submarine Cables and Land Cables for

Link 1: Israel – Cyprus• EuroAsia Interconnector HVDC Submarine Cables and Land Cables for

Link 2: Cyprus-Crete• EuroAsia Interconnector HVDC Submarine Cables and Land Cables for

Link 3: Crete-Attica

Page 15: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister
Page 16: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Construction Specifics

• construction of cable and related facilities in three phases (Cyprus-Israel, Crete-Attica, Cyprus-Crete)

• influenced by weather conditions and seasonal restrictions• actual construction activity expected to last between 12 and 24 months• land used will be reinstated to original condition, sub-sea routes

determined to avoid significant natural formations and geological obstacles

Page 17: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Construction Specifics [cont.]

• provision made in design to co-operate with other sub-sea operators (pipelines, cables, fibre-optics)

• interconnector cable buried at least two metres beneath ground, i.e. invisible for entire route

• only facilities such as the interconnector converter stations will be above ground; interconnector cable and all facilities designed / constructed to have minimum environmental impact

Page 18: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister
Page 19: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

THANK YOU!

Page 20: 8 October 2019 A presentation by: Andrew Demetriou · 8 October 2019 A presentation by: Andrew Demetriou. The EuroAsia Interconnector An Overview Andrew Demetriou LLB (Hons.), Barrister

Andrew DemetriouDirectorIOANNIDES DEMETRIOU LLC