7.3 ROADS AND BRIDGES
OBJECTIVES: The objectives of Roads and Bridges sector in the Annual Plan
2016-17 are as follows:
Widening and improvement on State highways and major district roads by providing
hot mix carpet.
Construction of bye-pass for towns to reduce congestion and accidents.
Construction of bridges/missing links for the economic upliftment of rural areas and
reduction in traveling distances.
Construction, widening and improvement of rural roads.
PROPOSALS: The following are the proposals of Roads and Bridges sector in the
Annual Plan 2016-17:
Surface improvement of existing State highways.
Construction, black topping, widening and improvement of major district and main
roads.
Construction/completion of major bridges.
Improvement of roads of touristic importance.
SCHEMES PROPOSED IN THE ANNUAL PLAN 2016-17:
1. BRIDGES:
A. BRIDGES COMPLETED DURING THE YEAR 2015-16: The following bridges
were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
1 XIII 1 Construction of parallel bridge at Arpora
Baga on MDR 10 in Calangute
Constituency.
558.01
XIII 2 Construction of double span (8.00 mts
each) RCC slab Culvert at Kudaswada in
V.P. Nagoa - Arpora under Calangute
Constituency.
61.62
XXIII 3 Construction of bridge at Ghodemol
Morlem in V.P.Morlem of Sattari Taluka in
Poriem constituency.
29.61
XXV 4 Construction of bridge at sulcorna over
river Kushavati in Quepem contituency
140.98
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in Annual Plan 2016-17 is as follows:
2
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
2 VI 1 Construction of Bridge connecting
Benaulim and Sinqetim including
approaches in Navelim Constituency,Goa
( Work is kept on hold due to Objection
from public)
1107.92
XIII 2 Re-construction of Tito bridge with double
psan (8.00 mts each) RCC slabs Culvert at
Tito junction in V.P. Anjuna - Caisua in
Siolim Constituency.
56.21
XVIII 3 Construction of two lane bridge connecting
Kharwada & Caranzalem village in
Panchayat Madkai in Madkai Constituency.
1132.08
XXIII 4 Const. of road from Gaonkarwada to the
house of Madhavi Vaze at Ambeli in V.P.
Khotodem in Valpoi Constituency.
27.52
XXIII 5 Const. of culvert Near Laximan Sawardekar
house at Maloli in V.P. Nagargao in Valpoi
Constituency.
12.99
XXIII 6 Construction of culvert along the State
highway no.1 with approaches at Supachi
pud , Harvalem in Sakhali constituency in
Bicholim Taluka
115.00
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW BRIDGES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new bridges are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
3 XIII 1 Re-construction of 6 mts., 3 span culvert at
Warkhand in V.P. Warkhand - Nagzar in
Pernem Constituency - Pernem Taluka.
265.66
XIII 2 Re-construction of Mini Bridge on
Junaswada - Ashve Bye Pass road in V.P.
Mandrem under Mandrem Constituency in
Pernem Taluka.
127.26
XVIII 4 Construction of high level road bridge
across river Mandovi between Savoiverem
& Cotambi including approaches in Goa.
2112.50
XVIII 5 Construction of 90mts long major bridge 797.00
3
across river Khandepar including
approaches Ambe-Dhullai in Sanvordem
Constituency.
XVIII 6 Construction of major bridge across river
Ragada including approaches at
Madhalawada Surla in Sanvordem
Constituency.
781.00
XVIII 7 Reconstruction of bridge at Palaskata
(Maisal) in V.P. Mollem in Sanvordem
constituency.
576.00
XVIII 8 Designing, Fabrication, Supplying &
Installation of new light weighed
Motorized bridge inspection trolley by
replacing the existing heavy, manually
operated trolley for Amona-Khandola
bridge at Khandola in Priol
Constituency in Ponda Taluka.
65.09
XXIII 9 Demolishing & Reconstruction of 2 spans
of 8.00m bridge on road VL26 at
Ch.0.200kms to Ch.0.216 kms in V.M.C.,
Valpoi, in Sattari Taluka.
246.92
XXIII 10 Const. of culvert at Shastri Devna at Ona in
V.P.Ona Maulinguem in Mayem
Constituency
53.20
XXIII 11 ReConstruction culvert at Paltadwada
Maulinguen in V.P.Ona Maulinguem
Kudchirem in Mayem Constituency in
Bicholim Taluka
23.82
XXIII 12 Construction of culvert between Tara
Nagar and Housing board colony along
with approach road at Harvalem in
Sankhali constituency
31.50
In addition to the above, there are various other new bridges proposed to be taken
up in the State, in the Annual Plan 2016-17. New bridges will be taken up as per the
priority and approval of the Government.
2. STATE HIGHWAYS :
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
4 VI 1 Improvement of the riding quality of the
stretch of State Highway No.5 from Arlem
junction to Raia ch.0 to ch.2000 in Salcete
471.23
4
Taluka
XVIII 2 Widening & strengthening of SH-7 from
Guddemol Junction to Sanvordem Tisk
from Ch.14.30Kms to 18.10 Kms in a
length of 3.80Kms in V.P. Sanvordem
in Sanvordem constituency.
667.34
XVIII 3 Improvement to riding surface of SH-6
from Sanguem Court to Uguem in a
length of 7.20Kms in Sanguem
Constituency. (Balance Work).
671.81
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
5 VI 1 Widening of state highway No.5 road
from existing 2 lane road to 4 lane road
from Arlem to Borim junction phase III
stretch from Ambora to Borim junction
ch 4490 to 6690.
739.07
VI 2 Construction of retaining wall along
State highway-5 near Ravindra Bhavan
Circle in Fatorda Constituency.
111.61
XIII 3 Providing hotmix carpet to road from Maruti
temple to Hotel Green Park for a length of
2.380m in Mapusa Const.
111.00
XVIII 4 Improvement to the accident prone vertical
curve on SH-7 at Kirlapalwada junction
at Ch.7Kms in V.P. Kirlapal-Dabal in
Sanvordem constituency.
194.24
XVIII 5 Re-construction of culvert on State
Highway-7 at Dharbandora in V.P.
Dharbandora in Sanvordem Constituency
of Dharbandora Taluka.
51.12
XVIII 6 Widening and strenghtening of road SH-7
from Savargal junction to Guddemol
junction from ch.10.30km to 14.30km.in
a length of 4.00km.in V.P.Kirlapal Dabal
in Sanvordem Constituency.
583.86
XVIII 7 Protection works providing drainage near
Pansamol junction on S.H.6, in V.P
Uguem, in Sanguem Constituency in
Sanguem Taluka
35.93
XVIII 8 Protective measures to S.H.6 near Uguem
mining by-pass junction in V.P Uguem,
33.12
5
in Sanguem Constituency in Sanguem
Taluka
XXIII 9 Imp. of road by widening and hotmixing of
SH3 from Ch. 0.00 to 6.10km from Honda to
Surla in Sankhali constituency
500.00
XXV 10 Construction of retaining wall on Curchorem
Chandor State Highway near GPS Hodar I
Curchorem Constituency.
34.73
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
6 VI 1 Widening & Providing hotmix carpet on
State Highway 8 from Chandor Cotta
bridge to Savio Hendric home in V.P.
Chandor in Cuncolim Constituency
265.96
XVIII 2 Hot mixing of four lane stretch of SH-3 at
Usgao in V.P.Usgaon Ganjem in Valpoi
Constituency in Ponda Taluka.
284.36
XVIII 3 Land acquisition for widening of S.H.7 from
Sanvordem Tisk to Dharbandora Junction
including by pass at Codli in Sanguem
Taluka.
596.85
XVIII 4 Providing hot mix carpet to the State
Highway from Ponda Tisk to Farmagudi
by-pass junction in Ponda Constituency
in Ponda Taluka
288.62
XXIII 5 Imp. of road by widening and hotmixing of
SH3 from Ch. 0.00 to 6.10km from Honda to
Surla in Sankhali constituency
350.00
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
3. MAJOR DISTRICT ROADS:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO
.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
6
7 II 1 Improvement of road connectivity for
Expo2014:- Improvement and resurfacing of
MDR1 between Old Goa to Pillar in
St.Andre constituency.
710.13
XIII 2 Improvement & hotmixing of MDR 15 from
Binani junction to Corporation Bank in
Tivim Constituency.
181.92
XIII 3 Improvement & hotmixing of road from
Ecoxim to Donwado and road leading to
Paithan in V.P. Salvador-do-Mundo in
Porvorim Constituency.
138.00
XVIII 4 Providing hot mix carpet on MDR-34 from
Valkini to Bhati in a length of 5.00Kms in
Sanguem Constituency.
286.77
XVIII 5 Improvement and Providing hot mix carpet
to the road from Banastari to Khandola in
Priol Constituency.
402.16
XVIII 6 Improvement of road by providing and
laying AC carpet four lane road from
Mahalwada to Navadurga Temple at
Madkai in Madkai V.P. in Madkai
Constituency.
227.92
XXIII 7 Improvement & hotmixinxg of road from
Ch.5680.00 on MDR.-26 (valpoi) to thane )
in Poriem Constituency
133.05
B. SPILLOVER WORKS OF THE YEAR2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
8 II 1 Improvement by widening and resurfacing of
road from NIO circle Dona Paula to GMC
Bambolim(MDR-3) in Tiswadi Taluka
4985.14 (Revised)
II 2 Widening and improvement of existing road
MDR 4 by providing 40mm thick AC carpet
starting from Merces junction to Patto
Ribandar including construction of side
drains in chimbel VP in Santa Cruz
Constituency.
241.76
VI 3 Improvement and widening of MDR
road including improvement of footpath
414.09
7
from Assolna to Velim in Velim
Constituency.
XIII 4 1) Urgent widening & providing hot mix
carpet on MDR-17 Pernem to Devsu
junction under Pernem Constituency.
323.50
XIII 5 2) Urgent widening & providing hot mix
carpet on MDR-16 Pernem Town to NH-17
Naibag in Pernem Constituency.
184.74
XIII 6 3) Improvement of road by providing hot
mix carpet from Madhlawada towards
Gaonkarwada Tuem via Vaidongar and
Mhaldarwado under Mandrem Constituency.
(Retender II call).
225.41
XIII 7 Improvement & hotmixing of MDR 15 from
Corporation Bank to Dhakti Chandai in
Tivim Constituency.
341.21
XIII 8 Improvement & widening of road with
footpath and protection wall from Moira
Club to Tulip Building from Ch 2.70 km,
3.90km (MDR - 14) in Aldona Constituency.
250.42
XIII 9 Improvement and hotmixing of road from
MDR 12 from Exocim to Gavar in Aldona
Constituency
109.36
XIII 10 Construction of protection wall to the road
embankment on LHS of the Nerul bridge
approaches on MDR 13 on Candolim side in
Calangute Constituency.
105.40
XIII 11 Improvement and beautification of left out
side portion of approach road of Siolim
Chopde bridge from Supriya bar toawards
bridge in V.P. Siolim - Marna under Siolim
Constituency.
113.97
XIII 12 Improvement and hot mixing of the MDR 7
from St. Michael Church junction to Vagator
Beach and Shapora - Caisua in V.P. Anjuna -
Caisua in Siolim Constituency.
502.11
XVIII 13 Providing Hot mix carpet to MDR 52 from
Collem to Shigao junction of Collem-
Savargal stretch in Sanvordem
constituency.
370.61
XVIII 14 Providing hot mix carpet to MDR 52 from
Shigao Junction to Voldem Junction of
Collem Savargal stretch in a length of 4.85
428.29
8
kms in Sanvordem Constituency in
Sanguem Taluka
XVIII 15 Improvement of road from Kamat House to
Ganesh Temple in Marcaim V.P. in
Marcaim Constituency in Ponda Taluka in
Ponda Taluka.
157.35
XXIII 16 Improvement &Widening of MDR-28 from
Kankire to Khotodem in Valpoi
Constituency.
426.70
XXIII 17 Improvement &Widening of MDR-28
fromChainage 2.00 Kms to Chainage
7.50Kms in Valpoi Constituency in Sattari
taluka.
599.37
XXV 18 Construction of road from Buring main road
toCotta Fatorpa Main road (MDR) near
Saraswati temple at Cotta Balli in Quepem
Constituency
88.75
XXV 19 .Widening , Strengthening and improvement
of roads from Balli Junction to Fatorpa in
Quepem Constituency
227.17
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
9 II 1 Improvement and resurfacing of MDR2
from Sozi bus stop old NH17 Goa Velha to
Military Camp gate at Bambolim in St.
Andre constituency
360.00
VI 2 Resurfacing of road MDR-43 from
Border and Betalbatim to Utorda Mollar
in Nuvem Constiteuncy.
283.07
XIII 3 1) Improvement, widening and providing
hotmix carpet to roads from MDR-18
Mihagar to Bhatwadi in V.P. Harmal under
Mandrem Constituency in Pernem Taluka.
217.28
XIII 4 Improvement & widening of road with
footpath and protection wall from Sai Bar
to Dhond Shop from Ch 3.90 to 6.20km
(MDR - 14) in Aldona Constituency.
196.71
XIII 5 Improvement & widening of road with
footpath and protection wall from Tarikode
249.25
9
to Moira bridge from Ch.0.00 to 1.70Km
(MDR-14) in Aldona Constituency.
XIII 6 Hotmixing and Improvement of MDR-12
from Betim to Salai Church for a length of
5.95 km in Porvorim Constituency, Bardez
Taluka.
400.40
XIII 7 Improvement and hot mixing of the MDR 7
from DMC Collage to Anjuna – Beach in
V.P. Anjuna – Caisua in Siolim
Constituency.
499.83
XIII 8 Improvement and hotmixing of MDR 5
from Siolim to Sodiem upto Pilimbi Chapel
in V.P. Siolim - Sodiem of Siolim
Constituency in Bardez Taluka.
305.76
XVIII 9 Improvement of road from Navdurga
English School to Navdurga Temple in
Marcaim V.P.in Marcaim Constituency
in Ponda Taluka.
170.29
XXIII 10 Improvement and Hot mixing of road from
Navelim junction to Ghodbay junction of
MDR 25 in Sakhali constituency of
Bicholim Taluka
183.00
XXV 11 Widening and improvement of MDR 50
road from Bhatpal Gate to Karvem in a
length of 3.25 kms. In V.P. Gaondongorem
in Canacona constituency.
50.47
XXV 12 4. Widening and improvement of MDR 50
road from Gaunem to Gaondongrem in a
length of 3.27 kms. In V.P. Gaondongorem
in Canacona constituency.
50.78
XXV 13 Widening and improvement of MDR 50
road from Gaondongrem to Bhuper in a
length of 3.30 kms. In V.P. Gaondongorem
in Canacona constituency
50.21
XXV 14 Widening and improvement of MDR 50
road from Badsorem to Bhars in a length of
3.20 kms. In V.P. Gaondongorem in
Canacona constituency.
48.69
XXV 15 Widening,hotmixing & providing retaining
wall from Karale to Tilamol in Quepem
Constituency.
260.00
XXV 16 Strengthening and widening including
hotmixing of MDR-40 from Ambedkar
Circle upto Tilamol junction in Curchorem
Constituency.
534.00
10
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
4.1. RURAL ROADS:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO
.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
10 II 1 Improvement of road connectivity for Expo
2014 from Dempo shipyard to Se Cathedral
V.P Old Goa in Cumbharjua Constituency.
319.52
II 2 Improvement of internal roads of
Danteshwar colony and reinstatement of
road from Chimbel Kirlawada junction upto
Military camp Gate-1 at Chimbel V.P. in
St.Cruz constituency
116.73
VI 3 Widening and Upgradation of road
leading from the end of the bridge
towards Cavelossim side to the MDR at
Cavelossim under Benaulim
Constituency.
178.87
VI 4 Strengthening of internal roads by
providing B.C Carpet in Navelim
Constituency.
469.16
XIII 5 1) Improvement of existing road by
providing hot mix carpet in Angadi
Ibrampur in Pernem Constituency in Pernem
Taluka.
127.28
XIII 6 2) Construction of road from Ibrampur to
Allorna in Pernem Constituency.
169.16
XIII 7 3) Urgent widening of road from Murmusem
junction near Health Centre Tuem to
Katurlim and hot mixing of road near
Industrial to Vetalwada and Zallurem in
V.P. Tuem under Mandrem Constituency.
165.56
XIII 8 4)Providing hot mix carpet for various left
out stretches of road under Jurisdiction of
V.P. Mandrem under Mandrem
Constituency.
200.72
XIII 9 5)Improvement, widening and providing hot
mix carpet to left out roads in V.P.
68.71
11
Agarwada under Mandrem Constituency.
XIII 10 Improvement & hotmixing of various roads
at Tivai waddo & Muddawaddo V.P.
Calangute in Calangute Constituency.
83.83
XIII 11 Improvement & hotmixing of various roads
at Gaurawaddo East in V.P. Calangute in
Calangute Constituency.
141.51
XIII 12 Improvement & hotmixing of road from
Arpora (Near Football ground) to Baga upto
Sankwadi V.P. Arpora - Nagoa in Calangute
Constituency.
122.00
XIII 13 Hotmixing of various roads at Betim in V.P.
Reis Magos of Saligao Constituency.
78.53
XIII 14 Widening & Imp of road from Socorro
Church to Moira in V.P. Socorro in
Porvorim Constituency.
53.00
XIII 15 Improvement and hotmixing of the existing
Gudem main road from the junction of Dr.
Pesu house to Kashi Kalyan Brahman
Devasthan at Gudem in Siolim-Marna in
Siolim Constituency.
134.77
XIII 16 Improvement and hotmixing of various left
out roads in V.P. Siolim-Marna under
Siolim Constituency.
171.92
XIII 17 Improvement and hotmixing of various left
out existing roads in V. P. Verla-Canca in
Siolim Consitutency.
179.73
XIII 18 Improvement and hot mixing of the main
roads from Rashtroli Temple to Narayan
Devasthan at Band and from Datta Math to
Saibaba Temple upto Panchayat border in
V.P. Verla-Canca in Siolim Constituency.
81.98
XVIII 19 Improvement and widening of MDR-34
from Uguem to Valkini in a length of
5.00Kms in Sanguem Constituency.
244.55
XVIII 20 Road widening and hot mixing of PWD
Main road at Ambemol in V P Kalay in
Sanvordem Constituency.
93.59
XVIII 21 Providing Hot mix to the PWD road leading
to Shekrewada at Matwada in a length of
1.88 Km. in V.P. Dharbandora in
Sanvordem Constituency.
71.22
XVIII 22 Construction of road from PWD road to Injo
Lambor house and Sidhesh Lambor
house at Pocarmol in V.P. Kalay in
Sanvordem Constituency
50.67
12
XVIII 23 Improvement of road and construction of
road side gutter to the Sapna Park area at
Prabhunagar in V.P.Curti Ponda
Constituency
48.55
XVIII 24 Improvement and widening of road from
NH4A junction at Khandepar to Water
Treatment Plant at Opa/Codar in V.P.
Curti Khandepar of Ponda Constituency.
315.87
XVIII 25 Improvement of road with hot mix from
main road Nirankal to Kurwalem in V.P.
Bethora Nirankal of Shiroda
Constituency.
98.07
XVIII 26 Providing hot mix for the road at Makadsai
in V.P. Shiroda of Shiroda Constituency.
71.18
XVIII 27 Providing hot mix for the road from main
road to Devaddem in V.P. Shiroda of
Shiroda Constituency.
125.59
XVIII 28 Providing hot mix for various roads in V.P.
Panchawadi of Shiroda Constituency.
113.84
XVIII 29 Providing AC carpet to bypass road from
Kundaim NH4A to Madkai Industrial
Estate in Marcaim Constituency.
330.51
XXIII 30 Urgent improvement of road from Khodiye
bridge to Advoi village in V.P.Pissurlem in
Poriem constituency.
32.75
XXIII 31 Improvement & hotmixing of internal road
within juidriction of V.P. Guleli in Valpoi
Constituency.
132.97
XXIII 32 Improvement & hotmixing of road from
Maloli to Satre Bridge in V.P. Nagargao in
Valpoi Constituency.
287.93
XXV 33 Construction of road from main road to
Kalshi V. P. Poiguinim in Canacona
constituency.
45.49
XXV 34 Imp. and B.T. of road leadind to Gurawal in
V.P. Agonda
13.76
XXV 35 Imp. of road from Karashirmol to Agonda
Village Panchayat including construction of
drainages at Dessaiwada and Karashirmol in
V.P. Agonda in Canacona Constituency.
17.00
XXV 36 Const. of road from Nanegaton to Karla in
V.P. Caure pirla in Quepem Constituency
149.46
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
13
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
11 II 1 Improvement and resurfacing of roads from
Madhuban junction to Community hall
Taleigao and near Gaunkar hospital and
Cardozowaddo in V.P Taleigao in Taleigao
Constituency
291.50
II 2 Improvement and resurfacing of road at La
Citadel and surrounding areas in V.P
Taleigao in Taleigao Constituency in
Tiswadi taluka.
226.25
VI 3 Improvement of various roads and
construction of drainage of various
internal roads in and around Mahalaxmi
Residency in V.P. Sancoale in Cortalim
Constituency
196.02
VI 4 Widening, strengthening and four laning
of Davorlim main road including
construction of concrete drainage in
Navelim Constituency.
724.55
XIII 5 1) Regrading of road from Chandel to
Bailpar Bridge approach in Pernem
Constituency”.
371.89
XIII 6 2) Construction of road from Ibrampur to
Allorna in Pernem Constituency.
169.16
XIII 7 3) C.R.F. :- 2013-14 : Widening and
Improvement of MDR-16 and MDR-19
including connecting Pernem Town bypass
from NH-17 to Tuem Industrial Estate in
Pernem Taluka in the State of Goa.
1890.46
XIII 8 4)Construction of approach road to
proposed Electronic City at Tuem under
Mandrem Constituency in Pernem Taluka.
194.16
XIII 9 Improvement & widening of road from
Prakash Gurav house to Grant Morod in
V.P. Saligao of Saligao Constituency.
83.23
XIII 10 Improvement & hotmixing of approach
road and surrounding are to Anthony High
School at Monte-De-Guirim in V.P. Guirim
of Saligao Constituency.
77.57
XIII 11 Improvement & hotmixing of road from
V.P. Candolim Office to Villa Felix house
at Camotim Vaddo Candolim and Various
internal roads in V.P. Candolim in
201.38
14
Calangute Constituency.
XIII 12 Improvement & hotmixing of roads at
Colvale Housing Board in V.P. Colvale in
Tivim Constituency
223.66
XIII 13 Widening of road by construction of
retaining wall from Mae - De – Deus
Chapel to Mavlingkar's house at Dhanva in
V.P. Tivim in Tivim Constituency.
90.58
XIII 14 Providing and laying hotmix carpet on road
to Mangirish Colony at Madel in V.P.
Tivim under Tivim Constituency.
58.81
XIII 15 Improvement and hotmixing of various
internal roads in Ward Nos I,II,III,IV,V,VI
and VII in V.P V.P .Sirsaim in Tivim
Constituency.
160.59
XIII 16 Improvement & hotmixing of road from
Sai Baba Temple Volwado to main road at
Shantadurga Temple at Moicawado, In the
Jurisdiction of V.P. Pilerne Marra in
Saligao Constituency.
84.39
XIII 17 Improvement & hotmixing of road from
Pilerne Church Volvado to CHOGM road
(At Amrekar Temple) Sawlem in V.P.
Pilerne - Marra of Saligao Constituency.
96.68
XIII 18 Improvement & widening of road with
protection wall from Calvim Bridge to
Railway track of Calvim in Aldona
Constituency in Bardez Taluka.
302.87
XIII 19 Improvement & widening of road with
footpath from Carona junction leading
towards the Calvi on Bridge at Carona in
Aldona Constituency.
203.32
XIII 20 Improvement & widening of road with
footpath from St. Thomas Church leading
towards Bhagwati Temple in V.P. Aldona
in Aldona Constituency.
219.84
XIII 21 Improvement & hotmixing of Advalpal -
Pirna road from Primary Health center to
Shantadurga High School and from MDR
15 to Dhakti Chandai in V.P. Pirna in
Tivim Constituency.
93.98
XIII 22 Improvement and hotmixing of road from
Gurudas Mandrekar’s house to Ramdas
Chodankar’s house and various interior
roads in V.P. Revora in Tivim
Constituency.
134.55
15
XIII 23 Improvement & hotmixing of various roads
internal roads at Satatexet in V.P. Aldona
in Aldona Constituency.
103.05
XIII 24 Improvement andwidening of existing road
with one side footpath from Bus stop
Ravalghadi Temple at Jaidevwaddo in V.P.
Nachinola in Aldona Constituency.
77.37
XIII 25 Const of drain and footpath from NH-17 to
Sanjay School, Godge Maharaj Hall to
Phadte house under V.P. Penha-de-france
in Porvorim Constituency.
87.62
XIII 26 Const of footpath & drains at Housing
Board Colony & nearby areas at Porvorim
under V.P.Penha-de-france in Porvorim
Constituency/
121.41
XIII 27 Improvement and providing hotmix carpet
to roads near Prabhu residency ,West
Coast Residency and Sita Apartments in
V.P. Socorro in Porvorim Constituency.
61.20
XIII 28 Hotmixing & improvement of roads at
Valley view & Supra Valley for a length of
2.005 km in V.P. Penha - de- france in
Porvorim Constituency in Bardez Taluka.
110.00
XIII 29 Hotmixing & improvement of roads for a
length of 2.01 Km at Pundalik Nagar in
V.P. Penha - de- france , Porvorim
Constituency ,Bardez taluka.
95.14
XIII 30 Widening & hotmixing of road leading to
Nisha and other roads at Badem in V.P.
Salvador - do - Mundo in Porvorim
Constituency.
159.33
XIII 31 Const of drain at various places in V.P.
Penha-de-france in Porvorim Constituency.
66.13
XIII 32 Hotmixing and Improvement of roads at
Vidhya nagar and surrounding areas for a
length of 3.585 Km in V.P. Penha de
France,Porvorim Constituency, Bardez
taluka.
136.22
XIII 33 Hotmixing and Improvement of roads at
Ekta Nagar , Kranti Nagar , Housing
Board & surrounding areas for a length of
7.423 km in V.P. Penha - de - france ,
Porvorim Constituency , Bardez Taluka.
251.56
XIII 34 Construction of footpath & widening of
road with protecting wall from Ganesh
temple at Torda to Madkaikar house at
305.86
16
Umbra in V. P. Salvador - do - Mundo in
Porvorim Constituency
XIII 35 Construction & reasphalting of various
roads and hotmixing of leftout roads at
Greenhill in V.P. Socorro in Porvorim
Constituency
88.79
XIII 36 Urgent repairs and providing hotmixing
carpet to roads in Mahadev Nagar in ward
no.12 of Mapusa Municipal Council in
Mapusa Constituency.
53.35
XIII 37 Improvement and hot mix of various roads
leading to Sateri Nagar, Brahmakumari
Ashram and near Salgaonkar house in V.P.
Verla-Canca in Siolim Constituency.
89.06
XIII 38 Improvement and hotmixing of Assagao
Panchayat main road from Kamat house
Junction at Sawantwaddo to Siolim-
Assagao Border via Badem in V.P.
Assagao, Bardez - Goa in Siolim
Constituency.
317.93
XIII 39 Improvement and beautification around the
Our Lady of Miracles Church at Badem
including providing and laying interlocking
pavers in the Church premises in V.P.
Assagao in Siolim Constituency.
43.69
XIII 40 Improvement and repairs of the various left
out with hotmix material in the jurisdiction
of V.P. Oxel of Siolim Constituency in
Bardez Taluka.
38.31
XIII 41 Improvement and widening of the existing
road from Our Lady of Miracles Church to
the main road at Badem in V.P. Assagao
Bardez - Goa in Siolim Constituency.
28.20
XVIII 42 Improvement and providing hot mix carpet
to the internal road in V.P. Tivre-Orgao
in Priol Constituency.
156.19
XVIII 43 Reconstruction of 6mts double span culvert
including approaches at Gothewada in
V.P. Bethora Nirankal of Shiroda
Constituency.
81.40
XVIII 44 Providing hotmix for the road at
Dongerwadi from Communidade Office
to Gauresh Kantak work shop in ward
No. 5 Digas V.P. Panchawadi of
Shiroda constituency in Ponda Taluka.
120.76
XVIII 45 Improvement of road carpet at Kitlan and 78.00
17
Badlewada by providing hotmix in
V.P.Bethora Nirankal of Shiroda
Constituency of Ponda Taluka.
XVIII 46 Strengthing & providing hot mix carpet to
the road Deulmol to Bolcornem in a
length of 3.20Km in V.P. Sacordem in
Sanvordem Constituency.
199.73
XVIII 47 Providing hot mix carpet to the road to
Talpan, Wagona, Pison, Audia-Goval,
Vaniawada & Bandol to Vagil in a
combined length of 4.80 Km. in V.P.
Kirlapal- Dabal in Sanvordem
Constituency.
238.35
XVIII 48 Improvement of pathways, roadsides &
compound wall within G.E.C. Campus
Farmagudi in Marcaim Constituency.
183.30
XVIII 49 Construction of road side retaining wall &
other various development works at
Durbhat in Marcaim Constituency.
86.33
XVIII 50 Various development works at Chirputem
& Shapur in V.P. Bandora in Marcaim
Constituency.
109.81
XVIII 51 Development works in and around village
Adpai in Marcaim Constituency.
105.12
XVIII 52 Providing & laying hot mix carpet from
Manaswada to Navadurga Temple,
Dassolwada in Kundai Village
Panchayat in Marcaim Constituency.
258.15
XVIII 53 Construction of road gutter and side
protection to the road Avantinagar,
Sainagar, Nanus and Palwada Usgao in
Ponda Constituency.
514.87
XVIII 54 Providing hotmix carpet to the road from
Manohar Prabhu's House to Barve farm
in V.P.Usgaon in Valpoi Constituency.
145.72
XVIII 55 Providing hot mix carpt to the road from
SH-6 to Tonynagar, Fonkuli &
Vishwambharwadi in a combined length
of 3.66Kms in V.P. Sanvordem in
Sanvordem Constituency.
252.34
XVIII 56 Construction of footpath and drains along
roadside from K.T.C. bus stand to
Farmagudi-Dhavali by pass road in
Marcaim Constituency.
268.48
XVIII 57 Strengthening of collapsed side near Shree
Ramnath Devasthan in V.P. Bandora of
76.19
18
Marcaim Constituency in Ponda Taluka
XVIII 58 Construction of road side retaining wall at
Dhonshi in Marcaim Constituency in
Ponda Taluka.
84.50
XVIII 59 Construction of by-pass road from GEC
Main Gate to Rear Gate of Engineering
College & ITI at Farmagudi in Marcaim
Constituency in Ponda Taluka
466.68
XVIII 60 Providing & laying AC Carpet from
Dassolwada to Mauzowada in Kundai
Panchayat in Madkai Constituency in
Ponda Taluka
250.67
XVIII 61 Improvement of road access, road side
protection wall and gutter facility to the
internal road of Moll Usgao, Godegal
and Par Khandepar in Valpoi
Constituency in Ponda Taluka.
113.90
XVIII 62 Development works in and around Ayappa
temple and Sapna Park in V.P. Curti in
Ponda Constituency.
147.28
XVIII 63 Widening & providing hot mix carpet to
Ch.0.00 to 2.00Kms from NH-4A at
Dhat Farm to Shigao mine weigh bridge
in V.P. Mollem in Sanvordem
Constituency.
216.91
XVIII 64 Improvement & B.T. of road to
Santonawado in a length of 2.00km in
V.P. Sanvordem in Sanvordem
Constituency
482.49
XVIII 65 Widening, Strengthening & Hot mixing of
the road to Periudok along with internal
roads in a combined length of 1.59Km.
in Sanvordem constituency in Sanguem
Taluka.
190.48
XVIII 66 Construction of protection wall near
Siddharudh Math to retain collapsed
portion at Dhade in V.P. Sanvordem in
Sanvordem Constituency in Sanguem
Taluka.
58.84
XVIII 67 Construction & B.T. of road from Cotarlim
to Modlowado in V.P. Uguem in
Sanguem Constituency.
116.46
XXIII 68 Hotmixing of various left out internal road
of V.P. Honda in Poriem Constituency.
313.78
XXIII 69 Improvement road from Zarme to Saleli
including 6mts.2span cuvert in Poreim
359.73
19
Constituency.
XXIII 70 Imp. & Hot mixing of road from Piligao
Panchayat Junction to Kankadevi temple in
Mayem Constituency
298.69
XXIII 71 Hot mixing of road from Barazan
Dhangarwada to naiginim and upto
Talewada bridge at Kudchirem in Mayem
Constituency
91.34
XXIII 72 Improvement & hotmixing of road
fromVelus Bridge to Maloli in V.P.
Nagargao in Valpoi Constituency.
414.76
XXIII 73 Improvement & hotmixing of road from
Shel Melauli Village to Shri Vinayak
Marathe Houseat Village Shel Melauli in
V.P. Guleli in Valpoi Constituency.
80.57
XXIII 74 Construction of road from Vadaval
Savardhat Dhangarwada to Ussap
harijanwada in Village Panchayat of
Latambarcem and Mencurem - Dhumacem
in Bicholim constituency
158.56
XXIII
75
Improvement and hotmixing of leftout
internal road in V.P. Mencurem -
Dhumacem and main road from Mencurem
Junction to Sal in Bicholim constituency
155.42
XXIII 76 Construction of road leading to Satichebhat
at V.P Kudne in Sankhali constituency
140.00
XXIII 77 Construction of road leading to Barazan
village of village panchayat Surla in Pale
constituency
60.00
XXIII 78 Imp. and Hotmixing of various roads of
Harvalem in Sakhali constituency
316.00
XXIII 79 Hot mixing and Imp. of internal roads at
Vasant Nagar, Rudreshwar colony and Tara
Nagar at Sakhali constituency
295.00
XXV 80 Construction of retaining wall for various
roads at Shelim in V.P. Loliem Polem in
Canacona Constituency
17.65
XXV 81 Construction of retaining wall and drains
for various roads at Agos in V.P. Loliem
Polem in Canacona Constituency
65.31
XXV 82 Improvement of road in ward No.06 of
Quepem Muncipal council including
widening of road from Ambaulim tio
Mother Tereza charity house in Quepem
Constituency.
46.65
XXV 83 Widening and strengthening of road by hot 245.20
20
mix of various internal roads in ward no. in
quepem municipal area in Quepem
constituency in quepem taluka.
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
12 II 1 Construction of new by pass road with
culvert from Taleigao to Santa Cruz in
Santa Cruz Constituency (proposal vide Sr.
no 81 in 2012 budget)
2500.00
II 2 Widening and improvement of existing road
by providing and laying 40mm thick
bituminous carpet with RCC culvert from
NH-17 Cujira junction to Bamanbhat Merces
and internal roads at Cujira under Santa Cruz
V.P in Santa Cruz constituency.
149.00
II 3 Imp. of existing internal roads by hot mixing
including construction of side drains cross
drains in Indira Nagar Chimbel V.P in
St.Cruz constituency.in Tiswadi taluka.
125.00
II 4 Improvement and resurfacing of road by P/L
40mm thick bituminous carpet for main road
and internal roads at St. Agusstinho Cabessa
and Alto Santa Cruz under St. Cruz V.P in
St. Cruz constituency
109.31
II 5 Improvement of existing internal roads by
hotmixing including construction of side
drains cross drains in Chimbel VP of Santa
Cruz Constituency
256.61
II 6 Improvement of existing roads by providing
40mm thick A.C/carpet starting from
Molloco junction to internal roads at
Bhamanbhatt and Paclo Colony including
construction of side drains in Merces V.P in
Santa Cruz in Tiswadi taluka.
152.00
II 7 Widening and resurfacing of existing road 221.85
21
with footpath from Madkaikar house at
Bhatulem to housing board colony at
Durgawadi in Santa Cruz V.P in St. Cruz
Constituency in Tiswadi taluka.
II 8 Improvement of existing road at Merces by
providing 40mm thick A.C carpet from Jack
Sequiera junction to internal roads at Tembar
Vaddy and other roads including
construction of side drains in Merces V.P in
St cruz Constituency in Tiswadi taluka.
95.59
II 9 Urgent repairs and strengthening /hotmixing
of internal roads at various places at Merces
in St. Cruz Constituency in Tiswadi Taluka.
96.81
II 10 Widening and hotmixing of existing roads
from Panchmanas to Dhado VP Carambolim
in Cumbarjua Constituency in Tiswadi
Taluka.
89.13
II 11 Providing Overlays and renewal of roads to
Divar island for the road from Ribander
Ferry to Divar centre and internal roads in
Cumbarjua Constituency in Tiswadi Taluka.
360.91
II 12 Providing Overlays and renewal of roads to
Divar island for the road from Old Goa Ferry
to Vanxim ferry and internal roads in
Cumbarjua Constituency in Tiswadi Taluka.
388.04
II 13 Providing Overlays and renewal of roads to
Divar island for the road from Divar Centre
to Naroa ferry and internal roads in
Cumbarjua Constituency Tiswadi taluka.
348.79
II 14 Improvement strengthening and laying
hotmix bituminous carpet for the left out
roads at Pandawada and Sodetim in V.P
Chodan of Mayem Constituency in Tiswadi
taluka.
324.30
II 15 Widening and hotmixing of main road
junction from Madel via Kerem Karabhat
upto Pomburpa ferry point and road leading
381.05
22
to GPS Deugi and internal connecting roads
at VP Chodan in Mayem Constituency
Tiswadi Taluka.
II 16 Improvement with resurfacing of road from
MDR-3 junction to Odxel village and from
Models building to Defence Minister house
under Taleigao V.P in Taleigao Constituency
in Tiswadi Taluka.
74.77
II 17 Improvement and resurfacing of road from
Miramar Circle to Caranzalem fish market
via Adharsh Circle under Taleigao
Constituency in Tiswadi taluka.
351.63
VI 18 Improvement & widening of road from
Arlem Junction to Ambajim in Fatorda
Constituency in Salcete Taluka.
543.28
VI 19 Improvement and resurfacing of internal
roads near Carmona Church in V.P.
Carmona under Benaulim Constituency
384.44
XIII 20 Providing hot mix carpet on various roads in
V.P. Torse under Pernem Constituency –
Pernem Taluka
237.82
XIII 21 Providing hot mix carpet on various roads in
V.P. Tambosem-Mopa-Ugvem under
Pernem Constituency – Pernem Taluka
189.07
XIII 22 Construction and B.T. of various roads in
V.P. Torse in Pernem under Pernem
Constiuency–Pernem Taluka
125.28
XIII 23 Improvement and providing hot mix carpet
on various roads in V.P. Chandel-Hasapur
under Pernem Constituency – Pernem
Taluka
222.36
XIII 24 Improvement and hot mixing of roads from
MDR-18 to Khalchawada beach for a length
of 1.55 km in V.P. Harmal under Mandrem
Constituency in Pernem Taluka.
55.98
XIII 25 Improvement, widening and providing
hotmix carpet to roads from MDR-18
Mihagar to Bhatwadi in V.P. Harmal under
Mandrem Constituency in Pernem Taluka.
217.28
XIII
26
Improvement, widening and providing
hotmix carpet to left out roads in V.P. Tuem
under Mandrem Constituency in Pernem
Taluka.
319.89
23
XIII 27 Improvement & hotmixing of road in Ward
No. 8 in a length of 1200 mts in V.P. Pilerne
- Marra of Saligao Constituency of Bardez
Taluka.
160.41
XIII 28 Land acquisition and widening of road from
Saligao Seminary to Verem Mansher in
Saligao Constituency.
751.52
XIII 29 Improvement & hotmixing of road from
Bodko vod to Govt. Primary school at
Sauntavaddo in V.P. Calangute in Calangute
Constituency.
289.08
XIII 30 Improvement of various leftout roads by
providing hotmix carpet in V.P. Moira of
Aldona Constituency in Bardez Taluka for a
length of 6.60 Km.
187.53
XIII 31 Impr and widening of road from Bandeshwar
Devasthan to gavar \junction
324.78
XIII 32 Hotmixing and imp of roads from Ganesh
temple to Socorro Church & various roads in
V.P. Socorro & Salvador-do-Mundo for a
length of 18.745Km, Porvorim Constituency.
502.09
XIII 33 Hotmixing and imp of roads around
Annapurna nagar & Alto Torda, V.P.
Salvador-do-Mundo for a length of 7.09km
in Porvorim Constituency.
230.7
XIII 34 Hotmixing of roads at Walkeshwar wada &
surrounding areas for a length of 1.830 km in
V.P. Penha-de-france, Porvorim
Constituency.
47.66
XIII 35 Hotmixing & imp of roads at Halliwada &
surrounding areas for a length of 3.66km in
V.P. Penha-de-france Porvorim
Constituency.
113.17
XIII 36 Hotmixing & imp of roads from Gauri Petrol
Pump to Gurudwara & surrounding areas for
a length of 6.105km in V.P. Penha-de-france
Porvorim Constituency.
233.29
XIII 37 Providing footpath at various places for a
length of 2.42km in V.P. Penha-de-france,
Porvorim Constituency.
162.36
XIII 38 Providing hotmix carpet to Khorlim bypass
& Karaswada in Mapusa Constituency.
39.00
XIII 39 Land Acquisition for improvement of Katch
road starting from Mahabaleshwar Vernekar
house ending upto the house of Gurudas
Chodankar at Badem in V.P. Assagao.
7.75
24
XIII 40 Improvement and development of the
parking area at St. Anthony Chruch at Siolim
in V.P. Siolim - Marna goa of Siolim
Consituency.
55.72
XIII 41 Improvement and hotmixing of road from
MDR 5 to Camurlim junction along Maina -
Paltodi in V.P. Sodiem - Siolim of Siolim
Constituency in Bardez Taluka.
128.96
XIII 42 Improvement and laying premix to the
existing road from Chapel to Mango tree
Rest. To Agnel Braganza house at
Dabolwada in V.P. Anjuna - Caisua in
Siolim Constituency of Bardez Taluka.
22.79
XIII 43 Construction of storm water drain along the
various roads from Edwin Fonseca houe to
Sanjay Sawant house and from Vasudev
Sawant house ot Laxman Sawant house
including othe branch road inV.P. Assagao
in Siolim Constituency of Bardez Taluka.
75.61
XIII 44 Improvement and laying premix to the
existing V.P. internal roads of V.P. Verla -
Canca in Siolim Constituency of Bardez
Taluka.
83.86
XIII 45 Improvement and hotmixing of various
internal roads at Munag and Soccolwado in
V.P. Assagao of Siolim Constituency of
Bardez Taluka.
116.96
XIII 46 Improvement and widening of the existing
accident prone stretch and logitudinal profile
correction of road from Ganesh Puri,
Mapusa (Marna Village boundary) to MDR
6 in V.P. Marna in Siolim Constituency.
1134.61
XIII 47 Imp. And hotmixing of existing surrounding
roads leading to Our Lady of Miracle Church
at Badem in V.P. Assagao at Badem in
Siolim Constituency of Bardez Taluka.
271.05
XIII 48 Land acquisition for construction of road at
Tarchibhat in V.P. Siolim – Marna under
Siolim Constituency.
30.00
XVIII 49 Improvement and hot mixing of road from
Keri to Panchme in V.P.Keri in Priol
Constituency of Ponda Taluka.
175.90
XVIII 50 Improvement of road surface by providing
hot mix at Paniwada in V.P. Borim of
Shiroda Constituency.
99.63
XVIII 51 Construction of road from Betal Temple at 69.24
25
Dhadem to Rongacatem at Antorem
village in V.P.Sanvordem in Sanvordem
Constituency
XVIII 52 Land acquisition for Construction of road
from NH-4A junction to Shigao Village
via Borcottem-Mollem in Sanguem
Taluka.
123.55
XVIII 53 Providing hot mix to the various internal
roads at Kudiyal and Voily Betki in V.P.
Borim of Shiroda Constituency Ponda
Taluka
196.80
XVIII 54 Providing hot mix for various internal roads
at Karai and Vazem V.P. Shiroda of
Shiroda Constituency Ponda Taluka
160.84
XVIII 55 Improvement of road at Gawaliwada &
branch roads at Nirankal by providing hot
mix to the road in V.P. Bethora Nirankal
of Shiroda Constituency in Ponda Taluka
102.72
XVIII 56 Improvement of road with construction of
embankment and soling at Dab Shirshirem
in V.P. Borim of Shiroda Constituency in
Ponda Taluka.
39.89
XVIII 57 Construction of compound wall along the
boundary of the Goa Engineering College
premises at Farmagudi in Marcaim
Constituency in Ponda Taluka.
244.60
XVIII 58 Construction of compound wall & drains for
Shree Kshetra Tapobhumi at Kundai in
Kundai V.P. in Madkaim Constituency in
Ponda Taluka.
264.72
XVIII 59 Providing hot mix to the road from
Durgabhat to Bondbag via Ganapati
temple in V.P. Bethora Nirankal of
Shiroda Constituency.
83.74
XVIII 60 ConstRuction of road side retaining wall for
road from Kundai –Manaswada road to
Marmato Bandh at Kundaim in Madkai
Constituency in Ponda Taluka.
118.57
XVIII 61 Development of works in and around
Talaulim village in Madkai Constituency
of Ponda Taluka.
280.14
XVIII 62 Construction of road from Baga to
Shantadurga Temple at Khandepar in
Ponda Constituency in Ponda Taluka.
178.74
XVIII 63 Providing hot mix carpet for the road from
Maruti temple to Ponda by-pass junction
384.18
26
via Upper Bazaar in Ponda Constituency
in Ponda Taluka.
XVIII 64 Improvement and resurfacing of the road at
Shantinagar in Ponda Constituency in
Ponda Taluka.
434.88
XVIII 65 Improvement of approach road to the Waste
Treatment Plant at Keriyem Khandepar in
Ponda Constituency in Ponda Taluka.
80.77
XVIII 66 Improvement of road carpet by providing hot
mix for the main road from Bethora By-
Pass to V.P. office Bethora Nirankal of
Shiroda Constituency
229.13
XVIII 67 Construction of road by providing soling and
fullgrout at Payekagal in V.P. Bethora
Nirankal of Shiroda Constituency
72.39
XVIII 68 Construction of road from Shree Betal
temple at Dhade to Dulbanagar-Mirabag
including 8m span culvert in V.P.
Sanvordem in Sanvordem Constituency
in Sanguem Taluka.
561.35
XVIII 69 Improvement & B.T. of Internal roads
including Hot-mixing at Guddemol &
Gandhinagar in V.P. Sanvordem in
Sanvordem Constituency in Sanguem
Taluka.
163.79
XVIII 70 Construction and B.T. of road near GPS at
Costi in V.P. Kalay of Sanvordem
Constituency of Sanguem Taluka.
89.95
XVIII 71 Providing hot mix to the various internal
roads at Kudiyal and Voily Betki in V.P.
Borim of Shiroda Constituency Ponda
Taluka
196.80
XVIII 72 Construction & B/T of road from Namna
Dessai house to Uday Sahakari house at
Bimbol in V.P. Collem in Sanvordem
Constituency of Sanguem Taluka.
64.17
XVIII 73 Construction of road from Potre to Nisrati
including 8.00mts Double Span small
bridge in a combined length of 825mts in
V.P. Bhati in Sanguem Constituency.
129.91
XVIII 74 Improvement & hot mixing of road from
Colomb to Asner & Mhalwado, in V.P.
Rivona in Sanguem Constituency.
298.21
XVIII 75 Improvement of roads by providing hot mix
carpet on various left out internal roads in
Municipal area in a combined length of
352.55
27
11.00Kms in Sanguem Constituency in
Sanguem Taluka.
XVIII 76 Improvement and providing parking to the
tourist vehicle at Collem-Dudhsagar road
along with adjacent roads in V.P. Collem
in Sanvordem Constituency
485.20
XXIII 77 Construction of road from Honda
Gaonkarwada to Saleli in V.P. Honda in
Poriem Constituency.
161.29
XXIII 78 Construction of road from main road at
Shalibar to Deulwada Narva in Mayem
Constituency in Bicholim Taluka
496.02
XXIII 79 Resurfacing of roadby usig waste plastic in
hot bituminous mixes for the road from
Kumbharwada Junction on MDR 22 to
Mayem Lake incl. road through which
Bhatwadi Arthwada Junction via Deus-
Bhatwadi in Mayem Constituency in
Bicholim Taluka
99.09
XXIII 80 Improvement & widening of road from
Khotodem jn. To Malpan Border ( sattari
Boundary) in Valpoi Constutiency.
218.46
XXIII 81 Improvement & widening of road VL-18
from Chainage 5.10Kms to 8.50Km in V.P.
Guleli in Valpoi Constituency
277.98
XXIII 82 Construction of Tambdo road at V.P.
Mulgao in Bicholim Constituency.
132.15
XXIII 83 Construction of gutter from Dodamarg
Radhakrishna Mandir to Shantadurga
temple, from Pravin Khandeparkar house to
Laximan Gawas house, from Sahadev
Gawas house to Dattaram Gawas,and from
Sahadev Gawas house to Shantadurga
temple at Kharpal in V.P. Latambarcem in
Bicholim constituency in Bicholim taluka
83.31
XXIII 84 Improvement and Hot mixing of road from
Navelim junction to Ghodbay junction of
MDR 25 in Sakhali constituency of
Bicholim Taluka
183.00
XXIII 85 Improvement and Asphalting of road at
Siddheshwar Nagar connecting SK-31 at Ch.
0.095 km in village panchayat Surla in
Sakhali constituency of Bicholim Taluka.
163.78
XXIII 86 Imp. And Hotmixing of various roads of
village Virdi and Gaunthan in Sakhali
constituency of Bicholim Taluka
133.29
28
XXIII 87 Improvement and Hot mixing of internal
roads of Housing Board Colony Sakhali in
Sakhali constituency of Bicholim Taluka
165.00
XXIII 88 Imp. And hotmixing of internal road of
Desai Nagar Sakhali in Sakhali constituency
of Bicholim Taluka
118.00
XXIII 89 Improvement and Hot mixing of internal
road at Pale Cottombi Panchayat in Sakhali
constituency of Bicholim Taluka
450.00
XXV 90 Resurfacing of the road from Iddar to Tirwan
in a length of 6.50 kms in V.P. Loliem-
Polem in Canacona constituency.
167.00
XXV 91 Construction of raod at Onthrem in Ward
No.05 in Quepem Municipal Area in
Quepem Constituency.
46.00
XXV 92 Improvement of leftout internal roads by
hotmix in Ward No.04 of Quepem Municipal
Area in Quepem Constituency.
92.00
XXV 93 Construction & repair of gutter at
Shashtrinagar Sirvoi in Ward No.04 of
Quepem Municipal Area in Quepem
Constituency.
80.00
XXV 94 Improvement and hotmixing of road at
Gaonkarwada and near Don Bosco Institute
in Ward No.05 of Quepem Municipal Area
in Quepem Constituency.
145.00
XXV 95 Improvement of Toleasandh road by
widening and hotmixing including retaining
wall in Ward No.05 of Quepem Municipal
Area in Quepem Constituency.
182.60
XXV 96 Improvement and widening of road from
Igramol to Devssa & Benamol in Ward
No.05 of Quepem Municipal Area in
Quepem Constituency.
129.12
XXV 97 Improvement of road including construction
of retaining wall to protect road embankment
at Vithalamoddi in Quepem Municipal Area
in Quepem Constituency.
80.50
XXV 98 Construction of road from Garbhat to
Konkanifond at Dhabem in V.P.Morpirla in
Quepem Constituency.
30.50
XXV 99 Widening and hotmixing of road from Odxet
to Gonval in V.P.Avedem in Quepem
Constituency.
184.00
XXV 100 Improvement of parking area by hotmix
infront of St.Joseph Chapel at Gonval and
126.00
29
various roads at Goval and Cottombi in
Village Panchayat area in Quepem
Constituency.
XXV 101 Widening of raod from Vantem junction to
Morpirla in Quepem Constituency.
60.00
XXV 102 Protection of road embankment,cross drains
& construction of road from Sodlem to
Kajuwada in V.P.Morpirla in Quepm
Constituency.
150.00
XXV 103 Hotmixing around Shree Shantadurga
Fatorpekarin temple at Fatorpa in Quepem
Constituency.
31.00
XXV 104 Improvement of road by hotmix including
wideingof road, providing retaining wall etc.
from Tilamol to Zambaulim in Quepem
Constituency.
433.63
XXV 105 Construction of road at Talewada in village
Xelvona in Curchorem Constituency.
17.94
XXV 106 Construction and black topping of roads in
St. Sebastian Colony at Hodar in Curchorem
Constituency.
56.08
XXV 107 Widening and hotmixing of road leading to
Gaurdian Angel Church in Curchorem
Constituency.
98.05
XXV 108 Widening and strengthening of internal roads
in ward No. 7 in V.P. Assolda - Xelvona in
Curchorem Constituency.
45.14
XXV 109 Strengthening of parking area for
Government Polytechnic School Campus in
Curchorem Constituency.
31.77
XXV 110 Widening and hotmixing of left out internal
roads in V.P. Xeldem in Curchorem
Constituency.
460.00
XXV 111 Improvement of road in New Colony at
Zanoda Nagvem in Molcornem in Sanguem
Constituency.
110.00
XXV 112 Providing hotmix of the road from Dashamol
to Bansi in V.P.Malkarnem in Sanguem
Constituency.
260.00
XXV 113 Widening and improvement of road from
Vagete to Kajur in V.P.Caure Pirla in
Sanguem Constituency.
68.00
XXV 114 Improvement of road by hotmix from
varcotto to Fatimawada in V.P.Caure Pirla in
Sanguem Constituency.
272.00
XXV 115 Protection of road embankment by retaining 37.73
30
wall, I.R. pavers, including G.I pipe railing
and cement drain at Velipwada in V.P. Caure
Pirla in Sanguem Constituency.
XXV 116 Construction and black topping of roads in
St. Sebastian Colony at Hodar in Curchorem
Constituency.
56.08
XXV 117 Widening and hotmixing of road leading to
Gaurdian Angel Church in Curchorem
Constituency.
98.05
XXV 118 Widening and strengthening of internal roads
in ward No. 7 in V.P. Assolda - Xelvona in
Curchorem Constituency.
45.14
XXV 119 Improvement and re-surfacing of
Nanegottov road in V.P. Caure Pirla in
Sanguem Constituency.
89.69
XXV 120 Imp. & Widening of road Char Rasta to
Patnem Junction including Bhagatwada and
Tembewada road in Canacona
107.12
XXV 121 Const. of protection wall including providing
crash barrier at Mudkud and Betul in V.P.
Agonda in Canacona
53.10
XXV 122 Re-surfacing of the internal roads including
providing drainage at Mirandawada in V.P.
Agonda in Canacona Constituency
81.37
XXV 123 Imp. & B/T of ring road at Karashirmol in
V.P. Agonda in Canacona Constituency
52.42
XXV 124 Imp. of ring road including improvement of
surrounding of Shri Lakhneshwar Temple in
V.P. Agonda in Canacona Constituency
65.38
XXV 125 Re-surfacing of road from Patnem junction
to Pallolem junction in Canacona
Constituency
83.81
XXV 126 Imp. and re-surfacing of road from Vagdem
to NH-17 in Canacona
49.85
XXV 127 Widening of road from Panna to Dessaiwada
including Improvement of junction at Panna
in V.P. Agonda in Canacona Constituency
120.15
XXV 128 Re-surfacing of road from Char - Rasta to
Pallolem beach in Canacona Constituency
58.23
XXV 129 Reinstatement of damage road due to laying
of under ground 11KV cable by Electricity
Dept. under jurisdiction of SD III/WD XXV
(R ),Canacona
88.31
XXV 130 Const. of 6m double span culvert including
approaches at Dumane in V.P. Agonda in
Canacona
64.00
31
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
4.2. RURAL ROADS (SPECIAL COMPONENT (SC) SUB-PLAN):
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
13 VI 1 Construction of drainage at Bogda in
Mormugao Constituency under SC & Sub
Plan
9.65
VI 2 Providing drainage system at Arossim in
V.P. Cansaulim Constituency (SC Sub
Plan)
10.60
XVIII 3 Prov. Hot mix carpet to the road from
MDR-33 to Mahatmaphulewada & internal
road to Deulwada in a length of 1.24Kms at
Sancordem in Sanvordem Constituency.
35.65
XXIII 4 Improvement of road and drainage network
at Harijanwada in V.P. Latambarcem in
Bicholim constituency
10.08
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
14 II 1 Improvement to the existing roads by laying
hot mixed Bituminous/Asphaltic Concrete
from main road to Chameren 20 point
programme houses,main road to Madel
crematorium & Varana Tirth & development
to surrounding Saibaba Temple to Chameren
20 point programme housesV.P. Chodan
Madel in Mayem constituency under
Schedule Caste Sub Plan of the state.
81.43
II 2 Improvement and hotmixing of existing
roads at St.Xavier Academy and temple
premises of Lord Shiva Nanijdham V.P Old
Goa in Cumbarjua Constituency of Tiswadi
taluka.
31.48
32
VI 3 Construction of drainage at Mangor
internal road in Vasco Constituency under
SC & Sub Plan
9.54
VI 4 Construction of drainage system from
Mangor junction to Sidhlingeshwar Math
in Vasco Constituency.(Under SC Sub
Plan)
9.65
XIII 5 Improvement of road with footpath and
drainage for 20point programme and Harijan
houses in village Moira in Aldona
Constituency.
37.21
XVIII 6 Improvement of footpath by providing
cement concrete interlocking pavers at
Khutyamol & Cansaulim at V.P.Mollem
in Sanvordem Constituency.
12.86
XXIII 7 Imp. & resurfacing of road leading to
Kankadevi temple Harijanwada at
Maulinguem in Mayem Constituency
18.75
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
15 VI 1 Immediate measures to internal roads of 20
Point Programme colony at Davorlim in
Navelim Constituency
14.83
XVIII 2 Construction of gutter at Takwada, Usgao in
Valpoi Constituency under SC Sub Plan
Scheme
14.12
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
4.3. RURAL ROADS (TRIBAL (ST) SUB-PLAN):
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
16 XVIII 1 Strengthing & providing hot mix carpet to
the road Deulmol to Bolcornem in a
length of 3.20Km in V.P. Sacordem in
Sanvordem Constituency.
160.25
33
XVIII 2 Construction of gutter & pathway at
Gaunem in Marcaim Constituency.
35.25
XVIII 3 Improvement of various drains, pathways
in village Bokadbag in Marcaim
Constituency.
48.74
XVIII 4 Construction of gutter & pathways at
Raigini in Marcaim Constituency.
36.78
XVIII 5 Imp. & B.T. of road from NH-4A to Tatodi
& internal roads of Tatodi in a
combined length of 2.73kms in V.P.
Dharbandora in Sanvordem
Constituency.
215.38
XVIII 6 Improvement & Providing hot mix carpet
from Neturlim to Verla in a length of
12.00Kms in V.P. Neturlim in
Sanguem Constituency.
554.70
XXV 7 Resurfacing of left out roads in V.P.
Gaondongrem in Canacona Constituency.
(Tribal sub Plan)
80.75
XXV 8 Resurfacing of road leading from NH/17 to
Tanshi in a length of 1.05 kms in V.P.
Loliem-Polem in Canacona Constituency.
(TSP)
42.19
XXV 9 Imp. & B/T of road from Dhawalkhajan to
Borim in V.P. Agonda in Canacona
Constituency
22.00
XXV 10 Imp. of road leading Mudkud and
Mirandwada by providing hot mix carpet in
a length of 5.57kms in V.P. Agonda
140.00
XXV 11 Imp. of road carpet from IB to Shri
Mallikarjun Temple in V.P. Shristhal in
Canacona
72.00
XXV 12 Imp. of road leading to Gharvoipurush
Temple by providing hot mix carpet in a
length of 4.80 kms in Canacona
104.00
XXV 13 Widening of road from Razambo to unnona
via Malkapone in V.P. Molkornem in
Sanguem Constituency.
97.66
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
17 VI 1 Construction of internal road at
Velipwaddo Balli in Cuncolim
43.48
34
Constituency.(Under ST Sub Plan)
XVIII 2 Improvement of various drains & pathways
in village Talulem of Marcaim
Constituency.
54.58
XVIII 3 Construction of the existing kattcha road
from Madkai main road to lower Kudjo
at Madkai V.P. in Madkai Constituency
214.16
XVIII 4 Construction of road to Adulshewada in
V.P. Sancordem in Sanvordem
Constituency.
43.90
XVIII 5 Improvement & providing hot mix to left
out roads in V.P. Curdi Vaddem in a
combined length of 13.70kms in
Sanguem Constituency.
455.12
XVIII 6 Improvement & B.T. of road from
Dongarwada to Wagamol in a length of
1.75Kms in V.P. Sacordem in
Sanvordem Constituency.
61.74
XVIII 7 Providing hot mix carpet to the road to
Talpan, Wagona, Pison, Audia-Goval,
Vaniawada & Bandol to Vagil in a
combined length of 4.80 Km. in V.P.
Kirlapal- Dabal in Sanvordem
Constituency.
229.28
XVIII 8 Improvement & providing hot mix carpet
to the internal road in V.P. Betki
Khandola in Priol Constituency.
237.58
XVIII 9 Strengthening & hot mixing of road from
main road Borim to Bethora Junction
via Shirshirem for the length of
7.50Kms in Shiroda Constituency.
247.17
XVIII 10 Improvement and B.T. of road from Verla
to Salgini and Tudav in combined
length of 10.70Kms in V.P. Neturlim in
Sanguem Constituency.
330.91
XVIII 11 Construction of road from water lake to
Shri Shantadurga Temple at Panchami,
Khandepar in Ponda Constituency.
228.63
XVIII 12 Improvement of blind curves to the road
from NH-4A to Maradwada in V.P.
Dharbandora in Sanvordem
Constituency in Dharbandora
Taluka.(Under 'Adivasi Vikas Yojana')
104.50
XXV 13 Construction of road from Fatra, Bhuper,
Zamblimol to Kulgati temple in V.P.
227.17
35
Gaondongrem in Canacona Constituency.
XXV 14 Construction of road from Paryemol to
Kudai in V.P. Cola in Quepem
Contituency
187.12
XXV 15 Imp. & B/T of various roads under V.P.
Shristhal in Canacona Constituency
30.28
XXV 16 B.T of left out roads including imp. of
drainage system in V.P. Shristhal in
Canacona Constituency
35.14
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
18 VI 1 Improvement of side drains and providing
protection wall at Velipwaddo in V.P.Balli
in Cuncolim Constituency.(Under ST Sub
Plan)
94.11
VI 2 Strengthening of internal road by
providing B.C. carpet in V.P. Aquem
Baixo in Navelim Constituency Under
Tribal Sub Plan
84.56
XVIII 3 Widening and hot mix of the road from
Curpem Church to Vichundrem in a
length of 5.00kms in V.P. Curdi
Vaddem in Sanguem Constituency.
273.82
XVIII 4 Providing Hot mix carpet to the roads in
Mollem Revenue village in V.P.
Mollem in Sanvordem Constituency.
468.13
XVIII 5 Providing hot mix carpet to the roads in
Sangod Revenue Village in V.P.
Mollem in Sanvordem Constituency.
492.84
XVIII 6 Improvement and providing hotmix carpet
to the road at Amadi and Kalzire at
Amarkhane in V.P. Keri of Priol
Constituency in Ponda Taluka.
79.75
XVIII 7 Improvement and providing hotmix carpet
to the road from Apewal to Karmale in
V.P. Keri of Priol Constituency in
Ponda Taluka.
100.21
XVIII 8 Improvement and providing hot mix carpet
to the road from Police station at
Konem to Junction in V.P. Veling –
Priol-Cuncoliem in Priol Constituency
251.22
36
of Ponda Taluka.
XVIII 9 Improvement and providing hotmix carpet
to the road from Mardol junction to
Kaneri border (Madkai) in V.P. Veling
Priol Cuncoliem of Priol Constituency
of Ponda Taluka.
122.20
XVIII 10 Construction & B.T. of road from SH-7 to
Reddy Nagar in V.P. Kirlapal-Dabal in
Sanvordem Constituency in
Dharbandora Taluka.
541.99
XVIII 11 Providing Hot mix carpet to the road to
Aglot & Deulwada- Aglot in Aglot
revenue village in Sanvordem
Constituency in Dharbandora Taluka.
50.37
XVIII 12 Providing Hot mix carpet to the roads at
Bhumicanagar in V.P. Dharbandora in
Sanvordem constituency in
Dharbandora Taluka.
103.24
XVIII 13 Widening & Providing Hot mix carpet to
the road from SH-7 to Dabal road
junction via Immaculate High School at
Colsai in V.P. Kirlapal-Dabal in
Sanvordem constituency in
Dharbandora Taluka.
110.71
XVIII 14 Providing drainage facility and cross drains
at Dhadewada in V.P. Dharbandora in
Sanvordem Constituency of
Dharbandora Taluka.
79.66
XVIII 15 Construction of road side gutter from Rama
Gaonkar shop to Culvert at Panaswada
in Aglot revenue village of Sanvordem
constituency in Dharbandora Taluka.
39.83
XVIII 16 Strengthening & Providing Hot mix carpet
to the road from main road to Somnath
temple including other internal roads at
Kamarkhand wada in V.P. Kirlapal-
Dabal in Sanvordem constituency in
Sanguem Taluka.
235.96
XVIII 17 Widening of road from main road to Vaili-
Bandol including construction of
retaining wall,gutter under 'Adivasi
Vikas Yojana' in V.P. Kirlapal-Dabal in
Sanvordem constituency in
Dharbandora Taluka.
86.20
XXV 18 Construction of road from Avali Bus stop 242.8
37
to Pansal Via Ghandewada via Bhajiwada
via Ghandiwada via Sabolewada upto shree
Mallikarjun temple in V.P. Cotigao in
Canacona Constituency. (Tribal Sub plan)
XXV 19 Improvement of Nadkem road in a length
of 4.00 kms. Including two culvert in V.P.
Cotigao in Canacona Constituency.
92.37
XXV 20 Construction of 6.00 mtrs. Span culvert at
sabolemwada Avali in V.P. Cotigao in
Canacona.
32.6
XXV 21 Resurfacing of various roads in a length of
5.50 kms in V.P. Cotigao in Canacona
Constituency.
113.07
XXV 22 Widening and improvement of MDR 50
road from Bhatpal Gate to Karvem in a
length of 3.25 kms. In V.P. Gaondongorem
in Canacona constituency.
50.47
XXV 23 4. Widening and improvement of MDR 50
road from Gaunem to Gaondongrem in a
length of 3.27 kms. In V.P. Gaondongorem
in Canacona constituency.
50.78
XXV 24 Widening and improvement of MDR 50
road from Gaondongrem to Bhuper in a
length of 3.30 kms. In V.P. Gaondongorem
in Canacona constituency
50.21
XXV 25 Widening and improvement of MDR 50
road from Badsorem to Bhars in a length of
3.20 kms. In V.P. Gaondongorem in
Canacona constituency.
48.69
XXV 26 Resurfacing of road from MDR 51 upto
Gavanem Dam & from MDR 51upto
Fulamol for a length of 3.60 kms In V.P.
Gaondongorem in Canacona constituency.
89.68
XXV 27 Resurfacing of Road from MDR 50 upto
Indrawada in a length of 2.45Kms. In V.P.
Gaondongrem in Canacona constituency
55.24
XXV 28 Resurfacing of Different stretches of road
near Tallem, Vazrem and satorlim In V.P.
Gaondongorem in Canacona constituency.
175.16
XXV 29 Widening and resurfacing of road from
Mone to Shristal in a length of 5.58 kms.
In V.P. Gaondongorem in Canacona
constituency.
217.67
XXV 30 Resurfacing of shesheval, Astegal and
Marli Tirwan road in a length of 3.20 kms
in V.P. Poinguinim in Canacona
83.32
38
constituency
XXV 31 Construction of retaining walls at
Gharvoipurush Temple Gullem in V.P.
Shristhal in Canacona
46.23
XXV 32 Re - surfacing of various roads at Gullem
in V.P. Shristhal in Canacona
93.94
XXV 33 Imp. of road from NH-17 to Paryemol by
providing hot-mix carpet in V.P. Cola in
Quepem Constituency.
114.00
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per
the priority and approval of the Government.
5. MINING ROADS:
B. SPILLOVER WORKS OF THE YEAR2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
20 XVIII 1 L.A. for construction of mining bye pass
road from Uguem to Kapxem (Phase-I)
Guddemol to Kapxem in Sanguem
Taluka.
591.21
2 L.A. for construction of mining bye pass
road from Uguem to Kapxem (Phase-II)
Uguem to Santona in Sanguem Taluka.
386.97
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
6. TOURISTIC ROADS:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
22 XIII 1 Widening and hotmixing of road from
CHOGM road to Navetim in V.P. Pilerne in
Saligao Constituency.
118.00
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
23 VI 1 Improvement of riding quality of main
roads of touristic importance of V.P.
218.35
39
Benaulim in Benaulim Constituency
XIII 2 Hotmixing of various roads at Alto - Pilerne
near Ruchira Bar in V.P. Pilerne of Saligao
Constituency.
104.80
XIII 3 Improvement & hotmixing of internal roads
in PDA Colony (On Northern side) in V.P.
Pilerne of Saligao Constituency.
67.38
XIII 4 Construction of gutter at Acoi and
Khamarkhazan in V.P Aldona in Aldona
Constituency
60.48
XIII 5 Widening and hotmixing of road from main
road (MDR No. 9) at Manshir (Near Shri.
Krishna Temple) to Mainem junction (At
Gokuldas Govekar house) in V.P. Pilerne -
Marra of Saligao Constituency.
97.43
XIII 6 Improvement & hotmixing of road from Sai
Baba Temple Volwado to main road at
Shantadurga Temple at Moicawado, In the
Jurisdiction of V.P. Pilerne Marra in Saligao
Constituency.
101.26
XVIII 7 Improvement of side shoulders and
protection work to the road MDR-33
from Gaudsai to Gawaliwada in V.P.
Sancordem in Sanvordem constituency.
196.58
XXV 8 Widening & improvement of road from
Tilamol to Assolda in Curchorem
Constituency.
73.97
XXV 9 Construction of pathway near the playground
to S.H. road Tilamol in V.P. Xeldem in
Curchorem Constituency.
33.48
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
24 II 1 Providing stainless steel railing along road
medians at various accident prone locations
on DB Marg of Panaji City,in Tiswadi
taluka.
50.00
XIII 2 Improvement & hotmixing of road in a
length of 2260 mtr in ward No. 1
Brittowaddo Parra of Calangute
Constituency of Bardez Taluka.
160.94
40
3 Development of road in a length of 1100
mtrs at ward No. 6 Sonarbhatt Guirim of
Saligao Constituency in Bardez Taluka.
127.79
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per
the priority and approval of the Government.
7. CENTRAL ROAD FUND:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
25 XXIII 1 Improvement widening and hotmixing of
S.H. No. 2 from Ch.0.00 at Assonora to
Ch.6.400 at Dodamarg including providing
Paved shoulder from Ch.6.400 at Assonora
to Ch.9.450 in Bicholim constituency.
1257.06
XXIII 2 Widening and Improvement of M.D.R. -23
(Bicholim - Ladfe - Dodamarg) road in
alength of 9.10 kms in Bicholim
constituency.
860.45
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
26 VI 1 Improvement and widening of road MDR
38 from Cansaulim to Verna linking N.H
17 at Goa State
571.00
XXIII 2 Imp. And hotmixing of road from Ch.00 to
27.00 from Sanquelim to Goa Boundary
(Chorla Ghat) on S.H.No.4 in Poriem const.
956.00
XXV 3 Providing drainage facility for left out road
in Assolda village panchayat area in a
length of 2.80km in V.P. Xeldem in
Curchorem constituency.
45.92
XXV 4 Providindg drainage facility to left out road
in Xeldem Village panchayat in a length of
2.8 kms in Curchorem Constituency.
47.95
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
41
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
27 XXIII 1 Improvement,widening and hotmixing of
road from Vazri Bridge (Goa) to Dodamarg
(Maharashtra - Boundary) in a length of
13.75 kms. in state of Goa
4572.61
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per
the priority and approval of the Government.
8. WESTERN GHATS DEVELOPMENT PROGRAMME:
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
30 XVIII 1 Improvement & B.T. of road from Deuwada
to Wagurme up to Crematorium in V.P.
Sancordem in Sanvordem Constituency in
Dharbandora Taluka
47.02
XVIII 2 Reconstruction of 2Nos of culverts at Navem
& Odkarwada on road from Udhalshe to
Kumbharwada in V.P. Sancordem in
Sanvordem Constituency.
38.50
XVIII 3 Improvement of access by providing
interlocking pavers from SH-6 to Anand
Naik house at Vishwambharwadi in V.P.
Sanvordem in Sanvordem constituency in
Sanguem Taluka
32.42
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per
the priority and approval of the Government.
42
PHYSICAL TARGETS PROPOSED FOR THE ANNUAL PLAN 2016-17: The following are the Physical Targets for Roads and Bridges proposed for the Annual
Plan 2016-17:
SR.NO.
DESCRIPTION UNIT 2016-17
A STATE PLAN SCHEMES
1. BRIDGES Nos 3
2. STATE HIGHWAYS
(a). Surface New Roads Kms 7
(b). Surface Improvement of Existing Roads Kms 16
3. MAJOR DISTRICT ROADS
Surface Improvement of Existing Roads Kms 50
4. RURAL ROADS
(a). Surface New Roads Kms 20
(b). Surface Improvement of Existing Roads Kms 250
5. MINING ROADS Kms 2
6. TOURISTIC ROADS Kms 8
7. WESTERN GHATS DEVELOPMENT PROGRAMME
Nos. 1
B CENTRAL SCHEMES
1. CENTRAL ROAD FUND Kms 3
C CENTRALLY SPONSORED SCHEMES
NIL
43
10.22 WATER SUPPLY AND SANITATION
INTRODUCTION: The present water supply demand in the State is catered
through seven regional water supply schemes installed at Opa, Assonora, Sanquelim,
Salaulim, Canacona, Dabose and Chandel. The Salaulim water supply scheme is the
largest amongst all the regional water supply schemes having capacity of 160 MLD
covering most part of the South Goa district.
OBJECTIVES: To improve the service levels of water supply in all the villages/towns to meet the
increasing tourist, industrial, commercial as well as domestic demand. It is proposed
to increase the supply level to 100 LPCD in rural areas and 135 LPCD in urban areas
together with emphasis for 24x7 water supply in the Twelfth Plan Period.
To provide assured source of drinking water supply in rural areas priority to partially
covered habitations to attain 100% coverage of water supply.
To improve the hygienic conditions and create sanitary awareness in rural areas by
constructing pour flush latrines in rural areas.
To extend sewerage facilities in the uncovered urban areas.
SCHEMES PROPOSED IN THE ANNUAL PLAN 2016-17:
I. WATER SUPPLY
1. URBAN WATER SUPPLY SCHEMES:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
1 IX 1 Improvement of water supply scheme in
Mormugao Constituency - Phase I
458.25
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
2 III 1 Water supply project for the corp. of the city
of Pnj. Under JNNURM-Providing lowering
& laying of distribution network at Pnj. Zone
- VI (Miramar & surrounding Areas)
1277.98
III 2 Water supply project for the corporation of
the city of Pnj. Under JNNURM - Providing,
lowering & laying of distribution network at
888.45
44
Pnj. Zone- V (Altinho & surrounding areas)
III 3 Water supply project for the corporation of
the city of Pnj. Under JNNURM - Providing,
lowering & laying of distribution network at
Pnj. Zone- II,III & IV (Panaji - Goa)
1251.71
IX 4 Improvement of water supply to Mormugao
Constituency - Construction of 650cum
OHR at Sada opposite to sada Subjail
135.61
IX 5 Replacement of old 300mm dia AC pipeline
with 300mm dia DI Class K - 9 pipeline
from 500m3 GLR at Monte to Gelin
Restaurant in Margao Constituency
98.95
XII 6 Supply installation testing and
commissioning of 33KV transformer and
vertical turbine pumps at SWW
328.72
XII 7 Augmentation of 160MLD Salauli Water
Supply Scheme – Providing & laying
300mm dia D.I. Conveying main from Balli
to Ghodkamorod GLR at Velim in Velim
Constituency.
390.20
XVII 8 Laying of underwater pipeline at Sirsaim
Quitla river crossing for water supply to
Aldona constituency.
97.92
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
3 III 1 Construction of 800m3 GLR at Marcaim in
Marcaim constituency
70.30
III 2 Improvement of water supply system in
various wards of village panchayat
Marcaim and Bandora – Supplying, laying ,
jointing and commissioning of 300
mm dia D.I conveying main from
Tapobhumi, Kundaim to 300m3 GLR at
Marcaim in Marcaim Constituency
302.12
IX 3 Improvement of Ws by laying of additionsl
water pipeline at ward no XVIII of
Mormugao Muncipal Council at New
Vaddem in Dabolim constituency
47.33
IX 4 Shifting & replacement of old pipeline with
150mm DI pipeline from Baina to Sada
93.68
45
junction in Mormugao Constituency.
XII 5 Augmentation of Salaulim Water Supply
Scheme. S.H: - Providing & laying 200mm
dia D.I. Conveying main from Khanagini to
300 m3 OHR at Gaval - Khol in Khola
Panchayat, in Quepem Constituency.
369.99
XVII 6 Improvement of water supply scheme to
Mapusa city in Bardez Taluka - Construction
of 1000m3 GLR at Dattawadi. Cosntruction
of pump house and testing and
commissioning of centrifugal pumpsets.
124.32
XVII 7 Improvement of water supply scheme to
Khorlim in Bardez Taluka--Providing &
laying conveying main and distribution main
and Construction of 800 m3 GLR.
414.00
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
2. RURAL WATER SUPPLY SCHEMES:
Majority of the villages in Goa State in general exhibit semi urban nature. The
requirement of water in most of the rural areas is that of a medium class town. Most of
the villages are covered under the seven regional water supply schemes and very few
villages are covered with local sources. Therefore, majority of rural population in Goa are
covered under treated water. At present the average supply level in villages is 82 LPCD
as against 40 LPCD as per the norms of Government of India for rural areas.
Action plan is made to cover most of the villages under regional water supply
schemes. It is aimed to increase the supply level of the existing covered villages to 100
LPCD in the Twelfth Plan period.
2.1 MINIMUM NEEDS PROGRAMME:
Following schemes are implemented under the programme:
(i) Piped water supply schemes with local sources.
(ii) Extension of regional water supply scheme to cover the villages.
(iii) Coverage of uncovered areas.
(iv) Improvements in the schemes.
(v) Improvement of service level.
(vi) Free water connections.
(vii) Schemes of SC/ST sub plan.
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
46
SR.
NO
.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
4 IX 1 Improvement of WSS Designing supplying
installation & commissioning & maint of 10
MLD pressure filter plant & construction of
3000 cum RCC sump at verna Pumping
station,Cuelim,verna Goa including
operation & maint for a period of 3 years
756.21
XVII 2 Strengthening, improvement, replacement
and minor extension of the distribtuion
network of various water supply scheme in
Mandrem constituency.
48.39
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
5 III 1 Construction of 25 MLD water treatment
plant on Madai river Ganjem - Ponda
Including rising mains conveying mains &
reservoirs at various places in Ponda,
Bicholim, Sanguem & Sattari Taluka -
Designing detail Engineering & construction
of 25 MLD water treatment plant including
all Civil, Mechanical, Electrical and
Instrumentation work on turkey basis on
Madai river at Ganjem Ponda including
operation and maintenance for a period of
five years.
5543.31
III 2 Construction of 10 MLD water treatment
plant at Maisal Dam Panchawadi in Shiroda
constituency.
5299.22
IX 3 Replacement of old 200mm dia AC pipeline
with 250mm dia DI line from PHE tank upto
Bogda Police in Mormugao Constituency
83.25
XX 4 Providing and laying and DI pipeine from
Sanvordem Tisk to Capxem for four lane in
VP Sanvordem Constituency
67.36
XX 5 Laying of ductile pipeline a Assolda
Xelvona from Assolda coparamoddi
junction to Xelvona railway gate in
curchorem Constituency
60.18
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
47
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
6 III 1 Supplying, laying, jointing & commissioning
of D.I conveying main from By-Pass road
junction (P-70) Curti to Betoda in
Shiroda Constituency
240.77
III 2 Improvement and strengthening of water
supply system to Bambolim Nauxi and
surrounding areas in St Andre Constituency.
623.64
III 3 Improvement and strengthening of water
supply system to Palem- Siridao and
surrounding areas in St Andre Constituency.
424.66
IX 4 Improvement of water supply system into
Antrix Manor & surrounding area in
Dabolim constituency
93.70
IX 5 Extension pf WS network to Littles Primary
School ,Zuarinagar ,Sancoale in Cortalim
constituency.
40.79
XVII 6 Construction of GLR and OHR at
Umtawado Calangute including pumping
installation.
272.00
XVII 7 Augmentation of water supply scheme from
15 MLD to 30 MLD Water treatment plant
at Chandel in Pernem taluka.
8510.57
XX 8 Augmentation of water supply to VP
Sancorda in Sanvordem constituency
309.45
XX 9 Improvement of water supply at Cavarem
Maina and Pirla in VP Cavrem Pirla in
Sanguem Constituency
553.47
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
2.2 Special Component (SC) Sub- Plan
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
8 XVII 1 Urgent repalcement of distribtuion pipeline
from Don Khamb to Aroba in Dhargal (SC
sub plan).
80.63
XVII 2 Construction of single seater pour flush
water seal latrines with twin leach pits for
37.55
48
five users for SC families in Pernem
cosntituency (150 Nos) of Pernem Taluka.
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
9 XX 1 Augmentation of WSS to Canacona SH:-
Providing and laying DI and Msrising main
600mm Dia from Chapoli to treatment plant
,Conveying main and distribution
pipeline,Construction of Service reservoir 2
nos in Canacona muncipal Area
178.83
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
2.3 Tribal (ST) Sub- Plan
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
11 III 1 Tribal sub plan and special component plan
for SC and ST communities in Shiroda
constituency – Supplying, laying and
jointing of distribution mains from 800 cu.m
GLR at Gowal Nirancal to Nirancal village
91.14
XX 2 Construction of RWSS to Jakem and
Manewada in VP Netravalim in Sanguem
constituency
48.09
XX 3 Improvement of RWSS to Vaddem Colony
II in Sanguem Constituency . Replacement
of AC pipeline at rising main, under TSP
60.97
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
12 XX 1 Replacement of 300 AC pipeline from
Xelpem to Sanguem by 400 mm DI from
Xelpem treatment plant to Sanguem GLR in
741.8
49
Sanguem Constituency under Tribal Sub
Plan
XX 2 Construction of 800m3 GLR at Sanguem
constituency in Sanguem Taluka under
Tribal sub Plan
70.75
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
II. SANITATION
1. URBAN SANITATION :
As per 2001 census, 50% of the State is urbanized. The State lacks well-knit
sewerage network and majority of population is still dependant on traditional septic tank
and soak pit system for the disposal of wastewater. Health hazards such as contamination
of ground water or drinking water is due to the lack of adequate soaking capacity of the
soil, letting of the waste water in open drains due to growing urbanization. It is proposed
to cover all the major towns with sewerage network using appropriate technology, to take
the goal of total sanitation and clean environment in urban areas. It is also proposed to
extend the network to the unsewered areas. It is necessary to enforce various measures to
make the residents to avail sewerage connection in sewered areas in the year 2016-17. It
is proposed to extend the subsidized sewage connections in the Twelfth Plan period.
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
13 IX 1 Construction of 87nos single seater pour
flush water seal laterines with twin leach pits
in Navelim Constituency
20.74
XXI 2 Minor extensions of sewerline to facilitate
house sewer connections at different places
in Ward No. II, III, IV, V and VI of
Mormugao Constituency.
38.46
XXI 3 Renovation/ modification of existing 14
MLD STP at Katem Baina, Vasco-da-Gama-
Design, supply, installation, testing &
commissioning of motor control centre panel
& surface aerator.
67.50
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
50
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
14 III 1 'Implementation of sewage scheme for
taleigao Dona Paula and Caranzalem areas
on the oustirts of Panaji City -Phase I
Design, Construction supply of ) O M for 5
years cyclic Activated sludge process/SBR
based 15 MLD sewage treatment plant
including erection
1672.00
III 2 Implementation of sewerage scheme for
Taleigao, Dona Paula and Caranzalem areas
in the outskirts of Panaji city- Phase II-
Laying of gravity sewer lines including
manholes for covering zones 15 & 18.- Part I
519.69
III 3 Implementation of sewerage scheme for
Taleigao, Dona Paula and Caranzalem areas
in the outskirts of Panaji city- Phase II-
Construction of wet well, gravity sewerlines
& raw sewage pumping mains covering
zones 12 (part) 13 & 14 part-II
1218.05
III 4 Implementation of sewerage scheme for
Taleigao, Dona Paula and Caranzalem areas
in the outskirts of Panaji city- Phase II-
Construction of wet well, gravity sewerlines
and raw sewage pumping mains covering
zones 16 (part) & 17, Part III
672.44
III 5 Implementation of sewerage scheme for
Taleigao, Dona Paula and Caranzalem areas
in the outskirts of Panaji city- Phase III-
Construction of wet well, gravity sewerlines
, rising mains & reinstatement of roads
covering zones 1,2,3,7,8, & 9.
3086.31
III 6 Implementation of sewerage scheme for
Taleigao, Dona Paula and Caranzalem areas
on the outskirts of Panaji city- Phase IV-
Construction of wet well, gravity sewerlines,
rising Main, reinstatement of roads covering
zones 4,5,6 & 10
2931.89
III 7 Maintenance of sewerage system n Panaji
city- Design, construction, supply, erection,
testing and commissioning of cyclic
1035.61
51
activation sludge process/ SBR based 2
MLD sewage treatment plant at Patto Panaji-
Goa including O & M for 5 years on
Turnkey basis.
IX 8 Construction of 150nos single seater pour
flush water seal laterines with twin leach pits
for 5 users in Navelim Constituency
37.55
IX 9 Revised Construction of single seater pour
flush water seal laterine with twin leach pits
for five users in Curtorim Constituency
56.39
XVII 10 Construction of single seater pour flush
water seal latrines with twin leach pits for
fiv users in Pernem Municipliarty area in
Pernem cosntituency (100 Nos).
25.03
XXI 11 Extending sewerage facility to the area from
Shri Maruti Mandir at Mangor to Baina
Cementry at Sasmolem Baina and
surrounding araes in Vasco Constitutency.
113.99
XXI 12 Providing sewerline to areas surrounding
Ganesh Temple at New Vaddem in Dabolim
Constituency.
65.16
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
15 IX 1 Construction of single seater pour flush
water seal laterines with twin leach pits for
five users in Curtorim const
19.32
XX 2 construction of 500 nos single seater pout
flush water seal latrines with twin leach pit
for five users in VP Collem in Sanvordem
Constituency in dharbandora Taluka
141.93
XX 3 Construction of 250 nos single seater pour
flush waterseal latrines with twin leach pits
for five users for Sanguem Constituency
70.48
XXI 4 Laying of sewerlines & construction of
manholes from Khapreshwar Temple to
Railway Guest House at Belabai in Vasco
Constitunecy.
60.09
XXI 5 Extension of sewer network to areas
surrounding Gulmohar Park Residency at
Chicalim in Dabolim Constituency.
69.21
52
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
2. RURAL SANITATION:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
16 XX 1 Constrcution 250 nos single seater pour
flush water seal latrines for five users with
leach pits in VP Sanvordem in Sanvordem
Constituency. (213 nos)
50.78
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
17 III 1 Construction of 213 nos. of single seater
pour flush water seal latrines with twin leach
pits for 5 users in shiroda village in shiroda
constituency.(Balance work).
50.79
III 2 Construction of 131 nos. of single seater
pour flush water seal latrines with twin leach
pits for 5 users in Borim village in shiroda
constituency.(Balance work).
31.24
III 3 Construction of 220 Nos. of single seater
pour flush water seal latrines witjh twin
leach pits for 5 users in Priol Constituency
(balance work)
52.46
XVII 4 Construction of single seater pour flush
water seal latrines with twin leach pits for
five users in Pernem cosntituency 327 nos
(Balance work).
77.97
XVII 5 Construction of single seater pour flush
water seal latrines with twin leach pits for
five users in Mandrem constituency 250 nos.
(Balance work) 199 nos.
47.45
XX 6 Construction of 200 nos single seater pour
flush water seal latrines with twin leach pits
for 5 users for VP Kaley in Sanvordem
constituency in Sanguem Taluka
50.00
53
XX 7 Construction of 250 nos single seater pour
flush water seal latrines with twin leach pits
for 5 users for Sanguem in Sanguem Taluka
62.59
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
18 III 1 Construction of 300 nos of single seater pour
flush water seal latrines with twin leach pits
for the user in Shiroda constituency.
75.11
III 2 Construction of 150 units of single
seater pour flush water seal latrines with
twin leach pits for five users in St.Andre
Constituency, Tiswadi Taluka.
42.20
III 3 Construction of 150 units of single
seater pour flush water seal latrines with
twin leach pits for five users in St.Andre
Constituency, Tiswadi Taluka.
42.20
III 4 Construction of 180 nos. of single seater
pour flush seal latrines in Bandora, Kavlem,
Kundaim and Durbhat- Agapur village
panchayat in Marcaim Constituency
50.75
XX 5 Construction of 200 nos single seater pour
flush water seal latrine with twin leach pits
for five users at VP Netravalim of Sanguem
Constituency.
56.39
XX 6 Construction of 200 nos single seater pour
flush water seal latrine with twin leach pits
for five users in Vaddem in VP Vaddem
curdi in Sanguemconstitency
56.39
XX 7 Construction of 250 nos single seater pour
flush water seal latrines with twin leach pits
for five users in VP Sanvordem in
Sanvordem constituency in dharbandora
Taluka
71.12
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
2.2 Tribal (ST) Sub- Plan
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
54
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
24 IX 1 Replacement of old damaged AC & GI
pipeline including shifting of service line in
Ilha de Rachol in village Panchayat Rachol
under TSP for SSANSAD ADARSH
YOJNA in Curtorim
29.42
XX 2 Construction of 500 nos single seater pour
flush water seal latrines with twin leach pits
for five users for LIG families inVP Cola in
quepem constituency in Canacona Taluka
under TSP
141.93
PHYSICAL TARGETS PROPOSED FOR THE ANNUAL PLAN 2016-17:
The following are the Physical Targets for Water Supply and Sanitation proposed for the
Annual Plan 2016-17:
SR.NO.
DESCRIPTION UNIT 2016-17
A STATE PLAN SCHEMES
WATER SUPPLY SECTOR
1 URBAN WATER SUPPLY
FREE TAP CONNECTIONS
Towns covered nos. 8
No. of free connections released nos. 700
Population covered nos. 3500
2 RURAL WATER SUPLY (UNDER MNP)
FREE TAP CONNECTIONS
No. of free tap connections released nos. 3200
Population covered nos. 16000
SANITATION SECTOR
1 URBAN SANITATION
SEWERAGE CONNECTIONS
Towns covered nos. 4
No. of sewerage connections released nos. 2200
Population covered nos. 11000
SUBSIDISED SEWERAGE CONNECTIONS
Towns covered nos. 3
No. of sewerage connections released nos. 100
Population covered nos. 500
55
2 RURAL SANITATION
No. of Individual Latrines constructed nos. 3400
Population covered nos. 17000
No. of Community Latrines constructed nos. 4
Population covered nos. 400
B CENTRAL SCHEMES
NIL NIL
C CENTRALLY SPONSORED SCHEMES
NATIONAL RURAL DRINKING WATER PROGRAMME (NRDWP)
Villages covered nos. NIL
56
10.23 DEPARTMENTAL HOUSING
OBJECTIVES:
To provide residential housing to Government staff at the place of work, this being an
integral part of employment amenities
Improvement to the existing old quarters.
SCHEMES PROPOSED IN THE ANNUAL PLAN 2016-17:
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
2 VIII 1 Construction of Police quarters at Arlem
Fatorda Margao. Administrative Approval
vide no. 17/16/2013/ HD(G) dtd.
14/11/2013.
696.75
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
3 VIII 2 Covering of Verandas for buildings C-1 to
C-8 at Junta qtrs.., Pajifond in Fatorda
Constituency.
Sent for Administrative Approval.
63.46
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per the
priority and approval of the Government.
PHYSICAL TARGETS PROPOSED FOR THE ANNUAL PLAN 2016-17: The following are the Physical Targets for Departmental Housing proposed for the
Annual Plan 2016-17:
SR.NO.
DESCRIPTION UNIT 2016-17
1. Improvement & Strengthening of Existing
Residential Quarters for Govt. Servants
under General Pool Accommodation.
Sq. mts. 1000
57
11.2 PUBLIC WORKS
OBJECTIVES: 1. To provide Government office accommodation at taluka head quarters for the
effective implementation of Government programme.
2. To develop land for various Government construction programme.
SCHEMES PROPOSED IN THE ANNUAL PLAN 2016-17:
A. SCHEMES COMPLETED DURING THE YEAR 2015-16: The following
schemes were completed during the year 2015-16:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
COST ON
COMPLETION
IN LAKHS
1 V 1 Revitalization of main street at parra in
calangute constituency
123.67
B. SPILLOVER WORKS OF THE YEAR 2015-16: The spillover works of the year
2015-16 in the Annual Plan 2016-17 is as follows:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
2 V 1 Construction of proposed new office
complex for pwd office in Bicholim(re
tender)
247.98
V 2 Proposed construction of bldg of police
station cum housing at mapusa
583.26
In addition to the above, there are various other spillover works in the State, of the
year 2015-16 in the Annual Plan 2016-17.
C. NEW SCHEMES PROPOSED FOR THE ANNUAL PLAN 2016-17: The
following new schemes are proposed to be taken up in the Annual Plan 2016-17:
SR.
NO.
WD SR.
NO.
NAME OF THE SCHEME AS PER AA
& ES ORDER
ESTIMATED
COST IN LAKHS
3 V 1 Construction of crematorium at Qitla 106.76
V 2 Renovation of crematorium located at
siquelim village in mayem constituency
0.38
V 3 Construction of hall near sai baba temple at
poilgao in mayem constituency
0.32
V 4 Construction of community hall along with 8
seat toilet in s no 108/26 in ward 11 at
kodgini surla bicholim
0.29
V
5
Repair & renovation of existing shed near
Rasttoril Devastan at patto haldanwada
mayem
0.26
58
In addition to the above, there are various other new schemes proposed to be
taken up in the State, in the Annual Plan 2016-17. New schemes will be taken up as per
the priority and approval of the Government.
PHYSICAL TARGETS PROPOSED FOR THE ANNUAL PLAN 2016-17:
The following are the Physical Targets for Public Works proposed for the Annual Plan
2016-17:
SR.NO.
DESCRIPTION UNIT 2016-17
1. Construction of New Buildings/ Modification of
Existing Buildings. Sq. mts. 4000