山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf ·...

18

Upload: buithuan

Post on 26-Feb-2018

229 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

山东省济南市历下区历山路70号

0531-88933691 [email protected]

0531-88576361 / 88576377

Page 2: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons
Page 3: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Catalogue

Catalogue

CATALOGUE

18-33

0302

Page 4: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Enterprise Introduction

Shandong Province Industrial Equipment Installation Corporation was established in 1958 and, after 50 years of development, is now a large-scale installation company boasting strong technical force, sophisticated technology and equipment, perfect detection means, and rich experience.

We hold now General Contractor Class 1 qualif ications for Mechanical and Electrical Installation, Class 2 qualifications for Housing Construction, electrical projects, environmental projects, metallurgical projects, petroleum chemical industry, and municipal public works, Class 2 professional qualification for elevator, decoration, steel structure, lifting equipment and kiln, Class 1 boiler, GC1, GD1, GB pressure pipeline, electric equipment (repair, test), fire facilities and other relevant qualification certificate, overseas project contracting qualification certificate and Certificates of quality, safety and environmental system.

Among the total 4385 registered company employees are 107 level-one constructors, 206 level-two constructors and 1356 of all kinds of professional and technical personnel.

The company's total assets is 476 million with 1530 machinery and equipment and all kinds of l ift ing, transportation, processing, welding, debugging, testing and other equipment.

We undertake domestic and foreign works such as the installation of various devices, the fabr icat ion o f non-s tandard equ ipment and pressure vessels, industrial furnace masonry work, electric and instrument commissioning, steel structure factory building, high level civil architecture, decoration and fitment, and etc. in industries as metallurgical, chemical, power, light industry, papermaking, medicine, food, petroleum, chemical, electronic and drinks, coke, etc.

Over the years, we always follow the business purpose of "Customer First, Credit First" to win the market with first-class service.

We were awarded the honorary t i t le of "advanced project quality manager" and the project acceptance rate is 100% for many years, and

Enterprise Introductionthe contract performance rate is 100% for five consecutive years. Many of the over 600 electric power and thermal power projects in recent years are awarded excellent at state, ministerial and provincial level.

Typically are:Yantai Synthetic Leather Plant Polyurethane

Industry Base instal lat ion, Shanghai Qingpu Industrial Park thermoelectric installation, Jigang in tegra ted raw mater ia l f i e ld cogenera t ion project, Zibo Jiazhou thermoelectric installation, Shandong Sports Center steel structure installation engineering, Shandong Chenming Paper Holdings Co., Ltd. self-contained power plant installation, Zhangqiu Riyue Chemical Co., Ltd. 20,000 tons / year of dimethyl formamide (DMF) installation works, ethylamine tank fabrication and installation works , F i r s t p ro jec t and 50MW gas power generation projects of coking waste heat boiler installation works of Weifang Steel Group Co., Ltd., Gaomi Wanren thermoelectric steam pipe renovation project, Jinan 2# garbage power plants and etc.

We constructed successively Son Dong Thermal Power Plant in Vietnam, Kalimantan thermal power plant in Indonesia, Malabo Gas Power Plant in Equatorial Guinea, Indonesia Pulp and Paper Group self-contained power plants and other overseas projects,

among which, China's first industrial base of polyurethane - Yantai Synthetic Leather project is were awarded silver medal for National High Quality Project.

The t rad i t iona l cu l tu re o f s ta te -owned enterprises makes the employees always put the interests of enterprises in the first place, and through long history accumulation shared values formed, therefore "Let the workers live a good life" has become the spirit of enterprise and the starting point of all work and at the final destination, and business philosophy of "Rule enterprise by law, quality for survival, base at trust, and unity for development" is our relentless pursuit.

0504

Page 5: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Enterprise Qualification

Enterprise Qualification

0706

Page 6: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Enterprise Qualification

0908

Page 7: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Enterprise Qualification

1110

Page 8: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

A. The highest national construction quality award

"Luban Prize"

B. The highest Shandong construction quality award

"Taishan Cup"

C. The honorary title of "Iron Installation Army"

D. "Lu'an Cup" for many successive years

Enterprise Strength

After decades of unremitting efforts, we are now widely respected and

recognized by the industry and the society, with a higher brand awareness

and reputation in the market, we will continue to make every effort,

innovation, and constantly enhance the corporate brand influence.

A B C

D

Enterprise Strength

1312

Page 9: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Enterprise Honors

Enterprise Honors

1514

Page 10: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Organization Chart

Organization Chart

1716

Page 11: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Engineering Achievements

A. Boiler installation works of Shandong Zhenghe Thermal Power Co., Ltd. B. Boiler installation works of Shandong Hongda Chemical Co., Ltd. C. Boiler Installation works of Taizhou Jintai environmental protection Thermoelectric Co., Ltd.

A BC

Thermal power works

Recent thermal power performanceHo t w a t e r b o i l e r s :1. 2 × 58MW hot water chain boiler installation of newly built heat source for Wudi County District Heating2. 4 × 70MW hot water boiler equipment installation works of Wengniute Xingyang Heating Co., Ltd.

Wa s t e h e a t b o i l e r :1.1 × 20t / h + 1 × 3MW black exhaust heat power generation project of Xinjiang Baicheng Junxin Chemical Co., Ltd. 2. B. 1×45t/h waste heat boiler installation works of Zhangqiu Riyue Chemical Co., Ltd.3. Phase I coking 1 × 50t / h high-pressure waste heat boiler of Weifang Steel Group Co.,4. 2×80t/h+2×50t/h+1×20MW waste heat power generation project of Shandong Lianmeng Chemical Co., Ltd.5. 1×55t/h+1×6MW waste heat power generation project of Shandong Lianmeng Chemical Co., Ltd.6.1×55t/h+1×6MW waste heat power generation project of Shandong Lianmeng Chemical Co., Ltd.

B o i l e r R e p l a c em e n t a n d I n s t a l l a t i o n :1. 2 × 130t / h high temperature and high pressure boiler + 2 × 30MW Turbine Equipment Replacement and Installation works

of Shandong Xinxian Ruixiang Thermal Power Co., Ltd.

2. 4 × 130t / h high temperature and high pressure circulating fluidized bed boiler + 3 × 25MW steam turbine generator set

with 3 × 30MW Turbine Equipment Replacement and Installation works of Ju County Fengyuan Thermal Power Co., Ltd.

3. 1 × 240t / h high temperature and high pressure circulating fluidized bed boiler and auxiliary equipment Replacement and

Installation works of Yanggu Shenqkuan Thermo Power Co., Ltd.

4. 2 × 240t / h + 2 × 50MW power plant project integral Replacement and Installation works of Shanxi Gu County Huakang

Foundry Co.

F l u i d i z e d b e d a n d p u l v e r i z e d c o a l b o i l e r :1. A. 2×75t/h boiler +6×130t/h high temperature and high pressure boiler installation works of Gaomi Vosges Thermal Power Co., Ltd. 2. 5×75t/h boiler +3×130t/h high temperature and high pressure boiler installation works of Shouguang Union Chemical Co. Ltd. 3. Shandong Zhenghe Thermal Power Co., Ltd. 1 × 260t / h high temperature and high pressure boiler + 1 × 15MW turbine installation works4. 2×220t/h high temperature and high pressure boiler + 1 × 18MW turbine installation works of Taizhou Jintai environmental protection5. 2 × 220t / h high temperature and high pressure boiler + 2 × 25MW turbine installation worksS of handong Hongda Chemical Co., Ltd. 6. 4 × 220t / h high temperature and high pressure boiler + 2 × 50MW turbine installation works of Weifang Iron and Steel Group Company7. 2 × 260t / h high temperature and pressure pulverized coal boiler installation works of Heilongjiang Quanlin ecological agriculture Ltd.

Engineering Achievements

1918

Page 12: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Ch em i c a l w o r k s

A. 100,000 tons / year of refined alcohol ketone installation works of Shandong Yongzhi Chemical Co., Ltd. B. 80,000 tons / year butadiene rubber project of Shandong Yuhuang Chemical Co., Ltd. C. 520,000 tons / year of granular urea works of Mingshui Chemical Co., Ltd. D. Phoase I, II and III 40,000 tons / year of DMF works of Shandong Jinmei Riyue Chemical Co., Ltd.

1. Shandong Mingshui Chemical Co., Ltd.1. Phase I and II 180,000 tons / year of urea project2. 120,000 tons / year and 300,000 tons / year methanol project3. Four M-190 compressor installation works2. Shandong Jinmei Riyue Chemical Co., Ltd.1. 30,000 tons / year aniline technological transformation works2. Phase I, II and III 40,000 tons / year of DMF works3. 120,000 tons / year methanol works4. 20,000 tons / year ethylamine works5. Φ1200 Ammonia installation works3. 300,000 tons / year of PVC, 240,000 tons / year of caustic soda relocationworks of Dezhou Shihua Chemical Co., Ltd. 4. Coking cogeneration synthetic ammonia, thiamine project processes, equipmentinstallation works of Shandong Hongda Chemical Co., Ltd. 5 . 1 mi l l ion tons / year delayed coking uni t insta l la t ion works of ShandongHengyuan Petrochemical Co., Ltd. 6 . 6000 tons / year Di f luoromethane insta l la t ion works of Shandong HuafuChemical Co., Ltd. 7. 400,000 tons / year of caustic soda, 400,000 tons / year of PVC resin works ofHebei Shenghua Chemical Co., Ltd. 8. 800,000 tons / year of LPG aromatics works of Shandong Shouguang LuqingPetrochemical Co., Ltd. 9. 100,000 tons / year caprolactam works of Shandong Dongju Chemical Co., Ltd.10. 45,000 tons / year total ammonia copper wash change alcohol hydrocarbonworks of Shandong Yuncheng Lufa Chemical Co., Ltd. 11. 80,000 tons / year butadiene rubber works, 100,000 tons / year of rare earthRubber works of Shandong Yuhuang Chemical Co., Ltd. 12. Foam resin installation works and 15,000 tons / year of alcohol works of JinanShengquan Group Co. Ltd. 13. 100,000 tons / year cyclohexanone installation works of Heze Juxing ChemicalCo., Ltd. 14. 300tds / d Recovery replacement and installation works of Hunan Huayao Pulp& Paper Co., Ltd.

Re c e n t C h em i c a l Wo r k s p e r f o rm a n c e

A BC

D

Engineering Achievements

2120

Page 13: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

A. Jinan City 2# Solid Waste Treatment Plant works (Luban Prize)

B. Suqian City garbage generation BOT works

C. Hanneng PV Base Building works

En v i r o nm e n t a l w o r k s

A B C

Ex h a u s t g a s t r e a tm e n t :1. 2 × 125MW coal-fired unit flue gas desulfurization works of Shandong Heze Power Plant2. 4 × 150MW generating units flue gas desulfurization works of Zouping Weiqiao Thermal Power Co., Ltd.3. 2 × 330MW generating units flue gas desulfurization works of Huaneng Dezhou Power Plant4. 3 × 75t / h + 2 × 58MW boiler flue gas desulphurization renovation works (EPC) of Wudi County Xinxing Thermal PowerLimited Liability Company

B i om a s s e n e r g y :

1. Weifang Changyi Anli biomass power 2 × 75t / h boiler + 2 × 12MW turbine installation works of China Huadian EngineeringGroup Co., Ltd. 2. Anda biomass 1 × 130t / h + 1 × 12MW generator sets and ancillary equipment installation works of Sangde EnvironmentalResources Co., Ltd. 3. Pingyi electricity Biomass Power Co., Ltd. 1 × 130t / h + 1 × 30MW turbine installation works of Dalian Qinneng ElectricPower Engineering Co., Ltd.

Ph o t o v o l t a i c p ow e r g e n e r a t i o n :1 . Q i n g h a i H a i y a n C o u n t y i n s t a l l a t i o n a n d c o m m i s s i o n i n g o f 2 M W p B I P V r o o f i n g p h o t o v o l t a i c p o w e r p l a n t w o r k s o f W e i h a i Z h o n g b o P h o t o e l e c t r i c C o . , L t d . 2 . Yu c h e n g H a n n e n g P V B a s e B u i l d i n g B I P V d e m o n s t r a t i o n p r o j e c t H a n n e n g P V I n v e s t m e n t C o . , L t d . ( G e n e r a l c o n s t r u c t i o n c o n t r a c t )3 . J i n a n Z h e n f a l o g i s t i c s w a r e h o u s i n g 1 . 1 7 3 M W p B I P V w o r k s o f S h a n d o n g X i n s h i j i W e n z h o u I n d u s t r i a l B a s e D e v e l o p m e n t C o . , L t d . 4 . 6 2 M W p r o o f D i s t r i b u t e d P o w e r w o r k s o f N i n g b o C o n s t r u c t i o n E n g i n e e r i n g C o . , L t d .

Win d p ow e r g e n e r a t i o n :1. 50MW large vertical axis wind power plant installation works of Shandong Zhongtai New Energy Co., Ltd. (the world's largestwind power generation equipment)

Wa s t e T r e a tm e n t :1. Changshu City Solid Waste Incineration Plant 2 × 300T / D boiler + 1 × 12MW turbine installation works of Shanghai PudongConstruction Management Co., Ltd. 2. Suqian City garbage power BOT Project 2 × 300T / D boiler + 1 × 12MW turbine installation works of EverbrightEnvironmental Energy (Suqian) Co., Ltd. 3. Jinan City 2# Solid Waste Treatment Plant 4 × 500T / D boiler + 2 × 18MW turbine installation works of EverbrightEnvironmental Energy (Jinan) Co., Ltd. 4. Nanjing Jiangbei Industrial Park intravenous garbage incineration power plant 4 × 500T / D incineration boiler installationworks of Nanjing Environmental Renewable Energy Co., Ltd. 5. Jixian garbage incineration power generation project 2 × 350T / D boiler + 1 × 12MW turbine installation works of TianjinGreen Power Renewable Energy Co., Ltd. 6. Gaomi garbage incineration power generation projects 2 × 400T / D boiler + 1 × 12MW turbine installation works of GaomiLilang Matilda Environmental Protection Technology Co.

Recent E

nvir

onm

enta

l Works p

erform

ance

Engineering Achievements

2322

Page 14: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

Metallurgical / Materials works

A. tar tower installation works of Jinan Iron and Steel Co. B. cement clinker cogeneration works of Qingzhou China United Cement Co., Ltd. C. cement clinker production line works of Beichuan United Cement Co., Ltd.

ABC

Metallurgy:1.320m2 sintering machine finished dust blower, chimney construction of Jinan Iron and Steel Co., Ltd. 2.1 # -4 # blast furnace gas washing Improvement works of Jinan Iron and Steel Co. 3.5 # 40000Nm³ / h oxygen plant works of Jinan Baldwin Gas Co. 4. Steel blower station expansion works of Zibo Zhanggang Iron and Steel Co., Ltd.5. Blast transformation works and Phase III medium and small plate of Jinan Iron andSteel Co., Ltd.

Bu i l d i n g Ma t e r i a l s :1. 6000T / D cement clinker production line of heat power station works of QingzhouUnited Cement Co. Ltd. 2. 4800T / D cement clinker production line works of Beichuan United Cement Co. Ltd.3. 3800T / D cement clinker production line preheater renovation works of DangdaShandong Cement Co. Ltd. 4. Installation of electromechanical equipment of 4000T / D cement clinker production lineof Linfen Shanshui Cement Co. Ltd. 5. Installation of electromechanical equipment of 5000T / D cement clinker production lineof Kazuocong Yuanhao Cement Co. Ltd. 6. Installation works of 1 million tons / year grinding station electromechanical equipmentof Jingbian County Shanshui Cement Co., Ltd. 7. 600,000 tons / year of grinding station works of Aohanqi Shanshui Cement Co., Ltd.8. Electromechanical equipment installation of 2 million tons / year of limestone deepprocessing projects of Yantai Shanshui Cement Co., Ltd. 9. 2 million tons / year of concrete aggregate and sand works of Anqiu Shanshui CementCo., Ltd. 10. Electromechanical equipment installation works of concrete aggregate of LinquShanshui Construction Materials aggregate Co. Ltd.

Recent metallurgical / Materials Engineering performance

Engineering Achievements

2524

Page 15: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

A, Fabrication and installation works of four steel lighthouse of Shandong Province gymnasiumB, Fabrication and installation works of tank group of Jianghan Oilfield Dalian projectC, Fabrication and installation works of tanks of Zhenghe Group Inc.

Fabrication and installation works of Steelwork / tank

S t e e l w o r k :1. Fabrication and installation works of steel roof trussof Jiangsu Kunshan float glass Co., Ltd., total weight 1800T2. Shandong Juli Group crane beam steel plant, area46,778 square meters, total weight 2600T3. Fabrication and installation works of 4200 squaremeters steel plant of Jinan Power Equipment Factory4. Steel fabrication and installation works of YantaiSynthetic Leather Factory, total weight 4263T5. Fabrication and installation works of 7836 squaremeters steel plant of integrated warehouse of Shandong Rizhao Pulp Mill

Recent steelwork / tank fabricationand installation works performance

AB C

Ta n k :1. 1 × 5000m³ furfural tank fabrication and installation works of Jinan Shengquan Group Co., Ltd.2. Fabrication and installation works of 1.6 million tons / year delayed coking unit and 1 × 20000m³ + 3 × 10000m³ slag tank of ShandongYuhuang Shengshi Chemical Co., Ltd. 3. Fabrication and installation works of 32% lye tank (VN = 5000 m³) of Dezhou Shihua Chemical Co., Ltd.4. Fabrication and installation works of 3 × 23000 m³ + 6 × 10000 m³ + 24 × 5000 m³ + 4 × 3000 m³ oil tanks and 2×5000 m³ water storagetanks of Dalian project, shibocanghai Construction Engineering Co., Ltd. Jianghan Oilfield5. Fabrication and installation works of 100,000 tons / year of refined crude benzene storage tanks of Shandong Weijiao Group Co., Ltd.6. Fabrication and installation works of 2 × 50000 m³ storage tanks of Zhenghe Group Inc.7. Fabrication and installation works of 400,000 tons / year PVC tank of Qingdao Haijing Chemical Group Co., Ltd.8. Fabrication and installation works of 3 × 10000m³ petrol tanks of Shandong Huaxing Petrochemical Group Co., Ltd.

Engineering Achievements

2726

Page 16: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

O t h e r w o r k s

A. China Petroleum gas station works

B. Jinan Daily relocation works

C. Auto 4S shop renovation works

D. Jinan Pulishi mineral water bottling plant No. 3 Branch plants waterline works

E. Boiler main control room of Jinan City 2# garbage disposal plant

F. Anheuser-Busch InBev (Yanji) Beer Co. production line works

A B CD

EF

Engineering Achievements

2928

Page 17: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

A. Indonesia MT.MURO gold mine self-contained power plant installation works

B. Indonesia IMM Bontang power plant installation works

C. 2 sets of 110MW power thermal generator sets in Son Dong Thermal Power Plant in Vietnam

Ov e r s e a s w o r k s

A BC

1. 1 × 75t / h boiler + 1 × 12MW turbine installation works of Indonesia PT.GT Power

Plant

2. 1 × 20t / h boiler + 1 × 3MW turbine installation works of Straits Marine &

Infrastructure Pte Ltd Thermal Power Plant

3. 2 × 40t / h boiler installation works of Indonesia IMM Bontang power plant

4. 2 × 110MW turbine installation works of Vietnam Son Dong Thermal Power Plant

5. 3 × 42MW gas turbine power plant installation works of Malabo Gas Power Plant

in Equatorial Guinea

6. 2 × 130t / h boiler + 2 × 30MW turbine installation works of Indonesia Pulp &

Paper Group Co. Ltd.

7. 2 × 50MW coal-fired electric power plant thermal control works of Westport

Cambodia

8. CNPC camp (in Iraqi) substation equipment installation and commissioning works

Recen t overseas works performance

Engineering Achievements

3130

Page 18: 山东省济南市历下区历山路70号 0531-88576361 / …epowerdubai.com/images/sdsazgs.pdf · point of all work and at the final destination, ... Phase I and II 180,000 tons

山东省济南市历下区历山路70号

0531-88933691 [email protected]

0531-88576361 / 88576377