7 steps for sustainable adoption (sharepoint- and project server-based pmis)

33
7 steps to Sustainable Adoption SP & PS based (PMIS) Mike Taylor, PMP Founder and CEO

Upload: innovative-e

Post on 11-Jun-2015

208 views

Category:

Leadership & Management


3 download

DESCRIPTION

Learn how to keep projects and project teams on task to reap lasting benefits from your PMIS investment.

TRANSCRIPT

Page 1: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

7 steps to Sustainable Adoption

SP & PS based (PMIS)

Mike Taylor, PMPFounder and CEO

Page 2: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

2

Why won’t this one fit?

Page 3: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Mike Taylor, PMP• 26 years Business & IT

solutions

• Founded two companies

• Passionate about human capacity to do great things

e: [email protected]

t: http://twitter.com/iecmike

w: http://innovative-e.com

Page 4: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Problem Space

Page 5: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

We all know: Most Projects Fail

5

~75% don’t meet key objectives first time Scope, Time, Budget ROI

It’s bad for everyone System users Management You

Really bad if the project is implementing a PMIS!

Page 6: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Timeless Issues

6

Ill defined and/or incomplete requirements

System breakage and/or bad user experience

Lack of user buy-in/adoption Training? Support? VALUE?

Page 7: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

7

Project Management

Intranet/Extranet Yammer Ready

Microsoft Project Server and SharePoint 2013

Future LOB Integration

SharePoint a modern Business Platform

Page 8: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

SharePoint Complexities

8

The platforms have embedded capabilities that evolved over years

Most don’t understand vast array of capabilities & how to best utilize

Organizations have their unique and often somewhat ad hoc processes

Pre-conceived notions applied

Over customization in many SharePoint implementations raising complexity & cost and

lowering sustainability

Page 9: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Traditional Approaches not Working

9

Works against platform

Overly Ambitious

Incomplete/Ad Hoc Processes

Users lose interest

Technology Focused

Page 10: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

I’ve seen the enemy and it’s me…

10

Page 11: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Adoption 1st, Value will follow

Page 12: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Sustainability Top Priority

12

If these solutions are used – they WILL deliver value. It’s self-evident.

In most cases, it is a waste of valuable resources (time and money) trying to fully justify solutions up front.

Page 13: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Sustainable Adoption

13

Drive Excitement Facilitate Change Empower and Assist

Page 14: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Identify Needs

Implement Grow

Prioritize

Iterative approach – it’s truly a Journey!

Page 15: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

7 Steps to Sustainable Adoption

Page 16: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

1. Rapid Results

Get something that works – fast!

• Address a limited set of pain points.

• Prioritized by what can be ADOPTED, not necessarily top value or relative pain to the enterprise.

Page 17: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

2. Use it – As is

Adjustment period

• No customizations or changes

• Fosters understanding of how platform works

• Avoids ‘chasing your tail’ requirements that waste time & money

Page 18: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

3. Improve Usability

Tweak through minor iterations

• Processes

• Reporting

• Adoption support – i.e. learnings, videos, etc.

Page 19: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

4. Onboard

Open up access to system

• New users in initial groups

• New groups, departments, etc.

.

Page 20: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

20

Making Things Simple Is Not Simple

Page 21: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

5. Enable Advanced Capabilities

Layer in advanced features addressing

• More dimensions of project management & collaboration

• Specific business pain points

Page 22: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

6. Integrate & Automate

Better accuracy & robust capabilities

• Data integration with out LOB systems

• Custom automation of advanced processes

Page 23: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

It’s All About Business Value

23

Expedite Innovation

Facilitate Engagement

Financial Gains

$

Page 24: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

7. Surface Successes & Value Realization Gain ongoing support and investment

• Begin with informal reporting of successes

• Create formal reporting structures for surfacing value realization

• Use business value metrics such as ROI,CSI, etc. wherever possible

Page 25: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

A Quick Example – Hawai’i OIMT PMIS Alanui

Page 26: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Project Challenges

• Core PM practices and processes are incomplete and/or undefined

• While pockets of expertise exists, organizational project management maturity is low

• Speed, agility, and scalability are critical

Page 27: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Solution Approach:Project Management on Your Terms™ • Rapid integration

• Phased approach balancing technology, process maturity, and personnel

• Application Maintenance & Organizational Adoption (AMOA)

Page 28: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Executive Dashboards

Page 29: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Program Status

Page 30: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Program Detail

Page 31: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Project Status

Page 32: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Recap Laser Focus on Adoption 7 steps:

1. Rapid Results

2. Us It – as is!

3. Improve Usability

4. Onboard

5. Enable Advanced Capabilities

6. Integrate & Automate

7. Surface Successes & Value Realization

Page 33: 7 Steps for Sustainable Adoption (SharePoint- and Project Server-based PMIS)

Q & A

Thank You!