7 fugai trainingturkish
TRANSCRIPT
-
8/11/2019 7 Fugai TrainingTurkish
1/18
TPM : Polyplex 7 Fugai
-1-15/11/2006
7 eit Fugai
-
8/11/2019 7 Fugai TrainingTurkish
2/18
TPM : Polyplex 7 Fugai
-2-15/11/2006
YETERSZ TEMZLN ZARARLI ETKLER
Arza Toz ve yabanc maddeler makinann hareketli ve kaygan paralarna pnmatik, hidrolik ve dier elektronik paralarn kaplayarakparalarn ileyiini etkileyiparza aa karrlar
KaliteBozukluklar
Kalite hatalar rne direk bulam olan yabanc maddelerle yadadolayl yollardan ekipman arzasyla oluur
Ani Arzalar Biriken toz ve kir tabakas atlaklarn bulunmasn zorlatrr, aroynamalara sebep verir,yetersiz yalamalardan dolay ani arzalarmeydana gelir.
Hz Kayb Toz ve kir ypranmay arttrr, srtnmeden kaynaklanan kayplaroluur
-
8/11/2019 7 Fugai TrainingTurkish
3/18
TPM : Polyplex 7 Fugai
-3-15/11/2006
7. GVENL OLMAYAN BLGELER
1. KK HATALAR2. YERNE GETRLMEYEN TEMELARTLAR 3. ULAILMASI ZOR OLAN BLGELER 4. BULAICI,SIZDIRICI KAYNAKLAR 5. KALTE KAYNAKLI HATALAR 6. GEREKSZ VE ACL OLMAYAN PARALAR
7 eit Fugai
-
8/11/2019 7 Fugai TrainingTurkish
4/18
TPM : Polyplex 7 Fugai
-4-15/11/2006
1.KK HATALAR :
Bulama,sznt Toz,kir,ya,gres,pas,boya Hasar atlama, krlma, ezilme,deformasyon, eilme,
Oynama Sallanma,yere dme ,eilme,tuhaflk,annma ,arpklk,
korozyon
Geveklik Kay ve zincirlerde
Anormal Durum Allmn dnda sesler,yksek s,titreim,tuhaf koku,renk deiimi, uygun olmayan basn ve akm
Yapma Engelleme, katlama ,biriken paralar,soyulma,almama
-
8/11/2019 7 Fugai TrainingTurkish
5/18
TPM : Polyplex 7 Fugai
-5-15/11/2006
2. YERNE GETRLMEYEN TEMEL ARTLAR
Yalama Yetersiz, Kirli,Tanmsz,Uygunsuz,Sznt
Yalama tedarii Kirli,hasarl ve deforme olmu yalama azl,arzal yalama borusu
Ya seviye gstergesi levelKirli,hasarl,szan ve doru seviyeyi gstermeyen
Skma Gevek,kayp somun ve civatalar,Vida diinin somunuok amas
-
8/11/2019 7 Fugai TrainingTurkish
6/18
TPM : Polyplex 7 Fugai
-6-15/11/2006
Temizlik Makina yaps, Muhafazalar, Yerleim,Ayak baslacak yerler,boluk
Kontrol Makina yaps, Muhafazalar, Yerleim,Ayak baslacak yerler,Tehizatlarn durumu ve hareketi,operasyon
Yalama Yalama azlnn pozisyonu, yap, ykseklik, ayakbaslacak yerler,yalama ak delii,alan
Skma Muhafazalar, yap, yerleim ls, Alan
Operasyon Makina yerleimi, valflerin pozisyonu,sviler,atak baslacak yer
Ayarlama Basn gstergesinin pozisyonu, termometreler, akm lerler,nem sayac , vakum sayac , etc.
3. ULAILMASI ZOR OLAN BLGELER
-
8/11/2019 7 Fugai TrainingTurkish
7/18
TPM : Polyplex 7 Fugai
-7-15/11/2006
rn Sznt,Dkntler, fkrma,yaylma, tama
Ham madde Sznt,Dkntler, fkrma,yaylma, tama
Yalar Sznt,Dkntler, fkrma,yaylma, tama,hidrolik akkanlar, fuel oil,etc.
Gaz Sktrlm havann szmas ,gazlar,buhar,egsozdumanlar,etc .
Akkanlar Szan su, Scak , souk, yar bitmi rnler, atk sular, etc.
Iskarta Kesiciler, paketleme malzemeleri, uygun olmayan rnler
Dierleri nsanlar tarafndan ve forklifler tarafndan bulatrrlan,krk camlar etc.
4. BULAICI SIZDIRICI KAYNAKLAR
-
8/11/2019 7 Fugai TrainingTurkish
8/18
TPM : Polyplex 7 Fugai
-8-15/11/2006
Yabanc Madde Toz , pas,kir, tala,nem,atk,tahta paracklar,kat paracklar
Darbe Drme ,sarsnt,arpma,titreim vb.
Nem ok az ve ok fazla sznt
Gain Size Sktrlm hava ayralar, merkezka ayralar,
Konsantrasyon Yetersiz s, stma, kartrma, buharlama etc.
Viskosity Yetersiz s, stma, kartrma, buharlama etc
5. KALTE HATALI KAYNAKLAR
-
8/11/2019 7 Fugai TrainingTurkish
9/18
TPM : Polyplex 7 Fugai
-9-15/11/2006
Machinery Pumps, fans, compressors, columns, tanks etc.Piping equipment Pipes, hoses, ducts, valves, dampers etc.
Measuringinstruments
Temperatures, pressure gauges, vacuum gauges,ammeters etc.
Electrical equipment Wiring, piping, power leads, switches, plugs etc.
Jigs & Tools General tools, cutting tools, jigs, molds, dies, frames etc.
Spare parts Standby equipment, spares, permanent stocks, auxiliarymaterials, etc.
Makeshift repairs Tape. String, wire, metal plates etc.
6. GEREKSZ VE ACL OLMAYAN PARALAR
-
8/11/2019 7 Fugai TrainingTurkish
10/18
TPM : Polyplex 7 Fugai
-10-15/11/2006
Zemin Dz olmayan zemin,atlaklar,delikler,kntlar,kabuk
Basamaklar ok dik, dzensiz, eksik,kaygan basamak
Aydnlatma Belirsiz,standartlarn dnda,kirli yada krk kaplamalar
HareketliMakinalar
Paralarn yerinden kmas,dklen ya yada krlm kaplama,acil durum butonunun olmamas
Yukarkaldranparalar
Teller,kancalar,vincin fren ve dier paralar
Dierleri zel materyaller,zeltiler,toksit gazlar,izolasyonmalzemeleri,tehlike iaretleri,koruyucu malzemeler vb.
7. GVENL OLMAYAN BLGELER
-
8/11/2019 7 Fugai TrainingTurkish
11/18
TPM : Polyplex 7 Fugai
-11-15/11/2006
KkHatalar
Gevek somun ve civatalar , kayp somun ve civatalar
Bolt length Tm civatalar somundan sadece 2- 3 di knt yapmaldr.
Civatalar Dz civatalar uzun delikte mi kullanlyor ? Sivri civatalar al cubuk ve kanallarda m kullanlyor?
Yayl civatalar vibrasyonu ilgilendiren paralar de mkullanlyor? Ayn civatalar ayn paralar da m kullanlyor?
Civata vesomunutespitleme
Aaya gmlen somunlar dardan grlebilir mi?
Somunun yn saat ynnde mi?
Somun ve civatalar iin kontrol noktalar
-
8/11/2019 7 Fugai TrainingTurkish
12/18
TPM : Polyplex 7 Fugai
-12-15/11/2006
Ya deposu Ya deposu her zaman temiz dzenli ve 5S standartlar uygulanyormu?Ya konteynr herzaman kapal m? Ya eidi belirtilmi mi ve dzenli stok kontrol yaplyor mu?
Yalama Azl
Gres manonu ,hz drc ve dier yalama azlklar herzamnatemiz tutuluyor mu?Yalama azl tozdan arnm m? Yalama azl doru eit ve adette etiketlenmi mi?
Ya seviyegstergesi
Ya seviye gstergesi herzaman temiz mi, herzaman kolay kontrolediliyor mu?
Doru ya seviyesi belirtiliyor mu? Ekipanlar ve ya borular ya szdryor mu Autoyalamaaralar
Oto yalama aralar dzgn iliyor mu &doru miktarda ya tedarikediyor mu?
YalamaKoullar
Dnen,kaygan paralar iyi yalanyor mu? Ar yalamadan dolay szdrma oluyor mu?
Yalama kontrol Noktalar
-
8/11/2019 7 Fugai TrainingTurkish
13/18
TPM : Polyplex 7 Fugai
-13-15/11/2006
V-Kaylar & Kasnaklar
atlak,ikin ypranm yada ya bulam kay var m? Bklm yada kayp kay var m? Gevek yada gergin kay var m? Benzer kaylar ayn gerginlikte mi ve hepsi ayn eit mi? Are top surfaces of belts protruding above the pulley rims? Are thebottoms any pulley groves shiny (indicating a worn belt or pulley)
Are pulleys correctly alignedRollerchains
Are any chains stretched 9indicating worn out pins or bushings Are any sprocket teeth worn, missing or damagedIs lubrication between pins and bushings sufficient Are sprockets correctly aligned
Shafts,Bearings &Couplings
Is there any overheating, vibration, abnormal noise due to excessiveplay, or lack of greasing. Are any keys or set bolts loose or missing Are any couplings misaligned or wobbling, Are any seals worn out
Gears Are gears rightly lubricated with proper amount of lubricant. Are any teeth missing, damaged worn out or jammed
Is there any unusual noise or vibration
Tama Sistemleri Kontrol Noktalar
-
8/11/2019 7 Fugai TrainingTurkish
14/18
TPM : Polyplex 7 Fugai
-14-15/11/2006
HydraulicCheckpoints
Is there correct quantity & level indicated for fluid in the reservoirIs fluid of correct Temp. And is min & max for temp. indicatedIs fluid cloudy (indicating air entrapment Are all fluid inlets & strainers clean, are any suction filters blocked Are any fluid reservoir breather filters blocked Are fluid pumps operating without any unusual noise or vibration
Are hydraulic pressure correct, and are operating ranges displayedHeatExchangers
Is any fluid or water leaking from fluid coolers or pipes Are temp. differences between fluid & water inlets & outlets are correct? Are any tubes blocked
HydraulicEquipment
Are there any fluid leaks ? Are hydraulic properly fastened? Are hydraulic devices operating correctly without speed loss orbreathing? Are hydraulic pressure correct? And all gauges working
Piping andWiring
Are all pipes and hoses fastened tightly? Are there any fluid leaks? Are any hoses cracked or damaged? Are all valves operating correctly? Is it easy to see whether valves areopen or closed/ Are any pipes, valves unnecessary?
Hydraulic checkpoints
-
8/11/2019 7 Fugai TrainingTurkish
15/18
TPM : Polyplex 7 Fugai
-15-15/11/2006
FRLs Are FRLs clean? Is it easy to see inside of them? Are they fitted rightway around?Is there sufficient oil. And are the drains are clear?Is the oil dip rate correct ?(approx 1 drop for every 10 strokes) Are the FRLs installed not more than 3 m from the equipment? Are the pressure adjusted to the correct value and operating ranges areclearly indicated?
PneumaticEquipment
Is compressed air leaking from pneumatic cylinders or solenoids? Are all pneumatic cylinders and solenoid valves firmly fastened? Are any pistons dirty, worn, damaged? Are the speed controllers installed right way around?Is there any abnormal sound or overheating of solenoid valves, and areany lead wires chafed or trailing?
Piping andWiring
Are there any places in pneumatic pipes or hoses where fluid is liable tocollect? Are all hoses and pipes clipped firmly in place? Are any hoses cracked, damaged, are there any air leaks? Are valves operating correctly and open and close position known
Pneumatic checkpoints
-
8/11/2019 7 Fugai TrainingTurkish
16/18
TPM : Polyplex 7 Fugai
-16-15/11/2006
ControlPanels
Are the interiors of distribution boards, switch boards, and controlpanels kept clean, tidy, and well organized by the application of 5Sactivities? Have any objects or flammable materials been left insideIs the wiring inside control panels in good condition? Are any wirescoiled or trailing? Are all ammeters and voltmeters operating correctly? Are any switches, bulbs broken? Do all switches work correctly? Are panel doors in good condition? Do they Open & close easily? Are there any unused holes? Are control panels water& dustproof?
ElectricalEquipment
Are all motors free of overheating, vibration, unusual noise & smell Are al motor cooling fans and fins are clean?
Are any bolts loose? Are pedestals free of cracks and damages?Sensors Are all manual switches clean and free of damages & excessive play
Are all switches installed in the correct position Are the interiors of limit switches is clean? Are any wires coiled ortrailing? Are any limit switch dogs worn, deformed, or of the wrong shape?
Electrical Checkpoints
-
8/11/2019 7 Fugai TrainingTurkish
17/18
TPM : Polyplex 7 Fugai
-17-15/11/2006
Sensors Are all photoelectric switches and proximity switches clean and free ofexcessive play? Are any sensors out of position? Are correct positions clearly indicated? Are all lead wires un-chafed, and is insulation intact at entry points?
Switches Are all switches installed in the correct position Are all manual switches clean and free of damages & excessive play Are emergency stop switches installed in appropriate locations and arethey in good working condition?
Piping andWiring
Are any pipes, wires, or power leads loose or unsecured? Are any ground wires damaged or disconnected? Are any pipes damaged or corroded? Are there any bare wires or wireswith damaged insulation? Are any wires coiled on the floor or dangling overhead?
Electrical Checkpoints Cont.
-
8/11/2019 7 Fugai TrainingTurkish
18/18
TPM : Polyplex 7 Fugai
15/11/2006