Item Specification
Statement
of
Compliance
Bidder’s
Proposal
II. Objective of
the Terms of
Reference
2.1 To provide a background information regarding the
preparation and submission of the proposed project to the
Designer-Builder;
2.2 To provide a background information regarding the proposed
project which should be handled in the shortest possible
time, at the lowest possible cost and at an acceptable quality
and performance to the Designer-Builder;
2.3 To outline the “Work” of the Designer -Builder that
has to be performed under the terms of its contract
with the Bureau of Internal Revenue, Revenue Region
No. 7, Quezon City.
2.4 To provide penalties in case of breach of the Designer-Builder’s obligations.
III. Role of the
Designer -
Builder
3.1 The Designer-Builder, for which this TOR applies, shall
provide technical services in preparation of the detailed
engineering design for the proposed two storey building
within the viable cost range and established design level.
In this regard, the Designer-Builder or the key personnel to be
assigned must have professional experience compatible with the
undertaking.
3.2. The Designer-Builder shall also implement the constructionactivities to complete the project in accordance with the
approved construction drawings and specifications and the
scope of work as specified in the contract.
3.3 The Designer-Builder shall complete the services or “Work”
within One Hundred ( 100 ) calendar days from receipt of
Notice to Proceed scheduled as follows:
3.3.1 Detailed Design Phase including review and approval
by Design and Build Committee (DBC) should becompleted within thirty (30) calendar days from
receipt of Notice to Proceed which shall include the
following:
Architectural Design
Floor Layout
Civil Design
Structural Design
Electrical Design
Sanitary/Plumbing Design Hydrological and Hydraulic Studies
Mechanical Design
Computer Network Cabling Design
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 3/12
Page | 89
Fire Detection and Protection Provisions
Communication box for telephone lines
Detailed list of materials including finishing
materials
Other Supplementary Plans
3.3.2 Construction Phase should be completed within Ninety (90) calendar days from submission of the
approved design as enumerated under Section 3.3.1.
IV. Extent of
the Project
4.1 The project consists of providing design-build services
to the Bureau of Internal Revenue, Revenue Region
No.7, Quezon City located at Quezon Ave. cor. Scout
Santiago St., Quezon City. The Designer-Builder shall
provide the detailed plans, technical knowledge,
supply and installation, equipment, labor, tools,
instruments, and construction of the Architectural,
Structural, Electrical, Sanitary, Mechanical worksrelated to the project.
V. General
Conditions
5.1 The Designer- Builder shall supply labor, materials andequipment, necessary for the Design and Build of thetwo storey building for the Taxpayer Service Section ofBIR, RDO 39 – South Quezon City, RR 7, Quezon City
5.2 Project Process
The Administrative Division in coordination with Engineersfrom the National Office, DBC and the project proponent
shall ensure the implementation and completion of design
development and construction.
The Designer-Builder shall provide all materials, labor,
equipment, tools, instruments needed or necessary to
complete the “Work”:
Development of Theme Concept and Preliminary
Scheme, Design of Building and its visual design.
Detailed Architectural and Engineering Design of the
approved Building Plan, which necessarily includes
the following:
Floor Layout
Civil Design
Structural Design
Electrical Design
Sanitary/Plumbing Design
Hydrological and Hydraulic Studies Mechanical Design
Computer Network Cabling Design
Fire Prevention and Protection Provisions
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 4/12
Page | 90
Communication box for telephone lines
Construction of the proposed Bldg. & its required
Infrastructures & Appurtenances.
5.3 The Work to be done shall consist of the design and
construction, complete in all details, of all works and
materials incidental to the Work.
5.4 All work shall be done in accordance with the governing
Rules and Regulations.
5.5 The construction shall be finished with first class
workmanship to the satisfaction of the DBC.
5.6 The Designer-Builder shall comply with pertinent
regulations and shall adopt safety measures, such as but not
limited to: enclosures, shieldings, coverings, warning
devices, off limits signs, etc.
5.7 The quality of materials to be furnished or work to be done
shall be done in accordance with the approved and
accepted parameters (“Annex A”). However, if specified
materials are not locally available, the Designer-Builder
shall immediately propose acceptable alternatives in
writing to the DBC. Within three (3) working days from
receipt of the same, the DBC shall approve or deny the
same.
5.8 The Designer-Builder, before commencing work, shallexamine the proposed location of the project and all
adjoining areas on which this work is in any way
dependent for perfect workmanship according to the intent
of these specifications. The Designer-Builder shall report
to the DBC any conditions which will prevent the
Designer-Builder from performing the work according to
requirements. A waiver of responsibility for defective
work will not be considered unless notice has been filed at
the time the Designer-Builder submitted its proposal.
It is the intention of these Specifications to call forfurnished work to be tested and ready for operation.
Whenever the word “provide” is used, it shall mean
“furnish and install, complete and ready for use”. Minor
details not usually shown or specified, but necessary for
the proper and efficient installation shall be included in the
work, the same as if herein specified or shown.
5.9 All permits and corresponding fees as may be assessed
by the local government units/regulating agencies
shall be on the account of the Designer- Builder.
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 5/12
Page | 91
VI. Design and
Build Activities
6.1 WORK / OPERATION PLAN
The CONTRACTOR shall submit the project work plan /
PERT-CPM consisting of the specific work activities within
seven (7) working days from receipt of Notice to Proceed.
6.2 DESIGN PHASE:
The activities of the Designer-Builder for the detailed design
phase would include but will not be limited to the
following:
6.2.1 PREPARATION OF THE DESIGN
The Designer-Builder shall prepare the design based
on the approved parameter “Annex A”, and
conceptual design and performance specifications
“Annex B” by the DBC.
6.2.2 ARCHITECTURAL/STRUCTURAL EVALUATION AND DESIGN
The design and construction works shall conform to
the requirements of the National Building Code,
Philippine Electrical Code, Code of Professional
Practice and other related pertinent practices, codes in
the Philippines as well as the local rules, regulations
and ordinances of the Quezon City Government and
must be acceptable to the DBC.
6.2.3 HYDROLOGICAL AND HYDRAULIC STUDIES
Carry out a hydrological study for all drainage structures
either existing or proposed with careful analysis of all
available data, including rainfall and flood records,
supplemented with details and flood inspection.
Catchments areas will be determined from available
maps and field investigations. All springs and possible
water sources shall be investigated. Pavement
elevations, drainage, channel should be designed
adequately to prevent flooding and erosion.
6.2.4 QUANTITIES
Compute all construction material quantities of the
two (2) storey building for TSS of RDO No. 39, South
Quezon City and prepare Bill of Quantities in the
manner and form specified by the DBC of this project.
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 6/12
Page | 92
VII. Construction
Phase
The activities of the Designer-Builder for the construction phase
would include but will not be limited to the following:
7.1 Designate one (1) Project Manager who shall work full
time during the construction period/duration of the
contract. He shall be in charge of the construction work
and is expected to perform the following:
7.1.1 Schedule, oversee and monitor the day to
day construction works.
7.1.2 Coordinate, address and resolve all concern/s of
nearby buildings and structures relative to the
construction and related services as required by
LGU and regulating agencies.
7.13 Conduct a project status meeting every Friday with
the DBC during which a progress report on allactivities for the week will be submitted.
7.2 PROJECT IMPLEMENTATION/CONSTRUCTION
7.2.1 The Designer-Builder shall carry out and complete
all items of work in accordance with the approved
plans and specifications.
7.2.2 ENGINEERING SUPPORT SERVICES
The Designer-Builder shall prepare the revisedmajor modifications/changes in design after the
approval of the proponent during the construction
implementation, if any.
7.2.3 PROGRESS REPORTS
The Designer-Builder shall prepare weekly and monthly
accomplishment reports supported with progress
photographs and S-Curves to monitor actual progress
status reports to be used as basis for progress billing to be
submitted to the Administrative Division of RR7-QC.
7.2.4 TURN-OVER OF THE COMPLETED PROJECT
The Designer-Builder shall deliver the completed
building accompanied with the requisite Occupancy
Permit within ninety (90) calendar days from receipt of
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 7/12
Page | 93
the approved design to BIR RR 7 for inspection and
approval. BIR, RR7, shall signify its approval or
exceptions to the project within ten (10) calendar days
from the delivery of the completed project. It is only
upon acceptance of BIR RR7, can there be turn-over of
the completed project.
The Designer-Builder shall within three (3) calendar days
address the exceptions noted by BIR RR7, if any. Unless
these exceptions are addressed by the Designer-Builder
and accepted by BIR RR7, no acceptance of the project
shall be issued and consequently, it is as if no turn-over
of a completed project has occurred.
VIII. Post
ConstructionDocumentation
8.1 The Designer-Builder shall submit the following
project documentations within fifteen (15) calendardays from the completion and acceptance of theproject.
8.1.1 As-built Plans duly signed and sealed bythe concerned engineer with his/her validregistration/professional license number,date of registration and current PTRNumber affixed/stamped on everypage/sheet of the document of thefollowing:
Architectural
Floor Layout
Civil Design / Structural
Electrical
Sanitary/Plumbing
Mechanical
Fire Protection
Other related Plans
8.1.2 All Plans and Documents shall be delivered
in sets as follows:
8.1.2.1 One (1) set Original Copies, scaled 1:100
meters prepared in Auto CAD 2000
Format, printed/plotted in Mylar Sepia
original copies
8.1.2.2 Five (5) sets Blue prints copies for each
plan
8.1.2.3 Two (2) sets Soft Copies in CD-ROM
format
8.1.3 Certificate of Occupancy (Building)
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 8/12
Page | 94
8.1.4 Other documents processed and issued in favor of the
BIR during the construction periods (i.e. Inspection
Reports, Building / Mechanical / Electrical Permits,
Fire Safety Reports, Clearances, and related
documents other than stated in Sections 3.3.1 and
5.10
IX. Provisions forStorage &
Material
Handling
9.1 The Contractor shall store his materials, equipmentand tools in one place of the building. The area shallbe coordinated with the Chief, Administrative Division.It shall be kept neat and clean at all times. Anydamage thereto or to the surrounding area arising fromany accident, paint spills, etc. shall be repaired and/orrestored to its original condition. Likewise, extra careshall be taken in the storage of hazardous chemicals(paints, thinners, lacquers, oils, solvents, etc.) in orderto avoid accident, explosion and/or fires. Oily rags,solvent-soaked foams, paint brushes and rollers shall
be kept in metal containers tightly sealed and shall becleaned and/or removed from the job site at the end ofevery working day.
9.2 Provisions for securing and safekeeping of storedmaterials, tools and equipment during theconstruction project shall be for the account of theDesigner-Builder.
X. Clearing of
Site
The Designer-Builder shall clean the whole area by removing
debris, discards, paint spots, excesses and spillage and shall
leave the entire premises free from rubbish caused by their workto the satisfaction of the BIR RR 7 at no extra cost.
XI. Service Level
Agreement
The Bureau of Internal Revenue shall maintain a Service Level
Agreement (SLA) with the Designer-Builder, with provision for
liquidated damages for non-compliance.
COMPONENTS DESCRIPTION
a. Project
Work plan
Submission of the
detailed work plan for theentire project within seven(7) working days fromreceipt of the Notice to
Proceed per Section 6.1.
One half of one
percent ( .5 of1%) of the
contract price
for every day of
delay.
b. DesignPhase
Submission of the Design
and other documents required
under Section 3.3.1 within
thirty (30) calendar days
from receipt of Notice to
Proceed.
One half of one
percent (.5 of
1%) of the total
contract price
for every day of
delay.
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 9/12
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 10/12
Page | 96
e. The Designer – Builder's personnel shall take all necessary
precautions for the safety of all persons and properties at or
near their area of work and shall comply with all the standard
and established safety regulations, rules and practices.
f. The Designer – Builder shall coordinate with any authorized/ or designated BIR personnel in the performance of their jobs.
g. The Designer – Builder shall be liable for loss, damage, or
injury as may be due directly through the fault or negligence
of its personnel. It shall assume responsibility thereof and the
BIR shall be specifically released from any responsibility arising therefrom.
h. The Designer – Builder shall neither assign, transfer, pledge,
nor subcontract any part or interest therein; however, sub-
contracting may be allowed provided that the main contractorshall be responsible for the full compliance of all applicable
provision of the TOR by the sub-contractor.
XIII. Terms of
Payment
13.1 The Designer-Builder, upon request, may be provided an
advance payment in an amount equivalent to fifteen percent
(15%) of the total contract price, net of VAT and applicable
withholding taxes, upon the submission of performance bond in
the form of cash or irrevocable standby Letter of Credit issued by
reputable commercial bank or Surety Bond issued by a bonding
company duly certified by the Insurance Commission to be ofgood standing
13.2Advance Payment shall be repaid by the Designer -Builder
thru deduction by BIR, RR7 of fifteen percent (15%) from the
Designer-Builder’s periodic progress billing.
13.3 The Designer – Builder shall collect payment
on progress billings based on the percentage of work
accomplished, within a reasonable time from submissionof all the required documents, subject to the required
Expanded Withholding Tax (EWT) of two percent (2%)
and Final Withholding VAT of five percent (5%), reduction
based on Section 13.2, if any, and ten percent (10%) retention
fund.
13.4 The retention fund shall be released only upon issuance of
Certificate of Acceptance issued by BIR RR7 and submission by
Designer-Builder of the Post construction documentation.
a. Progress Billing shall be made based on the following:
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 11/12
Page | 97
Progress
Billing
Percentage of Work
Completed
Percentage Terms
of Payment
DAMAGES
a. First
Billing
Thirty percent
(30%) of the work
accomplished
Thirty percent
(30%) of the
Contract Price
less advance payment (Sec.
13.2),
applicable
withholding
taxes and
retention fund
of ten percent
(10%) of the
contract price
(Sec. 13.3)
b. Second
Billing
Another thirty
percent (30%) of
work accomplished
or 60% project
completion
Thirty percent
(30%) of the
Contract Price
less advance
payment
(Sec. 13.2),
applicable
withholding
taxes and
retention fund
of ten percent(10%) of
the contract
price
(Sec. 13.3)
c. Final
Billing
Final Forty percent
(40%) of work
accomplished or
100% project
completion upon
acceptance
Forty percent
(40%) of the
Contract Price
Less advance
payment
(Sec. 13.2),
applicable
withholding
taxes and
retention fund
of ten percent
(10%) of
the Contract
Price (Sec.
13.3)
The percentage of completion of work shall be subject toreview and evaluation by BIR RR7.
8/12/2019 64872Section VI- Technical Specifications
http://slidepdf.com/reader/full/64872section-vi-technical-specifications 12/12
Page | 98
XIV. Pre-
Termination ofContract
14.1 The contract of the Design and Build of the two storey
building for the Taxpayer Service Section, of RDO 39 –
South Quezon City, RR 7, QC may be pre-terminated bythe BIR RR7 upon notice of any violation of the termsof the contract. In case of pre-termination, the Designer-Builder shall be informed by the BIR RR7, Thirty (30)calendar days prior to such termination.
14.2 In case of pre-termination, the Designer-Builder shallbe liable to an additional liquidated damages equivalentto five percent (5%) of the contract price as provided bythe Government Accounting and Auditing Manual(GAAM) and forfeiture of the Performance Security.
14.3 The BIR RR 7 shall have the right to blacklist theDesigner – Builder in case of pre-termination.
Prepared by: Checked and verified:
CLAVELINA S. NACAR ESTRELLITA T. PUNOProject Proponent Chief, Administrative Division
Recommending Approval:
JETHRO SABARIAGA
Assistant Regional Director
Approved by:
JONAS DP. AMORAOIC- Regional Director
b. Payments shall be made within a reasonable time from
submission of the required documents based on existing