64 AVENUE ARTERIAL WIDENING: 184 STREET TO FRASER HIGHWAY WWW.SURREY.CA/CCP 64 AVENUE ARTERIAL WIDENING: 184 STREET TO FRASER HIGHWAY WWW.SURREY.CA/CCP Welcome! Welcome to the 64 Avenue: 184 Street to Fraser Highway Project Open House We are widening and upgrading this section of road to build a better street that is safe, efficient and welcoming no matter how you choose to get around. What’s Happening Today? 64 Avenue is a busy transportation corridor and an important connector in, and between, communities. But traffic can be a challenge, and the street can be uninviting for people walking, rolling, taking transit and cycling. Today’s open house is an opportunity to: Learn about the project Explore the issues Ask questions & share feedback Feedback will help the project team understand any outstanding issues and explore solutions – now in the detailed design phase and as we move into construction in 2020.

Upload: others

Post on 20-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Welcome!Welcome to the 64 Avenue: 184 Street to Fraser Highway Project Open House

We are widening and upgrading this section of road to build a better street that is safe, efficient and welcoming no matter how you choose to get around.

What’s Happening Today?

64 Avenue is a busy transportation corridor and an important connector in, and between, communities. But traffic can be a challenge, and the street can be uninviting for people walking, rolling, taking transit and cycling.

Today’s open house is an opportunity to:• Learn about the project• Explore the issues• Ask questions & share feedback

Feedback will help the project team understand any outstanding issues and explore solutions – now in the detailed design phase and as we move into construction in 2020.

Page 2: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Show Us Where You LiveWhy Do We Ask?

Understanding where participants live provides context. It helps us to know who we are reaching. Using the dots provided, show us where you live on the map. If you live outside of the map area, use a sticky note to tell us where.

Page 3: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Project Benefits

• SAFETY: Make 64 Ave safe for everyone• SUPPORT SUSTAINABLE TRAVEL: Make transit, cycling, rolling

and walking more reliable, comfortable and enjoyable• CONNECTIONS & ACCESS: Ensure goods movement, services and

emergency response• PUBLIC REALM: Enhance public spaces and make streets inviting

places

We’re aiming to build streets that move more people. Arterials, like 64 Avenue, are planned to have travel lanes to meet anticipated demand, landscaped center medians, paving for cyclists, sidewalks for pedestrians, boulevards with street trees and streetlighting.

Part of the Major Road Network, 64 Avenue is a main road through the city, an important route for emergency vehicles and is served by multiple transit routes, with service to increase to Frequent Transit Network levels.

KEY DESIGN PRINCIPLES:

Page 4: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Project OverviewThe City is planning to widen 64 Avenue, between 184 Street and Fraser Highway, to two lanes in each direction with additional improvements for pedestrians, cyclists and transit users. There will be no provision for on-street parking. Upgrading this important east-west link supports trip safety and reliability for all road users. It's part of a multi-phase program of widening and providing multimodal infrastructure along the entire 64 Avenue corridor.

Page 5: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

What About the Rest of 64 Ave?

Road Safety

The City has adopted Vision Zero Surrey and is committed to working towards its vision of safe mobility:

Surrey has Zero people killed and seriously injured on its roads and human life is valued above all else in the transportation network.

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

We’ve heard you and we know that phased upgrading of 64 Ave may not be ideal.

64 Avenue is part of the Major Road Network and benefits from TransLink cost-sharing of road, cycling and pedestrian improvement projects. Due to the cost and complexity of the improvements, Surrey’s annual allocated funding will be spent in this 8-block segment.

196 St to Fraser Hwy was completed in 2017, Fraser Hwy to 184 St is next and 184 St to 177 St is planned for 2023.

Page 6: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

64 Avenue: 183A Street to 18488 64 Ave

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 7: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

64 Avenue: 18670 to 18850 64 Ave

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 8: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

64 Avenue: 18870 to 19042 64 Ave

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 9: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

64 Avenue: 18670 to 19042 64 Ave

Page 10: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

64 Avenue: 19050 64 Ave to Fraser Highway

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 11: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

188 Street: 6028 188 St to 6188 188 St

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 12: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

188 Street: 6198 188 Street to Lane South of 64 Ave

Building safe roads means that were designing roads to reduce the risk of crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed. Road design and infrastructure included in this Project support this vision through enhanced safety improvements for all road users.

Page 13: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Looking Ahead: Construction

Traffic Management & Access

A comprehensive traffic management plan will be required to keep area traffic moving safely and efficiently:• Work with traffic experts to plan any detour routes• Coordinate road and driveway closures, while

maintaining resident & business access• Employ traffic controllers during working hours• Coordinate with Coast Mountain Bus Company for

temporary bus stops

Hours of Works & Noise

• Will generally occur during regular business hours but may be extended to maintain schedule

• Will comply with noise bylaw hours (Mon. to Sat. between 7:00am and 10:00pm) or granted bylaw variances

The City will work with its construction contractors to minimize impacts on the community and to ensure public awareness of construction activities and traffic changes.

Page 14: 64 Ave Widening Presentation Boards - Surrey City of · crashes occurring by separating different kinds of road users, traffic moving in different directions or at different speed

6 4 A V E N U E A R T E R I A L W I D E N I N G : 1 8 4 S T R E E T T O F R A S E R H I G H W A Y W W W . S U R R E Y . C A / C C P

Thank You for Your Input! Please Stay InvolvedThank you for taking the time to share your input today. Please complete the comment form so we know what you think.

Stay Involved• In Person: Fill out a comment form today!

• Online: Visit the project webpage for updates: surrey.ca/ccp (Search ‘64 Ave Widening’)

• By Email: Send comments or questions to [email protected]