60553431 dwg la 001cpp illustrative ... - crystal palace park · palace terrace -area b •...

1
�v / 6 / ., ) - �//� J �, ( / [JJ Q ( -� ' I �- I I I . d I i J · I Crystal )/ Ga ' 105 \ Upper Italian •oo r I I Paxton Bust Coach Park lower Italian Terrace I I / v English Landscape• Area H ' . • • •• ' ' The Lodge p 1 a ./ I � Intermediate Lake Central Sports Area • Area E Crystal Palace National Sports Centre , r Wheeled Sports Area M Tidal Lakes Cricket Ground - Area G Cricket Ground KEY [ APPLICATION BOUNDARY C HARACTER AREAS TREES AND VEGETATION EXISTING BUILDINGS PROPOSED BUILDINGS WALLS, FENCING, GATES AND RAILINGS FOOTPATHS RAMPS STEPS PARKING I I / PROJECT CLIENT CRYSTAL PALACE PARK THE LONDON BOROUGH .bromley.gov.uk 2019 Regeneration Plan - Proposals Park Infrastructure (Park-wide) Remove clutter including redundant signage and fencing. Remove parking in the centre of the park, restore to parkland and provide parking on the edge of the park. • Improve wayfinding. Improve pedestrian routes and paths, and entrances. Provide limited low energy lighting to illuminate key pedestrian routes and structures. • Restore historic views where possible. Introduce a SuDS system to reduce surface water discharge from the park and local flooding. Enhance habitat diversity throughout the park and enable ecology corridors. Paxton Axis Where possible return the route of the Paxton Axis to its original ground levels along the spine of the park. Continue the Paxton Axis onto the Italian and Palace Terraces to re-connect the central unifying feature of the park. Open up Penge Gate for form continuous route through the park from Penge to Crystal Palace Park Parade i n the west. Anerley Hill Edge -Area A • Improve pedestrian access between Norwood Triangle and Crystal Palace Station. Renovate the Anerley Hill and Norwood entrances. Construct Capel Manor College on the Anerley site and integrate into the park. Palace Terrace -Area B Conserve, repair and reinstate the original entrance into Crystal Palace from Crystal Palace Parade. Level and create low maintenance gardens on the Upper Palace Terrace. Investigate potential creation of a cultural space which integrates with the renovated Crystal Palace Subway. Form a grass wildflower embankment on the Lower Palace Terrace and develop a serviced area to facilitate events on the Italian Terraces. Italian Terraces -Area C Conserve and repair the terra walls and replace missing balustrades and copings. Relocate the bust of Paxton to its original location on the Lower Italian Terrace and mount on new plinth. Restore the remaining statues and relocate those in storage. • Create a grass-surfaced event space on the Lower Italian Terrace. Transitional Landscape -Area D • After removal of parking re•contour to create a gentle undulating landform. Re•establish parkland with intermittent trees within grass. Tidal Lakes -Area F Renovate the dinosaurs and their setting . • Enhance Penge Gate car park. • Create new dinosaur themed play area. Construct Capel Manor College on the Farm site and integrate into the park. Cricket Ground -Area G Construct the Sydenham Villas residential development. • Renovate Sydenham Gate car park. Form a new play area, close to Sydenham Gate. • Create a new maintenance depot with the relocated maintenance building. • Remove the existing play area. • Create a new Information Centre. English Landscape -Area H Provide a new coach park accessible from the Rockhills entrance to service events i n the park. Construct the Rockhills residential development and provide new car park. Include community centre within the Rockhills development. Remodel and restore areas currently excluded from the park back to parkland. Explore potential new uses for Westwood Gate toilet block. Renovate the setting of the Concert Platform and improve drainage. • Create new play area. PLANNING STATUS CONTEXTUAL PROJECT NUMBER 60553431 SHEET TITLE CRYSTAL PALACE PARK REGENERATION PLAN ILLUSTTIVE REGENERATION PLAN PROJECT_SHEET NUMBER 60553431_DWG_LA_001 SCALE_SHEET SIZE 1 :2000@A 1 / 1 :4000@A3 ISSUE/REVISION - 31/01/20 PLANNING ISSUE I/R DATE DESCRIPTION

Upload: others

Post on 09-Jul-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 60553431 DWG LA 001CPP Illustrative ... - Crystal Palace Park · Palace Terrace -Area B • Conserve, repair and reinstate the original entrance into Crystal Palace from Crystal Palace

�v c// 6 �

�� ��/ .,gg"') - �//� ,,-

� J �, ( � / [J-{J Q_! ( -� � b:j '.)_ ""I

�G1W I

'"-

� � _,/f

�-

I

/; I I . -1.

d I il/!J'­

J _, t:::,·I Crystal

)/. f;:JGa

If

'

105

"'I

C: \

Upper Italian

•oo r • I

I • •

Paxton Bust

• •

Coach Park

lower Italian

Terrace

• I I

•••

/ v ;J

'· •

English Landscape• Area H '

.

• • ••• •

• • ••• •

• • ••• ••

••• •

'

'

The Lodge

p 1 a

.ttr/ I �

Intermediate Lake

Central Sports Area • Area E

Crystal Palace National Sports Centre

,._

r

Wheeled

Sports Area

?T 77

Tidal Lakes

Cricket Ground - Area G

Cricket Ground

KEY

[

APPLICATION BOUNDARY

CHARACTER AREAS

TREES AND VEGETATION

EXISTING BUILDINGS

PROPOSED BUILDINGS

WALLS, FENCING, GATES

AND RAILINGS

FOOTPATHS

RAMPS

STEPS

PARKING

I

I /

PROJECT

CLIENT

CRYSTAL

PALACE PARK

THE LONDON BOROUGH

www.bromley.gov.uk

2019 Regeneration Plan - Proposals

Park Infrastructure (Park-wide)

• Remove clutter including redundant signage and fencing.• Remove parking in the centre of the park, restore to parkland

and provide parking on the edge of the park. • Improve wayfinding. • Improve pedestrian routes and paths, and entrances.• Provide limited low energy lighting to illuminate key

pedestrian routes and structures. • Restore historic views where possible. • Introduce a SuDS system to reduce surface water discharge

from the park and local flooding. • Enhance habitat diversity throughout the park and enable

ecology corridors.

Paxton Axis • Where possible return the route of the Paxton Axis to its

original ground levels along the spine of the park. • Continue the Paxton Axis onto the Italian and Palace

Terraces to re-connect the central unifying feature of the park. • Open up Penge Gate for form continuous route through the

park from Penge to Crystal Palace Park Parade in the west.

Anerley Hill Edge -Area A • Improve pedestrian access between Norwood Triangle

and Crystal Palace Station. • Renovate the Anerley Hill and Norwood entrances. • Construct Capel Manor College on the Anerley site and integrate

into the park.

Palace Terrace -Area B • Conserve, repair and reinstate the original entrance into

Crystal Palace from Crystal Palace Parade. • Level and create low maintenance gardens on the Upper

Palace Terrace. • Investigate potential creation of a cultural space which integrates

with the renovated Crystal Palace Subway. • Form a grass wildflower embankment on the Lower Palace

Terrace and develop a serviced area to facilitate events on the Italian Terraces .

Italian Terraces -Area C • Conserve and repair the terrace walls and replace missing

balustrades and copings . • Relocate the bust of Paxton to its original location on the

Lower Italian Terrace and mount on new plinth . • Restore the remaining statues and relocate those in storage. • Create a grass-surfaced event space on the Lower Italian

Terrace.

Transitional Landscape -Area D • After removal of parking re•contour to create a gentle

undulating landform . • Re•establish parkland with intermittent trees within grass.

Tidal Lakes -Area F • Renovate the dinosaurs and their setting . • Enhance Penge Gate car park. • Create new dinosaur themed play area. • Construct Capel Manor College on the Farm site and integrate

into the park.

Cricket Ground -Area G • Construct the Sydenham Villas residential development. • Renovate Sydenham Gate car park. • Form a new play area, close to Sydenham Gate. • Create a new maintenance depot with the relocated

maintenance building.

• Remove the existing play area. • Create a new Information Centre .

English Landscape -Area H • Provide a new coach park accessible from the Rockhills

entrance to service events in the park. • Construct the Rockhills residential development and provide new

car park. • Include community centre within the Rockhills development. • Remodel and restore areas currently excluded from the park

back to parkland. • Explore potential new uses for Westwood Gate toilet block. • Renovate the setting of the Concert Platform and improve

drainage. • Create new play area.

PLANNING STATUS

CONTEXTUAL

PROJECT NUMBER

60553431

SHEET TITLE

CRYSTAL PALACE PARK REGENERATION PLAN ILLUSTRATIVE REGENERATION PLAN

PROJECT_SHEET NUMBER

60553431_DWG_LA_001

SCALE_SHEET SIZE

1 :2000@A 1 / 1 :4000@A3

ISSUE/REVISION

- 31/01/20 PLANNING ISSUE

I/R DATE DESCRIPTION