6 f.01 technology update for customers
TRANSCRIPT
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
© 2015 General Electric Company.
The information presented herein is intended for academic
purposes, only. Certain information has been derived from sources
assumed to be reliable, however, the said information may change
without notice. GE Company assumes no liability for use of any
such information presented herein. Reproduction without
authorization is forbidden. Results may vary given change in test
environment.
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
Imagination at work.
M. MahendhraMay, 2015
6F.01 technology overview
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
4
GE’s product portfolioReliable, flexible, efficient
Geared for 50Hz or 60Hz
60Hz gas turbines50Hz gas turbines
43 MW
79 MW
90 MW
187 MW227 MW
130 MW
265 MW299 MW
470 MW
275 MW
397 MWGE GT-9HAGE GT-9FGE GT-9EGE GT-7HAGE GT-7F
GE GT-6FGE GT-6B
GE GT-7E
330 MW
.03
.01
.05
.01
.05
.01
51 MW
4
80 MW
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
5
• 6F.01 is the new name for the 6C
• Over 110k fired hours & 99.2%
reliability
• True F-class performance &
flexibility
• Modular plant for ease of
installation & maintenance
6F.01 Technology Overview…
… F-class efficiency @ 50MW block size
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
GE’s F-class turbine evolution
6F.01 … GE’s latest evolutionary F-Class product
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
7
Take away boxes should only be used for occasional emphasis.Do not use on every slide.
GE F-class fleet serves all duty cycles
Data as of May 2014Source: GE Reliability Engineering
Units
Operating
HoursTotal(leader)
StartsTotal(leader)
6F 106 5.1 M (123,000)
59 k (3,200)
7F 78935.2 M
(152,000)
850 k (4,350)
9F 27213.3 M
(148,000)
147 k (2,040)
All F
1,160
53.5 M
(155,000)
1.0 M (4,350)
GE F–Class leading in units, reliability, availability … 50M+ hours
Reliability Availability Starting Reliability88%
92%
96%
100%
98.0%
90.6%
97.8%97.6%
90.1%
97.5%
GE F-Class Other OEM F-Class
*Source: ORAP®, All rights to Underlying Data Reserved: SPS®Rolling 12 Month Data Oct 12 – Sep 13
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
8
Take away boxes should only be used for occasional emphasis.Do not use on every slide.
6F.01 re-introduction35-70 MW Gas turbine orders
Shift in technology to F-Class driven by shift to CC/CHP
Source: McCoy Power Reports
By
cla
ss
By
ap
plicati
on
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
9
6F.01 … enhanced value6 DLN2.5 Can-annular
Combustors, increased TfireDual fuel capability
<25ppm NOx
3 stagesAdvanced and proven
HGP materials High Tfire capability
designed inImproved cooling/sealing
Through bolted nickel turbine rotor
High PR capable+2% speed
increase
Axial flow exhaustLow Mach LSB
3D aero compressor12 stages, 3 VGVRemovable blades
High flow R1 and inlet
Cold end drive2 bearings Single piece
forward stub shaftHigh torque capable
Reliable technology for efficient cogeneration/combined cycle
Introductory 6F.01Enhancement to 6F.01Pertinent experience
>100F below 9F.05 TfireEquivalent to 7F.05 Tfire
Same seals at 7F & HAGEAE TBC to GEP&W TBC
6B +1.35% speed…
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
10
6F.01 modular arrangement
Generator• Two pole
generator• Horizontal offset
load gear
Air inlet system• Silencer in elbow • CFD used to obtain low
pressure drop• Confirmed by model tests
Axial exhaust arrangement• Low pressure drop • Silencer before HRSG
Acousticenclosure
Take away boxes should only be used for occasional emphasis.Do not use on every slide.
Modular for quick installation and ease of maintenance
Modules not visible…• Gas Fuel Module with
low DP valves
• Combined load gear & lube oil module
• Static frequency converter with black start genset
• Control module with triple redundant Mark Vie …factory assembled & tested
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
11
Launch site • AKEnerji
• Kemalpasa, Turkey
• 2x1 6F.01 combined cycle
• GT shipments Dec 2003, May 2004
GT validation• 5 months, 161 hours of testing
• 2462 TC, Press and SG sensors
• Full speed no load through full speed full load
• Aeromechanics, aerodynamics, thermal profiles measured/confirmed
• Damping improvements made post test
Launch units
Take away boxes should only be used for occasional emphasis.Do not use on every slide.
Reliable technology for efficient cogeneration/combined cycle
Commercial operations• COD May 2005
• Over 110,000 operating hours
• Over 2,250 accumulated starts
• CSA coverage… CI, HGP, and MI performed
• Reliability/Availability … better than F Class industry
• AKEnerji reference letter…
• “fully satisfied with equipment and services”
• “average commercial reliability 99.2% last 4 years”
AKEnerji, Kemalpasa Turkey 6C installation Post validation inspection
© 2015 General Electric Company. Proprietary information. All Rights Reserved.
12
6F.01 …• Renamed to align with GE F-
Class
• 50M+ hrs experience
• Best in industry reliability &
availability
• Economical heat and power
• 55+% combined cycle
efficiency
• Demonstrated platform
• Comprehensive validation
• 9 years operating
experience… 110k hours,
2250 starts