Results from HSS Assessments in 20 Townships
(Infrastructure)
Dr. Thida KyuDeputy Director(Planning)
DOH
Conditions of RHCs in 20 TownshipsSr No
Name of Townships
No; of RHCs
RHC Building Need Renovation
Need NewConstruction
Labour room
+
Electri-city(EPC)Good Bad
1 Lewe 8 4 4 2 1 2 42 Yedashe 8 7 1 0 1 5 33 Shwe Gu 5 2 3 3 0 3 14 Bamaw 6 2 3 3 1 3 05 Pyinmana 5 4 0 0 1 0 1
6Nyaung Shwe 7 4 3 3 0 3 0
7Tharyarwaddy 6 4 2 2 0 1 2
8 Tha Htone 5 4 1 1 0 3 09 Mudon 6 5 1 1 3 3
10 Hsipaw 5 3 2 2 0 5 0Total 61 39 20 16 5 28 14
Conditions of RHCs in 20 TownshipsSr No
Name of Townships
No; of RHCs
RHC Building Need Renovation
Need NewConstruction
Labour room
+
Electri-city(EPC)
Good Bad
1 Myeik 5 4 1 1 0 5 2
2 Kyaing Tone 5 4 1 1 0 3 2
3 Kaw Hmu 5 2 2 2 0 5 3
4 Nga Putaw 5 2 2 2 0 4 0
5 Hakha 4 3 1 0 1 1 0
6 Hlaing Bwe 8 5 3 3 0 7 0
7 Hti Lin 5 4 1 1 0 0 0
8 Demawsoe 7 1 6 5 1 0 1
9 MaungDaw 9 7 2 2 0 1 1
10 Ye Oo 6 4 2 0 0 6 0
Total 59 36 21 17 2 32 9
RHCs which need renovation /new construction in HSS 20 TS
Total No: of RHCs which need renovation / new construction in HSS 20 TS
Total No; of RHCs- 120 in 20TSNeed Renovation -33Need New Construction -7
Sub-centres with No Building in HSS 20 TS
Township No SC building
Bamaw 1
Shwegu 1
Demawsoe 13
Hlaingbwe 10
Hakha 0
Thaton 6
Mudon 8
Maungdaw 8
Nyaung-Shwe 0
Kengtong 10
Township No SC building
Hsipaw 1
Ye-U 6
Pyinmana 4
Lewe 8
Htilin 1
Yedeshay 18
Thayawady 3
Kawhmu 2
Ngaputaw 6
Myeik 11
Total 117
Appointed MWs who have no SC building in 20 TS
TownshipMW
AssignedNo SC
building
Bamaw 27 1
Shwegu 23 1
Demawsoe 41 13
Hlaingbwe 47 10
Hakha 24 0
Thaton 43 6
Mudon 35 8Maungdaw 32 8Nyaung-Shwe 35 0
Kengtong 34 10
TownshipMW
AssignedNo SC building
Hsipaw 19 1
Ye-U 32 6
Pyinmana 17 4
Lewe 38 8
Htilin 28 1
Yedeshay 31 18
Thayawady 33 3
Kawhmu 24 2
Ngaputaw 29 6
Myeik 32 11
Total 624 117
Name of Townships No; of RHCs Labour Room + Electricity(EPC) Myeik 5 5 2Kyaing Tone 5 3 2Kaw Hmu 5 5 3
Nga Putaw 5 4 0
Hakha 4 1 0Hlaing Bwe 8 7 0
Hti Lin 5 0 0
Demawsoe 7 0 1
MaungDaw 9 1 1
Ye Oo 6 6 0
Lewe 8 2 4
Yedashe 8 5 3
Shwe Gu 5 3 1
Bamaw 6 3 0
Pyinmana 5 0 1
Nyaung Shwe 7 3 0
Tharyarwaddy 6 1 2
Tha Htone 5 3 0
Mudon 6 3 3
Hsipaw 5 5 0
Total 120 60 23
Labour Room attached RHCs & Electricity from EPC in HSS 20 TS
RHCs with attached Labour Room and Electricity from EPC
Nyaung Shwe
MUDON
Kamaroat S/C
In Mudon township -Totally 6 RHCs & 24 sub centers - 3 RHCs have labour room attached- 8 sub centers do not have sub-centre building, even no demarkated land space for S/C.
Kawt Kha Pon RHC attached at Village Authority’s building
Kawtkhapon RHC in Mudon has no building and it has to be opened at the local authority’s office in the morning.
PyinmanaAmong 5 RHCs in Pyinmana township, 1 RHC (Boe-ma) and 4 sub centres have no building, 1 sub centre is being constructed.
Temporary building for We’ Gyi S/C
Midwives who do not have sub centre building, have to stay in village administration offices or stay attached to village head’shome.
Shwegu
2 out of 5 RHC have good building. 3 RHCs need renovation. Only 3 RHCs have labour room ; Need to build one sub center
2 out of 5 RHC have good building. 3 RHCs need renovation. Only 3 RHCs have labour room ; Need to build one sub center
Yaydarshae
Aye Gye S/C does not have sub centre building and has to open at local authority officeOne local person from the village willing to give his own land to construct S/C
Kyun Pin Su S/C
Hle Pwe lay RHC has no RHC Building 18 sub centres have no sub-center buildings.
Bamaw township
Naung Lite SC under Ma au pin RHC
Naung Lite SC under Ma au pin RHC
3RHCs have labour room attached.
Thaton
2 sub centers Kyarpun RHC (Duyin Seik and Gaw ), 1 sub cencre (Thein Seik -2) under the Thein Seik RHC, 2 sub centres (Kadaik Lay and Tawgyi ) under Kadaikgyi RHC and Naungbo subcenter under Painetaw RHC have no building.
Hsipaw
One out of 14 sub-centers and 3 special region clinics ( Pan Hone, Nar Nyu and Ohn mu) had building that need major renovation and need to construct1 SC . 5 RHCs have labor rooms.
Conclusion • Infrastructures are needed for motivation of midwives
to work in the community especially in HTR areas
• Infrastructures for working and living have to be fulfilled
• Prioritization have to be done for those in real need than those that can wait for the construction of sub center
• Similarly for renovation, HSS program could take care of a few: but in the CTHP, gaps for refurbishment were mentioned for donors and other interesting parties concern and contribution.
Magyi Seik RHC,Nyaung Shwe
Gamone Taung RHC, Pyinmana