5jembatan pipa std & trus blok 2015 ok-model

1
2 Bh Flange Socket. Detail Junction Perlintasan Pipa Flange. 6 Bh %HQG 4 Bh 1 Bh Air Release (Sesuai Kebutuhan) 10cm D 10cm Pipa Steel Clamp Plat Strip Baut Angker Trust Block Beton K-175 Pasir Urug L= Variabel 10 W=VAriabel L= Variabel 10 W=VAriabel Pipa Steel Clamp Plat Strip Baut Angker Trust Block Beton K-175 Pasir Urug M.A %(1' ARAH ALIRAN L=6m s/d L=11m PERLINTASAN PIPA Skala 1 : 25 %(1' TRUST BLOCK K-175 LAPISAN PASIR T=5CM 6m Variabel Air Release (Sesuai Kebutuhan) 20 30 20 30 PIPA STEEL 0.40 PIPA STEEL BETON COR K-75 0.05 0.40 0.60 DETAIL TRUST BLOCK BAWAH 0.20 0.05 0.40 0.30 BETON COR K-75 DETAIL TRUST BLOCK ATAS Kode : Skala : Revisi : Tanggal : Gambar : Kab/Kota : - Tahun Anggaran 2015 Mengetahui / Menyetujui: EDDI, ST NIP. 196204241984031004 PPK PENGEMBANGAN AIR MINUM Diperiksa : IBNU SINA, ST NIP. 197602272009121001 ASISTEN SURVEY/PERENCANAAN Jembatan Perlintasan Standar S A T U A N K E R J A P E N G E M B A N G A N A I R M I N U M D A N S A N I T A S I P R O V I N S I A C E H Jalan Pemancar No. 5 Simpang Tiga Banda Aceh 23239, Telp/Fax. 0651-40955 e-mail: [email protected] KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT DIREKTORAT JENDERAL CIPTA KARYA

Upload: razuardi-ar

Post on 14-Dec-2015

77 views

Category:

Documents


16 download

DESCRIPTION

perpipaan

TRANSCRIPT

Page 1: 5jembatan Pipa Std & Trus Blok 2015 Ok-model

2 BhFlange Socket.

Detail Junction Perlintasan Pipa

Flange.6 Bh

Bend .45Á 4 Bh

1 BhAir Release (Sesuai Kebutuhan)

10cm

D

10cm

Pipa Steel

Clamp Plat Strip

Baut Angker

Trust Block Beton K-175

Pasir Urug

L= Variabel

10

W=VAriabel

L= Variabel

10

W=VAriabel

Pipa Steel

Clamp Plat Strip

Baut Angker

Trust Block Beton K-175

Pasir Urug

M.A

BEND 45Á

ARAH ALIRAN

L=6m s/d L=11m

PERLINTASAN PIPA

Skala 1 : 25

BEND 45Á

TRUST BLOCK K-175

LAPISAN PASIR T=5CM

6m Variabel

Air Release (Sesuai Kebutuhan)

20

30

20

30

PIPA STEEL

0.40

PIPA STEEL

BETON COR K-75

0.05

0.40

0.60

DETAIL TRUST BLOCK BAWAH

0.20

0.05

0.40

0.30

BETON COR K-75

DETAIL TRUST BLOCK ATAS

Kode :

Skala :

Revisi :

Tanggal :

Gambar :

Kab/Kota : -

Tahun Anggaran 2015

Mengetahui / Menyetujui:

EDDI, ST

NIP. 196204241984031004

PPK PENGEMBANGAN AIR MINUM

Diperiksa :

IBNU SINA, ST

NIP. 197602272009121001

ASISTEN SURVEY/PERENCANAAN

Jembatan Perlintasan

Standar

S A T U A N K E R J A P E N G E M B A N G A N A I R M I N U M D A N S A N I T A S I

P R O V I N S I A C E H

Jalan Pemancar No. 5 Simpang Tiga Banda Aceh 23239, Telp/Fax. 0651-40955 e-mail: [email protected]

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

DIREKTORAT JENDERAL CIPTA KARYA