Land Use Planning and Mobility ManagementSecuring travel plans through the planning process in London (& the UK)
PIMMS-transfer Master Class Stockholm 13-15 April 2010
Adrian Webb, Senior European Projects Officer, LEPT
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Before I start….this is a simple overview because…
Land use planning is a:
• Complex subject
• Involves lots and lots of words
• But I find it very interesting so could talk about for hours!
Please ask questions at any time if you are unsure of anything.
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
London Governance and Planning Policy
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
The Planning Process in London
Development application
Borough Planning
Consultation
Borough Decision
Greater London Authority
Transport for London
STAGE 1
STAGE 2
APPROVE
AGREE
REFUSE
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
UK Policy Processes
Mayors London Plan Mayor’s Transport Strategy
Local Development Frameworks Core Strategy
Supplementary Planning Docs
TfL Travel Plan Guidance
PPG 13DfT Travel Plan
Guidance
Area Action Plans
National
London wide
Local Level
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Regional Travel Plan Policy‘Developments with significant transport implications should include a Transport Assessment and Travel Plan as part of planning applications. Developers and planning authorities should refer to TfL’s guidance on Transport Assessments. All developments that exceed thresholds defined in TfL guidance on Workplace Travel Plans and Residential Travel Plans should have a Travel Plan.’
• London Plan – Policy 3C.2 February 2008
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Regional Guidance
• Thresholds• Type• Content• Deliverables• Measures • Monitoring• Enforcement
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Transport Assessments Vs. Travel Plans
Transport Assessments:
• Requirement based on size / impact of the development
• Sets out transport issues related to a development
• Identifies what measures will be required to deal with the anticipated transport impacts
• Aims to improve accessibility and safety for all modes of transport - SUSTAINABLE modes
Travel Plans:
• A mitigation measure
• Package of measures to promote alternatives to the private car
• Encourage effective use of current transport networks and support their enhancement
• Marketing AND physical measures
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Let’s relate this to an example….
PIMMS-transfer developers are applying for planning permission to build:
- 800 residential units
- a primary school
- a supermarket
- low levels of parking
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Let’s relate this to an example….
Public transport accessibility is good
Parking restrictions exist in proximity to the development site
But the local roads are already quite congested and there is some delay in the peak period at a nearby junction..
Local footways are in a reasonable condition and there are some safety concerns on the local crossing. Some cycle paths.
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Let’s relate this to an example….
We are the local authority; what would we want to submitted?• Standard planning documents and architectural drawings
and to assess the transport impact…..
• A Transport Assessment
• Assessment of trip generation and distribution
• Local junction assessment / current transport situation
• Bus loading study / pedestrian footway audit (PERS) / parking study
• A Travel Plan!!!
• Covers all land uses of the development, is coordinated, well managed and ensures commitment from the developer.
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Planning Conditions Vs Section 106 Agreements
Let’s say we (the local authority) support the PIMMS-transfer development in principle; how do we make sure a developer implements measures to mitigate against a developments impacts on the transport network?
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Planning Conditions
A condition is placed on the decision notice of a planning permission. Development is permitted only if these certain conditions are satisfied.
“e.g. a travel plan must be submitted prior to occupation of the development”
They are appropriate for securing travel plans when:
• Application is small scale• Application is not complex• Where the end user is known• Transport implications are not substantial but are important
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Planning Conditions
SIMPLE and STRAIGHTFORWARD but…
LIMITED IN SCOPE and
CANNOT be used to SECURE MONIES
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Section 106 = Obligation
A legal agreement between the local authority and the developer / applicant (as well as anyone else who may have interest in the land).
• Mainly for MAJOR developments
• Granted following planning permission
• Secure community infrastructure needs
• Mitigate the impact of the new development
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
What can planning obligations achieve?
• Restrict development or use of land
• Require certain operations of activities to be carried out
• Require land to be used in any specified way
• Require payments to be made to the authority either as a single sum or periodically
They are ENFORCEABLE
They can be UNCONDITIONAL or SUBJECT TO CONDITIONS
They can be of an INDEFINITE or SPECIFIED PERIOD
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Section 106 – it is like baking a cake!
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Back to the PIMMS-transfer development!
What local transport works might we want secured or contributions for to mitigate against the impact of the development?
Travel Plan
Pedestrian crossing improvement
Access improvements
Contribution to increase frequency on local bus route
Commitment to provide X no. of car club spaces
Commitment to a programme of monitoring
Junction improvement (e.g. re-signalling, approach works)
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
What would we include in a Section 106 for the PIMMS-transfer development travel plan?
PIMMS-transfer
s106
Outcomes to be
achievedMeasures Timetable Sanctions
Management and
responsibility
Securing sustainabilityand funding
Review andmonitoring
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
What funds can be secured via obligations for travel plans?
• Contributions (for capital or revenue funding)
• Transport improvements to support the travel plan
• Review
• Funding a Travel Plan Coordinator
• Payments related to contingency payments
• Bonds if travel plan targets are not achieved
• Or to undertake monitoring
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
Some examples
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
One Wood Street - London Workplace Travel Plan for office
development in the City of London required as part of S106 planning obligations.
Relocation of 700 staff from May 2008 OWS was one of the first private
sector organisations in the City to complete a Full Travel Plan
Travel Plan Measures: The provision of 105 cycle parking
spaces for staff as calculated in the Transport Assessment (July 2004)
No car parking provision on-site The provision of shower and locker
facilities for staff Pedestrian access to the building
59 ½ Southwark Street London SE1 0AL (UK)++44 (0)207 934 9583
www.lept-eu.org / [email protected]
London Borough of Hounslow
– Europa House Hotel
£20k (€22.5k) bond secured to guarantee the performance of the travel plan – to be used for remedial measures if necessary to meet targets
- Cranford Mosque Targets set for on-site and off-site parking. If targets not met remedial measures are specified in the travel plan which include additional shuttle buses (1 per 5 cars parked above target).