5 Signs Your Project Is Off The Rails!

Recently I was introduced to a company in Durham, NC that has spent more than 900 hundred hours with

a software developer trying to get a custom order entry system developed. It’s taken nearly 3 years and

they are still unable to launch the tool because of inconsistencies in the way the system handles sales

transactions. Their biggest questions: Why did this happen and how do we fix it?

In my experience, there are some common culprits that cause projects to fail:

1. Missing or lousy requirements

A lot of times the customer tries to reduce costs and some of the first places they look to are Business

Process Review and Optimizations and Requirements Gathering.

2. Scope Creep

Too often, the vendor’s project manager is not experienced enough to lead the customer through the

Change Management process and allows “little requests, just this once” to morph into larger monster

which consume time and resources.

3. Lack of End-User Involvement

Typically we see companies delegate mid-level managers to Core Team roles. I completely understand

the thinking behind this – these are the people who have proven that they can get things done. However,

they are also usually removed enough from the daily transaction of business that they can’t effectively

serve as subject-matter-experts. Without the right people in the right roles, bad decisions can easily be

made.

4. Ineffective Change Management

As mentioned regarding Scope Creep, allowing changes to occur in the scope can easily derail any

project. But Change Control is not the only consideration here. Change Management within the culture of

the organization is a huge ship to sail. Our old friend FUD (Fear, Uncertainty, Doubt) shows up and

infiltrates the ranks with ease. I have heard the following impressions expressed “This is just another

management bright idea that is going to fizzle”, “This is another way of eliminating jobs”, “Another

whiz-bang system from the IT guys! Remember when we couldn’t ship for a week when they built the

last one?”, “I’m an old dog, I don’t know nothing about these computers”. All of these are statements that

I have heard more than once and they can all lead to resistance or infrequently, sabotage.

5. Poor Quality Control

Technologists left to their own devices may or may not have tight, disciplined quality control

mechanisms. A misapplication of Agile Development could be seen as a developer releasing small pieces

of code that escapes integration testing. Data validation and report validation that is not done in a

comprehensive manner with controls will, of course, lead to errors in the system after GoLive.

Recognizing these characteristics early can help prevent your project from derailing, but what if it’s too

late?

Page 2: 5 signs your project is off the rails

©2010 Lionshare Software, Inc. All rights reserved. http://www.lionsharesoftware.comdfsdf

sdfLio

1

Lio

nsh

are

So

ftw

are

, In

c.

About Lionshare Software

Lionshare Software Inc., was launched by ERP and CRM selection consultants

and project managers with extensive experience in a variety of applications,

businesses and industry verticals. This allows us to identify common pitfalls

to avoid and best practices to employ when selecting and implementing

enterprise software applications.

By hiring Lionshare Software consultants to assist in the software-selection

process, our customers have reduced total project costs, had better results,

and have had a more satisfying experience than previous projects

Lionshare Software is a truly independent consulting firm with no

partnerships, relationships or affinity with any particular software product

or implementation vendor. This independence assures you get a truly

independent evaluation and recommendation that meets your specific

business requirements.

Contact us today and start your ERP or CRM project on the right track.

Lionshare Software, Inc.

148 East St. Suite 104

Pittsboro, NC 27312

919-542-8401

888-741-0262

www.lionsharesoftware.com

[email protected]