$4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline

February 2014

Page 2: $4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

City of Lake Elmo Request

$4 million dollars of state bonding funds to provide clean, potable water to homeowners

in the I-94 corridor – 42% of project costs;

The City of Lake Elmo will bond for $5.5 million

The project provides the correct pressure and

clean hydraulics to serve taxpayers that are

currently on PFC adulterated wells and new growth mandated by the Met Council

Page 4: $4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

Lake Elmo Mandated Growth

Page 5: $4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

Lake Elmo PFC Water Adulteration

30% of the Lake Elmo Water Aquifer is adulterated with PFCs and metabolites

Well #3 hovers at the health standard for acceptable PFC levels and has tested above in the last 18 months

Drilling a well on the I-94 Corridor may pull contaminated water across the ground water divide.

PFCs are persistent and bio-accumulativeMDH has reported PFCS MAY cause significant

health risks and suggested the transmission of untreated water from the northeast is prudent

Page 8: $4,ooo,ooo State Bonding Request for the Construction of Trunk Water Main Pipeline February 2014

Thank You for Your Consideration