Thank you for your patience while we make safety improvements to the intersection. WHAT’S BEING DONE? Dakota County will add, replace, and improve three traffic signal systems. County Road 46 and Buck Hill Road/Kenyon Avenue in Lakeville – includes new sidewalk ramps. County Road 30 (Diffley Road) and Nicols Road in Eagan – includes a right turn lane. County Road 30 (Diffley Road) and County Road 31 (Pilot Knob) in Eagan. WHEN WILL WORK TAKE PLACE? County Road 46 and Buck Hill Road/Kenyon Avenue in Lakeville – Work begins the week of April 17 and will continue through the end of May. County Road 30 (Diffley Road) and Nicols Road in Eagan – Work is scheduled to start in mid-May and take about 7 weeks to complete. County Road 30 (Diffley Road) and County Road 31 (Pilot Knob) in Eagan – Work is scheduled to start in mid-June and take about 6 weeks to complete. WHAT SHOULD I EXPECT? Work will include installing the new traffic signal system, replacing curb and gutter, installing pedestrian ramps and some private utility work. All roadways will remain open throughout construction. Some lane closures will be required and delays are expected. For the safety of the workers and other motorists, please be patient. FOR MORE INFORMATION Visit www.dakotacounty.us select Current Road Construction on the Transportation tab Contact: Todd Howard, Construction Engineer 952-891-7906 [email protected] OR Dakota County Transportation Department Mon. – Fri., 7 a.m. to 3:30 p.m. 952-891-7900 April 10 , 2017 CONSTRUCTION UPDATE 2017 Dakota County Signal Projects

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 46-45 Newsletter (2) - Dakota County, MinnesotaCounty Project 46-45 2017 Traffic Signal Project New Traffic Signal Installation. Title: Microsoft Word - 46-45 Newsletter (2).docx Author:

  Thank you for your patience while we make safety improvements to

the intersection.

WHAT’S BEING DONE?

Dakota County will add, replace, and improve three traffic signal systems.

County Road 46 and Buck Hill Road/Kenyon Avenue in Lakeville – includes new sidewalk ramps.

County Road 30 (Diffley Road) and Nicols Road in Eagan – includes a right turn lane.

County Road 30 (Diffley Road) and County Road 31 (Pilot Knob) in Eagan.

WHEN WILL WORK TAKE PLACE?

County Road 46 and Buck Hill Road/Kenyon

Avenue in Lakeville – Work begins the week of April 17 and will continue through the end of May.

County Road 30 (Diffley Road) and Nicols Road in Eagan – Work is scheduled to start in mid-May and take about 7 weeks to complete.

County Road 30 (Diffley Road) and County Road 31 (Pilot Knob) in Eagan – Work is scheduled to start in mid-June and take about 6 weeks to complete.

WHAT SHOULD I EXPECT?

Work will include installing the new traffic signal system, replacing curb and gutter, installing pedestrian ramps and some private utility work. All roadways will remain open throughout construction. Some lane closures will be required and delays are expected. For the safety of the workers and other motorists, please be patient.

FOR MORE INFORMATION Visit www.dakotacounty.us select Current

Road Construction on the Transportation tab

Contact: Todd Howard, Construction Engineer 952-891-7906 [email protected] OR Dakota County Transportation Department Mon. – Fri., 7 a.m. to 3:30 p.m. 952-891-7900

 

April 10 , 2017

CONSTRUCTION UPDATE 2017 Dakota County Signal Projects 

Page 2: 46-45 Newsletter (2) - Dakota County, MinnesotaCounty Project 46-45 2017 Traffic Signal Project New Traffic Signal Installation. Title: Microsoft Word - 46-45 Newsletter (2).docx Author:

!"$

GWX

I-35

162ND ST W

I-35 R

AMP

BUCK HILL RD

KENT

TRL

KENYON AVE

KENRICK AVE

JOPLIN AVE

158TH ST W

KENORA WAY

BURNSVILLE CIR

KEND

ALE

DRKENRICK LOOP

I-35 RAMP

I-35 R

AMP

I-35

Prep

ared b

y the

Dak

ota C

ounty

Tran

sport

ation

Dep

artme

nt

!"$

%&d(%&c(