Mobily WiMAX-LTE Project Site Survey Report
Mobily WiMAX-LTE Project
Technical Site Survey Report
Site ID: 4399
Site name: 4399
Support-structure Type: 7m RT 12m tower
Equipment Type: SHELTER
Prepared by HAYAT COMM Date Jan. 18, 2011
Reviewed by HUAWEI Tech., Co., Ltd. Date
Reviewed by Date
Approved by Date
4/7/2023 HUAWEI CONFIDENTIAL Page 1 of 35
Mobily WiMAX-LTE Project Site Survey Report
Information of Site Surveyor
Company* Hayat Comm. Date* Jan. 18, 2011
Surveyor* Jitender Phone* 0569318474 Approve RecordHuaweiMW Approver DateBTS Approver DateRF Approver DateCW Approver Date Astelit TNO Approver Date RNO Approver Date CPO Approver Date CW Approver Date
Huawei Technologies Co., Ltd.All Rights Reserved
4/7/2023 HUAWEI CONFIDENTIAL Page 2 of 35
Mobily WiMAX-LTE Project Site Survey Report
Table of Contents
1 Common Information...................................................................4
1.1 Site Basic Information...........................................................................................5
1.2 Information of indoor site.....................................................................................5
1.3 Information of outdoor site...................................................................................5
1.4 Site Access............................................................................................................6
1.5 Road Access to the Site.........................................................................................6
1.6 Security Status of the Site.....................................................................................6
1.7 Transmission Facility Available............................................................................6
1.8 Power Available....................................................................................................7
1.9 Earth System.........................................................................................................8
1.10 Cable Tray/ladder..................................................................................................8
1.11 Length Of Cables Needed.....................................................................................8
1.12 Civil Information...................................................................................................8
1.13 Existing Antenna System of Microwave...............................................................9
1.14 Existing IDU Information.....................................................................................9
1.15 New Antenna System of Microwave..................................................................10
1.16 Microwave Link budget......................................................................................11
1.17 Block Information...............................................................................................11
1.18 DCDB & HVAC Height Information.................................................................11
1.19 Shelter Temperature............................................................................................11
2 Site RF Survey............................................................................12
2.1 Environment Information....................................................................................12
2.2 Panorama Analysis..............................................................................................12
Evaluation of rooftop...............................................................................................................................21
2.3 RF parameters.....................................................................................................21
2.4 Site Photos...........................................................................................................21
2.5 Drawings.............................................................................................................34
4/7/2023 HUAWEI CONFIDENTIAL Page 3 of 35
Mobily WiMAX-LTE Project Site Survey Report
Common Information
Fill the table according to the on-site conditions.
Site ID* 4399 Site name* 4399
Site location* Madina
Survey Date* Jan. 18, 2011
Equipment room type Shelter
BS mode SHELTAR BS configuration S111
Site longitude (decimal) *24.4866
Site latitude (decimal) *39.668
Building height* 7mRT Support structure height* 12m tower
Name of shared site/co-location name Co-location operator MOBILY
Name of shared site/co-location name HUAWEI 3G
Co-location operator MOBILY
Survey person* Jitender
Contact number* 0569318474
Customer contact person Contact number
Property contact person Contact number
Permission to access the site* N/A Time to access the site* Any Time
Site survey implementation company* HAYAT
Site engineering implementation company
Radio network planning company
Note:- * Marks must be Filled
1.1 Site Basic Information
Site Type*BTS+MW BTS only BTS+MW hub MW Realy only MW hub only
Others ____________________
Site Importance Normal Important Very Important
Site Location* Rooftop In Building Green FieldExisting Water tower / chimney Other
4/7/2023 HUAWEI CONFIDENTIAL Page 4 of 35
Mobily WiMAX-LTE Project Site Survey Report
Equipment Room Type*Wall Type Concrete Metal Others ____________________
Floor type Concrete Metal Others ____________________ Antistatic Floor, Floor Height ______m
Equipment Room Size* 2x2 Shelter 3x2 Shelter Others ____________________
Equipment Fixing Method* On Floor On Wall Others ____________________
Indoor Grounding Bar* Hole Quantity of Inside Grounding Bar: ___2___ (In Use:_2_ Left:__)
Feeder Wiring Window* Hole Quantity of Feeder Wiring Window:__12____ (In Use:__7_ Left:__5_)
1.2 Information of indoor site
1.3 Information of outdoor site
Fence* No use In use. Length_____4 _____ m Width_____3____ m
Base Frame Type* Concrete Foundation Concrete Foundation + Steel Frame Steel Frame Others ____________________
Is There Extension Place for Huawei Mini
Shelter?* No Yes. How many cabinets can be installed in advance? 1 2
Mini Shelter Size * (mm)
Configuration Dimension (W x D x H) Enough Space?
1 unit(1 Cabinet) 905mm x 1,085mm x 2,155mm Yes No2 Unit(2 Cabinet) 1,755mm x 1,085mm x 2,155mm Yes No
2.5 unit (2.5 Cabinet) 2,640mm x 1,085mm x 2,155mm Yes No
3 unit (3 Cabinet) 2,610mm x 1,085mm x 2,155mm Yes No
Outdoor Grounding
Bar* Hole Quantity of Outside Grounding Bar:__15___ (In Use: _10__ Left:_5__)
1.4 Site Access
Access : * Free Regulated
Key's : * Elec. Key Combination key Other :
Specific Procedure : Normal shelter key
1.5 Road Access to the Site
Small truck 4x4 Car
4/7/2023 HUAWEI CONFIDENTIAL Page 5 of 35
Mobily WiMAX-LTE Project Site Survey Report
Access to the Site: * Truck - 3,5 t
State of the Road : * Good
Parking : * Close Easy
Far Away Difficult
Parking for Delivery : * Easy Free Off Charge
Difficult To Pay
Arrange With the Local PoliceNotes :
1.6 Security Status of the Site
Site OK * Yes No
Security Problem * Yes No
Earth cable connected to main bar * Yes No
Electric Socket Available * Yes No
Enough light available * Yes No
NOTES :
1.7 Transmission Facility Available
Optic Fibre for Transmission Available : Yes NoEthernet port for Transmission Available : Yes NoNotes :
1.8 Power Available
DC Power (-48V)
Rectifier Available : * Yes No Rectifier Operational : Yes No
Type : POWER WAER
Sys.Total rectifiers 7
Available, not in use: Other :
Current -48V DC Power Consumption : 32.5ANumber of Free Rectifier's Position : *
10,11
4/7/2023 HUAWEI CONFIDENTIAL Page 6 of 35
Mobily WiMAX-LTE Project Site Survey Report
Fuse Holder/MCB Breaker Available : Yes NoFuse Type in the Holder
Notes : There is no DCDP. Proposed in Rectifier. Proposed at 63A
GENERATOR DUAL: Yes NoGENERATOR SINGLE: Yes NoNo GENERATOR: Yes NoSCECO POWER: Yes NoDC Power - 48V
Ampere Type : Quantity : Fuse holder/MCB
Breaker:63A GE 1 Used/7 Spare
Fuse holder/MCB Breaker:
50A GE 0 Used/7 Spare
Fuse holder/MCB Breaker:
10A GE 1 Used/3 spare
Fuse holder/MCB Breaker: 32A GE 2 Used/1 Spare
Fuse holder/MCB Breaker:
6A GE 0 Used/1 Spare
Fuse holder/MCB Breaker:
Power Cable (BTS -48V) :
Portable Power Supply needed: Yes NoNotes:
CB 63A available
1.9 Earth System
Earth Cable : * Type MKEM y/g Needed Length
Bus Bar indoor/outdoor: * Yes No
Notes : New Grounding cable required.
1.10 Cable Tray/ladder
TYPE Required Length
Cable Tray: * Yes No
Cable ladder indoor: * Yes No
Feeder Gantry * Yes No
Re-use the existing cable Tray: * Yes No
4/7/2023 HUAWEI CONFIDENTIAL Page 7 of 35
Mobily WiMAX-LTE Project Site Survey Report
Re-use the existing cable Ladder: * Yes No
Re-use the existing feeder gantry: * Yes NoNotes :
1.11 Length Of Cables Needed
Cable Type Equipment Length (m)
Power Cable from DC-Bar to DCDP * DC-Bar 5
Power Cable from DC-Bar to DCDU* DCDU 7
Transmission Cable Length (Optical) : BBU 11
Grounding Cable Length: * DC-BOX 3
CPRI Cable Length (6 RRU’s x 1 CPRI Per RRU): * BU-RRU 8x6cpri
DC Power Cable Length: (6 RRU’s) * RRU 20
Grounding Cable Length: (6 RRU’s) * RRU 3
GPS Feeder Length: * GPS 5
RRU Feeder Length: (12 Feeders ) * RRU 150
Notes :Other Cables info
1.12 Civil InformationYes/No Requirements
Is there enough space for New RRU’s RACK * Yes 2M*2MIs there enough space for the new Mini Shelter* YES 800mm x 400mm
Is there enough space on existing tower for New Antenna * YES
Is there enough space on rooftop for new tower base * YES 6m*6m
Is there space for the wall mount on the parapet of the building YES 1.5m-2m
Are there enough holes available on the Roxtec frame * Yes At least 7 holes
Is there enough space available for the New Roxtec frame * Yes
Circumference of the ring to be installed on monopole tower base. No For Green Field sites
Notes : Other info
1.13 Existing Antenna System of Microwave
Quantity of Existing MW Antennas * 1 2 3 4 5 6 Others:_______________
Antenna 1 Antenna 2 Antenna 3 Antenna 4 Antenna 5 Antenna 6
Diameter/Polarization * 0.3
Height(m) * 19
Azimuth from Magnetic North(deg) * 125
Link Capacity *
Hop Distance (km) *
Far End Site ID *
Note:-
4/7/2023 HUAWEI CONFIDENTIAL Page 8 of 35
Mobily WiMAX-LTE Project Site Survey Report
1.14 Existing IDU Information
Service Interface * Fiber FE GE E1
The Label is available or not Yes No
Existing IDU pictures
1.15 New Antenna System of Microwave
Huawei IDU Type RTN910 RTN950 Others:_______________
Quantity of New MW Antennas 1 2 3 4 5 6 Others:_______________
New MW Antennas Antenna 1Antenna
2Antenna
3Antenna 4
Antenna 5
Antenna 6
Enough space for new antenna Yes No Yes N
o Yes No Yes No Yes No
Enough cable tray for new IF cableYes No Yes N
o Yes No Yes No Yes No
Diameter/Polarization 1.2
Height (m) 18
Antenna mounting type
Azimuth from Magnetic North(deg) 233.48
4/7/2023 HUAWEI CONFIDENTIAL Page 9 of 35
Mobily WiMAX-LTE Project Site Survey Report
Frequency Band (GHz)
Link Capacity
Hop Distance (km) 2.17
Far End Site ID 6480
Planned RX level
Fade Margin
Annual Availability
IF Cable Length (m)
Protection Type
Enough Space for new IDU Yes No
Transmission Rack Type(attach the picture)
Note:-
1.16 Microwave Link budget
1.17 Block
Information(Exchange Site)
Blocks Space Is there enough space for New TRM RACK(EN3B19inch2m)
1 Available Yes No
2 Available Yes No
3 Available Yes No
4 Available Yes No
4/7/2023 HUAWEI CONFIDENTIAL Page 10 of 35
We will submit separately with LOS
Note:- Attach Pathloss result.
Mobily WiMAX-LTE Project Site Survey Report
5 Available Yes No
6 Available Yes No
7 Available Yes No
8 Available Yes No
Note:- Block 8 is available.
1.18 DCDB & HVAC Height Information DCDB To Floor Height 1.75m HVAC To Floor Height 1.2mHVAC To Rack Distance (Block # 8 or 7 or 6) 2m
1.19 Shelter Temperature Shelter Temperature 32.1 C
2 Site RF Survey
2.1 Environment Information
2.2 Panorama AnalysisTable2-1 Photo of 4399 site and entironment
4/7/2023 HUAWEI CONFIDENTIAL Page 11 of 35
Mobily WiMAX-LTE Project Site Survey Report
4399 Tower location
Sector 1 0 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 12 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 2 120 deg.
Sector 3 240 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 13 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 1 antenna installation environment
Sector 2 antenna installation environment
4/7/2023 HUAWEI CONFIDENTIAL Page 14 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 3 antenna installation environment
0 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 15 of 35
Mobily WiMAX-LTE Project Site Survey Report
30 deg.
60 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 16 of 35
Mobily WiMAX-LTE Project Site Survey Report
90 deg.
120 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 17 of 35
Mobily WiMAX-LTE Project Site Survey Report
150 deg.
180 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 18 of 35
Mobily WiMAX-LTE Project Site Survey Report
210 deg.
240 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 19 of 35
Mobily WiMAX-LTE Project Site Survey Report
270 deg.
300 deg.
330 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 20 of 35
Mobily WiMAX-LTE Project Site Survey Report
Evaluation of Greenfield
2.3 RF parameters Table2-2 Table of RF parameters
Sector 1 Sector 2 Sector 3Cell ID 4399
Type of antenna
Manufactory Kathrein 742265
Kathrein 742265
Kathrein 742265
Width of level lobe 65° 65° 65°Gain of antenna 18 dBi 18 dBi 18 dBi
Height of ant (midpoint of ant)
19m 19m 19m
Azimuth (deg) 0 120 240Electrical downtilt 0 0 0Mechanical downtilt 1 1 1Length of feeder(m) 50m 50m 50mType of feeder(inch) 7/8” 7/8” 7/8”Supporting method of ant 9M TOWER 9M TOWER 9M TOWER
Supporting structure of antType of fixing RT RT RTHeight(m) 19m 19m 19m
TMA(Y/N) N N N
2.4 Site Photos
4/7/2023 HUAWEI CONFIDENTIAL Page 21 of 35
Mobily WiMAX-LTE Project Site Survey Report
Door label
Existing equipments pictures
4/7/2023 HUAWEI CONFIDENTIAL Page 22 of 35
Mobily WiMAX-LTE Project Site Survey Report
4 sides of shelter
4/7/2023 HUAWEI CONFIDENTIAL Page 23 of 35
Mobily WiMAX-LTE Project Site Survey Report
DDF
Indoor Grounding Bus Bar
4/7/2023 HUAWEI CONFIDENTIAL Page 24 of 35
Mobily WiMAX-LTE Project Site Survey Report
Out Door Grounding
Tower Feeder System / Tray / Ladder
4/7/2023 HUAWEI CONFIDENTIAL Page 25 of 35
Mobily WiMAX-LTE Project Site Survey Report
Access Road
Site Access
4/7/2023 HUAWEI CONFIDENTIAL Page 26 of 35
Mobily WiMAX-LTE Project Site Survey Report
Cable ladder Indoor
Cable ladder Outdoor
4/7/2023 HUAWEI CONFIDENTIAL Page 27 of 35
Mobily WiMAX-LTE Project Site Survey Report
Roxtec from Outdoors
Roxtec from Indoors
4/7/2023 HUAWEI CONFIDENTIAL Page 28 of 35
Mobily WiMAX-LTE Project Site Survey Report
Existing DC Power system
Proposed breaker picture
4/7/2023 HUAWEI CONFIDENTIAL Page 29 of 35
63A Available
Mobily WiMAX-LTE Project Site Survey Report
Space available for New wimax antenna.
No space in Existing Tower for new Wimax Antenna Sector 1
Existing Tower for new Antenna Sector 2
4/7/2023 HUAWEI CONFIDENTIAL Page 30 of 35
Existing 2G&3G Antenna Existing 2G&3G Antenna
Existing 2G&3G Antenna Existing 2G&3G Antenna
Mobily WiMAX-LTE Project Site Survey Report
Existing Tower for new Antenna Sector 3
Proposed RRU RACK Location
4/7/2023 HUAWEI CONFIDENTIAL Page 31 of 35
PROPOSED RRU RACK LOCATION
Existing 2G&3G Antenna Existing 2G&3G Antenna
Mobily WiMAX-LTE Project Site Survey Report
Feeder Window Location Existing or Proposed
Space for new TRM Rack
4/7/2023 HUAWEI CONFIDENTIAL Page 32 of 35
Existing Feeder Window Location
Space Available
Mobily WiMAX-LTE Project Site Survey Report
Proposed BBU Location
Existing MW Antenna picture
4/7/2023 HUAWEI CONFIDENTIAL Page 33 of 35
MWSize: 0.3mAz: 125°Ht:19m
Space Available for
BBU and IDU
Mobily WiMAX-LTE Project Site Survey Report
Proposed New Micro Wave
2.5 Drawings
Site layout with outdoor proposed requirement like gantry, cable tray, Bus bar, new opening, new equipment Etc.
Existing and Proposed floor layout Existing and proposed Antenna drawings Existing and Proposed cable ladder drawings. Existing and proposed Dc connection drawings.
4/7/2023 HUAWEI CONFIDENTIAL Page 34 of 35
MWSize: 1.2mAz: 233.48°Ht: 18m
Mobily WiMAX-LTE Project Site Survey Report
Proposed New Wimax AntennaProposed new Tower 9m
4/7/2023 HUAWEI CONFIDENTIAL Page 35 of 35
ProposedNew Wimax AntennaSector AAzi – 60 Degree HT: 16m
ProposedNew Wimax AntennaSector BAzi – 180 Degree HT: 16m
ProposedNew Wimax AntennaSector CAzi – 300 Degree HT: 16m
Space Available for
9m Tower