Submittal/Approval Letter To: Patrick Muench, P.E. Date: June 14, 2017 Turnpike Design Engineer Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( ) Federal Aid Number: Not Applicable Project Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320 State Road Number: 91 Co./Sec./Sub.: 94/470/000 Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( ) Request for: Design Exception ( ), Design Variation ( ) Community Aesthetic Feature: Conceptual ( ), Final ( ) Re-submittal: Yes ( ) No( ) Original Ref# - - Requested for the following element(s): ( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope ( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance ( ) Superelevation ( ) Horizontal Curve Radius ( ) Other This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320 (County Mile Post 15.078 to County Mile Post 31.168), in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. There are four locations along the project corridor where the SR 91 existing shoulder widths are less than 10 feet. The shoulder widths do not meet either the FDOT governing criteria (12 feet) or the AASHTO Criteria (10 feet Paved). Three of the four locations are the SR 91 Mainline outside shoulders at the three underpasses for Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). The fourth location is in the vicinity of the northbound and southbound bridges across Angle Road/Belcher Canal. The widening of the existing shoulder widths to meet the FDOT criteria will increase the construction cost significantly as well as impact the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Since there are no documented crashes citing narrow shoulder width as the contributing cause, and no benefit may be gained as a result of implementing the improvements, the benefit/cost ratio for widening the shoulders was determined to be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing any of the improvements discussed in this report. Furthermore, maintaining the current shoulder widths will eliminate any negative impacts on

Upload: others

Post on 28-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Submittal/Approval LetterTo: Patrick Muench, P.E. Date: June 14, 2017 Turnpike Design Engineer

Financial Project ID: 436517-1-52-01 & 436517-3-52-01 New Construction ( ) RRR ( )Federal Aid Number: Not ApplicableProject Name: Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM169.320State Road Number: 91 Co./Sec./Sub.: 94/470/000Begin Project MP: 153.230 End Project MP: 169.320 Full Federal Oversight: Yes ( ) No ( )Request for: Design Exception ( ), Design Variation ( )

Community Aesthetic Feature: Conceptual ( ), Final ( )Re-submittal: Yes ( ) No( ) Original Ref# - -

Requested for the following element(s):( ) Design Speed ( ) Lane Width ( ) Shoulder Width ( ) Cross Slope( ) Design Loading Structural Capacity ( ) Vertical Clearance ( ) Maximum Grade ( ) Stopping Sight Distance( ) Superelevation ( ) Horizontal Curve Radius ( ) Other

This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320 (County Mile Post 15.078 to County Mile Post 31.168), in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings.

SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions.

There are four locations along the project corridor where the SR 91 existing shoulder widths are less than 10 feet. The shoulder widths do not meet either the FDOT governing criteria (12 feet) or the AASHTO Criteria (10 feet Paved). Three of the four locations are the SR 91 Mainline outside shoulders at the three underpasses for Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). The fourth location is in the vicinity of the northbound and southbound bridges across Angle Road/Belcher Canal.

The widening of the existing shoulder widths to meet the FDOT criteria will increase the construction cost significantly as well as impact the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Since there are no documented crashes citing narrow shoulder width as the contributing cause, and no benefit may be gained as a result of implementing the improvements, the benefit/cost ratio for widening the shoulders was determined to be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing any of the improvements discussed in this report. Furthermore, maintaining the current shoulder widths will eliminate any negative impacts on

Page 2: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the shoulder widths, identified in Table 2.1, to remain.

Recommended by:

Date 6/14/2017Houman Assari, P.E., Responsible Professional Engineer

Approvals:

Date N/A Date Patrick Muench, P.E., Turnpike Design Engineer Russ Snyder, P.E., Turnpike Structures Design Engineer

N/A Date N/A Date Michael Shepard, P.E., State Roadway Design Engineer State Structures Design Engineer

N/A Date N/A Date State Chief Engineer FHWA Division Administrator

June 16, 2017

Houman Assari Digitally signed by Houman Assari Date: 2017.06.14 18:50:43 -04'00'

Patrick Muench

Digitally signed by Patrick Muench DN: cn=Patrick Muench, o=Florida Department of Transportation, ou=Florida's Turnpike Enterprise, [email protected], c=US Date: 2017.06.16 13:09:21 -04'00'

Page 3: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Page | 1  

Request for FTE Design Exceptions & Variations Checklist 

Date: 

     BMP:     EMP: EMP: 

 New Construction 

District:   Project Name: Project Section Exemption FPID:      Requested Control Element(s): 

Design Speed*  Horizontal Curve Radius

 Other __________

Lane Width Vertical Clearance**  Superelevation 

Shoulder Widths Maximum Grade Stopping Sight Distance  

RRR

Design Loading Structural Capacity* Cross Slopes 

*Requires supplementary review (i.e. Planning/Structures/etc)**Requires Utility Accommodation Manual (UAM) Exception Submittals

 Page #/ NA 

Submittal/Approval Letter (independent file from report)  Short description of project, applicable criteria and reason for variation requestApplicable signature fields, names, and titles listed  

Design Exception/Variation Report   Report Cover 

Project Title, FPID, digital sign, seal and date  Project description 

 General project information, typical section, begin/end milepost,    county section number  Include Work Mix, To – From, Objectives, Obstacles and Schedule. 

 Description of the variation element and applicable criteria (AASHTO and    Department value or standard) 

 Detailed explanation of why the criteria or standard cannot be    complied with or is not applicable  Description of any proposed value for project and why it is    appropriate 

 Amount and character of traffic using the facility  Description of the anticipated impact on Operations,    Adjacent Sections, Level Of Service, Safety, Long and Short    Term Effects 

Is the variation   temporary or   permanent?   Description of the anticipated Cumulative Effects 

 A plan view or aerial photo of the variation location  Showing right of way lines, and property lines of adjacent property. 

 A photo of the area.  Typical section or cross‐section of variation/exception location  The milepost and station location of the variation/exception  Any related work programmed or in future work plans 

BMP: 

Florida's Turnpike Enterprise

SR 91 Mainline Resurfacing and Safety Improvements from MM 153.230 to MM 169.32015.078

06/14/2017

31.168

436517-1-52-01 & 436517-3-52-01 ✔

S/A Letter

✔ 1

Cover

1, 2, 3, 4

4, E

A

D B

A w/ MM

5

Page 4: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Page | 2  

 The Project Schedule Management (PSM) Project Schedule   Activities submitted 

 < Phase I    Phase I – Phase II     Phase II – Phase III   Phase III – Phase IV     > Phase IV  

Letting:      All mitigating efforts 

 An explanation of what if any associated existing or future    Limitations as a result of public or legal commitments.  Description and explanation of any practical alternatives,    the selected treatment and why. 

 Comments on the most recent 5‐year crash history  Including all pertinent crash reports  Is the location of the variation on the High Crash List? 

 Description of the anticipated Cost (Social and to the Department –    Benefit/Cost)  Summary Conclusions 

Summary description of included support documentation such as:  Location map or description  Typical section  Aerial or Photo logs when they best illustrate the element issues  Crash History and analysis  Plan sheets in the area of the variation elements  Profiles in the area of vertical alignment variation elements  Tabulation of pole offsets for horizontal clearance variation  Applicable Signed and Sealed Engineering Support Documents 

For the specified conditions the following additional documentation is required: For design speed on FIHS/SIS 

 Provide typical sections at mid blocks and at intersections. For lane width 

 Provide locations of alternative routes that meet criteria  Proposal for handling drainage  Proposed signing and pavement markings 

For shoulder width  Proposal for handling stalled vehicles  Proposal for handling drainage 

For bridge width  Plan view of the approaching roadways  Existing bridge plans (these may be submitted electronically) 

For a bridge with a design inventory load rating less than 1.0  Written evaluation and recommendation by the Office of    Maintenance is required  Load rating calculations for the affected structure 

For vertical clearance  Locations of alternative routes that meet criteria 

 Page #/ NA 

✔ J

7

5, F

5, 6, G, H

N/A

N/A

6

N/A

N/A

N/A

8

A, B, D, F

Page 5: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Page | 3  

For cross‐slopeProposal for handling drainage 

Details on how the cross slope impacts intersections 

For conditions that may adversely affect the roadway’s capacity 

 Provide the comments on compatibility of the design and operation   with the adjacent sections  Effects on capacity (proposed criteria vs. AASHTO) using an    acceptable capacity analysis procedure  Calculate reduction for design year, level of service 

For superelevation  Provide the side friction factors for the curve for each lane of different    cross‐slope at the PC of the curve, the point of maximum cross‐slope,    and the PT of the curve using the following equation.   f = (V2 – 15Re)/(V2e+15R) 

For areas with crash histories or when a benefit to cost analysis is requested  Provide a time value analysis between the benefit to society quantified    in dollars and the costs to society quantified in dollars over the life of the    Exception/Variation. 

 Roadside Safety Analysis Program (RSAP)  Historical Crash Method (HCM) 

 Page #/ NA 

N/A

N/A

N/A

N/A

Page 6: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

St. Lucie County, Florida

FPID Numbers 436517-1-52-01 and 436517-3-52-01 Contract Number C9R86

SHOULDER WIDTH DESIGN EXCEPTION

Prepared For:

Florida Department of Transportation Florida’s Turnpike Enterprise

JUNE 2017

Prepared By: Propel Engineering, Inc. 6685 Forest Hill Boulevard, Suite 205 Responsible Engineer: Greenacres, FL 33413 Houman Assari, PE Certification of Authorization No. 31050 State of Florida, Professional Engineer Vendor No. F463316950 License No. 49029 This item has been electronically signed and sealed by Houman Assari, PE on 06/14/2017 using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

Houman Assari Digitally signed by Houman Assari Date: 2017.06.14 18:46:40 -04'00'

Page 7: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Table of Contents 1.0 Project Description ....................................................................................................................................................... 1

2.0 Description of the Design Exception ............................................................................................................................. 1 3.0 Design Criteria .............................................................................................................................................................. 3

3.1 American Association of State Highway and Transportation Officials (AASHTO) .................................................... 3

3.2 Florida Department of Transportation (FDOT) ....................................................................................................... 3 4.0 Proposed Criteria .......................................................................................................................................................... 4

5.0 Justification .................................................................................................................................................................. 4

5.1 Operational Conditions .......................................................................................................................................... 4

5.2 Safety Considerations ............................................................................................................................................ 5 5.3 Benefit/Cost Analysis ............................................................................................................................................. 5

5.4 Accommodation of Disabled Vehicles .................................................................................................................... 6

5.5 Spread Analysis ...................................................................................................................................................... 6 5.6 Right-of-Way Impacts ............................................................................................................................................ 7

5.7 Community Impacts ............................................................................................................................................... 7

5.8 Environmental Impacts .......................................................................................................................................... 7

5.9 Mitigation ............................................................................................................................................................... 7 6.0 Summary Conclusions ................................................................................................................................................... 8

APPENDICES

Appendix A: Location Map Appendix B: Typical Sections Appendix C: As-Built Plans Appendix D: Photo Log Appendix E: Traffic Data Appendix F: Crash History Appendix G: Cost Estimate Appendix H: Benefit/Cost Analysis Appendix I: Spread Analysis Appendix J: Project Schedule

Page 8: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 1

1.0 Project Description This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230 to MM 169.320 (County Mile Post 15.078 to County Mile Post 31.168), in St. Lucie County (94470-000) for a total length of 16.090 miles. The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders, and the paved median openings. Safety improvements will include construction of ground-in rumble strips, repair of all guardrail openings for maintenance access and adjustment or replacement of guardrail as necessary, cross slope correction to meet criteria, shoulder drop-off correction along the edge of pavement, replacement of non-compliant signing within the project limits, bridge deck repair at the L-20 and Angle Road/Belcher canal bridges, bridge railing retrofit at the Picos Road, CR 68, and Minute Maid Road overpass bridges, and repairs to the existing box culverts and farm crossings. SR 91 is classified as a Rural Principal Arterial – Expressway and is part of the National Highway System (NHS) and the State Highway System (SHS). SR 91 is also a Strategic Intermodal System (SIS) Corridor with a Limited Access Right-of-Way of 400 feet. The corridor has a posted and design speed of 70 MPH. The existing typical section is a four-lane, divided, rural facility with two 12 ft. lanes, an 8 ft. inside shoulder with 4 ft. paved, and a 12 ft. outside shoulder with 10 ft. paved, in each direction. The northbound and southbound roadways are separated by a 40-ft. median. An existing median double-faced guardrail with rub rail, predominantly located adjacent to the southbound inside shoulder, runs along the median within the project limits. In some locations, such as the segment between the Belcher Canal and L-20 Canal bridges, standard guardrail is located adjacent to the median shoulders and the outside shoulders for the northbound and southbound directions. The project is currently scheduled for letting on 01/09/2018, with a production date of 09/05/2017 and a Phase II submittal date of 04/04/2017. There are currently no major obstacles to meeting this schedule. The project schedule is included in Appendix J of this document. 2.0 Description of the Design Exception Based on information gathered from field reviews, the design survey for the project, and a review of the as-built plans, the SR 91 shoulders were evaluated for compliance with American Association of State Highway and Transportation Officials (AASHTO), Florida Department of Transportation (FDOT) and Florida’s Turnpike Enterprise (FTE) criteria for total shoulder width, and paved shoulder width. As indicated in Table 2.1, there are four locations along the project corridor where the SR 91 existing outside shoulder widths are less than 10 feet. The shoulder widths do not meet either the FDOT governing criteria (12 feet) or the AASHTO Criteria (10 feet Paved). Three of the four locations are the SR 91 Mainline outside shoulders at the three underpasses for Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059). The fourth location is in the vicinity of the northbound and southbound bridges across Angle Road/Belcher Canal. As required by Table 25.5.1 of the TPPPH, when a Design Exception is identified for one of the ten controlling elements, the element should be evaluated against PPM Chapter 25 criteria for the final determination of a Design Exception requirement. If the element meets PPM Chapter 25 design criteria, a technical memo will be required for approval, documenting that the element meets PPM Chapter 25 criteria and a Design Exception is not required. PPM Chapter 25 states that the standards used for shoulder widths may be the AASHTO interstate standards that were in effect at the time of original construction or inclusion into the interstate system. The AASHTO requirement for shoulder width at the time of original construction was 10 feet, therefore a Design Exception for shoulder width will be required for the current shoulder widths to remain. The Design Exception locations, as summarized in Table 2.1, have been included in Appendix A of this document.

Page 9: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shou

lder

Wid

th D

esig

n Ex

cept

ion

FPI

D No

s: 43

6517

-1-5

2-01

& 4

3651

7-3-

52-0

1

Turn

pike

Mai

nlin

e (S

R 91

) Res

urfa

cing

and

Safe

ty Im

prov

emen

ts fr

om M

M 1

53.2

30 to

MM

169

.320

2

Ta

ble

2.1

– O

utsid

e Sh

ould

er W

idth

Def

icien

cies

Loca

tion

Begi

n M

ile

Mar

ker

End

Mile

M

arke

r Di

rect

ion

Leng

th

(ft.)

Requ

ired

Shou

lder

Wid

th

(ft.)

Exist

ing

Shou

lder

W

idth

(ft

.)

Requ

ired

Pa

ved

Shou

lder

Wid

th

(ft.)

Exist

ing

Pave

d Sh

ould

er

Wid

th

(ft.)

Reco

mm

enda

tion

AASH

TO

New

Con

st.

(1 &

2)

FDO

T/FT

E N

ew C

onst

. (3

)

AASH

TO

New

Con

st.

(1 &

2)

FDO

T/FT

E N

ew C

onst

. (3

)

Pico

s Roa

d Un

derp

ass

154.

910

154.

940

NB

159

10

12

9.81

10

10

9.

81

Desig

n Ex

cept

ion

CR 6

8 Un

derp

ass

156.

090

156.

120

NB

159

10

12

9.45

10

10

9.

45

Desig

n Ex

cept

ion

Nort

h of

An

gle

Rd

/Bel

cher

Ca

nal B

ridge

157.

980

158.

140

NB

845

10

12

9.49

10

10

9.

49

Desig

n Ex

cept

ion

Min

ute

Mai

d Ro

ad

Unde

rpas

s 16

5.47

0 16

5.49

0 NB

10

6 10

12

9.

77

10

10

9.77

De

sign

Exce

ptio

n

Pico

s Roa

d Un

derp

ass

154.

930

154.

960

SB

159

10

12

9.91

10

10

9.

91

Desig

n Ex

cept

ion

Sout

h of

An

gle

Rd

/Bel

cher

Ca

nal B

ridge

157.

680

157.

890

SB

1,10

9 10

12

9.

56

10

10

9.56

De

sign

Exce

ptio

n

(1

)AA

SHTO

– A

Pol

icy o

n De

sign

Stan

dard

s – In

ters

tate

Sys

tem

(200

5), P

age

3 (2

)AA

SHTO

– A

Pol

icy o

n Ge

omet

ric D

esig

n of

Hig

hway

s and

Str

eets

(201

1), S

ectio

n 8.

2.4

(3)

FDO

T –

Plan

s Pre

para

tion

Man

ual,

Volu

me

1, C

hapt

er 2

, Sec

tion

2.3,

Tab

le 2

.3.1

Page 10: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 3

3.0 Design Criteria 3.1 American Association of State Highway and Transportation Officials (AASHTO)

A Policy on Design Standards – Interstate System – (2005) (AASHTO IS)

Cross Section Elements, Shoulders, Page 3:

“The paved width of the right shoulder shall not be less than 10 feet.” “On a four-lane section, the paved width of the left shoulder shall be at least 4 feet.”

A Policy on Geometric Design of Highways and Streets (2011)

Chapter 8 – Freeways, Section 8.2.4, Traveled Way and Shoulders:

“On four-lane freeways, the median (or left) shoulder is normally 4 to 8 feet wide, at least 4 feet of which should be paved and the remainder stabilized. The paved width of the right shoulder should be at least 10 feet.”

3.2 Florida Department of Transportation (FDOT) Plans Preparation Manual (PPM) (January 2017)

Volume 1, Chapter 2.3, Table 2.3.1 - Shoulder Widths and Cross Slopes – Freeways

The required shoulder widths on this type of facility without shoulder gutter, are eight (8) feet for the median shoulder with four (4) feet paved, and twelve (12) feet for the outside shoulder with ten (10) feet paved.” “The required shoulder widths on this type of facility with shoulder gutter, are 13.5 feet for the median shoulder with six (6) feet paved, and 15.5 feet for the outside shoulder with eight (8) feet paved.”

Volume 1, Chapter 25, Section 25.1.2 states: “The RRR design criteria applicable for Interstate Highways and Freeways are new construction criteria, with the following exceptions: 1. The standards used for horizontal alignment, vertical alignment, and widths of median,

traveled way and shoulders may be the AASHTO interstate standards that were in effect at the time of original construction or inclusion into the interstate system.”

Turnpike Plans Preparation and Practices Handbook (TPPPH) (March 3, 2017)

Volume 1, Section 2.3 -Shoulders does not provide any additional criteria regarding Shoulder Widths for this type of high speed facility. Volume 1, Chapter 25, Table 25.5.1 states that for the 10 controlling elements, which include shoulder width:

“If a Design Exception is identified under the ERCAR, the element should then be evaluated against Chapter 25 for final determination of a Design Exception. If the element meets Chapter 25 design criteria, a technical memo will be submitted for approval by the Turnpike Design Engineer documenting that the element meets Chapter 25 criteria and a Design Exception is not required.

Page 11: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 4

If a Design Exception is identified under the ERCAR and also does not meet Chapter 25 criteria, then a Design Exception will be processed against current new construction criteria.”

4.0 Proposed Criteria The proposed design is to allow the existing outside shoulder widths for SR 91 for the underpasses at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059), as well as the northbound and southbound approaches to the bridges across Angle Road/Belcher Canal, as identified in Table 2.1, to remain in place. 5.0 Justification The main objective of the project is to extend the service life of the existing asphalt pavement and improve safety related features along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public.

5.1 Operational Conditions A project Traffic Data Report was provided by FTE. The Traffic Data results were as follows:

Table 5.1.1 – SR 91 Traffic Data

Two-Way AADT Trucks (DDHV) Traffic Factors

2016 2018 2038 2016 2018 2028 KSTD (%) D (%) T24 (%) DHT (%)

32,500 33,900 45,200 145 151 202 10.5 60.7 14.0 7.0 The design and posted speed within the project limits is 70 mph. The Traffic Data is included in Appendix E of this document. The extent of the substandard shoulder width referenced in this exception is limited to the areas below the overpasses at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059), as well as the segment of SR 91 to the north of the northbound bridge across Angle Road/Belcher Canal and the segment to the south of the southbound bridge across the same facilities. As indicated in the FHWA document “Mitigation Strategies for Design Exceptions”, dated July 2007, shoulder width may have an impact on traffic operations and highway capacity on high-speed facilities, since narrow shoulder widths may reduce free-flow speeds and driver comfort. There will be a reduction in free-flow speed when the lateral clearance for outside shoulders is less than six (6) feet. Since the narrow shoulder widths are an existing condition and the existing width of the outside shoulders are greater than six (6) feet within the exception limits, no adverse impacts on the existing capacity and operation of the facility are anticipated if the current shoulder widths are maintained. The capacity of roadway is dependent on the number of lanes and the posted speed limit along the corridor. The scope of this project is limited to milling and resurfacing, therefore these elements will remain the same. Furthermore, the limited length of the substandard segments will not impede maintenance, law enforcement, and disabled vehicles from locating a suitable refuge area. There are additional design elements that are not in compliance with AASHTO and FDOT criteria, namely Vertical Clearance and Cross slope/Superelevation, that occur in the vicinity of the areas established for this Design Exception, however, no cumulative effects impacting the operation of the facility are expected.

Page 12: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 5

Based on the analysis performed, no long or short term adverse impacts are anticipated on operations, Level of Service, or adjacent roadway sections for the areas identified in this Design Exception, which is expected to be in place through the design life of the project. SR 91 from MM 152 to MM 193 is to be evaluated for widening by year 2035 which may ultimately eliminate the substandard shoulder widths along SR 91. A Project Development and Environment (PD&E) study would be required, which may address the shoulder width deficiency, prior to design and construction. 5.2 Safety Considerations Safety considerations associated with narrow shoulder widths are reduced recovery areas, as well as reduced storage space for disabled vehicles, maintenance operations, law enforcement activities, and stormwater management. The most recent 5-year crash history from the years 2011 through 2015 was reviewed. The crash data is included in Appendix F of this document. This report covers crash data, field investigations, and assessments of the existing conditions along the corridor. The data provided includes the location of each crash, the type of crash, the date, and the existing conditions.

The analysis of the crash history revealed a total of 376 crashes within the project limits. There have been 49 crashes that have occurred within the limits established for the Design Exception, eight of which have involved collisions with the outside roadside barriers. The long form crash report for only one of the eight crashes was available. The report was reviewed to determine whether narrow shoulder widths were a contributing factor to any of the crashes. The findings are summarized in Table 5.2.1.

Table 5.2.1 - Summary of Detailed Crash Report

Based on the available information, a correlation between the crashes and narrow shoulder widths could not be found. The analysis further revealed that the narrow shoulder locations, as identified in this Design Exception, are not on the Turnpike’s Top 30 Crash List. From the foregoing information presented, it is reasonable to conclude that the crashes would not be mitigated by widening the narrow shoulders, and safety is not compromised. 5.3 Benefit/Cost Analysis The widening of the existing shoulders to achieve compliant shoulder widths without compromising any existing conditions will require the reconstruction of the overpass bridges at Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059), since the piers of the existing structures need to be at an offset of at least 14 ft. to accommodate a new shoulder width of 12 ft. and the required pier protection barrier. The reconstruction of the bridges is impractical with respect to the scope of this rehabilitation project, based on the significant impacts on the environment, community, budget, and schedule.

Crash ID Year Location Summary Remarks

81963725 2013 MM

158.034 (R1)

Vehicle 1 was traveling northbound on SR 91 in the area of the 158 MM in the outside lane. Due to inclement weather and balding tires, Driver 1 lost control of Vehicle 1. Vehicle 1 traveled from the outside lane to the right shoulder striking the guardrail with its front right side. This action caused Vehicle 1 to rotate clockwise 180 degrees stopping on the shoulder facing NB to final rest.

According to our analysis of the nature of the crash, it was not attributed to the deficient shoulder width.

Page 13: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 6

The most cost effective approach to providing shoulder widths that would meet FDOT criteria under the existing bridges would be to realign mainline SR 91 to the inside, thereby narrowing the existing median width. This approach would require widening mainline SR 91, and consequently the inside shoulder, as well as replacement of the existing guardrail. To upgrade the shoulder width in the vicinity of the bridges across Angle Road/Belcher Canal to meet current standards, additional improvements beyond the widening of the existing shoulder such as, modifying existing drainage structures, regrading and stabilizing the front slope, and replacement of guardrail and connections to the bridge railings will be required. The estimated cost to construct the described improvements is $490,382.75, which has been included in Appendix G of this document. A Benefit/Cost analysis was performed, however, the B/C ratio was found to be zero, since there were no crashes found to be attributed to the narrow shoulder width in the analysis of the most recent 5-year crash history. Furthermore, based on the Highway Safety Manual, Crash Modification Factors (CMF) for shoulder widths greater than 8 feet wide can be assigned a CMF equal to 8 ft. wide shoulders. Therefore, the Crash Reduction Factor for widening the shoulders will effectively be zero. There are no anticipated social costs associated with the deficient shoulder widths.

5.4 Accommodation of Disabled Vehicles The narrowest shoulder width of 9.45 ft. occurs at the area below the overpass at County Road 68 (Structure No. 940056). The length of the shoulder width deficiency in this area does not exceed 159 ft. The deficiency lengths for the northbound and southbound segments in the vicinity of the bridges across Angle Road/Belcher Canal are 845 ft. and 1109 ft., respectively. However, the shoulder width deficiency in these areas is approximately six (6) inches with respect to AASHTO and approximately 2.5 feet with respect to FDOT requirements. The limited length of the substandard segments with shoulder widths at mainline SR 91 underpasses will not impede maintenance, law enforcement, and disabled vehicles from easily locating suitable refuge areas beyond the limits of the barrier in place to shield the existing bridge piers. For the remaining areas where the existing shoulder width varies between 9.49 ft. to 9.56 ft., the shoulder width is sufficient to accommodate disabled vehicles.

5.5 Spread Analysis Spread calculations were performed to ensure that existing spread calculations meet FTE criteria and no adverse impacts on the operation of the roadways are realized as a result of the narrow shoulder widths. The analysis pertains to the approaches to the SR 91 Mainline Bridge over the Angle Road/Belcher Canal. The spread criteria at this location has been met. This area represents the most critical location as the longest segment with the largest contributing area, and the low longitudinal slopes. Spread is not considered to be an issue in the areas below the Picos Road, CR 68, and Minute Maid Bridge overpasses due to flat longitudinal slopes, open shoulders on either side of the overpasses, and the short limit of the constrained sections which provides for minimal runoff that would need to be accommodate by these sections. The spread analysis results are included in Appendix I of this document.

Page 14: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 7

5.6 Right-of-Way Impacts Whether any of the Improvements to correct the shoulder width deficiency are implemented or the existing shoulder widths are allowed to remain in place, no right-of-way impacts are anticipated. 5.7 Community Impacts Since the substandard shoulder widths are an existing condition, no adverse community impacts are expected if the existing shoulder widths are maintained. However, if any of the Improvements to correct the shoulder width deficiency are implemented, the additional work will impact the maintenance of traffic on SR 91, thereby increasing the cost and extending the construction duration of the project. This will ultimately result in additional disturbance to the FTE consumers, and the local community.

5.8 Environmental Impacts With the implementation of the Improvements to correct the shoulder width deficiency, there may be impacts on the environmentally sensitive areas adjacent to the roadway as a result of placement of required embankment. Furthermore, Gopher tortoise burrows were observed during our field visits which will require coordination with Florida Fish and Wildlife Conservation Commission (FWC). The appropriate habitats must be surveyed during design to confirm whether the burrows are active. If the burrows are impacted, a relocation permit will be required prior to moving the tortoise. Relocation permitting does not typically occur until approximately 90 days prior to the start of construction in the area. Since the substandard shoulder widths are an existing condition, no adverse environmental impacts are expected if the existing shoulder widths are maintained. 5.9 Mitigation There are existing warning signs along the mainline on the approach to the bridges over Angle Road/Belcher Canal in both northbound and southbound directions to notify the travelling public of narrow shoulder widths. To enhance the safety with respect to narrow shoulder widths, the existing signs are to be replaced by new signs (W5-2 with supplemental W16-3aP Panels). As indicated previously, narrow shoulder widths will cause a reduction in free-flow speed when the lateral clearance for outside shoulders is less than six (6) feet. Since the narrow shoulder widths along the SR 91 Mainline outside shoulders at the three underpasses for Picos Road (Structure No. 940055), County Road 68 (Structure No. 940056), and Minute Maid Road (Structure No. 940059) are an existing condition and the existing width of the outside shoulders are greater than six (6) feet within the exception limits, no adverse impacts on the existing capacity and operation of the facility are anticipated if the current shoulder widths are maintained. Furthermore, the length of the shoulder width deficiency at the underpass locations does not exceed 159 ft. Therefore, no mitigation measures are proposed for the underpass locations. Additional mitigation strategies as outlined in the FHWA publication Mitigation Strategies for Design Exceptions, dated July 2007, include recessed pavement markings, delineators, object markers, high visibility bridge railing, and bridge lighting are either infeasible for application on this project, or impractical based on the scope of this resurfacing project.

There are no associated existing or future limitations as a result of legal or public commitments are known for this project.

Page 15: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320 8

6.0 Summary Conclusions The main objective of the project is to extend the life of the existing pavement through milling and resurfacing of the existing northbound and southbound travel lanes, inside and outside shoulders and the paved median openings. Additional safety related improvements will also be provided along the corridor. The proposed design provides a balance between pavement improvements and vehicular traffic operation while maintaining the safety of the traveling public. The widening of the existing shoulder widths to meet the FDOT criteria will increase the construction cost significantly as well as impact the construction duration and schedule. Furthermore, FTE’s customers would be impacted by the extended construction duration. Since there are no documented crashes citing narrow shoulder width as the contributing cause, and no benefit may be gained as a result of implementing the improvements, the benefit/cost ratio for widening the shoulders was determined to be zero. No quantifiable benefit in terms of safety, operational performance, or level of service can be derived from implementing any of the improvements discussed in this report. Furthermore, maintaining the current shoulder widths will eliminate any negative impacts on environmental concerns, community considerations, budget, or schedule. Therefore, the approval of this Design Exception is requested for the shoulder widths, identified in Table 2.1, to remain.

Page 16: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix A Location Map

Page 17: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 18: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix B Typical Sections

Page 19: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 20: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 21: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 22: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 23: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 24: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 25: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 26: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 27: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 28: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 29: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 30: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 31: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix C As-Built Plans

Page 32: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix D Photo Log

Page 33: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Figure 1 - NB SR 91 Mainline Outside Shoulder at Picos Road Bridge

Figure 3 - NB SR 91 Mainline Outside Shoulder at CR 68 Bridge

Figure 2 - SB SR 91 Mainline Outside Shoulder at Picos Road Bridge

Figure 4 - NB SR 91 Mainline Outside Shoulder at Minute Maid Road Bridge

Page 34: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception FPID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Figure 5 – NB SR 91 Mainline Outside Shoulder North of Angle Road/Belcher Canal Bridge

Figure 6 - SB SR 91 Mainline Outside Shoulder South of Angle Road/Belcher Canal Bridge

Page 35: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix E Traffic Data

Page 36: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 37: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Traffic and Revenue Consultant Florida’s Turnpike Enterprise

Florida Department of Transportation

AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com

MEMORANDUM Date:

To:

From:

Copies:

Subject: Typical Section Traffic Data and Equivalent Single Axle Loading (ESAL) Calculations_Update

FPN:

State Road:

Counties:

FY 2016 Turnpike Annual Traffic Trends Report

Page 38: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Lane Closure Traffic Data Page 2

AECOM P.O. Box 613069 Florida’s Turnpike Milepost 263, Building 5315 Ocoee, Florida 34761-3069 Tel: 407-532-3999 www.aecom.com

U.S. DOT Mitigation Strategies for Design Expectations

Typical Section Traffic Data and Trucks Directional Design Hour Volume

2016 2018 2038 KSTD D T24 (%) DHT (%) 2016 2018 2038

South of Fort Drum Service Plaza (MP 184)

32,500 33,900 45,200 10.5% 60.7% 14.0 7.0 145 151 202

Trucks (DDHV)Segment

Two-Way AADT Traffic Factors

Page 39: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Year AADT Lane Factor ESAL (1000S)

CUM-ESAL(1000S)

2018 33,900 0.763 694 6942019 34,600 0.761 706 1,4002020 35,400 0.759 721 2,1212021 35,900 0.758 730 2,8512022 36,600 0.756 743 3,5942023 37,300 0.755 755 4,3492024 37,900 0.753 766 5,1152025 38,500 0.752 777 5,8922026 39,000 0.751 786 6,6782027 39,600 0.750 797 7,4752028 40,100 0.749 806 8,2812029 40,700 0.748 816 9,0972030 41,200 0.747 825 9,9222031 41,700 0.746 834 10,7562032 42,200 0.745 843 11,5992033 42,700 0.744 852 12,4512034 43,200 0.743 861 13,3122035 43,700 0.742 869 14,1812036 44,200 0.741 878 15,0592037 44,700 0.740 887 15,9462038 45,200 0.739 896 16,842

14.0%

0.5

(1.567 - 0.0826 x Ln(One-Way AADT)-0.12368 x LV)

1.050 *Freeway - Urban - Flexible Pavement

LV = 0.000

ESAL = AADT x T24 x DF x LF x EF x 365

Opening to Mid-Design Year (2025) ESAL Accumulation: 5,198

Opening to Design Year (2032) ESAL Accumulation: 10,905

Opening to Mid-Design Year (2028) ESAL Accumulation: 7,587

Opening to Design Year (2038) ESAL Accumulation: 16,14820-year design

(Years 2018-2038)

14-year design (Years 2018-2032)

Florida's Turnpike - Ticket System

FPN 436517-1 Mainline Resurfacing from MP 153.2 to MP 169.3

Mainline - South of Fort Drum Service Plaza

Two (2) Lanes

(Daily Truck Factor) T24 =

(Directional Distribution Factor) DF =

(Lane Factor) LF =

(Load Equivalency Factor) EF* =

Page 40: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix F Crash History

Page 41: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8198

4049

01/

2/20

1118

.869

157.

019

14L

11

12

11

014

141

S1

814

S4

00

8198

6151

01/

2/20

1118

.869

157.

019

9R

21

51

11

09

21

N1

1

02

8197

8411

01/

5/20

1130

.884

169.

034

27R

S1

12

11

027

11

N77

1

00

8196

3697

01/

6/20

1120

.871

159.

021

27R

S1

51

11

027

1415

N17

1

00

8197

4819

01/

6/20

1120

.871

159.

021

27L

S2

51

11

027

715

S12

1

00

8197

4820

01/

6/20

1120

.871

159.

021

15L

22

51

11

014

148

E

21

S2

00

8196

3699

01/

13/2

011

21.8

7616

0.02

67

R2

11

11

10

90

1N

115

1N

20

081

9829

250

1/20

/201

124

.878

163.

028

27R

S1

54

11

027

141

N77

1

00

8197

5263

01/

30/2

011

26.8

8116

5.03

113

L1

15

11

10

1314

1S

1

10

081

9973

390

2/13

/201

118

.876

157.

026

27R

S1

11

11

027

31

N17

1

00

8200

1260

02/

18/2

011

19.9

0115

8.05

114

L1

15

11

10

142

11S

21

6S

20

081

9752

650

2/21

/201

115

.863

154.

013

14L

21

51

11

014

211

S25

211

S2

00

8204

3178

02/

27/2

011

22.8

7516

1.02

529

RS

15

21

10

2914

6N

1

10

081

9990

080

3/5/

2011

27.8

816

6.03

014

L1

11

21

10

1412

14S

773

14S

20

081

9861

570

3/9/

2011

16.5

5815

4.70

827

LS

15

11

10

2710

1S

2

10

182

0431

790

3/9/

2011

21.8

7616

0.02

627

LS

15

11

10

2714

1S

26

10

281

9829

280

3/14

/201

116

.058

154.

208

14R

11

11

11

014

714

N2

141

N3

00

8201

7236

03/

16/2

011

29.3

2316

7.47

31

RS

11

11

10

119

1N

25

10

182

0172

370

3/17

/201

119

.901

158.

051

27M

M1

11

11

027

141

S26

211

S2

03

8202

2051

03/

17/2

011

21.8

7616

0.02

614

R2

15

11

10

181

1N

128

1N

20

382

0647

260

3/22

/201

127

.88

166.

030

27M

M1

54

11

027

141

S25

1

00

8197

5271

04/

10/2

011

28.8

816

7.03

014

L2

11

11

10

140

1S

7

1S

20

281

9829

330

4/15

/201

118

.869

157.

019

27L

11

12

177

027

141

S77

1

00

8197

4829

04/

27/2

011

18.8

6915

7.01

929

LS

11

11

10

292

1S

2

10

081

9748

300

5/1/

2011

23.9

3116

2.08

127

RS

11

11

10

2710

1N

1

10

181

9829

370

5/7/

2011

17.8

6415

6.01

427

RS

11

11

10

273

1N

1

10

081

9829

380

5/13

/201

119

.901

158.

051

14R

21

11

11

014

11

N77

81

N2

00

8199

7349

05/

22/2

011

30.8

8416

9.03

41

R1

11

11

10

4219

1N

17

10

482

0650

250

5/24

/201

120

.852

159.

002

27L

S1

11

11

227

21

S2

1

01

8197

4804

05/

30/2

011

28.8

5316

7.00

327

LS

11

11

10

272

1S

2

10

181

9748

050

6/3/

2011

23.9

3116

2.08

127

LS

13

11

10

272

1S

1

10

082

0012

750

6/5/

2011

20.8

7115

9.02

127

MM

11

21

10

2712

1S

2513

1N

20

081

9748

060

6/12

/201

126

.881

165.

031

28R

S1

11

11

028

415

N2

1

01

8198

2922

06/

23/2

011

27.8

816

6.03

027

MM

21

31

770

2714

1S

77

10

081

9752

750

6/26

/201

121

.876

160.

026

14L

21

12

111

014

131

S12

413

S2

01

8204

3181

06/

26/2

011

20.8

7115

9.02

127

LS

11

21

10

2714

1S

1

10

181

9829

350

6/30

/201

117

.864

156.

014

29L

S1

11

11

029

91

S77

1

00

8197

4825

07/

21/2

011

16.8

3815

4.98

814

R2

11

11

10

141

1N

221

1N

20

081

9973

410

7/22

/201

131

.886

170.

036

14L

21

11

11

014

31

S1

101

S2

00

8198

4048

07/

24/2

011

15.0

1515

3.16

514

L1

11

11

10

144

1S

110

1S

20

0

Exem

ptio

n fro

m F

lorid

a Pu

blic

Rec

ords

Sec

tion

119,

Flo

rida

Stat

utes

: Th

e in

form

atio

n co

ntai

ned

in th

e C

rash

An

alys

is R

epor

ting

(C.A

.R.)

syst

em h

as b

een

com

pile

d fro

m in

form

atio

n co

llect

ed fo

r the

pur

pose

of i

dent

ifyin

g,

eval

uatin

g, o

r pla

nnin

g sa

fety

enh

ance

men

ts.

This

sys

tem

and

its

prod

ucts

iden

tify

info

rmat

ion

used

for t

he p

urpo

se o

f de

velo

ping

hig

hway

saf

ety

cons

truct

ion

impr

ovem

ent p

roje

cts

whi

ch m

ay b

e im

plem

ente

d ut

ilizin

g Fe

dera

l-aid

hig

hway

fu

nds.

Sin

ce th

is in

form

atio

n is

col

lect

ed fo

r the

abo

ve-m

entio

ned

purp

ose

it is

exe

mpt

from

dis

clos

ure

as a

pub

lic

reco

rd p

ursu

ant t

o Fe

dera

l law

. Any

doc

umen

t dis

play

ing

this

exe

mpt

ion

from

pub

lic re

cord

s sh

all b

e us

ed o

nly

for

thos

e pu

rpos

es d

eem

ed a

ppro

pria

te b

y th

e D

epar

tmen

t. Se

e Ti

tle 2

3 U

nite

d St

ates

Cod

e Se

ctio

n 40

9.

2011

Page 42: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8206

5031

08/

4/20

1121

.876

160.

026

27L

S1

11

11

043

141

S30

1

00

8198

2944

08/

7/20

1129

.881

168.

031

29L

S2

53

11

029

21

S29

1

00

8200

1282

08/

13/2

011

29.3

2316

7.47

318

R1

12

11

10

400

1N

11

1N

60

081

9752

790

8/25

/201

128

.08

166.

230

1M

M2

12

11

01

41

N12

1

01

8201

7251

09/

2/20

1127

.88

166.

030

27M

M1

11

11

027

41

N26

1

00

8200

1285

09/

16/2

011

28.8

816

7.03

014

L2

15

11

10

141

6N

221

1S

20

081

9840

620

9/22

/201

114

.862

153.

012

14R

21

51

11

014

11

N2

211

N3

02

8198

2949

09/

26/2

011

28.8

816

7.03

027

LS

11

11

10

2714

11S

1

10

082

0431

880

10/1

/201

126

.881

165.

031

27M

M1

12

11

027

11

N1

1

02

8198

4431

010

/6/2

011

19.0

5815

7.20

814

R1

11

21

10

148

4N

41

8N

20

081

9748

370

10/8

/201

131

.807

169.

957

27R

12

13

11

027

11

N12

1

00

8198

4066

010

/13/

2011

17.1

2115

5.27

123

LS

11

11

10

2316

1S

2

10

081

9829

530

10/1

5/20

1126

.881

165.

031

27L

S1

21

11

027

141

S29

1

00

8198

6174

010

/18/

2011

18.8

6915

7.01

929

LS

21

31

100

92

1S

30

10

081

9861

750

10/2

2/20

1119

.901

158.

051

9R

S1

11

11

040

31

N2

1

01

8204

3191

010

/31/

2011

26.8

8116

5.03

127

MM

25

31

10

2713

1S

12

10

081

9840

670

11/3

/201

120

.871

159.

021

27L

S1

12

11

027

715

S2

1

00

8198

6177

011

/16/

2011

24.8

7816

3.02

89

LS

11

11

10

4214

77S

212

1S

20

182

0172

630

11/1

6/20

1127

.88

166.

030

18R

21

51

11

040

61

N1

11

N2

00

8200

1290

011

/27/

2011

17.3

6715

5.51

727

LS

11

11

10

2714

1S

25

10

081

9829

610

12/5

/201

124

.878

163.

028

27R

S2

52

11

027

11

N1

1

00

8201

7267

012

/10/

2011

14.8

6215

3.01

215

R2

21

21

10

141

3N

28

1N

20

081

9861

850

12/1

5/20

1129

.323

167.

473

9L

X1

52

11

040

141

S2

1

00

8200

1291

012

/16/

2011

29.9

9616

8.14

615

L1

15

21

10

1413

77S

2914

1S

20

181

9861

860

12/2

2/20

1120

.871

159.

021

18R

S1

51

11

018

181

N1

1

00

8206

4754

012

/24/

2011

21.8

7116

0.02

11

RS

15

11

10

271

1N

2

10

282

0650

410

12/2

7/20

1116

.871

155.

021

34L

S2

13

11

042

15

S1

1

00

8197

5289

01/

1/20

1219

.901

158.

051

27L

S1

41

11

027

11

S31

1

00

8201

7274

01/

2/20

1229

.881

168.

031

14R

11

11

11

014

11

N2

81

N3

01

8198

6188

01/

8/20

1217

.015

155.

165

9M

M1

11

11

09

010

N6

11

N2

00

8206

4760

01/

14/2

012

17.0

5815

5.20

81

LS

15

11

10

219

1S

1

10

181

9752

900

1/15

/201

225

.68

163.

830

13R

21

51

11

013

11

N1

1

00

8197

8432

02/

11/2

012

14.9

1515

3.06

514

L1

12

11

10

185

77S

13

1S

30

182

0647

630

2/15

/201

216

.058

154.

208

9R

S1

31

111

01

1977

N30

1

01

8204

3196

02/

17/2

012

15.1

5815

3.30

814

R2

14

21

10

1410

6N

3

1N

20

081

9973

680

3/1/

2012

28.8

816

7.03

09

L2

21

21

10

403

1S

1

10

081

9829

670

3/2/

2012

17.8

6415

6.01

417

R2

11

11

10

50

1N

772

1N

20

081

9829

680

3/6/

2012

14.9

3515

3.08

527

RS

11

21

10

271

6N

777

1N

20

082

0201

060

3/29

/201

226

.058

164.

208

27L

S1

11

11

027

191

S77

1

11

8204

3198

03/

29/2

012

25.2

2316

3.37

327

LS

11

11

10

2714

1S

77

10

381

9555

620

4/16

/201

219

.901

158.

051

27R

S1

12

11

09

01

N

41

N2

00

8197

8446

04/

22/2

012

28.8

816

7.03

018

L1

11

21

10

4013

1S

773

1S

20

182

0013

050

4/27

/201

230

.323

168.

473

27M

M1

21

11

027

21

S1

1

02

8204

3202

04/

27/2

012

16.6

8115

4.83

127

RS

11

11

770

273

1N

77

10

182

0172

850

5/9/

2012

17.8

7815

6.02

827

L1

11

21

10

271

1N

11

1S

20

081

9973

720

5/14

/201

227

.996

166.

146

14R

12

13

110

014

131

N12

71

N2

00

8197

4848

05/

15/2

012

16.0

5815

4.20

827

MM

11

11

10

2714

1N

29

10

081

9752

950

5/26

/201

227

.181

165.

331

29L

S1

12

11

029

21

S17

1

03

2012

Page 43: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8197

4850

05/

29/2

012

26.3

2316

4.47

317

R2

11

11

10

50

1N

11

1N

20

082

0647

760

5/31

/201

217

.058

155.

208

14L

12

52

11

014

277

S2

91

S2

00

8202

0113

06/

15/2

012

22.8

7516

1.02

529

RS

25

21

10

292

1N

1

10

081

9784

540

6/28

/201

228

.88

167.

030

14R

11

11

11

09

077

N

111

N3

00

8200

1311

07/

2/20

1230

.996

169.

146

1R

S1

12

11

01

191

N1

1

02

8197

8456

07/

4/20

1228

.88

167.

030

14L

22

13

110

014

11

S10

81

S2

00

8198

6214

07/

13/2

012

23.9

3116

2.08

19

L1

11

11

770

99

6S

22

1S

20

282

0287

510

7/13

/201

224

.231

162.

381

28L

S1

11

11

028

74

N4

1

00

8198

4080

07/

15/2

012

29.0

5816

7.20

813

R2

25

31

10

1318

1N

1

10

081

9840

810

7/16

/201

216

.058

154.

208

14R

22

52

11

014

16

N2

211

N2

00

8200

1313

07/

20/2

012

16.9

3515

5.08

51

RS

11

21

10

119

1N

1

10

481

9784

620

7/29

/201

225

.88

164.

030

18L

11

51

11

018

21

S1

1

00

8197

8463

07/

29/2

012

27.0

5816

5.20

818

L2

15

11

10

181

1S

1

10

081

9753

030

8/7/

2012

22.9

7516

1.12

51

MM

21

21

10

119

14N

26

10

182

0647

840

8/7/

2012

29.3

2316

7.47

327

LS

21

31

10

279

6S

1

10

282

0201

240

8/11

/201

216

.058

154.

208

27L

22

23

110

027

141

S1

1

00

8197

5304

08/

17/2

012

17.3

7115

5.52

19

LS

11

21

10

90

77S

3014

1S

20

082

0432

050

8/17

/201

225

.823

163.

973

27R

S1

12

11

027

11

N2

1

00

8204

3206

08/

21/2

012

19.9

0115

8.05

127

R1

21

31

100

272

1N

1

10

082

0172

250

8/25

/201

215

.863

154.

013

27R

S2

13

11

027

141

N77

1

01

8200

1972

09/

1/20

1215

.558

153.

708

14L

21

51

11

314

141

S2

211

S2

01

8206

4792

09/

8/20

1216

.058

154.

208

9L

11

11

11

040

131

S1

1

00

8206

4793

09/

13/2

012

31.3

2316

9.47

31

RS

11

11

10

119

1N

1

10

281

9784

740

9/14

/201

221

.058

159.

208

27L

S1

12

11

027

141

S29

1

00

8197

8475

09/

15/2

012

26.9

9616

5.14

61

RS

11

21

10

119

1N

77

10

282

0019

760

9/29

/201

219

.319

157.

469

27M

M2

52

110

09

31

S77

1

00

8197

4861

09/

30/2

012

31.8

5417

0.00

427

RS

21

31

10

271

1N

125

1N

20

081

9753

100

10/1

/201

224

.505

162.

655

34M

M1

12

11

034

177

N26

1

00

8202

0131

010

/4/2

012

26.8

5416

5.00

414

LS

11

11

10

152

1S

2621

8S

20

181

9753

110

10/8

/201

231

.756

169.

906

27M

M2

13

11

027

141

N12

1

00

8202

2108

010

/11/

2012

31.8

5617

0.00

614

R2

11

11

10

142

11N

129

1N

20

082

0172

530

10/1

2/20

1224

.323

162.

473

27L

S1

51

11

027

41

S1

1

00

8196

3711

010

/13/

2012

15.8

4915

3.99

913

L1

14

11

10

132

1S

1

10

081

9748

650

10/2

1/20

1218

.935

157.

085

14L

21

11

11

014

21

S2

101

S2

03

8197

5314

010

/26/

2012

27.9

5316

6.10

327

MM

21

21

10

271

1N

12

10

082

0019

920

12/7

/201

230

.323

168.

473

9R

11

11

11

09

06

N2

11

N3

01

8225

3440

012

/7/2

012

31.3

2316

9.47

327

LS

15

41

10

2719

1S

26

10

282

9109

680

12/1

1/20

1216

.755

154.

905

27R

S2

52

11

027

11

N2

1

01

8197

4868

012

/22/

2012

29.3

2316

7.47

314

R2

11

11

10

1419

1N

214

1N

20

381

9753

180

12/2

2/20

1226

.954

165.

104

9M

M1

11

11

00

00

S

131

S2

00

8198

7884

012

/31/

2012

15.4

2715

3.57

727

RS

11

11

10

2714

1N

2

10

1

8196

3719

01/

2/20

1322

.85

161.

000

14R

21

12

11

014

61

N1

1

00

8201

1604

01/

3/20

1323

.905

162.

055

9R

S1

51

11

040

141

N1

1

03

8200

1996

01/

17/2

013

17.0

5815

5.20

814

R1

12

21

10

1414

1N

25

1N

20

081

9784

610

1/20

/201

327

.996

166.

146

27M

M1

11

11

027

141

S26

1

00

8209

6572

01/

21/2

013

21.8

5216

0.00

215

L2

15

11

10

152

1S

779

8S

20

081

9784

640

1/22

/201

320

.852

159.

002

18M

M1

11

111

018

1415

S77

1

00

8200

1999

01/

25/2

013

28.8

5316

7.00

327

MM

15

11

10

2713

1S

30

10

1

2013

Page 44: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8201

5375

01/

28/2

013

27.8

5316

6.00

327

MM

15

11

11

2714

15N

1

10

081

9844

440

2/5/

2013

18.0

5815

6.20

814

RS

11

11

10

141

14N

108

14N

20

082

0172

700

2/23

/201

320

.852

159.

002

14R

21

11

11

014

101

N1

41

N2

01

8201

7271

02/

23/2

013

21.9

3516

0.08

527

RS

15

11

10

271

1N

1

10

082

0938

620

2/23

/201

318

.058

156.

208

27R

11

11

11

027

141

N1

1

00

8197

5326

02/

24/2

013

17.9

4815

6.09

813

L1

11

11

10

131

1N

1

10

081

9753

270

2/24

/201

329

.053

167.

203

14M

M1

12

11

014

196

S2

31

S2

04

8197

5328

03/

4/20

1320

.752

158.

902

14L

11

11

24

014

11

S2

81

S2

00

8202

0086

03/

8/20

1321

.852

160.

002

14L

21

11

11

014

11

S2

81

S2

02

8201

7294

03/

12/2

013

26.9

2316

5.07

317

R2

11

11

10

170

1N

1

1N

20

082

0354

160

3/18

/201

314

.915

153.

065

5R

21

51

11

040

211

N1

141

N2

00

8225

3247

03/

18/2

013

16.0

5815

4.20

819

MM

21

21

10

2818

77N

6

10

082

0200

910

3/22

/201

328

.853

167.

003

14R

11

12

11

09

06

N77

11

N3

00

8202

0093

03/

31/2

013

26.8

5416

5.00

428

MM

11

11

10

2814

1N

77

10

082

8257

460

4/4/

2013

14.9

2915

3.07

928

LS

21

21

10

281

1S

12

10

182

0201

080

4/15

/201

329

.852

168.

002

27R

S2

12

11

027

21

N2

1

00

8204

3226

04/

16/2

013

24.3

2316

2.47

314

R1

15

11

11

1410

77N

253

6N

20

182

2549

780

4/16

/201

327

.228

165.

378

1L

S1

11

11

01

191

S29

1

01

8291

0985

04/

22/2

013

25.6

5116

3.80

127

RS

21

31

10

271

1S

2

10

081

9990

120

4/27

/201

320

.058

158.

208

9L

S1

11

11

09

61

S1

1

00

8204

3227

04/

27/2

013

25.3

2316

3.47

327

R2

15

11

10

2714

1N

221

1N

20

083

2476

760

4/28

/201

328

.996

167.

146

13L

21

31

11

013

21

S1

1

00

8225

3254

05/

4/20

1318

.935

157.

085

14L

21

11

11

014

11

N2

83

S2

02

8319

4804

05/

4/20

1316

.058

154.

208

30M

M2

52

11

130

141

S25

1

00

8225

4982

05/

9/20

1325

.323

163.

473

18R

21

11

112

09

211

N1

191

N2

01

8282

5747

05/

10/2

013

27.7

5316

5.90

314

L2

14

11

10

141

1S

28

1S

20

082

2532

570

5/18

/201

324

.323

162.

473

27L

S2

12

11

027

11

S12

1

00

8196

3723

05/

27/2

013

18.8

515

7.00

014

R1

11

21

10

147

11N

122

1N

20

082

8257

480

5/27

/201

328

.053

166.

203

14L

21

12

11

014

01

S

121

S2

00

8204

3234

05/

31/2

013

26.8

2316

4.97

329

RS

11

11

10

292

1N

1

10

481

9637

250

6/3/

2013

19.8

8415

8.03

427

RS

22

31

10

272

1N

12

10

082

0432

350

6/6/

2013

20.8

8415

9.03

427

MM

21

21

10

271

1N

1

10

282

0432

360

6/11

/201

319

.984

158.

134

27M

M2

13

110

027

11

N12

1

00

8318

3054

06/

18/2

013

19.9

7915

8.12

927

MM

12

11

10

2712

1S

77

11

283

1830

550

6/20

/201

318

.935

157.

085

27M

M1

12

11

027

11

S1

1

01

8204

3238

06/

23/2

013

23.9

0516

2.05

527

RS

11

21

10

271

1N

2

10

082

0432

390

6/23

/201

325

.851

164.

001

27L

S1

12

11

027

1414

S10

1

00

8324

7683

06/

25/2

013

19.0

5815

7.20

89

LS

15

11

10

421

15S

77

10

083

1830

570

6/27

/201

320

.852

159.

002

14L

21

12

11

114

111

S25

131

S2

01

8204

3242

06/

28/2

013

19.8

8415

8.03

414

L2

11

11

10

142

1S

112

1S

20

083

1830

590

6/29

/201

330

.996

169.

146

14R

11

12

11

014

141

N2

41

N2

05

8203

5422

07/

3/20

1318

.058

156.

208

14R

11

11

11

014

93

N2

11

N3

05

8318

3060

07/

4/20

1324

.323

162.

473

27M

M2

12

11

027

11

E1

1

00

8203

5423

07/

9/20

1317

.058

155.

208

14R

12

13

110

014

714

N77

141

N2

00

8203

5424

07/

15/2

013

28.3

2316

6.47

314

R2

11

21

10

143

1N

221

1N

20

082

8257

550

7/17

/201

327

.266

165.

416

27M

M1

12

11

00

06

0

11

S2

00

8324

7687

07/

18/2

013

30.4

9616

8.64

614

L2

15

11

10

142

1S

779

1S

20

082

0680

790

7/25

/201

320

.453

158.

603

22M

M2

13

110

022

11

S12

1

00

8332

7432

08/

1/20

1324

.852

163.

002

9M

M1

11

11

040

131

N1

1

01

Page 45: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8318

3064

08/

2/20

1316

.657

154.

807

14M

M1

51

11

327

113

S77

141

S2

03

8204

3247

08/

4/20

1328

.323

166.

473

36L

S2

12

110

036

81

S1

1

12

8282

5761

08/

8/20

1314

.947

153.

097

14R

11

42

11

00

210

0

31

N2

02

8366

4737

08/

15/2

013

16.9

3515

5.08

51

RS

21

21

10

4319

15N

2

10

183

1830

650

8/19

/201

326

.854

165.

004

9M

M1

11

11

043

11

N26

1

01

8366

4738

08/

24/2

013

18.0

5815

6.20

814

L1

11

11

10

1410

6S

153

1S

20

083

3403

260

9/1/

2013

20.8

5215

9.00

227

MM

15

11

10

2714

1S

77

10

182

0846

730

9/3/

2013

26.8

2316

4.97

318

L2

15

11

10

921

77O

21

1S

30

082

0846

740

9/3/

2013

26.8

2316

4.97

314

L2

15

11

10

141

1S

28

1S

20

183

2476

920

9/18

/201

319

.884

158.

034

9M

M1

51

11

09

31

S1

1

03

8209

5495

09/

23/2

013

16.0

5815

4.20

814

L2

25

31

100

1421

1S

24

1S

20

083

3274

360

9/23

/201

316

.058

154.

208

14L

S2

53

11

014

46

S2

121

S2

00

8206

7822

010

/5/2

013

18.9

3515

7.08

59

R1

11

21

10

409

1N

1

10

083

1830

750

10/6

/201

330

.996

169.

146

27R

S1

12

11

027

11

N1

1

00

8364

4192

010

/6/2

013

26.8

5416

5.00

434

LS

11

21

10

364

4S

4

10

083

6646

660

10/7

/201

330

.296

168.

446

29L

S2

13

110

042

141

S30

1

00

8366

4667

010

/7/2

013

27.8

0316

5.95

310

RS

25

21

12

152

6N

2510

8N

22

083

1830

760

10/1

4/20

1327

.823

165.

973

1L

21

11

11

01

191

N1

151

S5

02

8366

4671

010

/18/

2013

15.0

7715

3.22

730

MM

13

21

10

301

1S

29

10

083

6728

840

11/2

4/20

1319

.352

157.

502

9M

M1

11

11

09

141

S1

1

02

8332

7448

012

/1/2

013

22.8

516

1.00

014

R2

25

21

10

1414

1N

27

14N

20

083

6646

010

12/1

/201

320

.852

159.

002

14L

12

53

110

014

11

S2

81

S2

00

8367

2887

012

/1/2

013

23.3

516

1.50

014

R1

21

31

100

142

14N

109

1N

20

083

6880

420

12/1

/201

323

.05

161.

200

29R

S2

52

11

042

21

N1

1

01

8366

4605

012

/20/

2013

18.0

5815

6.20

89

MM

11

11

10

4014

1S

212

1S

20

183

6646

070

12/2

6/20

1326

.854

165.

004

27M

M1

11

112

043

141

N1

1

01

8324

7709

012

/29/

2013

21.3

5215

9.50

29

MM

21

21

100

2713

6S

77

10

0

8202

2103

01/

1/20

1417

.848

155.

998

14L

12

42

11

014

11

S1

814

S3

00

8318

3081

01/

1/20

1421

.935

160.

085

27M

M1

12

11

027

131

N1

1

00

8318

3082

01/

1/20

1418

.03

156.

180

14L

12

52

11

014

81

S12

11

S2

02

8366

4608

01/

1/20

1414

.996

153.

146

33L

S2

13

177

042

1015

S1

1

00

8366

4609

01/

1/20

1422

.058

160.

208

14R

12

12

110

014

11

N2

81

N3

00

8366

4614

01/

9/20

1423

.058

161.

208

14L

22

53

110

014

211

S2

91

N2

00

8366

4756

01/

9/20

1430

.856

169.

006

9M

M2

13

110

043

71

N12

1

00

8206

7827

01/

25/2

014

24.3

2316

2.47

36

L1

11

11

10

60

1S

1

10

183

2477

150

1/25

/201

430

.323

168.

473

18L

21

11

11

018

11

S2

913

S4

04

8198

6189

02/

14/2

014

28.3

8416

6.53

427

MM

11

11

10

4014

1N

2

10

181

9861

990

2/14

/201

428

.653

166.

803

14L

11

21

11

014

111

S2

11

S2

00

8368

8048

02/

16/2

014

25.8

5316

4.00

318

R1

13

11

120

181

1N

1

10

083

3274

570

2/23

/201

415

.158

153.

308

14R

21

11

11

014

116

N3

31

N2

04

8332

7458

02/

28/2

014

16.0

5515

4.20

514

R1

12

11

10

1411

6N

26

1N

20

082

0431

900

3/2/

2014

27.4

2316

5.57

314

R2

11

11

10

146

15N

214

15N

20

083

1903

370

3/3/

2014

28.8

5316

7.00

327

MM

11

11

10

273

1N

26

10

283

2477

210

3/6/

2014

30.9

9616

9.14

69

L1

25

21

120

93

1S

1

10

083

2477

220

3/6/

2014

30.9

9616

9.14

69

L2

25

21

120

914

1S

1

10

082

0019

900

3/10

/201

416

.857

155.

007

10R

21

11

11

010

158

N

41

N2

01

8330

0692

03/

22/2

014

18.2

3515

6.38

514

R2

13

11

11

143

1N

2512

1N

20

083

6880

530

3/25

/201

427

.384

165.

534

14L

22

12

11

014

11

S77

81

S2

00

2014

Page 46: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8204

3193

03/

29/2

014

17.8

3515

5.98

514

L1

25

21

100

141

14S

28

14S

20

183

6646

240

3/30

/201

429

.852

168.

002

9M

M1

51

11

043

1414

S30

1

00

8204

3195

04/

6/20

1419

.884

158.

034

27M

M1

51

11

027

116

S2

1

00

8209

5496

04/

17/2

014

14.9

0115

3.05

130

MM

12

21

10

3018

1S

77

10

182

9035

350

4/21

/201

418

.058

156.

208

27M

M1

11

11

027

141

N2

1

01

8332

7466

05/

2/20

1424

.852

163.

002

14L

11

51

11

014

11

S2

211

S2

02

8368

8057

05/

2/20

1431

.756

169.

906

18L

22

52

112

018

11

S1

1

00

8379

7346

05/

2/20

1420

.852

159.

002

27M

M2

52

11

027

115

S77

1

01

8206

7828

05/

14/2

014

21.8

5216

0.00

210

LS

11

21

10

1021

14S

212

8S

20

183

2397

980

5/14

/201

420

.552

158.

702

27L

S1

12

11

027

21

S1

1

00

8324

7725

05/

16/2

014

30.3

2316

8.47

327

MM

11

11

10

2714

1S

1

10

082

2478

510

5/26

/201

422

.058

160.

208

27L

S1

51

11

027

141

S2

1

02

8366

4630

05/

30/2

014

17.0

5815

5.20

814

R1

21

31

100

141

1N

28

14N

20

182

2478

520

6/8/

2014

28.8

5916

7.00

927

RS

25

31

100

2812

1N

29

10

283

7720

240

6/11

/201

421

.352

159.

502

27L

S2

53

11

027

31

S77

1

00

8366

4694

06/

12/2

014

14.9

7715

3.12

727

RS

21

31

100

272

1N

30

10

083

6646

330

6/23

/201

420

.058

158.

208

9L

S2

13

110

040

91

S1

1

00

8366

4772

06/

24/2

014

21.9

3516

0.08

527

MM

15

11

10

2714

1S

1

10

083

6647

730

6/29

/201

430

.996

169.

146

27L

21

51

11

040

277

S26

11

S2

04

8375

3924

06/

30/2

014

18.8

515

7.00

027

MM

15

11

10

2719

1S

12

10

083

6646

340

7/8/

2014

16.0

5815

4.20

830

MM

21

31

100

432

1S

1

10

082

9035

440

7/10

/201

418

.058

156.

208

39L

S2

13

11

039

131

S2

1

00

8290

3545

07/

18/2

014

29.0

5816

7.20

814

LS

11

11

10

1421

1S

1

10

083

7973

610

7/19

/201

417

.962

156.

112

14R

11

11

11

014

11

N10

81

N2

06

8379

7365

07/

26/2

014

24.7

7616

2.92

627

RS

22

31

100

421

1S

2

10

383

2477

300

7/27

/201

426

.323

164.

473

9R

S1

51

11

042

11

N1

1

04

8379

7277

07/

27/2

014

30.0

5816

8.20

814

L2

11

11

10

1414

1S

107

1N

20

083

8186

920

7/28

/201

416

.281

154.

431

27L

11

11

177

027

191

S77

1

01

8224

7853

08/

3/20

1418

.856

157.

006

27M

M2

12

110

09

11

S2

1

00

8377

2031

08/

16/2

014

23.3

516

1.50

014

LS

21

31

10

426

1S

1214

1S

20

183

7973

720

8/26

/201

424

.851

163.

001

9M

M1

11

11

043

131

S2

1

00

8379

7373

08/

26/2

014

29.3

7116

7.52

17

R2

11

11

10

70

1S

15

1S

20

083

6728

960

9/5/

2014

26.3

5116

4.50

114

R2

21

31

100

142

1N

109

1N

20

081

9990

230

9/13

/201

417

.598

155.

748

27M

M2

12

11

027

110

N6

1

01

8318

8202

09/

18/2

014

19.8

8415

8.03

49

LS

11

41

10

4014

1S

2

10

083

6646

990

9/24

/201

423

.323

161.

473

29R

S2

13

11

09

141

N1

1

00

8381

8702

09/

27/2

014

29.9

9616

8.14

627

RS

13

11

10

271

1N

2

10

283

6749

530

10/9

/201

420

.833

158.

983

28R

S1

11

11

028

377

N30

1

00

8379

7286

010

/9/2

014

19.0

5815

7.20

827

MM

15

11

10

271

1N

1

10

083

6646

420

10/1

2/20

1426

.854

165.

004

27M

M1

11

112

043

141

S1

1

00

8379

7287

010

/15/

2014

31.3

3916

9.48

914

R1

15

11

10

141

1N

28

1N

20

083

7045

530

10/1

8/20

1425

.058

163.

208

14L

21

51

11

014

21

S2

91

S2

08

8290

3552

010

/19/

2014

24.0

5816

2.20

814

R2

11

11

10

1410

6N

153

1N

20

083

7720

340

10/2

0/20

1423

.655

161.

805

18R

11

11

11

09

01

N77

151

N2

00

8290

3553

010

/22/

2014

26.3

2316

4.47

329

MM

11

21

10

294

8O

10

083

7720

360

10/2

7/20

1416

.099

154.

249

14R

21

11

11

014

41

N2

121

N2

00

8366

4701

010

/31/

2014

22.3

2316

0.47

327

R2

12

21

10

93

1N

1021

1N

20

083

1882

030

11/5

/201

429

.852

168.

002

5L

S1

11

11

040

21

S2

1

00

8330

0704

011

/9/2

014

18.9

3515

7.08

527

MM

21

31

40

271

1S

1

10

0

Page 47: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8323

9808

011

/18/

2014

19.3

115

7.46

014

L2

15

21

11

142

1S

29

1S

20

383

7972

910

11/2

1/20

1428

.058

166.

208

27M

M1

51

11

027

11

N1

1

01

8206

7835

011

/23/

2014

22.8

516

1.00

028

LS

11

21

10

282

6S

2

10

083

6646

450

11/3

0/20

1420

.058

158.

208

37R

S1

11

11

042

11

N1

1

00

8370

4559

012

/2/2

014

30.8

5416

9.00

414

R2

21

31

100

141

1N

778

1N

20

283

3007

110

12/5

/201

418

.011

156.

161

14L

21

51

11

014

211

S2

211

S2

00

8377

4969

012

/5/2

014

30.0

5816

8.20

827

MM

21

21

100

2714

1S

29

10

183

3274

810

12/1

1/20

1428

.853

167.

003

1R

S1

11

11

042

191

N1

1

01

8374

6625

012

/15/

2014

23.3

2316

1.47

313

R2

15

11

10

131

1N

1

10

083

6749

550

12/1

6/20

1417

.886

156.

036

28R

S1

51

11

028

74

S4

1

00

8317

7434

01/

1/20

1516

.058

154.

208

14R

22

13

11

014

21

N2

11

N2

00

8317

7435

01/

2/20

1519

.058

157.

208

14R

11

12

11

014

1414

N77

713

N2

00

8379

7300

01/

2/20

1516

.058

154.

208

34L

S2

13

11

034

1115

W12

1

00

8366

4704

01/

13/2

015

16.0

5815

4.20

89

L2

11

21

10

402

1S

77

10

1983

6646

500

1/18

/201

517

.058

155.

208

1M

M1

11

11

043

131

N1

1

01

8366

4651

01/

21/2

015

16.0

5815

4.20

830

MM

14

11

10

4314

1N

1

10

083

3274

890

1/31

/201

528

.853

167.

003

17L

11

51

11

05

01

S77

21

S2

00

8366

4652

02/

13/2

015

21.8

5216

0.00

214

R2

15

11

10

00

00

9

14N

30

083

6646

530

2/14

/201

521

.852

160.

002

14L

21

51

11

014

11

S2

91

S2

00

8323

5638

02/

22/2

015

15.1

5815

3.30

814

R1

11

11

10

1413

17N

33

1N

30

083

7973

950

2/23

/201

519

.96

158.

110

18L

11

11

11

018

181

S1

1

00

8374

6629

02/

28/2

015

15.1

1515

3.26

514

R2

21

21

10

141

6N

7710

1N

20

083

8146

190

3/7/

2015

31.0

5816

9.20

827

L2

11

21

10

90

6S

1

1S

20

083

7720

490

3/13

/201

527

.354

165.

504

27L

S2

52

11

027

31

S77

1

00

8323

5641

03/

16/2

015

20.8

3315

8.98

317

L2

11

11

120

1715

1S

1

10

083

7466

330

3/23

/201

529

.323

167.

473

14R

21

52

11

014

11

N2

81

N2

03

8374

6634

03/

24/2

015

14.9

215

3.07

030

L1

21

21

10

301

17S

778

1S

30

283

6646

550

3/26

/201

526

.055

164.

205

9R

S1

12

11

027

71

N77

1

00

8323

9821

03/

29/2

015

21.8

6716

0.01

727

RS

11

21

10

2714

1S

2

10

083

6646

580

3/29

/201

517

.055

155.

205

15R

11

11

11

015

50

N2

1013

N2

00

8377

4334

03/

29/2

015

21.8

5216

0.00

214

R1

15

11

10

1414

10N

772

1N

20

083

2002

940

4/1/

2015

15.0

6115

3.21

114

R1

15

11

10

1412

1N

4

1N

20

282

0678

450

4/3/

2015

19.8

8415

8.03

414

R1

11

11

10

142

14N

29

14N

20

083

3274

920

4/3/

2015

31.8

5617

0.00

614

L1

11

11

10

1413

1S

293

1S

20

382

0938

770

4/14

/201

524

.323

162.

473

27L

S2

31

11

027

11

S2

1

00

8199

9033

04/

15/2

015

17.3

5715

5.50

732

RS

11

11

10

428

1N

1

10

083

7720

540

4/19

/201

519

.384

157.

534

14R

21

11

11

027

131

S77

141

N2

01

8381

4621

04/

19/2

015

18.0

5815

6.20

827

MM

25

21

10

2714

1S

2

10

083

2748

320

5/14

/201

520

.86

159.

010

5R

21

11

11

040

181

S77

111

S2

00

8381

4622

05/

23/2

015

15.0

8615

3.23

627

RS

15

11

10

271

1N

10

183

6729

170

5/24

/201

528

.353

166.

503

14R

21

12

11

09

477

S31

131

S2

01

8367

2918

05/

27/2

015

29.3

5216

7.50

215

L2

11

11

770

152

77S

29

13S

20

383

7010

000

5/27

/201

528

.353

166.

503

28M

M1

11

11

028

84

S4

1

00

8323

9824

05/

28/2

015

23.5

516

1.70

014

L2

11

21

12

1421

1S

771

1S

21

484

5159

480

5/28

/201

518

.058

156.

208

27M

M1

51

11

045

01

N

211

N2

00

8451

5949

05/

31/2

015

15.0

8615

3.23

613

L2

15

11

10

131

1S

1

10

083

7720

570

6/2/

2015

18.7

5515

6.90

529

LS

12

11

10

428

1S

77

10

083

6729

190

6/3/

2015

23.4

0516

1.55

528

MM

15

11

10

280

10U

10

0

2015

Page 48: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Cras

h Nu

mbe

rEv

ent C

rash

Da

te

Crsh

Loc

Fina

l MP

On

Road

way

Turn

pike

M

M

Firs

t Ha

rmfu

l Ev

ent

Code

Accid

ent

Side

Of

Road

Lane

Of

Accid

ent

Code

Road

Su

rface

Co

nditi

on

Code

Light

ing

Cond

ition

Co

de

Even

t W

eath

er

Cond

ition

Co

de

Wor

k Zo

ne

Rela

ted

Code

Firs

t Roa

d Co

nditi

on

Code

Alco

hol

Invo

lved

In

Acc

. Co

de

Veh

#1

Harm

ful

Even

t Seq

01

Cd

Veh

#1

Poin

t Of

Impa

ct

Veh

#1

Mov

emen

t Co

de

Veh

#1

Dire

ctio

n O

f Tra

vel

Veh

#1

Firs

t Dr

iver

Ac

tion

Cd

Veh

#2

Poin

t Of

Impa

ct

Veh

#2

Mov

emen

t Co

de

Veh

#2

Dire

ctio

n O

f Tra

vel

Tota

l Nu

mbe

r O

f Veh

icle

Tota

l Nu

mbe

r O

f Fat

ality

Tota

l of

Inju

ries

Num

ber

8206

7832

06/

13/2

015

20.3

8415

8.53

427

MM

11

11

10

2714

1S

2

10

083

6729

260

7/13

/201

524

.405

162.

555

13L

21

51

111

013

11

S1

1

00

8206

7837

07/

18/2

015

21.8

5216

0.00

227

L1

11

21

10

279

1S

1

10

083

7466

410

7/18

/201

518

.03

156.

180

18R

S1

51

11

018

211

N77

11

N2

00

8366

4721

07/

19/2

015

15.0

7115

3.22

118

R2

15

21

120

1818

1N

1

10

183

7973

140

7/19

/201

516

.058

154.

208

18R

11

51

11

018

11

N1

1

00

8379

7315

07/

19/2

015

17.0

5815

5.20

818

R1

15

11

10

1818

1N

1

10

083

7720

620

7/24

/201

524

.155

162.

305

14L

11

51

11

00

00

S

31

S2

00

8377

2064

07/

28/2

015

26.6

0416

4.75

414

L1

15

11

10

1421

1S

3

1S

20

082

0678

460

7/29

/201

517

.735

155.

885

29L

S2

13

110

029

141

S1

1

00

8377

2068

08/

9/20

1524

.602

162.

752

27L

S1

51

11

027

11

S77

1

00

8374

6645

08/

16/2

015

25.3

2316

3.47

328

MM

11

21

10

2714

1N

25

10

083

7539

560

8/20

/201

517

.849

155.

999

14L

11

51

11

014

21

S29

81

S2

00

8328

5221

08/

21/2

015

18.3

515

6.50

029

R1

11

11

10

4018

1N

14

1N

20

283

2852

230

9/5/

2015

20.8

5215

9.00

227

MM

21

31

100

271

6N

1220

1S

20

183

3392

210

9/5/

2015

20.3

5815

8.50

827

MM

21

21

100

271

1S

30

10

083

6729

330

9/5/

2015

20.3

5215

8.50

29

L2

21

31

100

91

11S

214

1S

20

183

7466

470

9/5/

2015

18.9

3515

7.08

527

MM

21

31

10

278

1N

10

10

083

7539

580

9/9/

2015

31.8

5617

0.00

614

R1

15

11

12

1410

6N

252

77N

20

083

8120

910

9/9/

2015

20.0

5815

8.20

814

LS

188

771

10

144

1S

11

8S

20

084

5675

480

9/12

/201

520

.852

159.

002

18R

11

12

11

018

151

N1

1

00

8381

2094

09/

26/2

015

19.0

5815

7.20

813

R2

12

11

10

131

1N

1

10

083

6729

350

10/7

/201

520

.852

159.

002

9M

M1

51

11

145

16

N2

1

01

8333

9227

010

/12/

2015

31.7

9916

9.94

914

R1

11

11

10

010

00

3

1N

20

083

7466

500

10/1

5/20

1516

.935

155.

085

9R

S1

11

11

040

31

N1

1

00

8328

5227

010

/17/

2015

23.3

2316

1.47

314

L1

15

11

10

141

1S

221

1S

20

083

3392

300

10/2

2/20

1527

.423

165.

573

13L

S1

11

11

013

21

S1

1

01

8367

2937

010

/25/

2015

17.3

5715

5.50

79

MM

15

11

10

914

1S

2

10

084

8706

170

10/2

5/20

1522

.935

161.

085

14L

11

11

11

014

11

S2

81

S4

00

8374

6654

010

/30/

2015

21.9

3516

0.08

518

L1

15

21

10

181

1S

1

10

083

6567

390

11/6

/201

520

.377

158.

527

9M

M1

11

11

040

141

N1

1

03

8365

6742

011

/13/

2015

27.2

2316

5.37

329

LS

21

31

100

422

1S

26

10

083

6729

420

11/1

7/20

1521

.352

159.

502

14L

22

53

188

014

088

U

131

S2

03

8367

2943

011

/19/

2015

15.3

4715

3.49

74

R2

25

31

100

46

15N

12

10

183

2852

300

11/2

7/20

1516

.981

155.

131

36M

M1

12

11

027

114

N2

1

00

8328

5231

011

/28/

2015

15.1

5815

3.30

814

R1

11

11

10

1413

6N

34

1N

30

083

7466

650

11/3

0/20

1529

.323

167.

473

27L

S2

12

11

027

141

S77

1

00

8370

6455

012

/3/2

015

14.9

1515

3.06

59

MM

24

31

100

301

1S

29

10

083

7545

290

12/3

/201

518

.935

157.

085

29L

S2

12

110

042

25

S30

1

00

8370

6456

012

/4/2

015

31.2

8216

9.43

214

R1

25

21

10

1412

77N

254

11N

20

083

7466

660

12/7

/201

526

.323

164.

473

27R

S1

12

11

027

177

S1

1

00

8375

4531

012

/10/

2015

31.4

9616

9.64

69

RS

11

11

10

4010

1N

29

10

183

7545

360

12/1

8/20

1529

.852

168.

002

9R

S2

52

110

09

31

N2

1

02

8513

7361

012

/22/

2015

17.9

6315

6.11

327

MM

11

11

10

431

1S

26

10

185

2479

970

12/2

4/20

1528

.853

167.

003

14R

11

31

11

014

11

N1

1

00

8381

8036

012

/25/

2015

27.2

2816

5.37

827

MM

11

11

10

279

15S

7710

15S

20

1

Page 49: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix G Cost Estimate

Page 50: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

PAY

ITEM

NU

MBE

RIT

EM D

ESCR

IPTI

ON

UNIT

UNIT

PRI

CEQ

UAN

TITY

COST

110-

1-1

CLEA

RIN

G AN

D GR

UBBI

NG

AC5,

250.

00$

2.1

11,0

25.0

0$

110-

4-10

REM

OVA

L OF

EXIS

ITN

G CO

NCRE

TESY

20.0

0$

780

15,6

00.0

0$

120-

6EM

BANK

MEN

TCY

6.25

$

2075

12,9

68.7

5$

160-

4TY

PE B

STA

BILI

ZATI

ON

SY3.

25$

53

8517

,501

.25

$

28

5-70

1O

PTIO

NAL B

ASE

GRO

UP 1

SY7.

50$

20

6515

,487

.50

$

28

5-71

1O

PTIO

NAL B

ASE

GRO

UP 1

1SY

20.0

0$

1285

25,7

00.0

0$

334-

1-14

SUPE

RPAV

E AS

PHAL

TIC

CONC

, TRA

FFIC

DTN

85.0

0$

555

47,1

75.0

0$

337-

7-22

ASPH

CO

NC F

RICT

ION

COU

RSE,

FC-

5TN

130.

00$

13

517

,550

.00

$

33

9-1

MIS

CELL

AEO

US

ASPH

ALT

PAVE

MEN

TTN

210.

00$

14

530

,450

.00

$

42

5-11

MO

DIFY

EXI

STIN

G DR

AIN

AGE

STRU

CTUR

EEA

2,50

0.00

$

4

10,0

00.0

0$

520-

6SH

OUL

DER

GUTT

ER -

CONC

RETE

LF20

.00

$

20

0040

,000

.00

$

53

6-1-

1GU

ARDR

AIL

LF18

.00

$

46

0082

,800

.00

$

57

0-1-

2PE

RFO

RMAN

CE T

URF

, SO

DSY

2.

50$

47

7511

,937

.50

$

101-

1M

OBI

LIZA

TIO

N10

2-1

MAI

NTE

NAN

CE O

F TR

AFFI

C

P.E.

C.E.

I.15

%50

,729

.25

$

Tota

l Cos

t $

490

,382

.75

UTI

LITY

IMPA

CTS

10%

-$

CO

NTIN

GEN

CY10

%33

,819

.50

$

Cons

truc

tion

Cost

Est

imat

e fo

r Sho

ulde

r Wid

th Im

prov

emen

tsTu

rnpi

ke M

ainl

ine

(SR

91) R

esur

facin

g an

d Sa

fety

Impr

ovem

ents

fr

om M

P 15

3.23

0 to

MP

169.

320

St. L

ucie

Cou

nty,

Flo

rida

FPID

Num

bers

436

517-

1-52

-01

and

4365

17-3

-52-

01Co

ntra

ct N

umbe

r C9R

86 Subt

otal

$

3

38,1

95.0

0 10

%33

,819

.50

$

10%

33,8

19.5

0$

Page 51: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix H Benefit/Cost Analysis

Page 52: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Rev. 02/2014

District: County: Date Prepared: 05/26/17

Location:

Section : Beg. Milepost : 15.078 End Milepost : 31.168Rdway Type:

Control Element:

Service Life

Capital Recovery

Factor Total100 0.0408 -$ 15 0.0899 4,560.56$ 75 0.0425 -$ 20 0.0736 31,401.70$ 20 0.0736 956.80$ 20 0.0736 -$ 20 0.0736 -$

36,919.06$ Annual Cost = 36,919.06$

Total number of crashes = 49 0# of correctable crashes, PC = 0# of years of crash data, YD = 5

PC/YD = 0.00Crash reduction factor, CRF = 0.00%

CRF x (PC/YD) = 0.00Cost per crash, CPC = $254,951.00

Benefit = $0

BENEFIT/COST RATIO

Benefit $0.00Cost $36,919.06

Prepared by:

50,729.25$ -$

426,653.50$ 13,000.00$

Based on HSM, CMF for shoulder widths > 8 ft. is the same

0.00

Benefit-Cost Analysis

Turnpike 94 - St Lucie

ANNUAL COST OF IMPROVEMENTS

Shoulder Width

Realignment of SR 91at Picos Road, CR 68, and Minute Maid Road, as well as improvements at the Angle Road/Belcher Canal Bridge approches to provide compliant shoulder widths.

RoadwayDrainage

Signal

CostTypeROW

P.E.C.E.I.Structure

Additional crash reduction factor:

Dilnahar H. Shuvo, EI

SR 91 Mainline Resurfacing and Safety Improvements in St. Lucie County

94/470/000Turnpike Rural Divided

= =

Additional crash reduction factor:

Primary crash reduction factor (%):

OtherSub-Total 490,382.75$

Page 53: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix I Spread Analysis

Page 54: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230
Page 55: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Shoulder Width Design Exception PID Nos: 436517-1-52-01 & 436517-3-52-01

Turnpike Mainline (SR 91) Resurfacing and Safety Improvements from MM 153.230 to MM 169.320

Appendix J Project Schedule

Page 56: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

4365

17-1

RES

4365

17-1

RES

UR

FAC

4365

17-1

RES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST

LUC

IE C

OU

NTY

, (M

P 15

3.23

- 16

9.32

)71

933

605

-Sep

-15

A01

-Jul

-18

53.2

7%0

0

RESU

RFAC

E TP

RESU

RFAC

E TP

K M

AIRE

SURF

ACE

TPK

MAI

NLIN

E IN

ST.

LUC

IE C

OUN

TY, M

P 15

3.23

- 16

9.32

719

336

05-S

ep-1

5 A

01-J

ul-1

853

.27%

00

PE -

DES

IGN

PE -

DES

IGN

PE -

DES

IGN

534

151

05-S

ep-1

5 A

09-O

ct-1

771

.72%

185

0

PUB

LIC

INVO

LVPU

BLI

C IN

VOLV

EMEN

PUB

LIC

INVO

LVEM

ENT

66

24-A

pr-1

701

-May

-17

0%5-

Day

293

0R

3610

020

610

CO

OR

DIN

ATE

W/ E

MO

REG

ARD

ING

PU

BLIC

INVO

LVEM

ENT

55

24-A

pr-1

7*28

-Apr

-17

0%5-

Day

293

0R

3610

030

610

DO

CU

MEN

T PR

OPO

SED

PU

BLIC

INVO

LVEM

ENT

ACTI

VITI

ES1

101

-May

-17

01-M

ay-1

70%

5-D

ay29

329

3

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

SCO

PFI

NAL

DES

IGN

- SC

OPE

OF

SER

VIC

ES &

MH

EST

IMAT

E67

005

-Sep

-15

A10

-Dec

-15

A10

0%0

R31

6400

016

4PR

EPAR

E D

RAF

T SC

OPE

OF

SER

VIC

ES -

Obt

ain

Scop

e Te

mpl

, dev

el d

raft

SOS

160

05-S

ep-1

5 A

20-S

ep-1

5 A

100%

7 D

ayR

3724

420

724

DIS

CIP

LIN

E R

EVIE

W D

RAF

T SO

S - D

EVEL

OP

MH

EST

IMAT

ES6

006

-Oct

-15

A12

-Oct

-15

A10

0%5-

Day

R39

9002

072

4R

EQU

EST

CR

ASH

DAT

A FR

OM

TR

AFFI

C O

PS1

015

-Oct

-15

A15

-Oct

-15

A10

0%5-

Day

R37

2443

072

4R

EVIS

E D

RAF

T SC

OPE

OF

SER

VIC

ES5

018

-Nov

-15

A22

-Nov

-15

A10

0%7

Day

R37

2444

072

4D

ISC

IPLI

NES

REV

IEW

PR

E-FI

NAL

SO

S6

020

-Nov

-15

A01

-Dec

-15

A10

0%5-

Day

R31

6410

016

4FI

NAL

IZE

SCO

PE O

F SE

RVI

CES

/MAN

HO

UR

EST

IMAT

E5

004

-Dec

-15

A10

-Dec

-15

A10

0%5-

Day

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

CO

NS

FIN

AL D

ESIG

N -

CO

NSU

LTAN

T C

ON

TRAC

T AC

QUIS

ITIO

N21

40

04-J

an-1

6 A

01-N

ov-1

6 A

100%

0R

3724

101

724

CO

NFI

RM

AD

INFO

RM

ATIO

N (M

ajor

& M

inor

Wor

k Ty

pes

Verif

ied)

50

04-J

an-1

6 A

08-J

an-1

6 A

100%

5-D

ayR

3724

105

724

MEE

T W

ITH

TR

C/T

RC

KIC

KOFF

MEE

TIN

G1

009

-Jan

-16

A09

-Jan

-16

A10

0%7

Day

R37

2408

072

4TP

K R

EVIE

W F

INAL

DR

AFT

SOS

(Kat

hy/B

riann

a)5

011

-Jan

-16

A15

-Jan

-16

A10

0%7

Day

R37

2409

072

4SU

BMIT

FIN

AL D

RAF

T SO

S TO

PSU

10

18-J

an-1

6 A

18-J

an-1

6 A

100%

7 D

ayR

3724

100

724

POST

PLA

NN

ED A

D O

N F

DO

T W

EB S

ITE

*1

025

-Jan

-16

A25

-Jan

-16

A10

0%M

onR

3990

000

990

DES

IGN

CO

NSU

LTAN

T C

ON

TRAC

T AC

QU

ISIT

ION

(H

amm

ock)

198

025

-Jan

-16

A01

-Nov

-16

A10

0%5-

Day

R37

2420

572

4H

OLD

TEC

H P

ANEL

MEE

TIN

GS

*2

004

-Feb

-16

A05

-Feb

-16

A10

0%5-

Day

R32

3210

023

2FO

RM

AL A

D A

PPEA

RS

ON

FD

OT

WEB

PAG

E (C

one

of S

ilenc

e)*

10

22-F

eb-1

6 A

22-F

eb-1

6 A

100%

Mon

R39

9005

072

4LE

TTER

S O

F R

ESPO

NSE

LO

Rs

DU

E D

ATE

*1

007

-Mar

-16

A07

-Mar

-16

A10

0%M

onR

3724

130

724

PREP

ARE

LON

G L

IST

PAC

KAG

E *

50

08-M

ar-1

6 A

14-M

ar-1

6 A

100%

5-D

ayR

3724

140

724

TEC

H. R

EV. C

OM

MIT

TEE

EVAL

UAT

E LO

NG

LIS

T PK

G. *

50

15-M

ar-1

6 A

21-M

ar-1

6 A

100%

5-D

ayR

3990

040

724

LON

GLI

ST T

RC

MEE

TIN

G *

10

28-M

ar-1

6 A

28-M

ar-1

6 A

100%

Mon

R34

0110

040

1SE

LEC

TIO

N C

OM

MIT

TEE

SHO

RT

LIST

CO

NSU

LTAN

TS *

10

08-A

pr-1

6 A

08-A

pr-1

6 A

100%

Fri

R37

2418

072

4SE

ND

RFP

*1

018

-Apr

-16

A18

-Apr

-16

A10

0%M

onR

3230

000

230

SCO

PE O

F SE

RVI

CES

MEE

TIN

G (

Shor

tlist F

irms)

*1

025

-Apr

-16

A25

-Apr

-16

A10

0%M

onR

3990

060

230

DEA

DLI

NE

FOR

TEC

HIN

ICAL

QU

ESTI

ON

S *

10

02-M

ay-1

6 A

02-M

ay-1

6 A

100%

Mon

R39

9007

023

0C

ON

SULT

ANT

PAC

KETS

DU

E *

10

09-M

ay-1

6 A

09-M

ay-1

6 A

100%

Mon

R32

4900

024

9R

ECV.

WR

ITTE

N P

RO

POSA

LS/C

ON

DU

CT

OR

AL T

ECH

NIC

ALS

*1

027

-May

-16

A27

-May

-16

A10

0%Fr

iR

3724

220

724

TEC

HN

ICAL

EVA

LUAT

ION

*2

027

-May

-16

A31

-May

-16

A10

0%5-

Day

R39

9008

072

4TR

C S

CO

RES

DU

E *

10

03-J

un-1

6 A

03-J

un-1

6 A

100%

Fri

R34

0210

040

2FI

NAL

SEL

ECTI

ON

CO

MM

ITTE

E M

EETI

NG

S *

10

13-J

un-1

6 A

13-J

un-1

6 A

100%

Mon

R37

2433

072

4PR

EPAR

E C

ON

TRAC

T50

022

-Jun

-16

A31

-Aug

-16

A10

0%5-

Day

R37

2429

572

4SC

OPE

CLA

RIF

ICAT

ION

MEE

TIN

G1

029

-Jun

-16

A29

-Jun

-16

A10

0%5-

Day

R37

2402

072

4U

NIT

S M

EETI

NG

10

14-J

ul-1

6 A

14-J

ul-1

6 A

100%

5-D

ayR

3724

300

724

STAF

FHO

UR

NEG

OTI

ATIO

NS

MEE

TIN

GS

10

15-A

ug-1

6 A

15-A

ug-1

6 A

100%

5-D

ayR

3724

310

724

CO

NSU

LTAN

T SU

BMIT

FIN

AL P

RIC

E PR

OPO

SAL/

AUD

IT P

KG5

025

-Aug

-16

A31

-Aug

-16

A10

0%5-

Day

R37

2432

072

4PR

E-AW

ARD

AU

DIT

EVA

LUAT

ION

30

01-S

ep-1

6 A

06-S

ep-1

6 A

100%

5-D

ayR

3990

100

990

AWAR

D C

ON

TRAC

T

(Ham

moc

k)43

001

-Sep

-16

A01

-Nov

-16

A10

0%5-

Day

R37

2433

572

4TU

RN

PIKE

LEG

AL R

EVIE

W C

ON

TRAC

T1

014

-Oct

-16

A14

-Oct

-16

A10

0%5-

Day

R37

2434

072

4SE

ND

CO

NTR

ACT

TO C

ON

SULT

ANT

50

24-O

ct-1

6 A

28-O

ct-1

6 A

100%

5-D

ayR

3299

000

299

REQ

UES

T FU

ND

S1

027

-Oct

-16

A27

-Oct

-16

A10

0%5-

Day

R37

2436

072

4R

ECEI

VED

SIG

NED

CO

NTR

ACT

10

31-O

ct-1

6 A

31-O

ct-1

6 A

100%

5-D

ayR

3233

000

233

EXEC

UTE

CO

NTR

ACT

(DES

IGN

)1

001

-Nov

-16

A01

-Nov

-16

A10

0%5-

Day

PAVE

MEN

T D

EPA

VEM

ENT

DES

IGN

PK

PAVE

MEN

T D

ESIG

N P

KG

& T

YPIC

AL S

ECTI

ON

149

3421

-Sep

-16

A24

-Apr

-17

77.1

8%5-

Day

200

R31

9710

019

7R

EQU

EST

ESAL

(18

KIP)

CAL

CU

LATI

ON

S &

TRAF

FIC

DAT

AFR

OM

PLA

NN

ING

10

21-S

ep-1

6 A

21-S

ep-1

6 A

100%

5-D

ayR

3257

000

257

REC

EIPT

OF

ESAL

& T

RAF

FIC

DAT

A FR

OM

PLA

NN

ING

10

27-O

ct-1

6 A

27-O

ct-1

6 A

100%

5-D

ayR

3106

100

106

DES

IGN

SU

RVE

Y22

002

-Nov

-16

A05

-Dec

-16

A10

0%5-

Day

R31

0203

010

2LA

NE

CLO

SUR

E AN

ALYS

IS/4

5% T

CP

MEE

TIN

G1

007

-Mar

-17

A07

-Mar

-17

A10

0%5-

Day

EXC

EPTI

ON

S EX

CEP

TIO

NS

& V

ARIA

EXC

EPTI

ON

S &

VAR

IATI

ON

S11

134

14-N

ov-1

6 A

24-A

pr-1

769

.37%

5-D

ay20

0

R32

9401

029

4PR

EPAR

E D

RAF

T D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

200

14-N

ov-1

6 A

13-D

ec-1

6 A

100%

5-D

ayR

3294

030

294

REV

IEW

DR

AFT

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

O15

014

-Dec

-16

A06

-Jan

-17

A10

0%5-

Day

R32

9404

029

4PR

EPAR

E FI

NAL

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

O60

1809

-Jan

-17

A31

-Mar

-17

70%

5-D

ay20

0R

3294

050

294

REV

IEW

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

1515

03-A

pr-1

721

-Apr

-17

0%5-

Day

200

R31

9721

019

7SU

BMIT

SIG

N &

SEA

LED

EXC

EPTI

ON

S, V

ARIA

TIO

NS,

& T

ECH

MEM

O &

APP

RO

VE1

124

-Apr

-17

24-A

pr-1

70%

5-D

ay20

0

PAVE

MEN

T D

EPA

VEM

ENT

DES

IGN

PAVE

MEN

T D

ESIG

N87

606

-Dec

-16

A10

-Apr

-17

93.1

%5-

Day

300

R31

9700

019

7PR

EPAR

E D

RAF

T PA

VEM

ENT

DES

IGN

200

06-D

ec-1

6 A

05-J

an-1

7 A

100%

5-D

ayR

3197

060

260

REV

IEW

DR

AFT

PAVE

MEN

T D

ESIG

N15

006

-Jan

-17

A26

-Jan

-17

A10

0%5-

Day

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

CO

OR

DIN

ATE

W/ E

MO

REG

ARD

ING

PU

BLIC

INVO

LVEM

ENT

DO

CU

MEN

T PR

OPO

SED

PU

BLIC

INVO

LVEM

ENT

ACTI

VITI

ES

PREP

ARE

DR

AFT

SCO

PE O

F SE

RVI

CES

- O

btai

n Sc

ope

Tem

pl, d

evel

dra

ft SO

SD

ISC

IPLI

NE

REV

IEW

DR

AFT

SOS

- DEV

ELO

P M

H E

STIM

ATES

REQ

UES

T C

RAS

H D

ATA

FRO

M T

RAF

FIC

OPS

REV

ISE

DR

AFT

SCO

PE O

F SE

RVI

CES

DIS

CIP

LIN

ES R

EVIE

W P

RE-

FIN

AL S

OS

FIN

ALIZ

E SC

OPE

OF

SER

VIC

ES/M

ANH

OU

R E

STIM

ATE

CO

NFI

RM

AD

INFO

RM

ATIO

N (M

ajor

& M

inor

Wor

k Ty

pes

Verif

ied)

MEE

T W

ITH

TR

C/T

RC

KIC

KOFF

MEE

TIN

GTP

K R

EVIE

W F

INAL

DR

AFT

SOS

(Kat

hy/B

riann

a)SU

BMIT

FIN

AL D

RAF

T SO

S TO

PSU

POST

PLA

NN

ED A

D O

N F

DO

T W

EB S

ITE

*D

ESIG

N C

ON

SULT

ANT

CO

NTR

ACT

ACQ

UIS

ITIO

N

(Ham

moc

k)H

OLD

TEC

H P

ANEL

MEE

TIN

GS

*FO

RM

AL A

D A

PPEA

RS

ON

FD

OT

WEB

PAG

E (C

one

of S

ilenc

e)*

LETT

ERS

OF

RES

PON

SE L

OR

s D

UE

DAT

E *

PREP

ARE

LON

G L

IST

PAC

KAG

E *

TEC

H. R

EV. C

OM

MIT

TEE

EVAL

UAT

E LO

NG

LIS

T PK

G. *

LON

GLI

ST T

RC

MEE

TIN

G *

SELE

CTI

ON

CO

MM

ITTE

E SH

OR

T LI

ST C

ON

SULT

ANTS

*SE

ND

RFP

*SC

OPE

OF

SER

VIC

ES M

EETI

NG

(Sh

ortlis

t Firm

s) *

DEA

DLI

NE

FOR

TEC

HIN

ICAL

QU

ESTI

ON

S *

CO

NSU

LTAN

T PA

CKE

TS D

UE

*R

ECV.

WR

ITTE

N P

RO

POSA

LS/C

ON

DU

CT

OR

AL T

ECH

NIC

ALS

*TE

CH

NIC

AL E

VALU

ATIO

N *

TRC

SC

OR

ES D

UE

*FI

NAL

SEL

ECTI

ON

CO

MM

ITTE

E M

EETI

NG

S *

PREP

ARE

CO

NTR

ACT

SCO

PE C

LAR

IFIC

ATIO

N M

EETI

NG

UN

ITS

MEE

TIN

GST

AFFH

OU

R N

EGO

TIAT

ION

S M

EETI

NG

SC

ON

SULT

ANT

SUBM

IT F

INAL

PR

ICE

PRO

POSA

L/AU

DIT

PKG

PRE-

AWAR

D A

UD

IT E

VALU

ATIO

NAW

ARD

CO

NTR

ACT

(H

amm

ock)

TUR

NPI

KE L

EGAL

REV

IEW

CO

NTR

ACT

SEN

D C

ON

TRAC

T TO

CO

NSU

LTAN

TR

EQU

EST

FUN

DS

REC

EIVE

D S

IGN

ED C

ON

TRAC

TEX

ECU

TE C

ON

TRAC

T (D

ESIG

N)

REQ

UES

T ES

AL (1

8 KI

P) C

ALC

ULA

TIO

NS

& TR

AFFI

C D

ATAF

RO

M P

LAN

NIN

GR

ECEI

PT O

F ES

AL &

TR

AFFI

C D

ATA

FRO

M P

LAN

NIN

GD

ESIG

N S

UR

VEY

LAN

E C

LOSU

RE

ANAL

YSIS

/45%

TC

P M

EETI

NG

PREP

ARE

DR

AFT

DES

IGN

EXC

EPTI

ON

S, V

ARIA

TIO

NS

& TE

CH

MEM

OR

EVIE

W D

RAF

T D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

PREP

ARE

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

REV

IEW

FIN

AL D

ESIG

N E

XCEP

TIO

NS,

VAR

IATI

ON

S &

TEC

H M

EMO

SUBM

IT S

IGN

& S

EALE

D E

XCEP

TIO

NS,

VAR

IATI

ON

S, &

TEC

H M

EMO

& A

PPR

OVE

PREP

ARE

DR

AFT

PAVE

MEN

T D

ESIG

NR

EVIE

W D

RAF

T PA

VEM

ENT

DES

IGN

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

1 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.

Page 57: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

R31

9703

019

7PR

EPAR

E FI

NAL

PAV

EMEN

T D

ESIG

N9

027

-Jan

-17

A08

-Feb

-17

A10

0%5-

Day

R31

9707

026

0R

EVIE

W F

INAL

PAV

EMEN

T D

ESIG

N5

503

-Apr

-17

07-A

pr-1

70%

5-D

ay30

0R

3197

200

197

SUBM

IT F

INAL

SIG

N &

SEA

LED

PAV

EMEN

T D

ESIG

N &

APPR

OVE

11

10-A

pr-1

710

-Apr

-17

0%5-

Day

300

TYPI

CAL

SEC

TTY

PIC

AL S

ECTI

ON

TYPI

CAL

SEC

TIO

N87

2406

-Dec

-16

A10

-Apr

-17

72.4

1%5-

Day

300

R32

6001

026

0PR

EPAR

E D

RAF

T TY

PIC

AL S

ECTI

ON

S19

006

-Dec

-16

A04

-Jan

-17

A10

0%5-

Day

R32

6000

026

0R

EVIE

W D

RAF

T TY

PIC

AL S

ECTI

ON

S15

005

-Jan

-17

A25

-Jan

-17

A10

0%5-

Day

R32

6003

026

0PR

EPAR

E FI

NAL

TYP

ICAL

SEC

TIO

NS

60

26-J

an-1

7 A

02-F

eb-1

7 A

100%

5-D

ayR

3260

040

260

REV

IEW

FIN

AL T

YPIC

AL S

ECTI

ON

S40

1703

-Feb

-17

A30

-Mar

-17

57.5

%5-

Day

366

R32

6005

026

0SU

BMIT

FIN

AL S

IGN

& S

EALE

D T

YPIC

AL S

ECTI

ON

S &

APPR

OVE

11

10-A

pr-1

710

-Apr

-17

0%5-

Day

3010

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

RO

ADFI

NAL

DES

IGN

- R

OAD

WAY

230

145

02-N

ov-1

6 A

29-S

ep-1

736

.96%

5-D

ay18

70

R32

3410

023

4IS

SUE

NTP

AN

D S

CH

EDU

LE K

ICKO

FF M

TG (D

ESIG

N)

10

02-N

ov-1

6 A

02-N

ov-1

6 A

100%

5-D

ayR

3990

090

168

CO

NSU

LTAN

T SU

BMIT

QC

PLA

N1

011

-Nov

-16

A11

-Nov

-16

A10

0%5-

Day

R36

1005

029

0PM

LET

TER

TO

PIO

w/L

ETTI

NG

DAT

E &

CO

NST

. DU

R.10

1019

-Jul

-17

01-A

ug-1

70%

5-D

ay65

45R

3380

000

380

PRO

DU

CTI

ON

REA

DY

55

25-S

ep-1

729

-Sep

-17

0%5-

Day

200

60%

DES

IGN

60%

DES

IGN

60%

DES

IGN

7857

07-F

eb-1

7 A

25-M

ay-1

726

.92%

5-D

ay27

50

R31

1310

011

3PR

EPAR

E 60

% P

LAN

S54

3307

-Feb

-17

A21

-Apr

-17

38.8

9%5-

Day

200

R31

6810

016

8Q

A/Q

C A

UD

IT (6

0% P

LAN

S)1

124

-Apr

-17

24-A

pr-1

70%

5-D

ay20

0R

3235

200

235

CO

NSU

LTAN

T SU

BMIT

60%

PLA

NS

FOR

REV

IEW

11

25-A

pr-1

725

-Apr

-17

0%5-

Day

200

R33

0296

030

2C

ENTR

AL O

FFIC

E R

EVIE

W T

TMS

1010

26-A

pr-1

709

-May

-17

0%5-

Day

255

R34

6525

046

5Q

UAN

TITI

ES A

ND

REQ

UES

T FO

R IN

FO T

O C

ON

STR

UC

TIO

N1

126

-Apr

-17

26-A

pr-1

70%

5-D

ay25

0R

3302

002

302

REV

IEW

60%

PAY

ITEM

LIS

T10

1026

-Apr

-17

09-M

ay-1

70%

5-D

ay31

11R

3302

900

302

REV

IEW

60%

PLA

NS

1515

26-A

pr-1

716

-May

-17

0%5-

Day

200

R35

0719

150

7PR

EPAR

E C

ON

STR

UC

TIO

N D

UR

SC

HED

ULE

(CO

NST

RU

CTI

ON

)15

1527

-Apr

-17

17-M

ay-1

70%

5-D

ay25

5R

3302

100

302

SUBM

IT 6

0% C

OM

MEN

TS T

O C

ON

SULT

ANT

11

17-M

ay-1

717

-May

-17

0%5-

Day

200

R35

2200

552

2R

EVIS

E 60

% P

LAN

SH

EETS

FO

R U

TILI

TIES

55

18-M

ay-1

724

-May

-17

0%5-

Day

276

276

R31

6910

016

9FI

ELD

REV

IEW

11

18-M

ay-1

718

-May

-17

0%5-

Day

200

R31

6915

016

9IN

CO

RPO

RAT

E C

OM

MEN

TS F

RO

M F

IELD

REV

IEW

55

19-M

ay-1

725

-May

-17

0%5-

Day

200

100%

DES

IGN

100%

DES

IGN

100%

DES

IGN

3838

25-M

ay-1

718

-Jul

-17

0%5-

Day

340

R31

1330

011

3PR

EPAR

E 10

0% P

LAN

S20

2025

-May

-17

22-J

un-1

70%

5-D

ay20

0R

3235

400

235

CO

NSU

LTAN

T SU

BMIT

100

% P

LAN

S FO

R R

EVIE

W1

126

-Jun

-17

26-J

un-1

70%

5-D

ay34

0R

3310

910

310

CEN

TRAL

OFF

ICE

REV

IEW

TTM

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

002

310

REV

IEW

100

% P

LAN

SU

MM

ARY

BOXE

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

900

310

REV

IEW

100

% P

LAN

S15

1527

-Jun

-17

17-J

ul-1

70%

5-D

ay34

0R

3310

100

310

SUBM

IT 1

00%

CO

MM

ENTS

TO

CO

NSU

LTAN

T1

118

-Jul

-17

18-J

ul-1

70%

5-D

ay34

0

FIN

AL -

SIG

NE

FIN

AL -

SIG

NED

& S

EFI

NAL

- SI

GN

ED &

SEA

LED

3232

19-J

ul-1

731

-Aug

-17

0%5-

Day

340

R31

1340

011

3PR

EPAR

E FI

NAL

PLA

NS

1515

19-J

ul-1

708

-Aug

-17

0%5-

Day

340

R31

9004

011

3C

ON

SULT

ANT

SUBM

IT F

INAL

PLA

NS

11

09-A

ug-1

709

-Aug

-17

0%5-

Day

340

R32

4500

024

5FI

NAL

PLA

NS

REV

IEW

55

10-A

ug-1

716

-Aug

-17

0%5-

Day

340

R32

4510

024

5IN

CO

RPO

RAT

E FI

NAL

CO

MM

ENTS

& R

ESPO

NC

ES10

1017

-Aug

-17

30-A

ug-1

70%

5-D

ay34

0R

3235

500

235

CO

NSU

LTAN

T SU

BMIT

FIN

AL S

IGN

ED &

SEA

LED

PLA

NS1

131

-Aug

-17

31-A

ug-1

70%

5-D

ay34

0

FIN

AL D

ESIG

N

FIN

AL D

ESIG

N -

UTI

LIT

FIN

AL D

ESIG

N -

UTI

LITI

ES11

054

07-F

eb-1

7 A

11-J

ul-1

750

.91%

5-D

ay80

0R

3990

110

522

UTI

LITY

CO

OR

DIN

ATIO

N K

ICK

OFF

MEE

TIN

G1

007

-Feb

-17

A07

-Feb

-17

A10

0%5-

Day

R35

2221

052

2D

IST.

60%

PLA

N S

HEE

TS to

UTI

LITI

ES1

126

-Apr

-17

26-A

pr-1

70%

5-D

ay56

0R

3522

220

522

ALL

UTI

LITY

MAR

KUPS

RET

UR

NED

11

25-M

ay-1

725

-May

-17

0%5-

Day

560

R32

2800

022

8D

ISTR

IB. R

EVIS

ED P

LAN

SH

EETS

TO

UTI

LITI

ES1

123

-Jun

-17

23-J

un-1

70%

5-D

ay56

0R

3523

300

523

REC

EIVE

MAR

KUP

CO

RR

ECTI

ON

S FR

OM

UTI

LITI

ES1

110

-Jul

-17

10-J

ul-1

70%

5-D

ay56

0R

3266

000

266

UTI

LITI

ES C

ERTI

FIED

11

11-J

ul-1

711

-Jul

-17

0%5-

Day

840

CO

NSU

LTAN

T E

CO

NSU

LTAN

T EV

ALU

AC

ON

SULT

ANT

EVAL

UAT

ION

S11

611

626

-Apr

-17

09-O

ct-1

70%

5-D

ay59

0R

3238

110

238

PHAS

E II

CO

NSU

LTAN

T G

RAD

ES5

526

-Apr

-17

02-M

ay-1

70%

5-D

ay36

16R

3236

000

236

FIN

AL C

ON

SULT

ANT

GR

ADES

11

09-O

ct-1

709

-Oct

-17

0%5-

Day

5959

ENVI

RO

NM

ENT

ENVI

RO

NM

ENTA

L C

EREN

VIR

ON

MEN

TAL

CER

TIFI

CAT

ION

S18

096

03-N

ov-1

6 A

20-J

ul-1

746

.67%

5-D

ay64

0R

3990

030

328

NM

SA C

HEC

KLIS

T1

003

-Nov

-16

A03

-Nov

-16

A10

0%5-

Day

R33

3300

033

3C

ULT

UR

AL R

ESO

UR

CE

& AR

CH

AEO

LOG

ICAL

SU

RVE

Y61

3320

-Jan

-17

A21

-Apr

-17

45.9

%5-

Day

940

R36

1010

061

0N

OIS

E IN

VEST

IGAT

ION

2020

24-A

pr-1

719

-May

-17

0%5-

Day

105

41R

3174

000

174

CO

NTA

MIN

ATIO

N IN

VEST

IGAT

ION

2020

24-A

pr-1

719

-May

-17

0%5-

Day

105

41R

3328

000

328

FCC

CER

TIFI

CAI

TON

REQ

UIR

ED

Y/N

11

08-J

un-1

708

-Jun

-17

0%5-

Day

9474

R33

3310

033

3C

ERTI

FY C

ULT

UR

AL R

ESO

UR

CES

& A

RC

HAE

OLO

GIC

AL1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3610

200

610

CER

TIFY

PU

BLIC

INVO

LVEM

ENT

11

19-J

ul-1

719

-Jul

-17

0%5-

Day

640

R36

1030

061

0C

ERTI

FY N

OIS

E1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3174

100

174

CER

TIFY

CO

NTA

MIN

ATIO

N1

119

-Jul

-17

19-J

ul-1

70%

5-D

ay64

0R

3610

900

610

INC

LUD

E EN

VIR

ON

. CER

TIFI

CAT

ION

IN P

RO

JEC

T FI

LE1

120

-Jul

-17

20-J

ul-1

70%

5-D

ay64

0

* * R

IGH

T O

F W

A* *

RIG

HT

OF

WAY

* * R

IGH

T O

F W

AY1

123

-Jun

-17

23-J

un-1

70%

5-D

ay83

0

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

PREP

ARE

FIN

AL P

AVEM

ENT

DES

IGN

REV

IEW

FIN

AL P

AVEM

ENT

DES

IGN

SUBM

IT F

INAL

SIG

N &

SEA

LED

PAV

EMEN

T D

ESIG

N &

APPR

OVE

PREP

ARE

DR

AFT

TYPI

CAL

SEC

TIO

NS

REV

IEW

DR

AFT

TYPI

CAL

SEC

TIO

NS

PREP

ARE

FIN

AL T

YPIC

AL S

ECTI

ON

SR

EVIE

W F

INAL

TYP

ICAL

SEC

TIO

NS

SUBM

IT F

INAL

SIG

N &

SEA

LED

TYP

ICAL

SEC

TIO

NS

& AP

PRO

VE

ISSU

E N

TP A

ND

SC

HED

ULE

KIC

KOFF

MTG

(DES

IGN

)C

ON

SULT

ANT

SUBM

IT Q

C P

LAN

PM L

ETTE

R T

O P

IO w

/LET

TIN

G D

ATE

& C

ON

ST. D

UR.

PRO

DU

CTI

ON

REA

DY

PREP

ARE

60%

PLA

NS

QA/

QC

AU

DIT

(60%

PLA

NS)

CO

NSU

LTAN

T SU

BMIT

60%

PLA

NS

FOR

REV

IEW

CEN

TRAL

OFF

ICE

REV

IEW

TTM

SQ

UAN

TITI

ES A

ND

REQ

UES

T FO

R IN

FO T

O C

ON

STR

UC

TIO

NR

EVIE

W 6

0% P

AY IT

EM L

IST

REV

IEW

60%

PLA

NS

PREP

ARE

CO

NST

RU

CTI

ON

DU

R S

CH

EDU

LE (C

ON

STR

UC

TIO

N)

SUBM

IT 6

0% C

OM

MEN

TS T

O C

ON

SULT

ANT

REV

ISE

60%

PLA

N S

HEE

TS F

OR

UTI

LITI

ESFI

ELD

REV

IEW

INC

OR

POR

ATE

CO

MM

ENTS

FR

OM

FIE

LD R

EVIE

W

PREP

ARE

100%

PLA

NS

CO

NSU

LTAN

T SU

BMIT

100

% P

LAN

S FO

R R

EVIE

WC

ENTR

AL O

FFIC

E R

EVIE

W T

TMS

REV

IEW

100

% P

LAN

SU

MM

ARY

BOXE

SR

EVIE

W 1

00%

PLA

NS

SUBM

IT 1

00%

CO

MM

ENTS

TO

CO

NSU

LTAN

T

PREP

ARE

FIN

AL P

LAN

SC

ON

SULT

ANT

SUBM

IT F

INAL

PLA

NS

FIN

AL P

LAN

S R

EVIE

WIN

CO

RPO

RAT

E FI

NAL

CO

MM

ENTS

& R

ESPO

NC

ESC

ON

SULT

ANT

SUBM

IT F

INAL

SIG

NED

& S

EALE

D P

LANS

UTI

LITY

CO

OR

DIN

ATIO

N K

ICK

OFF

MEE

TIN

GD

IST.

60%

PLA

N S

HEE

TS to

UTI

LITI

ESAL

L U

TILI

TY M

ARKU

PS R

ETU

RN

EDD

ISTR

IB. R

EVIS

ED P

LAN

SH

EETS

TO

UTI

LITI

ESR

ECEI

VE M

ARKU

P C

OR

REC

TIO

NS

FRO

M U

TILI

TIES

UTI

LITI

ES C

ERTI

FIED

PHAS

E II

CO

NSU

LTAN

T G

RAD

ESFI

NAL

CO

NSU

LTAN

T G

RAD

ES

NM

SA C

HEC

KLIS

TC

ULT

UR

AL R

ESO

UR

CE

& AR

CH

AEO

LOG

ICAL

SU

RVE

YN

OIS

E IN

VEST

IGAT

ION

CO

NTA

MIN

ATIO

N IN

VEST

IGAT

ION

FCC

CER

TIFI

CAI

TON

REQ

UIR

ED

Y/N

CER

TIFY

CU

LTU

RAL

RES

OU

RC

ES &

AR

CH

AEO

LOG

ICAL

CER

TIFY

PU

BLIC

INVO

LVEM

ENT

CER

TIFY

NO

ISE

CER

TIFY

CO

NTA

MIN

ATIO

NIN

CLU

DE

ENVI

RO

N. C

ERTI

FIC

ATIO

N IN

PR

OJE

CT

FILE

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

2 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.

Page 58: 436517-1 S+S Design Exception - Shoulder Width 2017-06-14 · This project consists of resurfacing and safety improvements for the Florida’s Turnpike Mainline (SR 91) from MM 153.230

Activ

ity ID

PSM

Activ

ity N

ame

Orig Dur

Rem Dur

Star

tFi

nish

Dur

atio

n %

Com

plet

eC

alen

dar

Tota

lFl

oat

Free

Floa

t

R/W

RIG

HT

OF

R/W

RIG

HT

OF

WAY

AC

R/W

RIG

HT

OF

WAY

AC

QU

ISIT

ION

11

23-J

un-1

723

-Jun

-17

0%5-

Day

830

R31

8700

018

7**

*** N

O R

/W R

EQU

IRED

CER

TIFI

CAT

ION

****

*1

123

-Jun

-17

23-J

un-1

70%

5-D

ay83

63

* * C

ON

STR

UC

T* *

CO

NST

RU

CTI

ON

* * C

ON

STR

UC

TIO

N30

230

225

-Apr

-17

01-J

ul-1

80%

00

CC

-7 F

INAL

PLA

CC

-7 F

INAL

PLA

NS

PRC

C-7

FIN

AL P

LAN

S PR

OC

ESSI

NG

101

101

05-J

un-1

725

-Oct

-17

0%5-

Day

200

R30

5004

024

2C

OM

PILE

CO

NTR

ACT

IND

EX F

ILE

7878

05-J

un-1

722

-Sep

-17

0%5-

Day

200

R32

0400

020

4PR

OD

UC

TIO

N D

ATE

11

06-O

ct-1

7*06

-Oct

-17

0%5-

Day

200

R33

0511

530

5TU

RN

PIKE

OFF

ICE

FIN

AL R

EVIE

W &

PR

OC

ESSI

NG

66

09-O

ct-1

716

-Oct

-17

0%5-

Day

200

R32

4240

024

2R

EVIE

W F

INAL

SPE

C P

ACKA

GE

55

09-O

ct-1

713

-Oct

-17

0%5-

Day

200

R32

4250

024

2LE

GAL

REV

IEW

OF

SPEC

PKG

55

09-O

ct-1

713

-Oct

-17

0%5-

Day

200

R33

7012

037

0TU

RN

PIKE

OFF

ICE

SIG

N &

TR

ANSM

IT P

LAN

S PA

CKA

GE

33

17-O

ct-1

719

-Oct

-17

0%5-

Day

200

R33

7000

037

0PL

ANS

TO T

UR

NPI

KE C

ON

TRAC

TS1

125

-Oct

-17

25-O

ct-1

70%

5-D

ay20

0

CC

-7 D

ISTR

ICT

CC

-7 D

ISTR

ICT

CO

NTR

CC

-7 D

ISTR

ICT

CO

NTR

ACT

248

248

12-J

ul-1

729

-Jun

-18

0%0

0R

3524

100

524

* * P

OST

UTI

LITY

AG

REE

MEN

TS O

N W

EB S

ITE

11

12-J

ul-1

712

-Jul

-17

0%5-

Day

9237

R32

1900

121

9**

****

PO

ST P

ERM

ITS

ON

WEB

SIT

E1

121

-Jul

-17

21-J

ul-1

70%

5-D

ay85

65R

3580

100

580

BUIL

D W

P50

SCR

EEN

11

01-S

ep-1

701

-Sep

-17

0%5-

Day

5636

R33

0511

030

5TU

RN

PIKE

CO

NTR

ACTS

PR

OC

ESSI

NG

99

26-O

ct-1

707

-Nov

-17

0%5-

Day

202

R32

2900

022

9AD

VER

TISE

FO

R T

UR

NPI

KE C

ON

TRAC

T (

30 D

AYS)

(FR

IDAY

)5

510

-Nov

-17

08-D

ec-1

70%

Fri

44

R32

8000

028

0TU

RN

PIKE

CO

NTR

ACT

LETT

ING

(TU

ESD

AY)

11

09-J

an-1

8*09

-Jan

-18

0%Tu

e0

0R

3585

150

585

POST

BID

S (T

UES

DAY

)1

116

-Jan

-18

16-J

an-1

80%

Tue

1717

R35

2420

052

4* *

REM

OVE

UTI

LITY

AG

REE

MEN

TS fr

om W

EB S

ITE

11

03-M

ay-1

803

-May

-18

0%Th

u0

0R

3219

002

219

****

**

REM

OVE

PER

MIT

S FR

OM

WEB

SIT

E1

107

-May

-18

07-M

ay-1

80%

Mon

00

R35

8518

058

5AW

ARD

CO

NTR

ACT

11

22-M

ay-1

822

-May

-18

0%5-

Day

00

R35

8519

058

5EX

ECU

TE T

UR

NPI

KE C

ON

TRAC

T BY

CO

NTR

ACTO

R1

114

-Jun

-18

14-J

un-1

80%

5-D

ay0

0R

3585

400

585

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY D

.O.T

.1

129

-Jun

-18

29-J

un-1

80%

5-D

ay0

0

CO

NST

RU

CTI

OC

ON

STR

UC

TIO

NC

ON

STR

UC

TIO

N43

343

325

-Apr

-17

01-J

ul-1

80%

7 D

ay0

0R

3202

001

202

SCO

PE &

NEG

OTI

ATE

POST

DES

IGN

SER

VIC

ES1

125

-Apr

-17

25-A

pr-1

70%

7 D

ay13

384

R33

1200

031

2C

ON

STR

UC

TIO

N N

OTI

CE

TO P

RO

CEE

D1

130

-Jun

-18

30-J

un-1

80%

7 D

ay0

0R

3202

000

202

POST

DES

IGN

EFF

OR

TS1

101

-Jul

-18

01-J

ul-1

80%

7 D

ay0

0

* * C

Ei* *

CEi

* * C

Ei10

210

209

-Oct

-17

08-M

ar-1

80%

5-D

ay60

0

CEI

- C

ON

SULT

CEI

- C

ON

SULT

ANT

ACC

EI -

CO

NSU

LTAN

T AC

QU

ISIT

ION

102

102

09-O

ct-1

708

-Mar

-18

0%5-

Day

600

R34

0500

040

5AD

VER

TISE

FO

R C

EI1

109

-Oct

-17

09-O

ct-1

70%

5-D

ay59

0R

3203

000

203

CEI

CO

NSU

L C

ON

T EX

EC1

108

-Mar

-18

08-M

ar-1

80%

5-D

ay60

60

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JF

MA

MJ

JA

SO

ND

JFM

2016

2017

2018

2019

2020

2021

****

* NO

R/W

REQ

UIR

ED C

ERTI

FIC

ATIO

N **

***

CO

MPI

LE C

ON

TRAC

T IN

DEX

FIL

EPR

OD

UC

TIO

N D

ATE

TUR

NPI

KE O

FFIC

E FI

NAL

REV

IEW

& P

RO

CES

SIN

GR

EVIE

W F

INAL

SPE

C P

ACKA

GE

LEG

AL R

EVIE

W O

F SP

EC P

KGTU

RN

PIKE

OFF

ICE

SIG

N &

TR

ANSM

IT P

LAN

S PA

CKA

GE

PLAN

S TO

TU

RN

PIKE

CO

NTR

ACTS

* * P

OST

UTI

LITY

AG

REE

MEN

TS O

N W

EB S

ITE

****

**

POST

PER

MIT

S O

N W

EB S

ITE

BUIL

D W

P50

SCR

EEN

TUR

NPI

KE C

ON

TRAC

TS P

RO

CES

SIN

GAD

VER

TISE

FO

R T

UR

NPI

KE C

ON

TRAC

T (

30 D

AYS)

(FR

IDAY

)TU

RN

PIKE

CO

NTR

ACT

LETT

ING

(TU

ESD

AY)

POST

BID

S (T

UES

DAY

)* *

REM

OVE

UTI

LITY

AG

REE

MEN

TS fr

om W

EB S

ITE

****

**

REM

OVE

PER

MIT

S FR

OM

WEB

SIT

EAW

ARD

CO

NTR

ACT

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY C

ON

TRAC

TOR

EXEC

UTE

TU

RN

PIKE

CO

NTR

ACT

BY D

.O.T

.

SCO

PE &

NEG

OTI

ATE

POST

DES

IGN

SER

VIC

ESC

ON

STR

UC

TIO

N N

OTI

CE

TO P

RO

CEE

DPO

ST D

ESIG

N E

FFO

RTS

ADVE

RTI

SE F

OR

CEI

CEI

CO

NSU

L C

ON

T EX

EC

4365

17-1

ReD

oRES

UR

FAC

E TP

K M

AIN

LIN

E IN

ST.

LU

CIE

CO

UN

TY, M

P 15

3.23

- 16

9.32

Dat

a D

ate:

07-

Mar

-17

P

age

3 of

3

R

un D

ate:

29-

Mar

-17

Rem

aini

ng L

evel

of E

ffort

Actu

al L

evel

of E

ffort

Rem

aini

ng W

ork

Actu

al W

ork

Crit

ical

Rem

aini

ng W

ork

Layo

ut: ~

Proj

ect S

ched

ule_

1 F

ilter

s: T

ASK

filte

r: Al

l Act

iviti

es©

Prim

aver

a S

yste

ms,

Inc.