(400 level) - national open university of nigeria level... · 2019-02-12 · supervisors at places...
TRANSCRIPT
1
NATIONAL OPEN UNIVERSITY OF
NIGERIA
FACULTY OF AGRICULTURAL SCIENCES
TRAINING LOG BOOK
FOR
STUDENT’S INDUSTRIAL WORK
EXPERIENCE SCHEME
(SIWES)
FPY/SIWES PRACTICAL
(400 LEVEL)
2
GENERAL GUIDE FOR STUDENTS OF THE FACULTY OF AGRICULTURAL
SCIENCES, NATIONAL OPEN UNIVERSITY OF NIGERIA
In addition to the ITF Guidelines for SIWES participants, Faculty of Agricultural Sciences
students and the scheme are to note the following:
(i) Obtain and carry with you to your place of attachment copies of the following documents:
An Introductory Letter from the Study Centre
ITF Form 8 and
A Log-book from the Study Centre
(ii) Report at your place of attachment on the date stipulated on the letter of introduction from the
Study Centre.
(iii) Comply with the employer’s rules and regulations. Particularly, you have to be punctual at
your training locations.
(iv) Expect Supervisors from Faculty of Agricultural Sciences and the Industrial Training Fund
(ITF).
(v) The ITF will arrange to pay you SIWES allowance through the establishment to which you
are attached.
(vi) Successful completion of the SIWES programme is a pre-condition for the award of the
Bachelor degree in Agriculture.
(vii) The ITF may use the last two pages for its official purpose.
STUDENT’S
PASSPORT
PHOTOGRAPH
HERE
3
The Farm Practical Year Log Book
What You must Know!
Meaning and Purpose of B. Agric. FPY/SIWES Programme
Farm Practical Year/Student Industrial Work Experience Scheme (FPY/SIWES) is a
programme.
This is recommended by National Universities Commission (NUC) which is premised on the
philosophy that a 12 calendar month hands-on training.
The programme is mounted at 400 level for B. Agricultural Sciences
(FPY/SIWES) is compulsory requirements for graduation of students in all Nigeria
Universities by NUC Bench Mark Minimum Academic Standard (BMAS)
Operation of FPY/SIWES in NOUN ODL System
Farm practical training duration for students of Agriculture in NOUN is proposed to span
between 200 and 400 levels.
The FPY/SIWES programme in 72 weekends of intensive practical farm scheme.
200 level - 8weeks
300 level - 12 weeks
400 level - 52 weeks
Each student is expected to participate in a minimum of 12 hours of practical training per
weekend under the direction or supervision of the farm officer.
Each student is expected to identify institution/colleges of Agriculture/Agricultural
Development Project Offices (ADPs), Agricultural agencies with Agribusiness, Livestock
management, Agric. Mechanization, Crop & Soil activities and well- equipped private farms
closest to his/her location for the FPY/SIWES training.
The institutional based supervisors shall visit students once at 200 and 300 Level and twice at
400 Level
Effective Coordination, Monitoring and Efficient Evaluation
Supervisors at places of FPY/SIWES training and academic staff of the Faculty should site
the following:
i. Farm diary
ii. Log-book
iii. Evaluation/Grading Report at 200, 300 and 400 Level
iv. Attendance report at each enterprise also forms part of the final grading.
v. A written report that covers all activities in a bound form duly signed.
Session of Commencement of this Policy
2019/2020 academic Session because NUC granted approval for NOUN FPY/SIWES
programme with effect from February 2019.
4
The current students in 300 Level will register courses designated for 200 and 300 levels.
400 level students MUST register all 2019/20 enterprises/skills in their portal.
Grading system of the FPY
Each of the courses shall be graded by Industrial based supervisor (30%) and Institutional
based supervisor (70%), that gives, a total of 100%
FPY Logbook from 200 – 400 Level
Three (3) sets of Logbooks shall be used throughout the FPY (200, 300 and 400 Level)
S/N Level Number of Courses Total Weeks
per Course
Number of Weeks per Course
1 200 2 courses plus report writing 8weeks 3 Weeks per Course (6 weeks)
2 Weeks for report writing
2 300 3 courses plus report writing 12 weeks 3 Weeks per Course (9 weeks)
2 Weeks for report writing
3 400 10 courses plus report writing 52 weeks 4 Weeks per Course (40 weeks)
12 Weeks for report writing
5
STUDENT’S PARTICULARS
Full Name :_____________________________________________________________
Department: ____________________________________________________________
Matric. No. _____________________________________________________________
Programme: ____________________________________________________________
Duration of FPY/SIWES: _________________________________________________
Mobile Telephone No. ____________________________________________________
Email Address___ _______________________________________________________
Name of Establishment: __________________________________________________
Address of Establishment: ________________________________________________
Name of Industry Based-Supervisor: _______________________________________
Rank: _________________________________________________________________
Mobile Telephone No. ____________________________________________________
Email Address: __________________________________________________________
6
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
7
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
8
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
9
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
10
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
11
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
12
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
13
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
14
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
15
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
16
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
17
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
18
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date.
19
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
20
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
21
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
22
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
23
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
24
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
25
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
26
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
27
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
28
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
29
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
30
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
31
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
32
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
33
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
34
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
35
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
36
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
37
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
38
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
39
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
40
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
41
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
42
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
43
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
44
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
45
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
46
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
47
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
48
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
49
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
50
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
51
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
52
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
53
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
54
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
55
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
56
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
57
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
58
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
59
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
60
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
61
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
62
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
63
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
64
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
65
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
66
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
67
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
68
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
69
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
70
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
71
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
72
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
73
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
74
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
75
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
76
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
77
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
78
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
79
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
80
WEEKEND PROGRESS CHART
(Week Ending………………………….....)
DAY
DESCRIPTION OF WORK DONE
FRIDAY
SATURDAY
_____________________ ___________________
Student’s Signature Date
Comments by Industry-Based Supervisor___________________________________
_____________________________________________________________________
_______________ ___________________
Name & Signature Date
81
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
82
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
83
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
84
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
85
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
86
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
87
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
88
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
89
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
90
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
91
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
92
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
93
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
94
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
95
FOR SKETCHES, DIAGRAMS AND GRAPHS
(Additional drawings may be attached where necessary) Date:__________20____
96
FOR THE USE OF INSTITUTION–BASED SUPERVISOR ONLY
General Comments on 1st Visit:
_______________________________________________
Name
________________________________________
Signature of Supervisor
________________________________________
Date
97
COMMENTS BY I.T.F. OFFICIALS
General Comments on 1st Visit:
_______________________________________________
Name
________________________________________
Signature of Supervisor
________________________________________
Date