4 the agenda was presented by dc-13 '/, 'ire q dc-13

6
Proceedings of Projects and Works Committee Meeting -08/2014 -15 dated 30.09.2014 Meeting of Projects and Works Committee was held on 30.09.2014 under the Chairmanship of Sh. Shikhar Agarwal, Jaipur Development Commissioner in "Manthan" at 1.00 PM. After discussion on the agendas, the decisions made by the committee are as under:- Agenda Item No. OIC Subject/Agenda Details Decision taken Action to be taken by 1 MS PWC Confirmation of proceeding of 07/2014-15 PWC meeting held on 28.08.2014 The proceedings of PWC meeting 07/2014-15 held on 28.08.2014 were confirmed. MS PWC 2 MS PWC Compliance report of decision taken in PWC Meeting of 07 /2014-15 Compliance report was perused and found complied. MS PWC 3 f, pwc ,. :::::!:ng Agenda r`LPRoads 4 DC-13 s. ,-N1 'ff0 850,822 4 *let The Agenda was presented by DC-13. After discussions and deliberation, the committee decided to defer the Agenda DC-13 '/, q 'Ire l iffi cDRIcill 064cf 31.* 4 ft-8 31- 1447 t TkET 4 5 DC-5 f41 ;(T v( ITT 4 aTTITiftzi ill- A7T 4 11731Trd ,(c) -7 3 A1-11- A7 'T- i Zt ift31179. t ir 4Tff The Agenda was presented by DC-5. After discussions and deliberation the committee approved the part plan submitted by DC-5. ft .- a 1- 0117 - 7/3 Th -T DC-5 41167 ITirr 4-9 :1r4 3T- 19)- 4-ff Glieslci I 6 EE Project-II Revision of A&F for the work of "Strengthening and widening of B-2 Byepass, Tonk Road to New Sanganer Road, Jaipur" The Agenda was presented by EE Project-II. After discussions and deliberations the committee approved the Revision of A&F for the work of Strengthening and widening f B- 2 byepass Tonk Road to New Sanganer Road, Jaipur from Rs. 1360.95 lacs to 1597.44 lacs. EE Project-II 7 DC-10 300 Itre 1 rF 1 1 '1177371 The Agenda was presented by DC-10. After discussions and deliberations, the committee approved the revised map of Govindpura Ropada Group Housing Scheme. The Agenda was presented by DC- 10. After discussions and deliberation, the committee decided to approve the revised map of JDA scheme on the land of Animal Husbandary in village Jamdoli DC-10 DC- 10 tlT5T TT 6I\iRi 1 1 3T- 19A-ff WftIT T41791. 41 I' 1 l tiatiq .-7 31- 4- -9. cileicl I 8 DC-10 WITWPI - 44F- . 1 --i---------- eTff tiV-Ilei-f ftliFT 'et VI 4 SAT 31- 11:41tff t hW9T 11111. " Th -F \'46-1 'f Th 7 37 1 1349. 611" I 9 EE- Drainage i Construction of Drain from Ajmeri Pulia ( Parivahan Marg) to Gandah Nalla ( Via Civil The Agenda was presented by EE-Drainage. After discussions and deliberations, the EE- Drainage )

Upload: others

Post on 18-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

Proceedings of Projects and Works Committee Meeting -08/2014 -15 dated 30.09.2014

Meeting of Projects and Works Committee was held on 30.09.2014 under the Chairmanship of Sh. Shikhar

Agarwal, Jaipur Development Commissioner in "Manthan" at 1.00 PM. After discussion on the agendas, the decisions made by the committee are as under:-

Agenda Item No.

OIC Subject/Agenda Details Decision taken Action to

be taken by

1 MS PWC Confirmation of proceeding of

07/2014-15 PWC meeting held on 28.08.2014

The proceedings of PWC meeting 07/2014-15 held on 28.08.2014 were confirmed.

MS PWC

2 MS PWC Compliance report of decision taken in PWC Meeting of 07 /2014-15

Compliance report was perused and found complied.

MS PWC

3 f, pwc ,. :::::!:ng Agenda r`LPRoads

4 DC-13

s.,-N1 'ff0 850,822 4 *let The Agenda was presented by DC-13. After discussions and deliberation, the committee decided to defer the Agenda

DC-13 '/, q 'Ire liffi cDRIcill 064cf 31.* 4 ft-8 31-1447

t TkET 4

5 DC-5

f41;(T v( ITT 4 aTTITiftzi

ill-A7T 4 11731Trd ,(c) -7 3 A1-11-A7 'T-i Ztift31179. tir4Tff

The Agenda was presented by DC-5. After discussions and

deliberation the committee approved the part plan submitted by DC-5.

ft.-a 1-0117

-7/3 Th-T

DC-5

41167 ITirr 4-9 :1r4 3T-19)-4-ff Glieslci I

6 EE

Project-II

Revision of A&F for the work of "Strengthening and widening of B-2 Byepass, Tonk

Road to New Sanganer Road, Jaipur"

The Agenda was presented by EE Project-II. After discussions and deliberations the committee approved the Revision of A&F for the work of Strengthening and widening f B-2 byepass Tonk Road to New

Sanganer Road, Jaipur from Rs. 1360.95 lacs to 1597.44 lacs.

EE Project-II

7 DC-10

300 Itre 1 rF 1 1 '1177371 The Agenda was presented by DC-10. After discussions and deliberations, the committee

approved the revised map of

Govindpura Ropada Group Housing Scheme.

The Agenda was presented by DC- 10. After discussions and deliberation, the committee decided to approve the revised map of JDA scheme on the land of Animal Husbandary in village Jamdoli

DC-10

DC- 10

tlT5T TT 6I\iRi 1 1 3T-19A-ff WftIT T41791. 41 I' 1l tiatiq .-7 31- 4- -9. cileicl I

8 DC-10

WITWPI-44F- . 1--i----------eTff tiV-Ilei-f ftliFT 'et VI 4 SAT 31-11:41tff thW9T 11111." Th-F \'46-1 'f Th7 3711349. 611" I

9 EE-

Drainagei

Construction of Drain from Ajmeri Pulia ( Parivahan Marg) to Gandah Nalla ( Via Civil

The Agenda was presented by EE-Drainage. After discussions and deliberations, the

EE-

Drainage

)

Page 2: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

Lines Phatak) to 22 Godwan

Pulia to Sahakar Marg

committee approved the

proposal for Construction of

Drain from Ajmer Pulia

(Parivahan Marg) to Gandah

Nalla ( Via Civil Lines Phatak) to

22 Godam Pulia to Sahakar

Marg. Amounting Rs.

9,50,72,955.00

10 EE-

Drainage

Proposal for sanction of

Project and A&F for the work

"Construction of drain & other

related work from

Powerhouse Chouraha to

Kabeer Marg via Collectorate

Circle"

The Agenda was presented by

EE-Drainage. After discussions

and deliberations, the

committee approved the

proposal A&F sanction for the

work "Construction or drain and

other related work from Power

House Chouraha to Kabeer

iviarg via conectorate Circle"

amounting Rs.10,92,95,615.00

EE-

Drainage

11 EE-

Drainage

Revision in the scope of work

of construction of drain and

other related work as follows:

Original route-From Indira

Circle to Rambagh circle to Lal

kothi to Sahakar Marg and

upto Ganda Nalla- Proposed

Route- In addtion to existing

proposal of Tonk road

construction of drain from

Rambagh circle to Ambedkar

circle and upto Ganda Nallah

and from High Court to

Ambedkar Circle

The Agenda was presented by

EE-Drainage. After discussions

and deliberations, the

committee approved the

Revision in the scope of work of

construction of drain and other

related work as follows: Original

route-From Indira Circle to

Rambagh circle to Lal kothi to

Sahakar Marg and upto Ganda

Nalla- Proposed Route- In

addtion to existing proposal of

Tonk road construction of drain

from Rambagh circle to

Ambedkar circle and upto

Ganda Nallah and from High

Court to Ambedkar Circle

EE-

Drainage

12 EE Pr.4

(Electrical)

A&F Proposal for

Electrification of JDA Marriage

Resort Hub Scheme at village

Govindpura Ropada Tehsil

Sanganer, Jaipur

The Agenda was presented by EE P-4 Electrical. After

discussions and deliberations,

the committee approved the

A&F proposal for Electrification

of JDA Marriage Resort Hub

scheme at village Govindpura

Ropada Tehsil Sanganer, Jaipur

amounting Rs.8,98,86,955.00

EE P.4 Electrical

S-1 EE-

Drainage

"Construction of drain from

Ajmer Pulia to Amanishah

Nalla via Sodala Tiraha'", JDA,

Jaipur

The Agenda was presented by

EE-Drainage. After discussions

and deliberations, the

committee approved the A&F

proposal for "Construction of

drain from Ajmer Pulia to

Amanishah Nall? via Sodala

EE-

Drainage

Page 3: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

Tiraha", JDA, Jaipur amounting

Rs. 14,63,34,667.00

S-2 EE-7

Proposal for Revised A&F

sanction for the work "Repair

of Sirsi Road from Queens

Road to C-Zone Byepass, Zone-

7 area, JDA

The Agenda was presented by

EE-7. After discussions and

deliberatins, the committee

decided to approve the Proposal

for revised A&F sanction for the

work "Repair of Sirsi Road from

Queens Road to C-Zone

Byepass, Zone-7 area, JDA from

Rs. 387.16 lacs to Rs. 408.66 lacs

EE-7

S-3 ROLVRUE;

EE- ::

Proposal for approval of GAD

for the work of "Construction

of six lane High Level Bridge

connecting Riddi Sidhi junction

to Mansarovar link road on

Amanishah Nallah"

The Agenda was presented by

EE-ROB/RUB-II. After discussions

and deliberatins, the committee

approved the Proposal for

approval of GAD for the work of

"Construction of six lane High

Level Bridge connecting Riddi

Sidhi junction to Mansarovar

link road on Amanishah Nallah"

EE

ROB/RUB-

II

S-4 EE-Garden

Revision of A&F sanction for

Development work of Ram

Niwas Garden and approval

for execution of works

suggested by Hon'ble

Empowered Committee

The Agenda was presented by

EE-Garden. After discussions

and deliberations, the

committee decided to approve

the Revision of A&F sanction for

Development work of Ram

Niwas Garden and approval for

execution of works suggested by

Hon'ble Empowered Committee

from Rs. 1092.00 lacs to Rs.

1282.60 lac

EE-

Garden

S-5 EE-Pr.4

Electrical

A&F Proposal for construction

of 33/11 KV GSS for various

Affordable Housing Schemes

in JDA Region, Jaipur

The Agenda was presented by

EE P.4 Electrical. After

discussions and deliberations,

the committee approved the

A&F Proposal for construction

of 33/11 KV GSS for various

Affordable Housing Schemes in

JDA Region, Jaipur amounting

Rs.10,69,17,672.00

EE P.4

Electrical

5-6 EE-10A

Repair & Renewal of road

from Agra road to Ring Road

via Lakheshra Viilage in Zone

10A area, JDA, Jak, ,ur

The Agenda was presented by

EE-10A. After discussions and

deliberatins, the committee

:=nnrr,...,. ,=ri the A&f Sanction for

Repair & Renewal of road from

Agra road to Ring Road via

Lakheshra Viilage in Zone 10A

area, JDA, Jaipur amounting Rs.

2,40,60,939.00

EE-10A

I

5-7 EE PRN

16,17,18,19

The Agenda was presented by

EE- PRN-16,17,18,19. After

disyssiszns and deliberations,

EE PRN

16,17,18,

19

1124 -PH th-A-9T li f=44- -IF 1WiiT •f-16(1, 1 Tifilfff Th---9-rdr A -i-A 1=41:Our INd I

Page 4: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

the committee approved the A&F Sanction for construction of Drains in various GNSS in PRN amounting Rs. 156.94 crore.

S-8 EE-9

Proposal for sanction of A&F for Rs. 3,88,73,608.00 for work of construction of 100 feet wide sector road in front of Chakrol JDA scheme Zone-9, Jaipur

The Agenda was presented by EE-9. After discussions and deliberations, the committee decided to approve the proposal for sanction of A&F for work "Construction of 100 feet wide sector road in front of chakrol JDA scheme Zone-9, Jaipur amounting Rs. 3,88,73,608.00

EE-9

S-9 EE-9

Proposal for sanction of A&F for Rs. 3,11,46,131.00 for work of Construction Of 100 feet & 80 feet wide sector rodd in Sector-37 zone-9 DA, Jaipur

The Agenaa was presented by EE-9. After discussions and deliberations, the committee decided to deter the Agenda

EE-9

S-10 DC-13

(riiii 44(4 zi %Al1 MR WiSt .4 The Agenda was presented by DC-13. After discussions and deliberations, the committee deferred the Agenda

D13 eqcf 4 %All 911 1 4 4 7114

'0 `4A4 01464 t 4Atri. a1-4-. - C°3 V r4tthul ir4tT 41

5-11 EE-PHE-III

A&F sanction for the work of "Providing,Laying and commissioning of sewer system for proposed PRN JDA area of Jaipur City Phase-I amounting Rs. 1,71,60,84,567.00

The Agenda was presented by EE-PHE-Ill. After discussions and deliberations the committee approved the A&F sanction for the work of "Providing,Laying and commissioning of sewer system for proposed PRN JDA area of Jaipur City Phase-I amounting Rs. 1,71,60,84,567.00

EE-PHE-III

S-12 EE-11

Proposal for approval of A&F sanction for Construction of Missing Links of various Sectokr roads in JDA, Jaipur

The Agenda was presented by EE-11. After discussions and deliberations, the committee approved the proposal of A&F sanction for Construction of Missing Links of various Sectokr roads in JDA, Jaipur amounting Rs. 6503.73 lacs

EE-11

S-13 EE-7

Proposal of A&F sanction for "Construction of CC road and Drain at Girdharipura Katchi Basti and Sanjay Nagar Katchi Basti, Zone-7, JDA, Jaipur

The Agenda was presented by EE-7. After discussions and deliberation, the committee decided to approve the A&F sanction for "Construction of CC road and Drain at Girdharipura Katchi Basti and Sanjay Nagar Katchi Basti, Zone-7, JDA, Jaipur amounting Rs.379.99 lacs

EE-7

Page 5: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

S-14 EE-7

Proposal for A&F sanction for

the work "Construction of

road at JDA approved colonies

near Ajmer Road in Zone-7

area, JDA, Jaipur"

The Agenda was presented by

EE-7. After discussions and

deliberations, the committee

approved the A&F sanction for

the work "Construction of road

at JDA approved colonies near

Ajmer Road in Zone-7 area, JDA,

Jaipur" amounting Rs. 263.43

lacs

EE-7

S-15 EE-

Electrical-1

S-16

S-17

S-18

EE-

Electrical-1

EE-

Electrical-1

DC-13

Shifting and Dismantling of

existing HT/LT lines including

street light work in PRN Area,

Jaipur

Providing and fixing of street

light of Service road (Both

side) of C-Zone bye pass from

Ajmer road to Sikar road,

Jaipur

Providing and fixing of Street

Light on various sector roads

in PRN Area, JDA, Jaipur

,G ■311-4 UN flef

bi 34 31-ft t

.art tH

tq*NI 90 859/ 2370

•coelf 0.04 to 860/2370 isoca 0.

03 to 861 /2374 •4(1)611 0.03 *0,

862 / 2576 0.01

*,864/2207 '(chef( 0.09

*0,864/2208 ,N).541 0.04 to 865

.(4).511 5.81 *0865/2375 cbcif 0.

27 tO, 865/ 2586 •?ctmlf 0.30 *0,

1001/ 2407 .c.b611 0.02 to

1002 / 2408 •M)61f 0.04

*0,1004 / 2411 ,(ct)(11T 0.07

tO,f -dT —12 cr2,c4 ,meiT 6.75 *0

q 7tiztrf4- 3r174-4-9

t-qt

The Agenda was presented by

EE-Electrical-1. After discussions

and deliberations, the

committee decided to approve

the A&F sanction for Shifting

and Dismantling of existing

HT/LT lines including street light in PRN Area, Jaipur

amounting Rs.27,79,19,012.00

The Agenda was presented by

EE-Electrical-1 After discussions

and deliberations, the

committee approved the A&F

sanction for Providing and fixing

of street light of Service road

(Both side) of C-Zone bye pass

from Ajmer road to Sikar road,

Jaipur amounting

Rs.5,17,19,543.00

The Agenda was presented by

EE-Electrical-I. After discussions

and deliberations, the

committee approved the A&F

sanction for Providing and fixing

of Street Light on various sector

roads in PRN Area, JDA, Jaipur

amounting Rs.5,07,17,220.00

The Agenda was presented by

DC-13. After discussions and

deliberatins, the committee

decided to approve the

Residential Scheme at Village

Jaitpura, Tehsil Chomu on Sikar

Highway to 1T1 Road

EE-

Electrical-

1

EE-

Electrical-

1

EE-

Electrical-

1

DC-13

Page 6: 4 The Agenda was presented by DC-13 '/, 'Ire q DC-13

S-19 S-19

EE-

ctr ical-1

Shifting and dismantling of

existing ENV/132 line from 132 KV GSS Vaishali to C-Zone

byepass, Jaipur

The Agenda was presented by

EE-Elect.l. After discussions and

deliberations, the committee

approved the A&F proposal

amounting Rs. 1040.00 lacs but with condition that cabling be

done instead of shifting.

EE-

Electrical-

I

S-20 EE-12

Proposal for permission of

additional work i.e

construction of road from

olafarm road to Natlalpura village via Harnath baba jat ki Dhani Gram Panchayat

Mundiyaramsar Zone 12 JDA

Jaipur under the on going

original work "Construction of

roads in Gram Panchayat Mundiyaramsar Zone 12 JDA,

Jaipur.

The Agenda was presented by EE-12. After discussions and

deliberations, the committee granted permission to take up additional work construction of

road from olafarm road to NatlaIrrA village via Harnath

baba jat ki Dhani Gram

Panchayat Mundiyaramsar Zone 12 JnA Jaipur under the on going original work

"Construction of roads in Gram Panchayat Mundiyaramsar Zone

12 JDA, Jaipur.

EE-12

The meeting ended with vote of thanks to the chair.

Addl. Chief Engineer-IV & MS PWC, JDA, Jaipur.

Dated: hot No. JDA/EE-5/D- 4 S. Copy to following for kind perusal and necessary action:

1. P.S. To JDC, Jaipur Development Authority, Jaipur. 2.P.S. to Collector, Jaipur. 3. P.S. to Secretary, Jaipur Development Authority, Jaipur. 4. Chief Town Planner, Rajasthan, Jaipur. 5. Director (Engineering-I), Jaipur Development Authority, Jaipur. 6. Director (Engineering-II), Jaipur Development Authority, Jaipur. 7. Director (Finance),Jaipur Development Authority, Jaipur. 8.Director (T.P.),Jaipur Development Authority, Jaipur. 9. Addl. Chief Engineer, 1/11/IIIN/Electrical, JDA, Jaipur 10.The Conservator of Forest, JDA, Jaipur 10.Addl. Commissioner (East/West/LPC/ Land/Admn, JDA, Jaipur. 1 VNINII/VIII/IX/X, Rural JDA, Jaipur.

12. Addl. Chief Town Planner, (MP) JDA, Jaipur. 13.Advisor (RRP)JDA, Jaipur 14.Sr. Town Planner ( ),JDA, Jaipur 15. OSD (R.M.), Jaipur Development Authority, Jaipur. 16.Deputy Commissioner ( ), Jaipur Development Authority, Jaipur. 17.Executive Engineer ( ), Jaipur Development Authority, Jaipur. 18.Sr. Horticulturist, JDA, Jaipur 18.PRO, Jaipur Development Authority, Jaipur./PMIS Cell 19.System Analyst, JDA, Jaipur.

Ex tia~Engineer-5 JDA, Jaipur